You are on page 1of 25

READY BUILT FACTORY

JEDDAH-4 SITE

BILL OF QUANTITIES
GENERAL SUMMARY
Cluster of 2*12 Factory Units (900m2)
Item
Description

Amount (SR)

BILL # 1

PRELIMINARIES

TOTAL

BILL # 2

SITE WORKS

TOTAL

1,992,672.00

BILL # 3

ARCHITECTURAL & STRUCTURAL

TOTAL

14,869,897.00

BILL # 4

MECHANICAL

TOTAL

4,020,858.00

BILL # 5

ELECTRICAL

TOTAL

3,872,080.00

BILL # 6

SERVICE BUILDINGS

TOTAL

444,493.00

TOTAL
Page 1 of 25

inc

25,200,000.00

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 1 :PRELIMINARIES

Cluster of 2*12 Factory Units (900m2)


Item

Description

1.0

DIVISION 1 - GENERAL REQUIREMENTS

1.1

All general requirements including but not limited to


Contractor's bid, temporary access & facilities including
site offices, toilets for workers, light and power, office
stationaries, internet connection, waste, supply
,ventilation, air conditioning, fire protection, submittals,
samples.

1.2

1.3

Unit

Qty

Unit
Rate
SR

Amount
SR

LS

inc

inc

LS

inc

inc

LS

inc

inc

Provide as-built drawing, shop drawing, construction


schedules, and reports, O & M manuals, warranties,
bonds and all necessary insurances.

Not withstanding the method of measurement used for


this bill of quantites, the Contractor shall be deemed to
have included in his tender everything necessary to carry
out the works in accordance with the Tender Documents,
and saudi codes and standards.

CARRIED TO GENERAL SUMMARY


Preliminaries

inc
2 of 23

READY BUILT FACTORY


JEDDAH-4 SITE
CARRIED TO GENERAL SUMMARY

Preliminaries

inc

2 of 23

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 2: SITE WORKS
Cluster of 2*12 Factory Units (900m2)
Item

Description

2.0

SITE WORKS

2.1

CLEARING AND GRUBBING

2.1.1

2.0.1

2.0.2

2.2
2.2.1

2.2.2

2.2.3

2.2.4

2.2.5

Unit

Qty

Clearing and grubbing up to the perimeter of the First


Stage of development, remove all existing shrubs,
grass and other debris present at site and dump to
approved location.

70074

Levelling works
Cutting
Excavation in all types of soil, including rocky soil to
reach the level of the finish grade level , price includes
removal of waste material

Concrete side walk cast in situ (4000 psi) type(v)


cement,brush finish,100mm thick, reinforced with one
layer of wiremesh 8@200x200 WWF on compacted
soil as per spes.

1320

Supply and install 650x300x150 precast concrete


curbstone for sidewalk, one side round edge including
50mm lean concrete base , and concrete for back
support as per drawings and specs.

Lm.

3980

34140

Supply and lay 200 mm thick base course up to the full


width of the road including spreading, watering,
compaction not less than 98% and testing (parking &
Access road).

6840

Road markings, including road centerline, road side


line, road directional signs, parking lane and other
necessary road markings as per standards.

Lot

Fill
Backfilling with selected material from the result of
excavation free of debris and boulders to reach the
level of the settlement, in layers not exceeding 250 mm
with compaction minimum 95% for each layer. Price
includes testing each layer by a specialized
laboratory.accoding to specifications and approval to
engineer.

Unit Rate

Amount

SR

SR

PAVEMENTS AND PARKINGS

Supply and lay 70mm thick binder course asphalt


including prime coat MC1(Access road, driveway,
parking).

Site Works

4 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 2: SITE WORKS
Cluster of 2*12 Factory Units (900m2)
Item

2.2.6

2.3
2.3.1
2.3.1.1

2.3.1.2

2.3.1.3

2.3.1.4

2.3.1.5

Description

Supply and install concrete Wheel bumper,including


fixation and accessories 1800mmx200mmx200mm ,
painted with yellow and black stripe as per standards.

Unit

Qty

Nos.

384

Sand beddings, 100 mm thick with 20mm thick of


gravel topping of 12mm dia Nominal size gravel ,as
shown on the drawings.

Gravel beddings,50mm thick ,with 15mm dia Nominal


size gravel for planting basins as shown on the
drawings .

1460

PENNISETUM
SETACEUM
SKYROCKET,should
include 6 pantalets in every 1 m2 seeding containing 3
plantlets., including the planting layer.

730

RUSSELIA EQUISETIFORUNIT,should include 6


pantalets in every 1 m2 seeding containing 3 plantlets.,
including the planting layer.

730

PHONEINIX DAUTYLIFERA , including the planting


layer.

Nos.

120

Unit Rate

Amount

SR

SR

LANDSCAPING
Provide Landscaping including plants

CARRIED TO COLLECTION
Site Works

5 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item

Description

Unit

QTY

2.0

DIVISION 02- SITE WORKS

2.1

Excavation in all type of soils to the required depth


including
disposal
of
excavated
materials,shoring,dewatering and any necessary works
to complete the work , according to Specifications and
drawings.

7400

Backfilling with selected material free of debris and


boulders, above the footings in layers not exceeding
250 mm with compaction minimum 95% for each layer.
Price includes testing each layer by a specialized
laboratory , the soil report recommendations must be
followed.

