ZXSDR BS8900A GU360

Outdoor GSM/UMTS Dual Mode Macro BTS

Hardware Installation
Hardware Version: HV3.1

ZTE CORPORATION
No. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn

LEGAL INFORMATION
Copyright 2013 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited.

Additionally, the contents of this document are protected by

contractual confidentiality obligations.


All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided as is, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.

Revision History
Revision No.

Revision Date

Revision Reason

R1.3

20130426

Update version (HV3.1)


1. Updated topic Installing the Heater in the BC8910A Cabinet
2. Updated topic Installing Heating Films in the PC8910A
Cabinet
3. Updated topic Internal Power Cables
4. Updated topic Installing the DC Power Cable for the
PC8910A Cabinet
5. Updated topic Installing the Power Cable for the Fan Subrack
in the PC8910A Cabinet
6. Updated topic Installing the Access Control Cable for the
PC8910A Cabinet

R1.2

20121121

This manual is updated in accordance with the updated Cabinet


Installation Guide.

R1.1

20120401

The contents in the manual were modified and reorganized.

R1.0

20110411

The First Edition

Serial Number: SJ-20110330173733-002


Publishing Date: 2013-04-26(R1.3)

SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Contents
Chapter 1 About This Manual.................................................................... 1-1
Chapter 2 Installation Overview ................................................................ 2-1
2.1 Introduction........................................................................................................ 2-1
2.2 Product Overview............................................................................................... 2-1
2.3 Installation Requirements.................................................................................... 2-4
2.3.1 Concrete Base Requirements ................................................................... 2-4
2.3.2 Space Requirements ................................................................................ 2-5
2.4 Installation Preparations ..................................................................................... 2-6
2.4.1 Installation Personnel ............................................................................... 2-6
2.4.2 Tools and Meters...................................................................................... 2-6
2.4.3 Environment Acceptance .......................................................................... 2-8
2.5 Installation Workflow........................................................................................... 2-8

Chapter 3 Unpacking and Inspection ....................................................... 3-1


3.1 Overview ........................................................................................................... 3-1
3.2 Checking Goods ................................................................................................ 3-1
3.3 Unpacking the Cabinet ....................................................................................... 3-1
3.4 Unpacking Hardware Components ...................................................................... 3-3
3.5 Inspection and Handover .................................................................................... 3-4

Chapter 4 Cabinet Installation................................................................... 4-1


4.1 Overview ........................................................................................................... 4-1
4.2 Cabinet Installation Flow..................................................................................... 4-1
4.3 Installing the Rain Cap........................................................................................ 4-2
4.4 Installing the Cabinet Base ................................................................................. 4-3
4.5 Installing the Cabinet on the Base ....................................................................... 4-6
4.5.1 Installing the BC8910A/PC8910A Cabinet.................................................. 4-6
4.5.2 Installing the RC8910A/RC8911A Cabinet ................................................. 4-7
4.6 Stacking the Cabinet ........................................................................................ 4-10
4.7 Grounding the Cabinet...................................................................................... 4-14
4.7.1 Grounding the Stand-Alone Cabinet ........................................................ 4-15
4.7.2 Grounding the Stacked Cabinet............................................................... 4-16

Chapter 5 Hardware Component Installation........................................... 5-1


5.1 Overview ........................................................................................................... 5-1
5.2 Installing an RF System Unit ............................................................................... 5-3
I
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

5.3 Installing the Batteries ........................................................................................ 5-5


5.4 Installing Heaters ............................................................................................... 5-6
5.4.1 Installing the Heater in the BC8910A Cabinet............................................. 5-6
5.4.2 Installing Heating Films in the PC8910A Cabinet ........................................ 5-8

Chapter 6 Cable Installation ...................................................................... 6-1


