Grading & Drainage
2
Details are not enough to pricing following items. There
3
Perforated stone drain cover
4
Surface drain
Scupper drain
Drain below timber decking
1
Pool main drain point
2
Black PVC grating with L angle
3
Drain below timber decking
4
Drain point
5
Copper gutter and copper chains
6
7
8
9
10
11
12

Build in furniture
Page number L11-HW/10 item number A & B
Our understanding is our cost should be included only f
ST-04 size and thickness
WD-01 Wood thickness, fixing details & painting metho
Provide details of ST-04P (Foot).
What is the timber species of drawers and doors
What is the meaning of symbol GN 1/1 (pool grill elevat

13

Page no L11-HW/10 item no C


Our understanding is our cost should be included only fi

14

L11& L15-SP/3 item no A, B, C


Our understanding is our cost should be included only fi

15

Issued details drawings are not enough for pricing item

16

Page number : L11& L15-SP/3 item no. C pool seat size

17

Page number: L12=-HW/6 item no. A seat size?

18
19

20

Vertical Garden
BOQ mentioned all the vertical garden unit is Item. Th
Doors
Please issue sectional elevation for Flush door at umbre
Timber wall panelling
Please issue typical details for timber wall panel
Exhaust hood

21
22
23
24
25
26
27

Page number: L11-HW/6 item number. B and page num


PC-01
Our understanding is cut concrete flooring. Is it correct?
Movable furniture
OF- 24 Image not available in the issued set of the draw
Signage base
Please issue detailed drawing for Signage base
PVC Grating
Please issue typical detail for PVC grating.
Pebbles
PB-04 is not available Sri Lankan market. Please provide
Floor finishes
BOQ said There are different code of granite type price
If you can please provide BOQ quantity separately. Beca

5-04-2016
ax
Email

ollowing items. There for please provide typical drain details and drain point details

mber A & B
uld be included only for furniture works? Please clarify and details are not enough to pricing and provide follo

ails & painting method

wers and doors


N 1/1 (pool grill elevation C)

uld be included only finishing works? Is it correct or not. If not please provide structural drawings.

uld be included only finishing works? Is it correct or not.


ough for pricing item number A page number : L11& L15-SP/3 (Drawing no 9.01 & 4 @9.11)

m no. C pool seat size ?

. A seat size?

rden unit is Item. There are so many sub-contractors works involve to complete for this work, Because Very

r Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.

ber wall panel

mber. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details
flooring. Is it correct?

issued set of the drawings

Signage base

market. Please provide Any there suppliers for this.

of granite type price under one item. ( Ex. Page no : L1-HW/1 Special finish floor)
antity separately. Because that prices are different code to code.

icing and provide following details accordingly.

drawings.

his work, Because Very difficult to price this item without quantities. There for please provide provisional sum

mongers.

ecause lack of details and please issued detailed drawings

ovide provisional sum valves for this item.