2400

Backfilling of 150 mm thick granular base course ( 1",


3/4") under grade slab. This layer should be layed over
the compacted and tested selected backfill. compaction
and compaction test ( Factory)

3200

260

40

M
M

1030
220

46

50

2.2

2.3

3.0

DIVISION 3 - CONCRETE

3.1

Cast in place Lean concrete, Minimum Compressive


Strength after 28 days ( fc' ) = 3000 Psi as per the
drawing, type V cement, including formworks and
curing.

3.1.1

100 mm thickness Lean concrete under the foundation.

3.1.2
3.2

3.2.1
3.2.2
3.2.3

50 mm thickness Lean concrete under grade beams.

Unit
Rate

Amount

SR

SR

Cast in place reinforced concrete for the substructures, Minimum Compressive Strength after 28
days ( fc' ) = 4000 Psi ,as per the drawing ,type V
cement,including formworks & curing & testing and
reinforcement ( 60000 psi yield strength).
For Factory:
Isolated Footings
Grade beams
Pedestal including installation of anchor bolts
Note: Anchor bolts will besupplied by PEB Contractor

3.2.4

For Guard House:


Isolated Footing

Architectural - Structural

6 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item

Description

Unit

QTY

3.2.5
3.2.6

Grade beams
Columns neck

M
M

3.2.7

For SCECO Room:


Footing

3.2.8
3.2.9

Grade beams
Columns neck

20
10

3.2.10

RC Wall For Trenches

20

252

3.3

3.3.1

Unit
Rate

Amount

SR

SR

50
10

Cast in place reinforced concrete for the superstructures, Minimum Compressive Strength after 28
days ( fc' ) = 4000 Psi ,as per the drawing ,type I
cement ,including formworks & curing & testing and
reinforcement ( 60000 psi yield strength).

Solid Slab for (Mezzanine)100mm thick with WWF


200x200x8mm reinforcement.
Note: Steel deck for Mezzanine will be supplied by PEB
Contractor

3.3.2

Columns (Guard House)

24

3.3.3

Drop Beam (Gurad House)

48

3.3.4

Roof Slab (Guard House)

54

3.3.5

Ramp

40

3.3.6

Columns (Sceco Room)

3.3.7

Roof beams ( Sceco Room)

3.3.8

Roof Slab ( Sceco Room)

4240

3.4

For Factory: Provide 4000 psi, 200 mm thk concrete


floor slab on grade with (2) layers WWF200 x 200, 10
mm dia Top & Bottom . Including 12 mm thk filler board
and sealant between (grade beams and slab on grade)
& (pedestals and slab on grade).as per drawings and
specifications

Architectural - Structural

7 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item
3.5

3.6

Description

36

For Sceco Room: Provide 4000 psi, 150 mm thk


concrete floor slab on grade with one (1) layers WWF
200 x 200, 10 mm dia. Including 12 mm thk filler board
and sealant between grade beam and slab on grade.as
per drawings and specifications

12

7200

DIVISION 04 - MASONRY

4.1

Supply and install insulated 400X200X200 mm CMU


(From Al Mojil or equivalent) for external walls with
standard lintels for all openings to include
intermediatate columns at every 3.5 m.and bond beam
at every 4.20m. vert. height with necessary joining
reinforcement between walls, columns and bond
beams. Including anchors, filler board and steel
reinforcement and whatever needed to do a perfect
work.

4.2

QTY

For Guard House: Provide 4000 psi, 100 mm thk


concrete floor slab on grade with one (1) layers WWF
150 x 150, 8 mm dia. Including 12 mm thk filler board
and sealant between grade beam and slab on grade.as
per drawings and specifications

4.0

4.1.1

Unit

For Factory

Amount

SR

SR

Supply and install 400X200X200 mm CMU ( From Al


Mojil or equivalent ) for internal walls with standard
lintels for all openings to include intermediatate
columns at every 3.5 m.and bond beam at every 4.20m
vertical height with necessary joining reinforcement
between walls, columns and bond beams. Including
anchors, filler board and steel reinforcement and
whatever needed to do a perfect work

4.2.1

For Factory

9660

4.2.2

For Sceco Room

100

For Guard House: Supply and install insulated


400X200X200 mm CMU (From Al Mojil or equivalent)
for external walls with standard lintels for all openings
to include necessary joining reinforcement between
walls and beams.

840

4.3

Unit
Rate

Architectural - Structural

8 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item
4.3.1

4.4

Description

For Sceco Room: Supply and install regular non - load


bearing 200 mm thick CMU for external walls with
standard lintels for all openings to include necessary
joining reinforcement between walls and beams.

12 mm Thick Double Fire Rated Gypsum Board wall for


factory

4.6

Internal and external plastering to walls and columns


min. 20 mm thick with cement mortar of specified grade
including mesh corner beads angle heads, CE bonds
to complete the works as per drawing. (Guard House,
Trans. Room & Factory)

5.0

DIVISION 05- METALS

5.1

Supply and install 2200Hx1000mmW Standard Sceco


steel door with primer and final paint and other
necessary accessories to complete the work.,Acording
to specifications and requirements of SCECO

5.3

QTY

Unit
Rate

Amount

SR

SR

For Guard House : Supply and install regular non - load


bearing 100 mm thick CMU for internal walls with
standard lintels for all openings to include necessary
joining reinforcement between walls and beams.

4.5

5.2

Unit

Supply and install standard SCECO steel gate 2500 x


3600 mm including painting and other accessories to
complete the work.,Acording to specifications and
requirements of SCECO

Supply and install steel ladder with safety cage as per


drawings. And specifications .

160

102

580

29000

Nos.

Nos.

Nos.

