Design of D/S wing wall

Top level of wingwall


Cistern level
Height of abutment
Top width
Rear slope
Rear batter
Base width
Height
Density

=
=
=
=
1:
=
=
=
=

420.602
416.7
3.902
0.6
0.55
2.1461
2.7461
3.902
2

30

15

B*I*o

1/2*h=

tan h)/(1v)=

00

-1

Increment
Unit weight of concrete
Unit weight of water
Stress Due to Earth pressure (Active)
cos
Cos^2(
Cos^2
Cos(
Sin(
Sin(
Cos(
Cos(

=
=
=
=

1+ Sin(Sin
Cos(Cos(
1
Sin(Sin
Cos(Cos(

1+

0.5

Pa
1/2*w*h2*Ca
Earth pressure:
Vertical component=
Horizontal component=

1
1
0.768
0.722
0.707
0.5
0.876
0.722
1.748

2
0.5

0.327

1.803

Cos^2(
cos Cos^2 Cos(

Ca

m
m
m
t/m3

0
0%
2.4 t/m3
1 t/m3

=
=
=
=
=
=
=
=

Cos^2(
cos Cos^2 Cos(
Ca =

28.81

m
m
m
m

1+

1
Sin(Sin
^0.5
Cos(Cos(

0.589581
=
=
=
=

0.6

8.98 t
6.22 t
6.48 t

0.55

3.902

0
Coeff.

(m)
Weight of masonry
1
1
0.5
1
0.5
1
Static Earth pressure:
Vertical component=
Horizontal component=

B
(m)

0.6
2.7461
D
(m)

0.6
2.1461
0

2.1461
Unit.wt.
(t/m3)

3.902
3.902
3.902

2.4
2.4
2.4

V=
x
e
6e/b

=
=
=

Forces(t)
V

Moment(tm)

(m)

5.62
10.05
0

2.45
1.43
2.75

13.77
14.37
0

6.22

0.72
1.3

4.48
8
40.62
40.62

21.89
21.89
1.86
0.49
1.071

Maximum stress=

P/A(1+6e/b) =

16.51 t/m2

Minimum stress=

P/A(1-6e/b) =

-0.57 t/m2

6.48
6.48

Design of Abutment
Top level of abutment
Cistern level
Height of abutment
Top width
Rear slope
Rear batter
Base width
Height
Density

=
=
=
=
1:
=
=
=
=

421.88
416.7
5.18
0.5
0.5
2.59
3.09
5.18
2

30

15

B*I*o

1/2*h=

tan h)/(1v)=

00

-1

Increment
Unit weight of concrete=
Unit weight of water=
Stress Due to Earth pressure (Active)
cos
Cos^2(
Cos^2
Cos(
Sin(
Sin(
Cos(
Cos(

=
=
=
=

1+ Sin(Sin
Cos(Cos(
1
1+ Sin(Sin
Cos(Cos(

0.5

Pa=1/2*w*h2*Ca=
Earth pressure:
Vertical component=
Horizontal component=

1
0.996
0.8
0.748
0.707
0.5
0.894
0.748
1.727

2
0.5

0.335

1.664

Cos^2(
cos Cos^2 Cos(

Ca

m
m
m
t/m3

0
0%
2.4 t/m3
1 t/m3

=
=
=
=
=
=
=
=

Cos^2(
cos Cos^2 Cos(
Ca=

26.57

m
m
m
m

1+

1
Sin(Sin
^0.5
Cos(Cos(

0.55744
=

14.96 t

=
=

9.93 t
11.19 t

0.5

0.5

5.18

0
Coeff.

(m)
Weight of masonry
1
1
0.5
1
0.5
1
Static Earth pressure:
Vertical component=
Horizontal component=

B
(m)

0.5
3.09
D
(m)

0.5
2.59
0

2.59
Unit.wt.
(t/m3)

5.18
5.18
5.18

2.4
2.4
2.4

Forces(t)
V

e
(m)

6.22
16.1
0

2.84
1.73
3.09

17.66
27.85
0

9.93

0.86
1.73

8.54
19
73.05
73.05

x
e
6e/b

11.19
32.25
11.19
=
32.25
2.27 m
0.72 m
1.398 m

Maximum stress=

P/A(1+6e/b) =

25.03 t/m2

Minimum stress=

P/A(1-6e/b) =

-4.15 t/m2

V=

Moment(tm)

oment(tm)

Design of sarda fall masonry canal section


NAME OF WORK:-

Construction of sharda type fall at R.D. 10000m of LMC gip.

1.HYDRAULIC PARTICULARS:

1
2
3
4
5
6
7
8
9

Full supply diascharge u/s


Drop
Full supply level
Full supply depth
Bed level
Bed width
Assume Bligh coefficient
Water side slope
Bed slope
10 Free board

U/S

Q
68.00
68.00
HL
1.28
FSL 421.13
419.85
D
2.75
2.75
CBL 418.38
417.10
U/S 17.50
17.50
BLC
6.00
1.5
:1
1:
3000
0.50
0.50

Cumec

useTrepazodial crest

m
m
m
m
m

Drop

u/s T.B.L. = 421.63


u/s F.S.L. =

D/s

421.13

1.28

Creast width= 0.95

d/s T.B.L. =

Creast level= 419.8

420.35

d/s F.S.L. = 419.85

u/s CBL= 418.38

F.B.
2.75

d/s CBL= 417.10

1.68

cistern level= 416.70


###

#NAME?

