Professional Documents
Culture Documents
=
=
=
=
1:
=
=
=
=
420.602
416.7
3.902
0.6
0.55
2.1461
2.7461
3.902
2
30
15
B*I*o
1/2*h=
tan h)/(1v)=
00
-1
Increment
Unit weight of concrete
Unit weight of water
Stress Due to Earth pressure (Active)
cos
Cos^2(
Cos^2
Cos(
Sin(
Sin(
Cos(
Cos(
=
=
=
=
1+ Sin(Sin
Cos(Cos(
1
Sin(Sin
Cos(Cos(
1+
0.5
Pa
1/2*w*h2*Ca
Earth pressure:
Vertical component=
Horizontal component=
1
1
0.768
0.722
0.707
0.5
0.876
0.722
1.748
2
0.5
0.327
1.803
Cos^2(
cos Cos^2 Cos(
Ca
m
m
m
t/m3
0
0%
2.4 t/m3
1 t/m3
=
=
=
=
=
=
=
=
Cos^2(
cos Cos^2 Cos(
Ca =
28.81
m
m
m
m
1+
1
Sin(Sin
^0.5
Cos(Cos(
0.589581
=
=
=
=
0.6
8.98 t
6.22 t
6.48 t
0.55
3.902
0
Coeff.
(m)
Weight of masonry
1
1
0.5
1
0.5
1
Static Earth pressure:
Vertical component=
Horizontal component=
B
(m)
0.6
2.7461
D
(m)
0.6
2.1461
0
2.1461
Unit.wt.
(t/m3)
3.902
3.902
3.902
2.4
2.4
2.4
V=
x
e
6e/b
=
=
=
Forces(t)
V
Moment(tm)
(m)
5.62
10.05
0
2.45
1.43
2.75
13.77
14.37
0
6.22
0.72
1.3
4.48
8
40.62
40.62
21.89
21.89
1.86
0.49
1.071
Maximum stress=
P/A(1+6e/b) =
16.51 t/m2
Minimum stress=
P/A(1-6e/b) =
-0.57 t/m2
6.48
6.48
Design of Abutment
Top level of abutment
Cistern level
Height of abutment
Top width
Rear slope
Rear batter
Base width
Height
Density
=
=
=
=
1:
=
=
=
=
421.88
416.7
5.18
0.5
0.5
2.59
3.09
5.18
2
30
15
B*I*o
1/2*h=
tan h)/(1v)=
00
-1
Increment
Unit weight of concrete=
Unit weight of water=
Stress Due to Earth pressure (Active)
cos
Cos^2(
Cos^2
Cos(
Sin(
Sin(
Cos(
Cos(
=
=
=
=
1+ Sin(Sin
Cos(Cos(
1
1+ Sin(Sin
Cos(Cos(
0.5
Pa=1/2*w*h2*Ca=
Earth pressure:
Vertical component=
Horizontal component=
1
0.996
0.8
0.748
0.707
0.5
0.894
0.748
1.727
2
0.5
0.335
1.664
Cos^2(
cos Cos^2 Cos(
Ca
m
m
m
t/m3
0
0%
2.4 t/m3
1 t/m3
=
=
=
=
=
=
=
=
Cos^2(
cos Cos^2 Cos(
Ca=
26.57
m
m
m
m
1+
1
Sin(Sin
^0.5
Cos(Cos(
0.55744
=
14.96 t
=
=
9.93 t
11.19 t
0.5
0.5
5.18
0
Coeff.
(m)
Weight of masonry
1
1
0.5
1
0.5
1
Static Earth pressure:
Vertical component=
Horizontal component=
B
(m)
0.5
3.09
D
(m)
0.5
2.59
0
2.59
Unit.wt.
(t/m3)
5.18
5.18
5.18
2.4
2.4
2.4
Forces(t)
V
e
(m)
6.22
16.1
0
2.84
1.73
3.09
17.66
27.85
0
9.93
0.86
1.73
8.54
19
73.05
73.05
x
e
6e/b
11.19
32.25
11.19
=
32.25
2.27 m
0.72 m
1.398 m
Maximum stress=
P/A(1+6e/b) =
25.03 t/m2
Minimum stress=
P/A(1-6e/b) =
-4.15 t/m2
V=
Moment(tm)
oment(tm)
1.HYDRAULIC PARTICULARS:
1
2
3
4
5
6
7
8
9
U/S
Q
68.00
68.00
HL
1.28
FSL 421.13
419.85
D
2.75
2.75
CBL 418.38
417.10
U/S 17.50
17.50
BLC
6.00
1.5
:1
1:
3000
0.50
0.50
Cumec
useTrepazodial crest
m
m
m
m
m
Drop
D/s
421.13
1.28
d/s T.B.L. =
420.35
F.B.