6.0

DIVISION 06 - WOODS AND PLASTIC

7.0

DIVISION 07- THERMAL & MOISTURE


PROTECTION.

7.1.

Provide and apply 2 coats of bitumen waterproofing


paint on concrete surfaces in contact with soil.

5500

7.2

Provide and lay 200 micron thick polythelene sheet


under grade slab & blinding concrete.

31000

Architectural - Structural

9 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item

7.3

Description

Supply and apply anti termite under all concrete in


touch with earth for all buildings.

Unit

QTY

L.S.

7.4.1 4mm thick membrane

440

7.4.2 50mm thk rigid insulation (extruded polystyrene)

440

7.4.3 150 micron polyethylene sheet

440

7.4.4 50mm thk gravell toppings

440

7.4.5 Supplying and fixing 3 mm thk extruded aluminum


flashing 80 mm with sealent and 50 x 50 cant strip.

LM

460

Sets

24

Sets

48

Sets
Sets

72
48

7.4

DIVISION 8 - DOORS & WINDOWS

8.1

DOORS

8.1.2

8.1.3

8.1.3.1
8.1.3.2

Amount

SR

SR

Water proofing system (Guard House & SCECO room)

8.0

8.1.1

Unit
Rate

Supply and install (RS) 4000H x 3000L mm heavy duty


industrial type Roll up Shutter door, manual control
system with push botton as per manufacturer
specification with complete accessories as per door
schedule.
(Entrance Door) . Shutter curtains are
constructed from 77mm high flat section continuosly
interlocked galvanised steel slats, with polyurethane
filled inside the slats. The thickness of both inner &
outer layer of the slat is 0.6mm. Color as per cliente
request and specifications

Supply and install (D1) 1000 x 2200 mm single swing


Glass door with aluminum frame as per manufacturer
detail with complete accessories as per door schedule.
(For Factory Main Entrance & Mezzanine office)

Supply and install (D2) 1000 x 2200 mm single swing


Aluminum door with aluminum frame as per
manufacturer detail with complete accessories as per
door schedule.
(For Storage and Toilet)
(For Offices)

Architectural - Structural

10 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item
8.1.4

Description

Unit

QTY

144

Sets

24

Sets

24

Sets

24

Sets

24

Supply and install 150 x 150 x 7 mm unglazed ceramic


tiles with approved quality on screed.(Saudi Ceramics
or equivalent) (For Toilets)

650

Supply and install 600 x 600 x 8 mm ceramic tiles with


approved quality on screed.(Saudi Ceramics or
equivalent) (For Office & Guard House)

3230

9.1.3

Supply and install trowelled concrete with shake dry


hardener. (Factory Area Ground Floor)

19740

9.1.4

Supply and install saudi black marble strip 30mm thk,


300mm wide for stair STEPS with anti-slip strips.
Lm.

600

8.1.5

8.2
8.2.1

8.2.4

9
9.1
9.1.1

9.1.2

Amount

SR

SR

Supply and install (D3) 800 x 2000 mm single swing


solid phenolic door with stainless steel framing system
as per manufacturer detail with complete accessories
as per door schedule.
Sets

8.1.4.1
8.1.4.2

Unit
Rate

(For Toilet Rooms)


(For Toilet Room for Guard House)
Supply and install (D4) 1000 x 2200 mm single swing
metal door with louver and steel framing system as per
manufacturer detail with complete accessories as per
drawing. (For Guard House)
WINDOWS
Supply
and
install
cladding
glass,
fixed
( STRUCTURAL GLASS )(W1) 3600 x 7200 mmx with
10mm thk. double panel clear tempered glass on
Aluminum frame, manufacturer label shall pass the test
requirements. (For Front Elevation-Entrance)

Supply and install aluminum glass window (W4) 1200


x 1200 mm with 12mm thk., Fixed Window, with Single
pane clear tempered glass, manufacturer label shall
pass the test requirements. (For Guard House)

DIVISION 9 - FINISHES
Floor Finishes

Architectural - Structural

11 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item
9.1.5

Description

Unit

Supply and install saudi black marble for half landing


and landing 20mm thk, bordering with a 100mm of
Galaxy marble

QTY

152

17760

Application of marble chips (exposed aggregate) at


external walls on rough plastered wall to conform with
specification requirements to complete the works as
per drawing. Color is subject for Client approval.(ASCO
or equivalent)

8430

Supply and install 150 x 150 x 7 mm glazed ceramic


wall tiles on cement mortar (Saudi Ceramics).(For
Toilets)

2080

580

460

Unit
Rate

Amount

SR

SR

9.3 Wall Finishes


9.3.1

9.3.2

9.3.3

9.3.4

9.3.5

9.4
9.4.1

9.4.5

Application of 2 coats of acrylic paint at internal walls


composed 1 coats primer and final coat on smooth
plastered finish to conform with specification
requirements to complete the works.(JOTUN PAINT or
equivalent) (Factory, Guard house, sceco room)

Supply and install wood/glass partition with steel frame


not less than 2000mm high glass for the whole length
of the mezzanine, manufacturer label shall pass the
test requirements. (For View window Mezzanine)

Supply and install phenolic toilet partitions board 13mm


thick, complete with stainless steel framing system as
per manufacturer detail with complete accessories
(size as shown in drawings 1600x2000)
CEILING FINISHES
Supply and install 12.5 mm thk 600 x 600mm acoustic
perforated steel ceiling on exposed T grid supension
sytem as per drawing. (For Office)

Supply and install 12.5 mm thk, moisture resistant


acoustic ceiling on exposed supension sytem. (For
Toilets)

650

Nos.