#NAME?

#NAME?

#NAME?

1.98
8.90

1.70

R.L. = 415.13
0.30

10.60

2.00

2.00

2.00

8.30

section at A - A
3.10

2.80
24.90

17.50

1.70

0.50
2.80

Plan

2.30

3.80

Design of Canal fall (Sharda type)


Hydraulic particulars :
U/S
i
ii
iii
iv
v
vi
vii
viii
ix
1

Full supply discharge (Q) cumecs


Drop (HL) m

68

1.278
421.13 419.852
2.75
2.75
418.38 417.102
17.5
17.5
6
1.5 :1
1:00
5000

Full supply level (m)


Full supply depth (m)
Canal bed level (m)
Bed width (m)
Assume bligh coefficient (BLC)
Water side slope
Bed slope

Length of crest
In case of vertical drop falls, the length of crest should be the same as the D/S.
bed width of channel.
17.5 m
Crest length (L) =
Crest Level
If Q is
>
15 Adopt trapizodial creast
C
=
2.26
The discharge is given by

Velocity Head

=
=
=
=
=
=
=
=

U/S TEL

RL of crest

Adopt crest level


Shape of Crest
(a). Width of crest
D1
Bt

Thickness at base

x L x D(3/2) x (D/Bt)(1/6)

0.067
U/S FSL + velocity head
421.13+0.067
421.20 m
U/S TEL - D
421.197-1.334
419.86 m
419.87 m

= 0.55 * D1

Width of crest (Bt)

Keep width of crest


(b). Width at base

2.26

=
0.80
m
68 = 2.26 x17.5xD^1.5x(D/0.8)^0.1666
D =
1.33
m
1.5 : 1
Va = 68/(17.5+2.75x1.5)x1.5)
Va =
1.143
m/sec
ha =
Va2/2g

Velocity of approach with slope

where

= C x L x D(3/2) x (D/Bt)(1/6)
=

Assuming crest width (Bt)

D/S
68

= height of crest in metre above D/S bed


=
2.77
m
=
0.55
X 2.77
=
0.92
m
=
0.95
m
= 0.5 x D1

= 0.5
X
2.77
=
1.38
m
Provide thickness at base
=
1.40
m
Its top shall be capped with 20 cm thick cement concrete
Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45
degree from the u.s. edge of the crest and extending b 1.0 m in the earthen
bank from the line of FSL
Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept
vertical
Upstream Protection
Brick/stone pitching in length
2.75 m should be laid on the U/S
bed sloping down towards the crest 1:10 ; and three drain pipes of 15 cm
diameter at the bed during the closure of the channel

Cistern Elements
Depth of cistern
dc
q
dc
Thus Depth of cistern
RL of cistern

Provide RL of cistern
Length of cistern

Provide cistern for


Length of Impervious floor
Bligh's coefficient
Maximum static head

= dc / 3
2
= (q / g )

1/3

=
3.89 cumec/m
=
1.16 m
=
0.390 m
= D/S bed level - Depth of cistern
= 417.102
0.390 m
= 416.712 m
= 416.700 m
= 3.8xdc + 0.415+ HL
= 3.8x1.16+0.415+1.278
=
4.938
m
=
5.0 m

=
6
= Crest level - D/S bed level
=
419.87
417.10
=
2.77
m
Total floor length required
=
6
X
2.77
=
16.608
Total floor length provided
=
16.70
m
Minimum d.s. floor length reqd.
= 10.53*dc + 4.877-1.5* HL
= 10.53x1.16+4.877-1.5x1.278
=
19.01
m
Provide D/S floor length reqd.
=
19.10
m
Provide D/S floor
16.70 m long and the balance 2.40 m
under and upstream of the crest.
9
i

Depth of sheet piles from scour considerations :


U/S sheet pile :
Discharge intensity 'q'
=
3.89
cumec/m
=
3.36
m
Depth of scour 'R' = 1.36{q2/f}1/3
Anticipated scour = 1.25 R
=
4.20
m
R.L. of the bottom of scour hole
= 421.13-4.2

Minimum depth of U/S cutoff below bed


level
(where yd is water depth im m at u/s)

ii

Provided u/s cut off wall depth


RL of the bottom of sheet pile
Cistern level
Provide sheet pile bottom elevation at
D/S sheet pile :
Discharge intensity 'q'
Depth of scour 'R' = 1.36{q2/f}1/3
Anticipated scour = 1.5 R
R.L. of the bottom of scour hole