2.75
1.68
#NAME?
#NAME?
#NAME?
#NAME?
1.98
8.90
1.70
R.L. = 415.13
0.30
10.60
2.00
2.00
2.00
8.30
section at A - A
3.10
2.80
24.90
17.50
1.70
0.50
2.80
Plan
2.30
3.80
68
1.278
421.13 419.852
2.75
2.75
418.38 417.102
17.5
17.5
6
1.5 :1
1:00
5000
Length of crest
In case of vertical drop falls, the length of crest should be the same as the D/S.
bed width of channel.
17.5 m
Crest length (L) =
Crest Level
If Q is
>
15 Adopt trapizodial creast
C
=
2.26
The discharge is given by
Velocity Head
=
=
=
=
=
=
=
=
U/S TEL
RL of crest
Thickness at base
x L x D(3/2) x (D/Bt)(1/6)
0.067
U/S FSL + velocity head
421.13+0.067
421.20 m
U/S TEL - D
421.197-1.334
419.86 m
419.87 m
= 0.55 * D1
2.26
=
0.80
m
68 = 2.26 x17.5xD^1.5x(D/0.8)^0.1666
D =
1.33
m
1.5 : 1
Va = 68/(17.5+2.75x1.5)x1.5)
Va =
1.143
m/sec
ha =
Va2/2g
where
= C x L x D(3/2) x (D/Bt)(1/6)
=
D/S
68
= 0.5
X
2.77
=
1.38
m
Provide thickness at base
=
1.40
m
Its top shall be capped with 20 cm thick cement concrete
Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45
degree from the u.s. edge of the crest and extending b 1.0 m in the earthen
bank from the line of FSL
Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept
vertical
Upstream Protection
Brick/stone pitching in length
2.75 m should be laid on the U/S
bed sloping down towards the crest 1:10 ; and three drain pipes of 15 cm
diameter at the bed during the closure of the channel
Cistern Elements
Depth of cistern
dc
q
dc
Thus Depth of cistern
RL of cistern
Provide RL of cistern
Length of cistern
= dc / 3
2
= (q / g )
1/3
=
3.89 cumec/m
=
1.16 m
=
0.390 m
= D/S bed level - Depth of cistern
= 417.102
0.390 m
= 416.712 m
= 416.700 m
= 3.8xdc + 0.415+ HL
= 3.8x1.16+0.415+1.278
=
4.938
m
=
5.0 m
=
6
= Crest level - D/S bed level
=
419.87
417.10
=
2.77
m
Total floor length required
=
6
X
2.77
=
16.608
Total floor length provided
=
16.70
m
Minimum d.s. floor length reqd.
= 10.53*dc + 4.877-1.5* HL
= 10.53x1.16+4.877-1.5x1.278
=
19.01
m
Provide D/S floor length reqd.
=
19.10
m
Provide D/S floor
16.70 m long and the balance 2.40 m
under and upstream of the crest.
9
i
ii
416.93
= yd/3+0.60
=
=
=
=
=
=
0.92+0.6
1.52
1.52
416.86
416.70
416.70
m
m
m
m
=
3.89
cumec/m
=
3.36
m
=
5.05
m
= 419.852-5.05 m
=
414.80 m
yd/2 +0.6
1.375+0.6
=
1.975
m
Provided d/s cut off wall depth =
1.975
m
RL of bottom of sheet pile = D/S bed level-depth of cutoff
= 417.102-1.975
Sheet pile bottom elevation
=
415.13 m
Provide sheet pile bottom elevation=
414.80 m
iii Total floor length and exit gradient
The exit gradient should be checked for the condition when there is no water in
the stilling basin when high flood is passing in the river; this provides the worst
static
condition.