6.1 Overview ........................................................................................................... 6-1
6.1.1 External Cables........................................................................................ 6-1
6.1.2 Internal Power Cables .............................................................................. 6-3
6.1.3 Internal Signal Cables............................................................................... 6-5
6.1.4 Cable Holes and Waterproof Modules........................................................ 6-5
6.2 Installing External Cables.................................................................................. 6-15
6.2.1 Installing External Cables for BC8910A.................................................... 6-15
6.2.2 Installing External Cables for RC8910A/RC8911A .................................... 6-24
6.3 Installing Internal Cables................................................................................... 6-26
6.3.1 Installing the DC Power Cable in the RC8910A/RC8911A Cabinet............. 6-26
6.3.2 Installing the DC Power Cable for the PC8910A Cabinet........................... 6-27
6.3.3 Installing the Power Cable for the Fan Subrack in the PC8910A Cabinet ..... 6-29
6.4 Installing Internal Signal Cables ........................................................................ 6-30
6.4.1 Installing the Battery Temperature Sensor Cable ...................................... 6-30
6.4.2 Installing the Access Control Cable for the PC8910A Cabinet ................... 6-32
6.4.3 Installing SFP Cables ............................................................................. 6-33

Chapter 7 Installation Checklists .............................................................. 7-1


7.1 Overview ........................................................................................................... 7-1
7.2 Cabinet Installation Check .................................................................................. 7-1
7.3 Module Installation Check ................................................................................... 7-2
7.4 Cable Installation Check ..................................................................................... 7-2
7.5 Other Checks..................................................................................................... 7-3

Chapter 8 Ending Works............................................................................ 8-1


Figures............................................................................................................. I
Tables ............................................................................................................ III
Glossary .........................................................................................................V

II
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 1

About This Manual


Introduction
This manual describes how to install the ZXSDR BS8900A GU360 Outdoor GSM/UMTS
Dual Mode Macro BTS, including unpacking and inspection, cabinet assembly and
installation, hardware component installation, and cable installation.

Target Group
This document is intended for personnel who perform installation of the ZXSDR BS8900A
GU360. Installation personnel must have the training and competence required to perform
their work correctly.

Related Documents
Before starting the installation, installation engineers must read and understand the
following documents:
l
l

Personal Health and Safety Information


System Safety Information

The following document should be kept handy for reference:


l
l
l

Antenna System Installation Instruction


ZXSDR BS8900A GU360 Outdoor GSM/UMTS Dual Mode Macro BTS Hardware
Description
ZXSDR BS8900A GU360 Outdoor GSM/UMTS Dual Mode Macro BTS Product
Description

1-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

This page intentionally left blank.

1-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 2

Installation Overview
Table of Contents
Introduction ................................................................................................................2-1
Product Overview .......................................................................................................2-1
Installation Requirements ...........................................................................................2-4
Installation Preparations .............................................................................................2-6
Installation Workflow ..................................................................................................2-8

2.1 Introduction
This chapter provides a product overview of the ZXSDR BS8900A GU360, the installation
preparations, and a general installation flow.

2.2 Product Overview


The ZXSDR BS8900A GU360 is an outdoor dual-mode macro base station. It consists of
various combinations of four cabinets as described in Table 2-1.
Table 2-1 ZXSDR BS8900A GU360 Cabinets
Cabinet

Full Name

Description

BC8910A

BC8910A GU360 outdoor

Contains a power supply module and a BaseBand Unit

baseband cabinet

(BBU) module.

RC8910A GU360 outdoor

Contains six RF System Units (RSUs) at most.

RC8910A

radio frequency cabinet


RC8911A

PC8910A

RC8911A GU360 outdoor

Contains three RSUs at most, and provides space for a

radio frequency cabinet

storage battery group.

PC8910A GU360 outdoor

Provides space for two storage battery groups.

battery cabinet

Note:
The ZXSDR BS8900A GU360 supports both DC and AC power supplies. The board
layout in the BC8910A cabinet varies with different types of power supplies. For
information of board layout in the BC8910A cabinet, refer to ZXSDR BS8900A GU360
Outdoor GSM/UMTS Dual Mode Macro BTS Hardware Description.