416.93

= yd/3+0.60

=
=
=
=
=
=

0.92+0.6
1.52
1.52
416.86
416.70
416.70

m
m
m
m

=
3.89
cumec/m
=
3.36
m
=
5.05
m
= 419.852-5.05 m
=
414.80 m

Minimum depth of d/s cutoff below bed


level

yd/2 +0.6

(where yd is water depth in m at d/s )

1.375+0.6

=
1.975
m
Provided d/s cut off wall depth =
1.975
m
RL of bottom of sheet pile = D/S bed level-depth of cutoff
= 417.102-1.975
Sheet pile bottom elevation
=
415.13 m
Provide sheet pile bottom elevation=
414.80 m
iii Total floor length and exit gradient
The exit gradient should be checked for the condition when there is no water in
the stilling basin when high flood is passing in the river; this provides the worst
static
condition.
Maximum
static head
= 419.87
417.10
= 2.77
m
depth of d/s cut off wall d
= 1.98
m
H
1
GE
=
------ X -----d
1
GE*d
------------- =
----------=
0.12
H

From Khosla's exit gradient curve


=
13.29

Hence requirement of total floor length b=


X
d

=
13.29
X
1.98
Provided total floor length
=
26.30
m
iv The floor length shall be provided as below:D/S floor length including cistern
=
16.70
m
Width of the crest at base
=
0.95
m
Upstream floor
=
8.65
m
Total
=
26.30
m
10 Pressure calculations
Let the u/s floor thickness

0.30

and downstream near cutoff wall


Upstream sheet pile
d
b

0.30

=
=
=

418.38
1.68
26.30
1.68
26.30

d/b =

m.
-

416.70

m
m
=

0.06

From Khosla's Pressure curves

C1
D1
DC1

=
8.34
=
77.49
%
=
84.26
%
=
6.77
%
Correction for floor thickness
=
1.21
(+ ve)
Correction for interference due to d/s sheet pile line, C = 19D/b'.(d+D)/b
where,
D
= 417.102-414.802
=
2.30
m
d
= 418.38-416.7
1.68
m
25.90
b'
=
b
=
26.30
m
Then,
C
=
0.86
(+ ve)
corrected
= 77.49+1.21+0.86
C1
=
79.56
%
ii Downstream sheet pile
d
= 417.102-414.802
=
2.30
m
b
=
26.30
m
d
2.30
=
=
0.09

b
26.30
From Khosla's Pressure curves
=
6.24

=
26.22
%

=
18.27
%
D
7.95
%
D=
Correction for floor thickness
=
1.04
(- ve)
Correction for interference due to u/s sheet pile line, C = 19D/b'.(d+D)/b
where, d
= 417.102-414.802
2.30
m
D
= 418.38-416.7
1.68
m
b'
= 25.90
m
b
= 26.30
m
than, C
= 0.73
(- ve)
corrected
= 26.22-1.04-0.73

= 24.45
%
11 Downstream Floor thickness
i
At 0.00 m
from toe of creast wall to
2.00
m
% pressure
24.45

=
+

16.50

79.56

24.45

24.45

25.90

X
=

Unbalanced head

=
=
=
=

ii

iii

iv

vi

Floor thickness required


Provide floor thickness
At 2.00 m
from toe of creast wall to
% pressure
=
14.50
24.45
+
X
25.90
=
Unbalanced head
=

79.56

50.68
%
50.68
x
100.00
1.40
m
1.40
/
1.12
m
4.00
m
79.56

44.54
%
44.54
x
100.00
=
1.23
m
Floor thickness required
=
1.23
/
Provide floor thickness
= 0.99
m
At 4.00 m
from toe of creast wall to
6.00
m
% pressure
=
12.50
24.45
+
X
79.56
25.90
=
38.40
%
Unbalanced head
38.40
x
=
100.00
=
1.06
m
Floor thickness required
=
1.06
/
Provide floor thickness
= 0.85
m
At 6.00 m
from toe of creast wall to
8.00
m
% pressure
=
10.50
24.45
+
X
79.56
25.90
=
32.25
%
Unbalanced head
32.25
x
=
100.00
=
0.89
m
Floor thickness required
=
0.89
/
Provide floor thickness
= 0.71
m
At 8.00 m
from toe of creast wall to
12.00
m
% pressure
=
8.50
24.45
+
X
79.56
25.90
=
26.11
%
Unbalanced head
26.11
x
=
100.00
=
0.72
m
Floor thickness required
=
0.72
/
Provide floor thickness
= 0.58
m
At 8.00 m
from toe of creast wall to
16.00
m
% pressure
=
4.50
24.45
+
X
79.56
-

24.45
2.77

1.25

24.45
2.77

1.25

24.45
2.77

1.25

24.45
2.77

1.25

24.45
2.77

1.25

24.45

24.45

25.90

X
=

Unbalanced head

Floor thickness required


Provide floor thickness
12 Downstream Protection
i
Bed Protection
Length of bed protection

ii

=
=
=
=

79.56

13.82
%
13.82
x
100.00
0.38
m
0.38
/
0.31
m

= 3*d/s water depth


=
3.00
x
=
8.25
m

24.45
2.77

1.25

2.75

This shall consist of R.R.Stone dry pitching


This shall be protected by a toe wall 0.4 m wide R.R.sotne masonry and of
depth equal to 0.80m.
Side protection
Length of bed protection =
3*d/s water depth
=
3.00
x
2.75
=
8.25
m
Provide dry stone pitching 0.2 m thick on sides, resting on wall 0.4m wide and
of the same depth as other toe walls.

NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D.

DESIGN
1.HYDRAULIC PARTICULARS:
1 Full supply diascharge u/s
2 Drop
3 Full supply level
4 Full supply depth
5 Bed level
6 Bed width
7 Assume Bligh coefficient
8 Water side slope
9 Bed slope

Q
HL
FSL
D
CBL
U/S
BLC

U/S
68.00

D/s
68.00

1.28
421.13
419.85
2.75
2.75
418.38
417.10
17.50
17.50
6.00
1.5
:1
1:
3000

Cumec
m
m
m
m
m

>

15
C

trapazodial creast
2.26
=

DESIGN
1. Length of crest
In case of vertical drop falls, the length of crest should be the same as the d.s. bed width of channel.
Crest length (L)

Thus Q
Q
Q

>
=
=
=
=
=

17.50

2. Crest Level
The discharge is given by
Assuming crest width (Bt)

68
D
Velocity of approach with slope
Va
Va
ha

Velocity Head

u/s TEL

RL of crest

Adopt crest level

=
=
=
=
=
=
=
=
=
=
=

3. Shape of Crest
(a). Width of crest
where

Width of crest (Bt)


D1

Bt
Keep width of crest
(b). Width at base
Thickness at base

=
=
=
=
=
=
=

15
cumec
hence trapazodial creast
C x L x D(3/2) x (D/Bt)(1/6)
2.26
x L x D(3/2) x (D/Bt)(1/6)
0.80
m
x
2.26
17.5
x D3/2 x
(D
/
1.33
m
1
:
1
68
/(
17.5
+
2.75 x 2.75
1.221
m/sec
Va2/2g
0.076
u/s FSL + velocity head
421.13
+
0.076
421.21 m
u/s TEL - D
421.21
1.33
419.80 m
419.80 m

adopted

0.8

D1
height of crest in meter above d.s. bed
419.80
417.102
2.69
m
X
0.55
0.90
m
0.95
m

0.5 x D1+D
=
=
0.5
X 2.69
=
1.35
m
Provide thickness at base
=
1.40
m
Its top shall be capped with 20 cm thick cement concrete

4.Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45 degree from the u.s. edge
of the crest and extending b 1.0 m in the earthen bank from the line of FSL
5. Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept vertical
6. Upstream Protection

)1/6

Brick/stone pitching in length 2.75 m should be laid on the u.s. bed sloping down towards
the crest 1:10 ; and three drain pipes of 15 cm diameter at the bed during the closure of the channel
7. Cistern Elements
Depth of cistern

dc / 3

(q2 / g ) 1/3
=
=
3.885714 cumec/m
=
1.15 m
=
0.385 m
But provided =
0.38 m
=
d/s bed level - Depth of cistern
=
417.102
0.385 m
=
416.717 m
Provide RL of cistern
=
416.700 m
Length of cistern =
5.2*dc+1.067+HL
=
5.2
X
1.155
+ 1.067 + 1
=
8.071 m
Provide
9.0 m long cistern at RL
416.700 m.
dc
q
dc
Thus Depth of cistern
RL of cistern

8. Length of Impervious floor


Bligh's coefficient
Maximum static head

Total floor length required


Total floor lengthprovided
Minimum d.s. floor length reqd.

Provide d.s. floor length reqd.


Provide d.s. floor

=
=
=
=
=
=
=
=
=
=
=

6
Crest level - d/s bed level
419.80
417.10
2.70
m
6
X
2.70
16.188
16.20 m
6.77*dc+5.182+HL
6.77
X
1.15
14.28 m
14.30 m

14.30 m long and the balance

1.90

+ 5.182

1.28

m under and upstream of the crest.

9 Floor thockness
Draw the hydrolic gradient line 1:7 for maximum static head i.e. when water headed upto the top of creast on
the u/s.and no water in down stream . The ordinate between the H.G. line and floor level would give the un balanced head .

The maximum uplift pressure in the u/s shall be counter balanced by the weight of water it self. Hence
theoretically there is no requirement of floor thickness in u.s. but minimum floor thickness of 0.30 m should be provided.

maximum unbalanced head at toe

floor thickness required

=
=

1.86
say

1.25 =
1.50 m

1.49 m

1.40
say
say
0.94
say

1.25 =
1.10 m

1.12 m

1.25 =
0.80 m

0.75 m

0.48
say

1.25 =
0.38 m

0.38 m

maximum unbalanced head at


floor thickness required

2.25

m from toe

maximum unbalanced head at


floor thickness required

4.50

m from toe

maximum unbalanced head at


floor thickness required

6.75

m from toe

10 Curtain wall :(a) Down stream curtain wall:The curtain wall at d/s end of floor should be 45 cm thick and depth d/2 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor =
2.75 / 2 =
1.375 +
0.6 =
1.975 say
2.00 m
(b) Up stream curtain wall
The curtain wall at d/s end of floor should be 45 cm thick and depth d/3 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor =
2.75 / 2 =
0.916667 +
0.6 =
1.52 say
1.50 m

11 D.S. protection :(a) Bed protection


Length of bed protection =

3 x d3

3 x fsd

3.00 x

2.75 =

8.25 m

12 Side protection :Length = same as for bed protection.=


pk_nandwana@yahoo.co.in

8.25

NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D.