Maximum
static head
= 419.87
417.10
= 2.77
m
depth of d/s cut off wall d
= 1.98
m
H
1
GE
=
------ X -----d
1
GE*d
------------- =
----------=
0.12
H
=
13.29
X
1.98
Provided total floor length
=
26.30
m
iv The floor length shall be provided as below:D/S floor length including cistern
=
16.70
m
Width of the crest at base
=
0.95
m
Upstream floor
=
8.65
m
Total
=
26.30
m
10 Pressure calculations
Let the u/s floor thickness
0.30
0.30
=
=
=
418.38
1.68
26.30
1.68
26.30
d/b =
m.
-
416.70
m
m
=
0.06
C1
D1
DC1
=
8.34
=
77.49
%
=
84.26
%
=
6.77
%
Correction for floor thickness
=
1.21
(+ ve)
Correction for interference due to d/s sheet pile line, C = 19D/b'.(d+D)/b
where,
D
= 417.102-414.802
=
2.30
m
d
= 418.38-416.7
1.68
m
25.90
b'
=
b
=
26.30
m
Then,
C
=
0.86
(+ ve)
corrected
= 77.49+1.21+0.86
C1
=
79.56
%
ii Downstream sheet pile
d
= 417.102-414.802
=
2.30
m
b
=
26.30
m
d
2.30
=
=
0.09
b
26.30
From Khosla's Pressure curves
=
6.24
=
26.22
%
=
18.27
%
D
7.95
%
D=
Correction for floor thickness
=
1.04
(- ve)
Correction for interference due to u/s sheet pile line, C = 19D/b'.(d+D)/b
where, d
= 417.102-414.802
2.30
m
D
= 418.38-416.7
1.68
m
b'
= 25.90
m
b
= 26.30
m
than, C
= 0.73
(- ve)
corrected
= 26.22-1.04-0.73
= 24.45
%
11 Downstream Floor thickness
i
At 0.00 m
from toe of creast wall to
2.00
m
% pressure
24.45
=
+
16.50
79.56
24.45
24.45
25.90
X
=
Unbalanced head
=
=
=
=
ii
iii
iv
vi
79.56
50.68
%
50.68
x
100.00
1.40
m
1.40
/
1.12
m
4.00
m
79.56
44.54
%
44.54
x
100.00
=
1.23
m
Floor thickness required
=
1.23
/
Provide floor thickness
= 0.99
m
At 4.00 m
from toe of creast wall to
6.00
m
% pressure
=
12.50
24.45
+
X
79.56
25.90
=
38.40
%
Unbalanced head
38.40
x
=
100.00
=
1.06
m
Floor thickness required
=
1.06
/
Provide floor thickness
= 0.85
m
At 6.00 m
from toe of creast wall to
8.00
m
% pressure
=
10.50
24.45
+
X
79.56
25.90
=
32.25
%
Unbalanced head
32.25
x
=
100.00
=
0.89
m
Floor thickness required
=
0.89
/
Provide floor thickness
= 0.71
m
At 8.00 m
from toe of creast wall to
12.00
m
% pressure
=
8.50
24.45
+
X
79.56
25.90
=
26.11
%
Unbalanced head
26.11
x
=
100.00
=
0.72
m
Floor thickness required
=
0.72
/
Provide floor thickness
= 0.58
m
At 8.00 m
from toe of creast wall to
16.00
m
% pressure
=
4.50
24.45
+
X
79.56
-
24.45
2.77
1.25
24.45
2.77
1.25
24.45
2.77
1.25
24.45
2.77
1.25
24.45
2.77
1.25
24.45
24.45
25.90
X
=
Unbalanced head
ii
=
=
=
=
79.56
13.82
%
13.82
x
100.00
0.38
m
0.38
/
0.31
m
24.45
2.77
1.25
2.75
DESIGN
1.HYDRAULIC PARTICULARS:
1 Full supply diascharge u/s
2 Drop
3 Full supply level
4 Full supply depth
5 Bed level
6 Bed width
7 Assume Bligh coefficient
8 Water side slope
9 Bed slope
Q
HL
FSL
D
CBL
U/S
BLC
U/S
68.00
D/s
68.00
1.28
421.13
419.85
2.75
2.75
418.38
417.10
17.50
17.50
6.00
1.5
:1
1:
3000
Cumec
m
m
m
m
m
>
15
C
trapazodial creast
2.26
=
DESIGN
1. Length of crest
In case of vertical drop falls, the length of crest should be the same as the d.s. bed width of channel.