48

Nos.

48

10.0

DIVION 10 - SPECIALTIES

10.2

Provide and install soap dispenser

10.4

Provide and install mirror, Size 1200 x 800 mm

Architectural - Structural

2700
0

12 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 3: ARCHITECTURAL & STRUCTURAL
Cluster of 2*12 Factory Units (900m2)
Item

10.4.1

10.5
10.5.1
10.5.2
10.6
10.6.1
10.6.2
11
11.1

Description

Unit

QTY

Provide and install mirror, Size 500 x 800 mm For


Guard House .

Nos.

24

Provide and install toliet tissue holder , surface


mounted, satin finish stainless steel
For Factory
For Guard House

Nos.
Nos.

144
24

Provide and install toilet hook strip, wall mounted, satin


fin stainless.
For Factory
For Guard House

Nos.
Nos.

144
24

Lot

Unit
Rate

Amount

SR

SR

DIVION 11 - PRE ENGINEERED BUILDING


Pre-engineered building, supply and installation of PEB
, on permanent concrete foundations, steel structures
to be epoxy painted (white color) including roof
sheeting gauge 26 (0.7 mm thk.)sky lights, rib
corrogated pre-painted Single skin panels outer and
inner skin(color to be selected by Client and
Consultant), provide roofing with 50mm thk fiberglass
insulation, elevated framed openings for ventilators and
other required openings for utilities to the roof and
walls, all around wall shall be covered with block wall,
roof platforn to support refrigeration equipments,
platform's walkways shall be 6mm thk painted
chekered plates, and all necessary accessories to
complete the work. Area covered= 10,800 sq. m.

CARRIED TO COLLECTION

Architectural - Structural

13 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES

BILL NO. 4: MECHANICAL

Cluster of 2*12 Factory Units (900m2)


Item

Description

15
15.1

DIVISION 15- MECHANICAL WORKS


FIRE PROTECTION SYSTEM
Supplying, installing, aligning, testing and commissioning of the
fire protection network, complete with pipes, fittings, test plugs,
hangers & supports, excavation and backfilling, fresh clean
water for hydro test and all other accessories required for
completion of the system.

Unit

Qty

Supply and install UPVC Pipes and fittings, schedule 80,


complete with supports,excavation and backfilling and all other
accessories as per drawings.
6"
4"
21/2"
11/2"

Lm
Lm
Lm
Lm

30
960
0
0

15.1.5
15.1.6
15.1.7
15.1.8

Supply and install seamless carbon steel pipes and fittings,


schedule 40, , ASTM A 53 complete with hangers & supports,
painting and accessories.
6"
4"
21/2
11/2"

Lm
Lm
Lm
Lm

20
40
120
80

15.1.9

Supply and install fire hose cabinet (FHC-1), complete with 30m
long hose, nozzle, shut-off valve and fixing accessories.

No.

24

15.1
15.1.1
15.1.2
15.1.3
15.1.33
15.1.4

15.1.10

Supply and install fire hose cabinet (FHC-2) with foam,


complete with 30m long hose, nozzle, shut-off valve and fixing
accessories.

No.

15.1.9

Supply and install portable fire extinguisher (FE-1), chemical


powder, type ABCE, 6kg capacity with mounting hook and
accessories.

No.

No.

No.
No.

4
24

No.

15.1.9.1
15.2.1
15.2.1.1
15.2.1.2
15.2.1.3

15.2.2

15.2.3

15.2.3.1
15.2.3.2
15.2.3.3
15.2.4
15.3

Mechanical

Supply and install portable fire extinguisher (FE-2),CO2, wheel


type, 6kg capacity includes all accessories.
Supply and install OS&Y Gate valve complete with valve box
4"
2.5"
Supply and install Fire Alarm Check Valve (ACV) assembly,
complete with accessories.
6"
Supply and install Fire Hydrant with (valve box with gate valve) ,
complete with accessories.
Supply, install, test and commissioning a complete set of fire
pumps - UL/FM comprising of main electric driven pump, diesel
pump and jockey pump,split case type, complete with pipes,
valves, gauges, switches, control panel, diesel day tank and
necessary accessories to put the system in reliable operation.

Unit
Rate
SR

Amount
SR

No.

Set

Set

Main Electric Driven Pump: 500gpm, 8bar, 55hp 380v / 60hz


Diesel Driven Pump: 500gpm, 8bar, 60bhp
Jockey Electric Driven Pump: 50gpm, 8bar, 6hp
Supply and install Fire Department Connection(FDC) 4" with
check valve as per specs and drawings.
WATER SUPPLY SYSTEM

14 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES

BILL NO. 4: MECHANICAL

Cluster of 2*12 Factory Units (900m2)


Item

15.3.1

Description

Unit

Qty

4"

Lm

20

15.3.1.2

3"

Lm

840

15.3.1.3

2"

Lm

180

15.3.1.4

21/2"

Lm

180

15.3.1.5

11/2"

Lm

500

15.3.1.6

11/4"

Lm

204

15.3.1.7

1"

Lm

900

15.3.1.8

1/2"

Lm

300

15.3.1.7

3/4"
Supply and install valve box with gate valve, complete with
accessories.

Lm

80

15.3.2.1

21/2"

No.

24

15.3.2.2

11/2"

No.

24

15.3.2.3

1"

No.

15.3.2.4

Gate Valve (GV)

15.3.2.4.1 21/2"

Nos.

15.3.2.4.2 11/2"

Nos.