Depth of sheet piles from scour considerations :

U/S sheet pile :


Discharge intensity 'q'
Depth of scour 'R' = 1.36{q2/f}1/3
Anticipated scour = 1.25 R
R.L. of the bottom of scour hole

=
3.89 cumec/m
=
3.36 m
=
4.20 m
= #NAME? 4.20
= #NAME? m
Minimum depth of u/s cutoff below bed level =
yd/3+0.60
= #NAME? +
0.60
= #NAME? m
Provided u/s cut off wall depth = ###
m
RL of the bottom of sheet pile
= ###
m
Provide sheet pile bottom elevation at = #NAME? m
If U/S sheet bottom El. is above Cistern level then provide El.=

(where yd is water depth im m at u/s)

#NAME? m

D/S sheet pile :


Discharge intensity 'q'
Depth of scour 'R' = 1.36{q2/f}1/3
Anticipated scour = 1.5 R
R.L. of the bottom of scour hole

=
3.89 cumec/m
=
3.36 m
=
5.04 m
= 419.85
- 5.04
= 414.81 m
Minimum depth of d/s cutoff below bed =
yd/2
+ 0.60
=
1.38
+ 0.60
=
1.98 m
Provided d/s cut off wall depth = 1.98 m
RL of bottom of sheet pile = d/s bed level-depth of cutoff
Sheet pile bottom elevation
= 417.10
- 1.98
Provide sheet pile bottom elevation=
415.10 m

(where yd is water depth in m at d/s )

###

Total floor length and exit gradient


The exit gradient should be checked for the condition when there is no water in the stilling basin
when high flood is passing in the river; this provides the worst static condition.
Maximum static head
depth of d/s cut off wall

= 419.80
= 2.70
= 1.98

417.10

m
m

H 1
------X -----d
1
GE*d
------------= ----------=
0.12
H

From Khosla's exit gradient curve


=
12.57
Hence requirement of total floor length b=
X d
=
12.57 X 1.98
Provided total floor length
=
24.90 m
GE

The floor length shall be provided as below:d.s floor length including cistern
Width of the crest at base
Upstream floor
Total

=
=
=
=

14.30
1.40
9.20
24.90

= 24.83 m

m
m
m
m

Pressure calculations
Let the u/s floor thickness
and downstream near cutoff wall

=
=

0.30
0.30

m
m.

(i) Upstream sheet pile


d

= 418.38
- #NAME?
= #NAME? m
b
=
24.90
m
#NAME?
d/b =
=
#NAME? '=
24.90
From Khosla's Pressure curves
= #NAME?
C1 = #NAME? %
%
D1 = #NAME? % DC1 ###
Correction for floor thickness = #NAME? (+ ve)
Correction for interference due to d/s sheet pile line, C = 19D/b'.(d+D)/b
where,

Then,
C1 corrected

D
d
b'
b
C

= 417.10
415.10 = 2.00
= 418.38
#NAME? = ###
=
24.50
m
=
24.90
m
= #NAME? (+ ve)
= #NAME? +
#NAME? + ###
=
###
%

m
m

(ii) Downstream sheet pile


d = 417.10
- 415.10
= 2.00
m
b = 24.90
m
d
8.00
=
=
0.08
=
b
24.90
From Khosla's Pressure curves
=
6.74

=
25.17 %

=
17.56 %
= 7.61 %
D
D
Correction for floor thickness = 1.14
(- ve)
Correction for interference due to u/s sheet pile line, C = 19D/b'.(d+D)/b
where,
d = 417.10 415.10
= 2.00 m
D = 418.38 #NAME? = ###
m
b' = 24.50
m
b = 24.90
m
than,
C = #NAME? (- ve)
- 1.14
corrected = 25.17
= #NAME? %
Downstream Floor thickness
(i) At 0.00 m from toe of creast wall to
2.00 m
13.90
24.10

###

= #NAME? %
#NAME? x 2.70
Unbalanced head =
100.00
Floor thickness required = #NAME?
/
1.25

###

% pressure

= #NAME?

### m

###

###

Provide floor thickness =


(ii) At

2.00 m from toe of creast wall and upto


% pressure

= #NAME?