Crest length (L)
Thus Q
Q
Q
>
=
=
=
=
=
17.50
2. Crest Level
The discharge is given by
Assuming crest width (Bt)
68
D
Velocity of approach with slope
Va
Va
ha
Velocity Head
u/s TEL
RL of crest
=
=
=
=
=
=
=
=
=
=
=
3. Shape of Crest
(a). Width of crest
where
Bt
Keep width of crest
(b). Width at base
Thickness at base
=
=
=
=
=
=
=
15
cumec
hence trapazodial creast
C x L x D(3/2) x (D/Bt)(1/6)
2.26
x L x D(3/2) x (D/Bt)(1/6)
0.80
m
x
2.26
17.5
x D3/2 x
(D
/
1.33
m
1
:
1
68
/(
17.5
+
2.75 x 2.75
1.221
m/sec
Va2/2g
0.076
u/s FSL + velocity head
421.13
+
0.076
421.21 m
u/s TEL - D
421.21
1.33
419.80 m
419.80 m
adopted
0.8
D1
height of crest in meter above d.s. bed
419.80
417.102
2.69
m
X
0.55
0.90
m
0.95
m
0.5 x D1+D
=
=
0.5
X 2.69
=
1.35
m
Provide thickness at base
=
1.40
m
Its top shall be capped with 20 cm thick cement concrete
4.Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45 degree from the u.s. edge
of the crest and extending b 1.0 m in the earthen bank from the line of FSL
5. Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept vertical
6. Upstream Protection
)1/6
Brick/stone pitching in length 2.75 m should be laid on the u.s. bed sloping down towards
the crest 1:10 ; and three drain pipes of 15 cm diameter at the bed during the closure of the channel
7. Cistern Elements
Depth of cistern
dc / 3
(q2 / g ) 1/3
=
=
3.885714 cumec/m
=
1.15 m
=
0.385 m
But provided =
0.38 m
=
d/s bed level - Depth of cistern
=
417.102
0.385 m
=
416.717 m
Provide RL of cistern
=
416.700 m
Length of cistern =
5.2*dc+1.067+HL
=
5.2
X
1.155
+ 1.067 + 1
=
8.071 m
Provide
9.0 m long cistern at RL
416.700 m.
dc
q
dc
Thus Depth of cistern
RL of cistern
=
=
=
=
=
=
=
=
=
=
=
6
Crest level - d/s bed level
419.80
417.10
2.70
m
6
X
2.70
16.188
16.20 m
6.77*dc+5.182+HL
6.77
X
1.15
14.28 m
14.30 m
1.90
+ 5.182
1.28
9 Floor thockness
Draw the hydrolic gradient line 1:7 for maximum static head i.e. when water headed upto the top of creast on
the u/s.and no water in down stream . The ordinate between the H.G. line and floor level would give the un balanced head .
The maximum uplift pressure in the u/s shall be counter balanced by the weight of water it self. Hence
theoretically there is no requirement of floor thickness in u.s. but minimum floor thickness of 0.30 m should be provided.