24

Lm

15.3.2.5.2 3/4"

Lm

260

15.3.2.5.3 1/2"

Nos.

280

15.3.2.5

15.3.2.5.4 Gate Valve (GV)


11/2"
Supply and installation of Water hammer arrestor complete
15.3.2.5.5 according to specification including all other necessary
accessories for each toilet room
Mixer for the lavatory / wash basin , single lever arm with
15.3.2.6
accessories

0
Nos.

Nos.

48

Sets

120

15.3.2.7

Perenial spray (PS) for each water closet

Sets

168

15.3.2.8

Hose Bibb, 3/4"

Nos.

Supply and install electric water heater(EWH) vertival type, 50


15..3.2.9 Liters, below ceiling, complete with mounting bracet, angle
valves and all other accessories.

Nos.

48

Supply and install electric water heater(EWH) vertival type, 30


15.3.2.10 Liters, below ceiling, complete with mounting bracet, angle
valves and all other accessories.

Nos.

24

Set

Mechanical

SR

Supply and installation of CPVC pipes, schedule 80 for hot


water supply piping system, complete with fittings and
accessories.

15.3.2.5.1 1"

15.3.3

Amount

Supply and installation of UPVC pipes, schedule80for cold


water supply piping system, complete with fittings and
accessories.

15.3.1.1

15.3.2

Unit
Rate
SR

supply, install Booster pump set, 2 pumps , 2 duty- 1 standby,


5hp,100 gpm,.4 Head bar, 220v-1P-60hz, complete with valves,
control panel, pressure switch, gauges, pipe headers,
expansion tank complete with testing and commisioning and all
other required accessories to put the system in operation.

15 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES

BILL NO. 4: MECHANICAL

Cluster of 2*12 Factory Units (900m2)


Item
15.4

Description

Unit

Qty

15.4.1

15.4.2

Supply and installation of uPVC pipes, schedule 40 for


sewage ,drainage piping system and vent piping system,,
complete with fittings and accessories.

set

15.4.2.1

8"

Lm

80

15.4.2.2

6"

Lm

1040

15.4.2.3

4"

Lm

1520

15.4.2.4

3"

Lm

480

15.4.2.5

2"

Lm

400

15.4.2.6

Floor drain (FD) with cover stainless steel 316 as per specs and
drawings.

Nos.

240

Nos.

24

Nos.

72

Nos.

96

168

15.4.2.9

Supply and install Gully Traps with cover heavy duty and all
other accessories as per specs and drawings.
Floor Clean-out (FCO), 4" with cover as per specs and
drawings.

15.4.3

Roof drain (RD) dome type, 4"

15.4.4

Supply and install plumbing fixtures complete with flexible


connections, valves and all other accessories as per specs and
drawings.

15.4.5

Western water closet (flush tank type)

Nos.

15.4.6

Eastern water closet (flush tank type)

Nos.

15.4.7

Lavatory / Wash basin

Nos.

120

15.4.8

Stainless steel single bowl pantry sink complete with overflow


and all accessories .

Nos.

24

Nos.

80

Lot

24

Lot

24

15.5
15.6
15.61
15.8
15.8.1
15.8.1.1

Concrete Manholes including heavy duty steel cover, size as per


drawings.
Concrete Trench, 350x4000mmx300mm deep including heavy
duty steel grating
Concrete Trench, 300x1500mmx300mm deep including heavy
duty steel grating
Irrigation systems
Supply and Instalation and other necessary accessories to
complete the work. Testing and commissioning .
UPVC PIPE 25mm CLASS5

Lm

900

15.8.1.2

UPVC PIPE 32mm CLASS5

Lm

840

15.8.2.3

UPVC PIPE 50mm CLASS 5

Lm

30

15.8.2.4

UPVC PIPE 40mm CLASS5

Lm

120

15.8.2.5

UPVC PIPE 75mm CLASS5

Lm

Mechanical

Amount
SR

SEWER AND DRAINAGE SYSTEM


Supply and installation of Submersible pump set, 2 pumps , 1
duty- 1 standby, 1/2hp, 30 gpm.1 head bar, 220v-1P-60hz,
complete with valves, control panel, pressure switch, gauges,
pipe headers, . testing and commissioning and all other required
accessories to put the system in operation.

15.4.2.8

Unit
Rate
SR

16 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES

BILL NO. 4: MECHANICAL

Cluster of 2*12 Factory Units (900m2)


Item

Description

Unit

Qty

15.8.2.6

RAIN BIRD SOLENOID VALVE 2"

Nos.

15.8.2.7

RAIN BIRD Decoder FD-101

Nos.

10

15.8.2.8

RAIN BIRD CONTROLLER ESP-LXD 50 STATION

Nos.

15.8.2.9

ISOLATION GATE VALVE 2.5''

Nos.

15.8.210 BRASS GATE VALVE PEGLER 1.5"

Nos.

10

15.8.2.11 BRASS GATE VALVE PEGLER 2"

Nos.

15.8.2.12 RAIN BIRD QUICK COUPLING VALVE 3RC

Nos.

14

15.8.2.13 RAIN BIRD VALVE BOX (JMB)

Nos.

15.8.2.14 VALVE BOX 10" ROUND (VB-10RND)

Nos.

15.8.2.15 RAIN BIRD BUBBLER MODEL 1401 (0.25 GPM)

Nos.

540

15.8.2.16 RAIN BIRD BUBBLER MODEL 1402 (0.50 GPM)

Nos.