#NAME? m

4.00 m
+

11.90
24.10

= #NAME? %
#NAME? x 2.70
Unbalanced head
=
100.00
Floor thickness required = #NAME?
/
1.25

###

###

###

###

Provide floor thickness =


#NAME? m
4.00 m from toe of creast wall and upto
6.00 m
9.90
% pressure
= #NAME? +
X ###
###
24.10
= #NAME? %
#NAME? x 2.70
Unbalanced head
=
=
###
m
100.00
Floor thickness required
= #NAME?
/
1.25
=
### m
Provide floor thickness =
#NAME? m
(iv) At
6.00 m from toe of creast wall and upto
9.10
7.90
% pressure
= #NAME? +
X ###
###
24.10
= #NAME? %
#NAME? x 2.70
Unbalanced head =
= ### m
100.00
Floor thickness required = #NAME?
/
1.25
=
### m
Provide floor thickness
= #NAME? m
Downstream Protection
(a). Bed Protection
Length of bed protection
= 3*d/s water depth
=
3.00
x 2.75
=
8.25 m
This shall consist of R.R.Stone dry pitching
This shall be protected by a toe wall 0.4 m wide R.R.sotne masonry and of depth equal to 0.80m.
(iii) At

(b). Side protection


Length of bed protection =

3*d/s water depth


=
3.00
x 2.75
=
8.25 m
Provide dry stone pitching 0.2 m thick on sides, resting on wall 0.4m wide and of the
same depth as other toe walls.

2.80

2.80

3.80

0.5 :1

1.00

2.80

23.40

X- section at A-A

416.700

creast level = 419.800

0.50

11.20

3.80

0.50

2.30

2.80

0.50

Cistern level=

421.630

17.50

TBL

418.380

0.50

0.00

2.750

CBL

B.W. 17.50

0.500
F.B.

FSD

###

0.50

TBL

0.30

1.98

4.53

NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D.

2.80

0.80

3.10
CANAL DATA
U/S

TBL

421.630
3.25

U/S FSL

421.130

Creast level
u/sCBL

0.95

419.800

418.380

416.700
###

###

###

R.L #NAME?

R.L.

CBL

418.380

417.102 m

FSL

421.130

419.852 m

TBL

421.630

420.352 m

B.W.

17.50

17.50

D/S FSL

419.852

FSD

2.750

2.750

F.B.

0.500

0.500

68.000

68.000

cum

###
RL #NAME?

R.L.

###

100.000 m

8 Discharge
d/sC.B.L.

cistern level=

100.000

420.352

2.75
1.40

NSL

TBL

3.10

1.68

D/S

#NAME?

417.102

RL #NAME?
1.98

#NAME?

R.L. 415.427

R.L #NAME?

0.30

R.L. 415.127

0.70
8.90
10.60

1.70

2.00

2.00

2.00

8.30

14.30
(Drawing not to scale)

DETAIED ESTIMATE
NAME OF WORK:-CONSTRUCTION OF sharda type FALL a 0

SNO.
ITEM
1 Earth work in excavation including loading
unloading disposal and dressing of excavated
earth within intial lead of 50m and lift upto
1.5m in dry or moist including dressing of
excavted area with cost of dewatering
wherever required and all applicable taxes
and levies etc complete in all respect
A. Hard soil mixed with kankar, boulder
morrum
D/S cistern
D/S curtain wall
U/S impervious floor
U/S curtain wall
Wing wall A-A
Side wall B-B
Side wallC-C

QTY

1
1
1
1
2
2
2

0.00
0.00
0.00
0.00
2.60
0.00
0.00

A. E/w in hard Dence soil


2 Earth work in excavation including loading
unloading, disposal
and dressing of
excavated rock within initial lead of 50 m and
lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of
dewatering wherever required and all
applicable taxes and . levies etc. complete in
all respect.
(A)Soft disintegreted rock.
(B)Hard rock not rquirding blasting
Phylites & other hard

0.00
0.00
0.00
0.00
0.00
2.30
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
25 % qty taken
=

25 % qty taken
25 % qty taken
25 % qty taken

rockrequiring nominal blasting

=
=
=

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
cum

0.00
0.00
0.00
cum

3 Cement concrete M-10(1:3:6) well mixed and


laid in position complete including all leads of
all construction material including curing and
finishing having well graded broken stone
aggregate of complete as per technical
specification
(a)maximum size upto 20mm
Wing wall A-A
Side wall B-B
Side wallC-C

2
2
2

0.00
0.00
0.00

0.00
2.30
0.00

0.00

0.00

4 Cement concrete M-20(1:1.5:3) well mixed


and laid in position complete including all
leads of all construction material including
curring and finishing having well graded
broken stone aggregate of maximum size
upto 20mm complete as per technical
specification
D/S cistern