=
=
1.86
say
1.25 =
1.50 m
1.49 m
1.40
say
say
0.94
say
1.25 =
1.10 m
1.12 m
1.25 =
0.80 m
0.75 m
0.48
say
1.25 =
0.38 m
0.38 m
2.25
m from toe
4.50
m from toe
6.75
m from toe
10 Curtain wall :(a) Down stream curtain wall:The curtain wall at d/s end of floor should be 45 cm thick and depth d/2 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor =
2.75 / 2 =
1.375 +
0.6 =
1.975 say
2.00 m
(b) Up stream curtain wall
The curtain wall at d/s end of floor should be 45 cm thick and depth d/3 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor =
2.75 / 2 =
0.916667 +
0.6 =
1.52 say
1.50 m
3 x d3
3 x fsd
3.00 x
2.75 =
8.25 m
8.25
=
3.89 cumec/m
=
3.36 m
=
4.20 m
= #NAME? 4.20
= #NAME? m
Minimum depth of u/s cutoff below bed level =
yd/3+0.60
= #NAME? +
0.60
= #NAME? m
Provided u/s cut off wall depth = ###
m
RL of the bottom of sheet pile
= ###
m
Provide sheet pile bottom elevation at = #NAME? m
If U/S sheet bottom El. is above Cistern level then provide El.=
#NAME? m
=
3.89 cumec/m
=
3.36 m
=
5.04 m
= 419.85
- 5.04
= 414.81 m
Minimum depth of d/s cutoff below bed =
yd/2
+ 0.60
=
1.38
+ 0.60
=
1.98 m
Provided d/s cut off wall depth = 1.98 m
RL of bottom of sheet pile = d/s bed level-depth of cutoff
Sheet pile bottom elevation
= 417.10
- 1.98
Provide sheet pile bottom elevation=
415.10 m
###
= 419.80
= 2.70
= 1.98
417.10
m
m
H 1
------X -----d
1
GE*d
------------= ----------=
0.12
H
The floor length shall be provided as below:d.s floor length including cistern
Width of the crest at base
Upstream floor
Total
=
=
=
=
14.30
1.40
9.20
24.90
= 24.83 m
m
m
m
m
Pressure calculations
Let the u/s floor thickness
and downstream near cutoff wall
=
=
0.30
0.30
m
m.
= 418.38
- #NAME?
= #NAME? m
b
=
24.90
m
#NAME?
d/b =
=
#NAME? '=
24.90
From Khosla's Pressure curves
= #NAME?
C1 = #NAME? %
%
D1 = #NAME? % DC1 ###
Correction for floor thickness = #NAME? (+ ve)
Correction for interference due to d/s sheet pile line, C = 19D/b'.(d+D)/b
where,
Then,
C1 corrected
D
d
b'
b
C
= 417.10
415.10 = 2.00
= 418.38
#NAME? = ###
=
24.50
m
=
24.90
m
= #NAME? (+ ve)
= #NAME? +
#NAME? + ###
=
###
%
m
m
=
25.17 %
=
17.56 %
= 7.61 %
D
D
Correction for floor thickness = 1.14
(- ve)
Correction for interference due to u/s sheet pile line, C = 19D/b'.(d+D)/b
where,
d = 417.10 415.10
= 2.00 m
D = 418.38 #NAME? = ###
m
b' = 24.50
m
b = 24.90
m
than,
C = #NAME? (- ve)
- 1.14
corrected = 25.17
= #NAME? %
Downstream Floor thickness
(i) At 0.00 m from toe of creast wall to
2.00 m
13.90
24.10
###
= #NAME? %
#NAME? x 2.70
Unbalanced head =
100.00
Floor thickness required = #NAME?
/
1.25
###
% pressure
= #NAME?
### m
###
###
= #NAME?
#NAME? m
4.00 m
+
11.90
24.10
= #NAME? %
#NAME? x 2.70
Unbalanced head
=
100.00
Floor thickness required = #NAME?
/
1.25
###
###
###
###
2.80
2.80
3.80
0.5 :1
1.00
2.80
23.40
X- section at A-A
416.700
0.50
11.20
3.80
0.50
2.30
2.80
0.50
Cistern level=
421.630
17.50
TBL
418.380
0.50
0.00
2.750
CBL
B.W. 17.50
0.500
F.B.
FSD
###
0.50
TBL
0.30
1.98
4.53
2.80
0.80
3.10
CANAL DATA
U/S
TBL
421.630
3.25
U/S FSL
421.130
Creast level
u/sCBL
0.95
419.800
418.380
416.700
###
###
###
R.L #NAME?
R.L.
CBL
418.380
417.102 m
FSL
421.130
419.852 m
TBL
421.630
420.352 m
B.W.
17.50
17.50
D/S FSL
419.852
FSD
2.750
2.750
F.B.
0.500
0.500
68.000
68.000
cum
###
RL #NAME?
R.L.
###
100.000 m
8 Discharge
d/sC.B.L.
cistern level=
100.000
420.352
2.75
1.40
NSL
TBL
3.10
1.68
D/S
#NAME?
417.102
RL #NAME?
1.98
#NAME?
R.L. 415.427
R.L #NAME?
0.30
R.L. 415.127
0.70
8.90
10.60
1.70
2.00
2.00
2.00
8.30
14.30
(Drawing not to scale)
DETAIED ESTIMATE
NAME OF WORK:-CONSTRUCTION OF sharda type FALL a 0
SNO.