540

15.8.2.17 Supply, installation and testing of the water spray irrigation works of
the finest quality brand spray angle and all necessary complete.

Nos.

15.8.3.1

RAIN BIRD 1/2" SPIRIAL BARB ELBOW SBE-050

Nos.

400

15.8.3.2

RAIN BIRD 1/2" SPIRIAL BARB ADAPTER SBA-050

Nos.

400

15.8.3.3

IRRIGATION WIRE Maxi Cable AWG # 12

MTR

1600

15.8.3.4

RAIN BIRD WIRE CONNECTOR

Nos.

28

15.8.3.6

supply, install Irrigation pump set, 2 pumps , 1 duty- 1 standby,


2hp, 35 gpm.3head bar, 220v-1P-60hz, complete with valves,
control panel, controllers, pressure switch, gauges, pipe
headers, expansion tank complete with testing and
commissioning and all other required accessories to put the
system in operation.

Set

15.9
15.9.1

SR

Supply and installation of in line Exhaust Fans complete with supports


and accessories.
EF-01 - 400 CFM

Nos.

24

15.9.1.2

EF-01 -600 CFM

Nos.

24

15.9.2

Supply and installation of indoor ductwork as per SMACNA


Standards, complete , VD,FD, duct tape,Flexible Duct adhesive, duct
sealant, hangers, supports and all other accessories.(Flanged TDC
Type)

KG

500

15.9.3

Supply and installation of exhaust Square Diffusers, complete with


supports and accessories..
EAG 6"X6 "

Nos.

240

15.9.4

Supply and installation of splite unite A/C 18000 BTU including


Electric Heater and accessories required for complete installation..

Nos.

15.9.5

WALL Exhaust Fans 100 CFM complete with supports and


accessories...

Nos.

24

CARRIED TO COLLECTION

Mechanical

Amount

HEATING, VENTILATION AND AIR CONDITIONING

15.9.1.1

15.9.3.1

Unit
Rate
SR

17 of 25

READY BUILT FACTORY


JEDDAH-4SITE

BILL OF QUANTITIES
BILL NO. 5: ELECTRICAL

Cluster of 2*12 Factory Units (900m2)


Item
16
16.1

Description

Unit

Qty

Unit
Rate
SR

Amount
SR

DIVISION 16- ELECTRICAL WORKS


GROUNDING SYSTEM
Supply, Install and test following grounding wires
including terminations and all materials needed for
a complete installation.

16.1.1

Bare copper ground wire 95 mm2

Lm

1040

16.1.2

PVC insulated copper wire 70 mm

Lm

120

16.1.3

Ground rod with inspection pit

Nos.

16

16.1.4

Ground rod without inspection pit

Nos.

12

16.1.5

Exothermic connection& EQUIPOTIONAL BAR

Lot

16.2

FIRE ALARM SYSTEM


Supply, install, test and commision fire alarm
system including, wires, conduit and other
materials and system components required for a
complete and functional installation.

16.2.1

intelgence Ionization smoke detector

Nos.

144

16.2.2

Manual Pull Station

Nos.

72

16.2.3

Alarm Bell

Nos.

72

16.2.4

Fire Alarm Control Panel analoge addressable 2


loop

Nos.

24

Firewarning flash light with horn

Nos.

48

Conduits and wiring outlet

Nos.

360

Nos.

Nos.

16.2.4.1
16.2.5
16.3

16.3.1

16.3.2

Electrical

Raceways and manholes


supply, install,test meduim duty manhole size as
required including excavation, concret .exterior
and
interior
coating
of
hot
bituminous
paint,backfilling draining pipe and pipe between
manhole (size as required) and all accessories
required to complete the work according to
specification
Manholes
1200x1000x800mm
deep
concrete
manhole
including steel cover meduimt duty600*600mm
1500x1200x1000mm deep concrete manhole
including steel cover meduim duty 800*800mm

18 of 25

READY BUILT FACTORY


JEDDAH-4SITE

BILL OF QUANTITIES
BILL NO. 5: ELECTRICAL

Cluster of 2*12 Factory Units (900m2)


Item

16.3.3

1500x1500x1200mm deep concrete manhole


including steel cover meduim duty 800*800mm

16.4
16.4.1

upvc pipe
4inch diameter pvc conduit for low voltage cable
including excavation and all required works need to
complete installtion the system and every factory must
install 3 NO. upvc pipe for every factory (2 no 6 inch
upvc pipe spare FOR EVERY FACTORY).

LM

5760

NOS

1788

30x60cm surface mounted led light 20 watt 2000


lumen constant current drive ,220v,60hz IP44 ,CR
80,steel
housing
>or=0.6mm,powder
coated
white, ,diffuser(opal or prismatic or double
prapolic,approved later)

Nos.

60

600x600mm Recess mounted led light 36 watt 3600


4000k, ,220v,60hz(IP-44),CR >80. constant led drive
steel housing >or=0.6mm,powder coated white,
,diffuser(opal or prismatic or double
prapolic,approved later)

Nos.

432

Recessed downlight luminare led light 40 watt with


reflector IP44 ,220 v ,4000k ,3600LUMEN
,CR>80,low glare for office

Nos.

360

Recessed downlight luminare led light 25 watt with


reflector IP44 ,220 v ,4000k ,2000LUMEN
,CR>80,low glare for toilet

NOS

336

Nos.

144

Nos.

312

Nos.

48

16.5.1

light out let including wiring ,conduit ,light switch


and all accessories required to complet the work

16.5.4

16.5.5

16.5.6

16.5.7

Qty

12

Lighting Fixtures
Lighting Fixtures including supports and all
accessories as required for a complete installation
of following for factory office:

16.5.3

Unit

Nos.