0.00
0.00
0.00
Total
for 1 nos

0.00

0.00
0.00
0.00
0.00
0.00
cum

0.00

D/S curtain wall


D/S curtain wall
U/S impervious floor
U/S curtain wall
coping
creast top

1
1
1
1
2
1

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0
0
Total
for 1 nos

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
cum

1
2
2
2

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
Total
for 1 nos

0.00
0.00
0.00
0.00
0.00
0.00
cum

2
2
2

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
Total
for 1 nos

0.00
0.00
0.00
0.00
0.00
cum

1
2
2
2
2

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

5 Random rubble stone masonry (using R,R.


stone where 75% stone to be not less than
15 cm. in any direction and weighing not less
than 23 kg. for foundation including curing
all leads of all construction material and all
taxes and with inial lift delift 5m from ground
level etc complete
In cement sand mortar 1:5
Creast wall
Wing wall A-A
Side wall B-B
Side wallC-C
6 Random rubble stone masonry (using R,R.
stone where 75% stone to be not less than
15 cm. in any direction and weighing not less
than 23 kg. for superstructure including
curing all leads of all construction material
and all taxes and with inial lift delift 5m from
ground level etc complete
In cement sand mortar 1:5
Wing wall A-A
Side wall B-B
D/S return
7 Plaster in cement sand mortar 1:3 including
raking of joints smooth finishing & curing etc.
including all leads of all construction material
complete of thickness 20 mm.
Creast wall
Wing wall A-A
Side wall B-B
Side wallC-C
D/S return

for 1

total
nos

0.00
0.00
0.00
0.00
0.00
0.00
0.00

8 Flush and ruled pointing on stone masonry


including raking of joint and curing etc.
complete including all leads of all
construction materials in mortar ratio cement
sand mortar (1:3)
Rate as BSR 2006 page 42 item 15c
Wing wall A-A out side

0.00

0.00

0.00

Side wall B-B out side


Side wallC-C out side
D/S return out side

2
2
2

0.00
0.00
0.00

0.00
0.00
0.00
for 0

9 Rehandling excavated earth


( excluding
rock) in trenches, pilinth side of foundations
etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering including cost of water
including
loading
unloading
wherever
required with cost of dewatering wherever
required and all applicable taxes .

total
nos

as per item no 1
for 1 nos

0.00
0.00
0.00
0.00
0.00
sqm

0.00
0.00
cum

DETERMINATION OF CONJUGATE DEPTH


(Refer IS 4997-1968)

HL/DC =

0.231

0.235

0.240

0.244

0.249

0.254

0.259

0.264

0.269

D1/DC =

0.6

0.598

0.596

0.594

0.592

0.59

0.588

0.586

0.584

q
DC
HL/DC
D1/DC
D1
D2
Ef1
Ef2

=
=
=
=
=
=
=
=
=

#NAME?
3.89
1.15
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Sequent depth determination


0.7

0.6

D1/DC

HL

0.5

0.4

0.3

0.2

#NAME?

0.1

0
0

10

HL/DC
30

20

40

50

60

VALUES OF COEFF

Cs / C
Y-AXIS
0.000
0.460
0.680
0.800
0.860
0.905
0.930
0.950
0.965
0.975
0.980
0.985

VALUES OF h d / H d
h d / Hd
X-AXIS
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550

RATIO OF MODIFIED COEFFICIENT TO FREE DISCHARGE COEFFICIENT Cs / C

COEFFICIENT OF DISCHARGE

RATIO OF DISCHARGE COEFFICIENTS DUE TO TAILWATER EFFECT

f(x) = - 118.8555361122x^6 + 334.5618522008x^5 - 376.0978919526x^4 + 216.52231639x^3 - 68.35965232


R = 0.9996402935
0.8

0.6

0.4

0.2

0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

RATIO OF MODIFIED

f(x) = - 118.8555361122x^6 + 334.5618522008x^5 - 376.0978919526x^4 + 216.52231639x^3 - 68.35965232


R = 0.9996402935
0.8

0.990
0.998
0.999
1.000
1.000

0.600
0.650
0.700
0.750
0.800

0.6

0.4

0.2

Value of
1/ =d/b
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1

=
=
=

0.000
0.004
0.007

KHOSLA CURVE

D'

0
14
19
21
23
25
26.5
27
28.5
29.5
30

0
19
27
31
34
37
40
42
43.5
44
44.5

0
29
40
47
53
57.5
62
65
68.5
71
74

Scale for f = P/Hx100

h d / He
Cs / C
Cs

0.1

0.2

0.3

0.4

0.5

0.6

DEGREE OF SUBMERGENCE hd / He

0.7

0.8

0.9

Khosla curve
80
70
60
50
40
30
20
10
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

Value of 1/a =d/b

Depressed floor
w.s.
H
b

E =
D =
c' =
D; =
D' =
D' =

w.s.
d

cos-1(-2)
cos-1(-1)
100E
100D
100D;

(Depressed floor)

D-2/3(E-D)+3/^2 (Depressed floor)

Sheet pile at end

0.9

0.274

0.279

0.284

0.290

0.295

0.301

0.306

0.312

0.318

0.324

0.582

0.58

0.578

0.576

0.574

0.572

0.57

0.568

0.566

0.564

ermination

40

50

60

DUE TO TAILWATER EFFECT

78919526x^4 + 216.52231639x^3 - 68.3596523269x^2 + 11.8271760909x + 0.0038481177

0.7

0.8

0.9

78919526x^4 + 216.52231639x^3 - 68.3596523269x^2 + 11.8271760909x + 0.0038481177

0.7

0.8

0.9

D'