ITEM
1 Earth work in excavation including loading
unloading disposal and dressing of excavated
earth within intial lead of 50m and lift upto
1.5m in dry or moist including dressing of
excavted area with cost of dewatering
wherever required and all applicable taxes
and levies etc complete in all respect
A. Hard soil mixed with kankar, boulder
morrum
D/S cistern
D/S curtain wall
U/S impervious floor
U/S curtain wall
Wing wall A-A
Side wall B-B
Side wallC-C
QTY
1
1
1
1
2
2
2
0.00
0.00
0.00
0.00
2.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
25 % qty taken
=
25 % qty taken
25 % qty taken
25 % qty taken
=
=
=
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
cum
0.00
0.00
0.00
cum
2
2
2
0.00
0.00
0.00
0.00
2.30
0.00
0.00
0.00
0.00
0.00
0.00
Total
for 1 nos
0.00
0.00
0.00
0.00
0.00
0.00
cum
0.00
1
1
1
1
2
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
Total
for 1 nos
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
cum
1
2
2
2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
for 1 nos
0.00
0.00
0.00
0.00
0.00
0.00
cum
2
2
2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
for 1 nos
0.00
0.00
0.00
0.00
0.00
cum
1
2
2
2
2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
for 1
total
nos
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2
2
2
0.00
0.00
0.00
0.00
0.00
0.00
for 0
total
nos
as per item no 1
for 1 nos
0.00
0.00
0.00
0.00
0.00
sqm
0.00
0.00
cum
HL/DC =
0.231
0.235
0.240
0.244
0.249
0.254
0.259
0.264
0.269
D1/DC =
0.6
0.598
0.596
0.594
0.592
0.59
0.588
0.586
0.584
q
DC
HL/DC
D1/DC
D1
D2
Ef1
Ef2
=
=
=
=
=
=
=
=
=
#NAME?
3.89
1.15
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
0.6
D1/DC
HL
0.5
0.4
0.3
0.2
#NAME?
0.1
0
0
10
HL/DC
30
20
40
50
60
VALUES OF COEFF
Cs / C
Y-AXIS
0.000
0.460
0.680
0.800
0.860
0.905
0.930
0.950
0.965
0.975
0.980
0.985
VALUES OF h d / H d
h d / Hd
X-AXIS
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550
COEFFICIENT OF DISCHARGE
0.6
0.4
0.2
0
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
RATIO OF MODIFIED
0.990
0.998
0.999
1.000
1.000
0.600
0.650
0.700
0.750
0.800
0.6
0.4
0.2
Value of
1/ =d/b
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
=
=
=
0.000
0.004
0.007
KHOSLA CURVE
D'
0
14
19
21
23
25
26.5
27
28.5
29.5
30
0
19
27
31
34
37
40
42
43.5
44
44.5
0
29
40
47
53
57.5
62
65
68.5
71
74
h d / He
Cs / C
Cs
0.1
0.2
0.3
0.4
0.5
0.6
DEGREE OF SUBMERGENCE hd / He
0.7
0.8
0.9
Khosla curve
80
70
60
50
40
30
20
10
0
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
Depressed floor
w.s.
H
b
E =
D =
c' =
D; =
D' =
D' =
w.s.
d
cos-1(-2)
cos-1(-1)
100E
100D
100D;
(Depressed floor)
0.9
0.274
0.279
0.284
0.290
0.295
0.301
0.306
0.312
0.318
0.324
0.582
0.58
0.578
0.576
0.574
0.572
0.57
0.568
0.566
0.564
ermination
40
50
60
0.7
0.8
0.9
0.7
0.8
0.9
D'
0.7
0.8
0.9
w.s.