16.5

16.5.2

Wall mounted emergency led light 20watt , 220 V,


60 Hz., 3 hour 1500 lumen,CR>80, 20 watt,ip65

suspeded highbay luminare LED LIGHT lamp ,


housing die cust aluminum ,>15000 lumen ,
1x200watts 4000K ,CR> 80 , IP 44 .220V

16.5.8

led exite light fixture 8 watt battry for 3 hour IP44

16.5.9

decorative glvanized steel pole 6 meter 2*200watt


led light double arm complete with concorete base
and wiring for factory parking

Nos.

28

decorative glvanized steel pole 6 meter 200watt led


light complete with concorete base and wiring for
street lighting

Nos.

48

16.5.10

Electrical

Description

Unit
Rate
SR

Amount
SR

19 of 25

READY BUILT FACTORY


JEDDAH-4SITE

BILL OF QUANTITIES
BILL NO. 5: ELECTRICAL

Cluster of 2*12 Factory Units (900m2)


Item

Description

16.6

Wiring Device
Wiring devices includes switches and Receptacle
outlets complete with device boxes, cover plates
and all accessories for a complete installation:

16.6.1

220V,2P,3W,13A,Duplex
Grounding Slot.

16.6.2

Receptacle

Unit

Outlet

with

Qty

Nos.

240

220V,2P,3W,13A,Floor Mounted Duplex Receptacle


Outlet with Grounding slot.

Nos.

72

16.6.3

220V,2P,3W,13A, Single Receptacle Outlet with


Grounding slot

Nos.

96

16.6.4

Switch 32Amp,220v,1 pole for ac unit

Nos.

72

16.6.5

Switch 32Amp,220v,1 pole for heater

Nos.

48

16.6.6

telephone recptical rj11

NOS.

48

16.6.7

t.v outlet

NOS

24

16.7

Unit
Rate
SR

Amount
SR

Panel boards
Panel boards complete with main and branch with
all accessories, installation and termination.
Distribution/Power And Lighting Panelboards:

16.7.1

LP 1, MCCB 60/100 Amp.30way (service panel)

Nos.

24

16.7.2

LP2 SINGLE PHASE PANEL FOR GUARD ROOM

Nos.

24

16.7.3

PP-HVAC/OFF, 100 Amp.

Nos.

16.7.4

MDP, 200Amp.
Branches:
1no 80/100Amp,light,power,ac (service panel)
2no 60A mccb ,spare
1 no 30A mccb

Nos.

24

16.7.5

l.v panel for pump water,irrigration &fire pump tank

NOS

16.7.6

l.v street lighting pole panel 32A 12 way with timer

NOS

Lm
Lm
Lm

130
2100
0

Lm

400

Lm

400

16.8

Wires and Cables


Cable including pulling in the conduits, and
termination etc. as required
for a complete
installation of following sizes ,CU/XLPE/PVC

Electrical

16.8.1
16.8.2
16.8.3
16.8.4

4cx150mm2 +1cx70mm2
4cx120mm2 +1cx70mm2
4cx185 mm2 +1cx95mm2
4cx25 mm2 +1cx16 mm2 from main panel to Bransh

16.8.5

4cx10mm2 +1cx10E CU/XLPE/STA for lighting pole

20 of 25

READY BUILT FACTORY


JEDDAH-4SITE

BILL OF QUANTITIES
BILL NO. 5: ELECTRICAL

Cluster of 2*12 Factory Units (900m2)


Item

Electrical

Description

Unit

Qty

Unit
Rate
SR

Amount
SR

21 of 25

READY BUILT FACTORY


JEDDAH-4SITE

BILL OF QUANTITIES
BILL NO. 5: ELECTRICAL

Cluster of 2*12 Factory Units (900m2)


Item

Description

16.9

Disconnect Switch
Installation of disconnect switch including junction
boxes,wiring. clamps, screws, hangers and all
other necessary accessories to complete the work

16.9.1

16.1

16.10.1
16.10.2
16.10.3
16.11

DS 30 A
DS 125 A

Qty

Nos.
Nos.

Nos.
Nos.
Nos.

2
2

LM
EA
LM

3000
8
320

lot

Unit
Rate
SR

Amount
SR

POWER TRANSFORMER
Supply, install, test and commision package
Transformer (RMU 630A,TRANSFORMER , (L.V
SIDE including main breaker, branch circuit breaker
,kwh for branch circuit breaker or kwh separate
room)) 13.8kv\400v\230v 60HZ including, wires,
conduit.grounding and other materials and system
components required for a complete and functional
installation.
package oil transformer 500 KVA DYN 11
package oil transformer 1000 KVA DYN 11
package oil transformer 1500 KVA DYN 11
LIGHTNING SYSTEM
Supply, Install and test following grounding wires
air trminal , down conductors ,bare coppers and all
materials needed for a complete installation.

16.11.1
16.11.2
16.11.3

bare tape copper 3*25mm


air teminal rod 60cm hieght
down conductor 70 mm2

16.12.1

supply electrical service from sceco to the project


including all financial cost including m.v
equipments, kva cost,and all administration
proceducer with sceco to complete the work

CARRIED TO COLLECTION

Electrical

Unit

22 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 6: SERVICE BUILDINGS (Cluster of 2*12 Factory Units)
UNDERGROUND WATER TANK &PUMP ROOM (900m2)
Item

Description

Unit

Qty

Unit
Rate
SR

Amount
SR

UNDERGROUND WATER TANK &PUMP ROOM


2.0

DIVISION 02- SITE WORKS

2.1

Excavation in all type of soils to the required depth including


disposal of excavated materials, temporary supports to
strengthen aspects of the excavation, dewatering and any
necessary works to complete the work , according to
Specifications and drawings.