0.7

0.8

0.9

w.s.

heet pile at end

0.330

0.336

0.342

0.348

0.355

0.361

0.368

0.375

0.382

0.389

0.562

0.56

0.558

0.556

0.554

0.552

0.55

0.548

0.546

0.544

0.396

0.403

0.410

0.417

0.425

0.433

0.441

0.448

0.456

0.465

0.542

0.54

0.538

0.536

0.534

0.532

0.53

0.528

0.526

0.524

0.473

0.481

0.490

0.499

0.508

0.517

0.526

0.535

0.545

0.554

0.522

0.52

0.518

0.516

0.514

0.512

0.51

0.508

0.506

0.504

0.564

0.574

0.584

0.594

0.605

0.616

0.626

0.637

0.648

0.660

0.502

0.5

0.498

0.496

0.494

0.492

0.49

0.488

0.486

0.484

0.671

0.683

0.695

0.707

0.719

0.732

0.745

0.758

0.771

0.784

0.482

0.48

0.478

0.476

0.474

0.472

0.47

0.468

0.466

0.464

0.798

0.812

0.826

0.840

0.855

0.870

0.885

0.900

0.916

0.932

0.462

0.46

0.458

0.456

0.454

0.452

0.45

0.448

0.446

0.444

0.948

0.964

0.981

0.998

1.015

1.033

1.051

1.069

1.087

1.106

0.442

0.44

0.438

0.436

0.434

0.432

0.43

0.428

0.426

0.424

1.125

1.145

1.165

1.185

1.206

1.227

1.248

1.270

1.292

1.314

0.422

0.42

0.418

0.416

0.414

0.412

0.41

0.408

0.406

0.404

1.337

1.360

1.384

1.408

1.433

1.458

1.484

1.510

1.536

1.563

0.402

0.4

0.398

0.396

0.394

0.392

0.39

0.388

0.386

0.384

1.591

1.618

1.647

1.676

1.706

1.736

1.767

1.798

1.830

1.862

0.382

0.38

0.378

0.376

0.374

0.372

0.37

0.368

0.366

0.364

1.895

1.929

1.964

1.999

2.035

2.071

2.108

2.146

2.185

2.225

0.362

0.36

0.358

0.356

0.354

0.352

0.35

0.348

0.346

0.344

2.265

2.306

2.348

2.391

2.435

2.479

2.525

2.571

2.619

2.667

0.342

0.34

0.338

0.336

0.334

0.332

0.33

0.328

0.326

0.324

2.716

2.767

2.818

2.871

2.925

2.980

3.036

3.093

3.151

3.211

0.322

0.32

0.318

0.316

0.314

0.312

0.31

0.308

0.306

0.304

3.272

3.335

3.399

3.464

3.531

3.599

3.669

3.741

3.814

3.889

0.302

0.3

0.298

0.296

0.294

0.292

0.29

0.288

0.286

0.284

3.965

4.044

4.124

4.206

4.290

4.376

4.464

4.554

4.647

4.742

0.282

0.28

0.278

0.276

0.274

0.272

0.27

0.268

0.266

0.264

4.839

4.939

5.041

5.145

5.253

5.363

5.476

5.591

5.710

5.832

0.262

0.26

0.258

0.256

0.254

0.252

0.25

0.248

0.246

0.244

5.958

6.086

6.218

6.354

6.493

6.636

6.784

6.935

7.090

7.250

0.242

0.24

0.238

0.236

0.234

0.232

0.23

0.228

0.226

0.224

7.415

7.584

7.759

7.938

8.123

8.313

8.509

8.711

8.919

9.133

0.222

0.22

0.218

0.216

0.214

0.212

0.21

0.208

0.206

0.204

9.355

9.583

9.818

10.061

10.312

10.572

10.839

11.116

11.402

11.698

0.202

0.2

0.198

0.196

0.194

0.192

0.19

0.188

0.186

0.184

12.004

12.320

12.648

12.987

13.339

13.703

14.080

14.472

14.878

15.300

0.182

0.18

0.178

0.176

0.174

0.172

0.17

0.168

0.166

0.164

15.738

16.193

16.666

17.158

17.669

18.201

18.756

19.334

19.936

20.564

0.162

0.16

0.158

0.156

0.154

0.152

0.15

0.148

0.146

0.144

21.219

21.904

22.619

23.366

24.148

24.967

25.824

26.723

27.666

28.656

0.142

0.14

0.138

0.136

0.134

0.132

0.13

0.128

0.126

0.124

29.695

30.788

31.939

33.150

34.426

35.773

37.195

38.698

40.288

41.972

0.122

0.12

0.118

0.116

0.114

0.112

0.11

0.108

0.106

0.104

43.757

45.652

47.666

49.808

52.091

54.526

0.102

0.1

0.098

0.096

0.094

0.092

You might also like