2-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Table 2-2 describes three common cabinet combinations of the ZXSDR BS8900A GU360.
Table 2-2 Cabinet Combinations of the ZXSDR BS8900A GU360
Cabinet Combination

Description

Power Supply

Number of Supported
RSU and Battery Group

BC8910A + RC8910A +

A standard cabinet

AC power

RSU: 6

PC8910A

combination with a battery

supply

Battery group: 2

A compact cabinet

AC power

RSU: 3

combination without battery

supply

Battery group: 1

A cabinet combination

DC power

RSU: 6

applicable in scenarios that a

supply

cabinet.
BC8910A + RC8911A

cabinet, which is applicable in


scenarios with little demand
for capacity.
BC8910A + RC8910A

DC power supply is used and


no battery is needed.

Cabinet Combination: BC8910A + RC8910A + PC8910A


Figure 2-1 shows the standard cabinet combination of the ZXSDR BS8900A GU360, which
includes three cabinets: BC8910A, RC8910A, and PC8910A.
Figure 2-1 Cabinet Combination (BC8910A + RC8910A + PC8910A)

2-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 2 Installation Overview

Cabinet Combination: BC8910A + RC8911A


The compact combination is recommended for a site with little demand for capacity. The
ZXSDR BS8900A GU360 adopting this combination includes two cabinets: BC8910A and
RC8911A, as shown in Figure 2-2.
Figure 2-2 Cabinet Combination (BC8910A + RC8911A)

Cabinet Combination: BC8910A + RC8910A


The standard cabinet combination of BC8910 and RC8910A must be adopted when only
a DC power supply is available on site, as shown in Figure 2-3.

2-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 2-3 Cabinet Combination (BC8910A + RC8910A)

2.3 Installation Requirements


2.3.1 Concrete Base Requirements
A stable concrete base is required to support the ZXSDR BS8900A GU360 outdoor macro
base station before installation of the ZXSDR BS8900A GU360.
l
l
l

The concrete base should be level with a slope no greater than 1.5 mm/m.
The concrete base must have a compressive strength greater than 25 N/mm2 to
support the riveting of the cabinet.
The dimensions of the concrete base must be appropriate for cabinet installation.
Figure 2-4 shows the minimum dimensions for the concrete base that supports the
installation of a single cabinet.

2-4
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 2 Installation Overview

Figure 2-4 The Minimum Dimensions of Concrete Base

2.3.2 Space Requirements


Sufficient space must be reserved to facilitate operation and maintenance. Figure 2-5
illustrates the space requirements around the cabinet.
Figure 2-5 Space Requirements

2-5
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Note:
When the cabinet is placed with its left side along a wall, a minimum distance of 350 mm
must be provided between the cabinet and the wall so that the cabinet door can be fully
opened for operation and maintenance.

2.4 Installation Preparations


2.4.1 Installation Personnel
Installation personnel must be trained and certificated by ZTE Corporation and must
possess the knowledge of installation and debugging of the ZXSDR BS8900A GU360.

2.4.2 Tools and Meters


Table 2-3 lists the tools and meters required during installation.
Table 2-3 Tools and Meters
Type

Special-purpose tools

Tool/Meter

Required Quantity

75 coaxial cable stripper

75 coaxial cable crimping pliers

Multi-functional crimping pliers

Multimeter

Earth resistance tester

Electric percussion drill (a set of auxiliary drill

bits)
Tools for drilling

Vacuum cleaner

Power strip (with at least three 2-way sockets

and three 3-way sockets, and a current capacity


higher than 15 A)

2-6
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 2 Installation Overview

Type

Tool/Meter

Required Quantity

Cross screwdrivers (4-inch, 6-inch, and 8-inch

each)
Flathead screwdrivers (4-inch, 6-inch, and 8-inch

each)
Phillips screwdriver

Adjustable wrenches (6-inch, 8-inch, 10-inch,

and 12-inch each)


Dual-purpose spanners (17-inch and 19-inch
General-purpose tools

each)
Socket wrench set

Allen wrench set

Torque wrench

Claw hammer (5 kg)

Electric iron (300 W)

Electric iron (40 W)

Solder wire

Tape measure (50 m)