2.2

Backfilling with selected material free of debris and boulders,


above the footing in layers not exceeding 250 mm with
compaction minimum 95% for each layer. Price includes testing
each layer by a specialized laboratory.

3.0

DIVISION 3 - CONCRETE

3.1

Supply and Pouring Lean concrete, Minimum Compressive


Strength after 28 days ( fc' ) = 3000 Psi as per the drawing and
specifications , including formworks.

3.1.1
3.2

100 mm thickness Lean concrete under the foundation

610

50

15

Supply and Pouring fair face reinforced concrete for the water
tank and the pump room , Minimum Compressive Strength after
28 days ( fc' ) = 4000 Psi ,as per the drawing ,type of cement will
be according to the soil report recommendations,including
formworks and reinforcement ( 60000 psi yield strength).

3.2.1

RC. Footings (Water tank &Pump Room)

50

3.2.2

RC.Walls (Water tank &Pump Room)

80

3.2.3

Roof Slab (Water tank &Pump Room)

35

Provide and lay Water Stop for (Water Tank) according to


drawings and specifications.

LM

50

NO.

250

3.3

3.4

Heavy Duty Steel Cover as per drawings and specifications

4.0

DIVISION 04 - MASONRY

4.1

Supply and install regular non - load bearing 100 mm thick CMU
for protection walls around the water tank according to the
drawings and specifications.

5.0

DIVISION 05- METALS

5.1

Galvanized steel rungs , height as shown in drawings.

NO.

5.2

stainlesssteel ladder , height as shown in drawings.

NO.

Service Buildings

23 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 6: SERVICE BUILDINGS (Cluster of 2*12 Factory Units)
UNDERGROUND WATER TANK &PUMP ROOM (900m2)
Item

Description

7.0

DIVISION 07- THERMAL & MOISTURE PROTECTION.

7.1

Provide and lay 2 layers of Waterproofing Membrane 4mm


including 1 layer protection board for RC Footings and RC Walls
in contact with soil.according to the drawings and specifications.

Unit

Qty

370

Provide and lay Epoxies 2 Coating for inner surfaces( RC Walls


& RC Footings& Bottom of Roof )

325

7.3

Provide and lay 200 micron thick polythelene sheet under


blinding concrete.

130

7.4

Supply and apply anti termite under all concrete in touch with
earth for (Water tank and Pump room).

L.S.

360

30

10

7.2

Unit
Rate
SR

Amount
SR

SEPTIC TANK
2.0

DIVISION 02- SITE WORKS

2.1

Excavation in all type of soils to the required depth including


disposal of excavated materials, temporary supports to
strengthen aspects of the excavation, dewatering and any
necessary works to complete the work , according to
Specifications and drawings.

2.2

Backfilling with selected material free of debris and boulders,


above the footing in layers not exceeding 250 mm with
compaction minimum 95% for each layer. Price includes testing
each layer by a specialized laboratory.

3.0

DIVISION 3 - CONCRETE

3.1

Supply and Pouring Lean concrete, Minimum Compressive


Strength after 28 days ( fc' ) = 3000 Psi as per the drawing and
specifications , including formworks.

3.1.1
3.2

100 mm thickness Lean concrete under the foundation


Supply and Pouring fair face reinforced concrete for the water
tank and the pump room , Minimum Compressive Strength after
28 days ( fc' ) = 4000 Psi ,as per the drawing ,type of cement will
be according to the soil report recommendations,including
formworks and reinforcement ( 60000 psi yield strength).

3.2.1

RC. Footings (Septic Tank)

30

3.2.2

RC.Walls (Septic Tank)

40

Service Buildings

24 of 25

READY BUILT FACTORY


JEDDAH-4 SITE

BILL OF QUANTITIES
BILL NO. 6: SERVICE BUILDINGS (Cluster of 2*12 Factory Units)
UNDERGROUND WATER TANK &PUMP ROOM (900m2)
Item

3.2.3
3.3

Description

Roof Slab (Septic Tank)


Provide and lay Water Stop for (Septic Tank) according to
drawings and specifications.

3.4

Heavy Duty Steel Cover as per drawings and specifications

4.0

DIVISION 04 - MASONRY

4.1

Supply and install regular non - load bearing 100 mm thick CMU
for protection walls around the water tank according to the
drawings and specifications.

5.0

DIVISION 05- METALS

5.1

Galvanized steel rungs , height as shown in drawings.

7.0

DIVISION 07- THERMAL & MOISTURE PROTECTION.

7.1

Provide and lay 2 layers of Waterproofing Membrane 4mm


including 1 layer protection board for RC Footings and RC Walls
in contact with soil.according to the drawings and specifications.

7.2

7.3

7.4

Provide and lay Epoxies 2 Coating for inner surfaces( RC Walls


& RC Footings& Bottom of Roof )
Provide and lay 200 micron thick polythelene sheet under
blinding concrete.

Supply and apply anti termite under all concrete in touch with
earth for (Septic Tank).

Unit

Qty

20

LM

35

NO.

155

NO.

235

252

82

L.S.

Unit
Rate
SR

Amount
SR

CARRIED TO COLLECTION

Service Buildings

25 of 25