0.330
0.336
0.342
0.348
0.355
0.361
0.368
0.375
0.382
0.389
0.562
0.56
0.558
0.556
0.554
0.552
0.55
0.548
0.546
0.544
0.396
0.403
0.410
0.417
0.425
0.433
0.441
0.448
0.456
0.465
0.542
0.54
0.538
0.536
0.534
0.532
0.53
0.528
0.526
0.524
0.473
0.481
0.490
0.499
0.508
0.517
0.526
0.535
0.545
0.554
0.522
0.52
0.518
0.516
0.514
0.512
0.51
0.508
0.506
0.504
0.564
0.574
0.584
0.594
0.605
0.616
0.626
0.637
0.648
0.660
0.502
0.5
0.498
0.496
0.494
0.492
0.49
0.488
0.486
0.484
0.671
0.683
0.695
0.707
0.719
0.732
0.745
0.758
0.771
0.784
0.482
0.48
0.478
0.476
0.474
0.472
0.47
0.468
0.466
0.464
0.798
0.812
0.826
0.840
0.855
0.870
0.885
0.900
0.916
0.932
0.462
0.46
0.458
0.456
0.454
0.452
0.45
0.448
0.446
0.444
0.948
0.964
0.981
0.998
1.015
1.033
1.051
1.069
1.087
1.106
0.442
0.44
0.438
0.436
0.434
0.432
0.43
0.428
0.426
0.424
1.125
1.145
1.165
1.185
1.206
1.227
1.248
1.270
1.292
1.314
0.422
0.42
0.418
0.416
0.414
0.412
0.41
0.408
0.406
0.404
1.337
1.360
1.384
1.408
1.433
1.458
1.484
1.510
1.536
1.563
0.402
0.4
0.398
0.396
0.394
0.392
0.39
0.388
0.386
0.384
1.591
1.618
1.647
1.676
1.706
1.736
1.767
1.798
1.830
1.862
0.382
0.38
0.378
0.376
0.374
0.372
0.37
0.368
0.366
0.364
1.895
1.929
1.964
1.999
2.035
2.071
2.108
2.146
2.185
2.225
0.362
0.36
0.358
0.356
0.354
0.352
0.35
0.348
0.346
0.344
2.265
2.306
2.348
2.391
2.435
2.479
2.525
2.571
2.619
2.667
0.342
0.34
0.338
0.336
0.334
0.332
0.33
0.328
0.326
0.324
2.716
2.767
2.818
2.871
2.925
2.980
3.036
3.093
3.151
3.211
0.322
0.32
0.318
0.316
0.314
0.312
0.31
0.308
0.306
0.304
3.272
3.335
3.399
3.464
3.531
3.599
3.669
3.741
3.814
3.889
0.302
0.3
0.298
0.296
0.294
0.292
0.29
0.288
0.286
0.284
3.965
4.044
4.124
4.206
4.290
4.376
4.464
4.554
4.647
4.742
0.282
0.28
0.278
0.276
0.274
0.272
0.27
0.268
0.266
0.264
4.839
4.939
5.041
5.145
5.253
5.363
5.476
5.591
5.710
5.832
0.262
0.26
0.258
0.256
0.254
0.252
0.25
0.248
0.246
0.244
5.958
6.086
6.218
6.354
6.493
6.636
6.784
6.935
7.090
7.250
0.242
0.24
0.238
0.236
0.234
0.232
0.23
0.228
0.226
0.224
7.415
7.584
7.759
7.938
8.123
8.313
8.509
8.711
8.919
9.133
0.222
0.22
0.218
0.216
0.214
0.212
0.21
0.208
0.206
0.204
9.355
9.583
9.818
10.061
10.312
10.572
10.839
11.116
11.402
11.698
0.202
0.2
0.198
0.196
0.194
0.192
0.19
0.188
0.186
0.184
12.004
12.320
12.648
12.987
13.339
13.703
14.080
14.472
14.878
15.300
0.182
0.18
0.178
0.176
0.174
0.172
0.17
0.168
0.166
0.164
15.738
16.193
16.666
17.158
17.669
18.201
18.756
19.334
19.936
20.564
0.162
0.16
0.158
0.156
0.154
0.152
0.15
0.148
0.146
0.144
21.219
21.904
22.619
23.366
24.148
24.967
25.824
26.723
27.666
28.656
0.142
0.14
0.138
0.136
0.134
0.132
0.13
0.128
0.126
0.124
29.695
30.788
31.939
33.150
34.426
35.773
37.195
38.698
40.288
41.972
0.122
0.12
0.118
0.116
0.114
0.112
0.11
0.108
0.106
0.104
43.757
45.652
47.666
49.808
52.091
54.526
0.102
0.1
0.098
0.096
0.094
0.092