Steel tape (5 m)

Spirit level (400 mm)

Plumb bob

ESD wrist strap

Safety helmets and non-slip gloves

One for each person

Hacksaw (with several saw blades)

Long nose pliers (8-inch)

Diagonal cutting pliers (8-inch)

Slip joint pliers (8-inch)

Combination pliers (8-inch)

Needle file set (medium size)

Tweezers

Paint brush

Scissors

Heat blower

Solder sucker

Hydraulic crimper

Measurement tools

Protection tools

Benchwork tools

2-7
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Type

Auxiliary tools

Tool/Meter

Required Quantity

Crowbar

Pulley

Rope

Ladder

Spectrum analyzer (required in special cases)

Base station tester

Mobile phone (for test purpose)

Field strength tester (required in special cases)

Meters

2.4.3 Environment Acceptance


Before the installation of the ZXSDR BS8900A GU360, site preparation work must
be completed, and an environment acceptance test must be performed before an
Environment Acceptance Report presented.

2.5 Installation Workflow


Figure 2-6 shows the workflow for installing the ZXSDR BS8900A GU360. For installation
details, refer to the later chapters in this manual.
Figure 2-6 Installation Workflow

2-8
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 3

Unpacking and Inspection


Table of Contents
Overview ....................................................................................................................3-1
Checking Goods.........................................................................................................3-1
Unpacking the Cabinet ...............................................................................................3-1
Unpacking Hardware Components .............................................................................3-3
Inspection and Handover............................................................................................3-4

3.1 Overview
This chapter describes how to unpack and inspect the ZXSDR BS8900A GU360 cabinet
and hardware components.

3.2 Checking Goods


Prerequisite
l
l

The goods have been delivered to the installation site.


ZTE engineers and technicians of the operator are both present.

Steps
1. Verify that the number of items delivered is correct, all packages are intact, and the
delivery address is the same as the installation site.
2. Open the package with the serial number one, take out the packing list and the
Unpacking and Inspection Report. Then verify that the contents in this package
match the packing list. Keep the packing list for reference. Repeat this step for each
package belonging to the delivery.
3. If any items are found missing, damaged, unordered, or delivered in error, inform the
project supervisor to fill in the Unpacking and Inspection Feedback Form, and contact
ZTE for handling these items.
End of Steps

3.3 Unpacking the Cabinet


The cabinet is delivered partly equipped in a crate. The following tools are required for
opening the crate: a claw hammer, a pair of pliers, flathead screwdrivers, and a crowbar.
3-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Steps
1. Remove the metal packing sheet, and then remove the top cover in the direction
indicated by the arrow on the crate.
2. Erect the crate on its base.
3. Pull out the cabinet from the crate.
4. Remove the plastic packing bag of the cabinet.

Caution!
Do not remove the plastic bag of the cabinet before pulling out the cabinet. Hold the
base or solid parts with both hands when moving or laying the cabinet. Do not exert
force on the parts that are not rigid enough, such as cable support and fixing beam, to
avoid injury to personnel or damage to the cabinet.

End of Steps

Example
Figure 3-1 shows the disassembly of the crate.
Figure 3-1 Disassembly of the Crate

1. Top cover
2. Pad 1

3. Pad 2
4. Cabinet

5. Side cover
6. Main body of the crate

3-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 3 Unpacking and Inspection

3.4 Unpacking Hardware Components


Generally, cartons are used to pack the auxiliary electronic equipment, terminal equipment,
and auxiliary materials. The auxiliary electronic equipment are wrapped with antistatic
bags for protection during transportation. To avoid damage to the electronic equipment,
always wear an ESD wrist strap before unpacking them.
Required tools are diagonal cutting pliers, and a paper knife.
The following example shows how to unpack a circuit board.

Prerequisite
Before you open a carton containing hardware components, be sure to wear an
ElectroStatic Discharge (ESD) wrist strap and connect it to the ground.

Steps
1. Verify that the board type and quantity on the carton label is the same as that on the
packing list. Sign the acknowledging receipt of items.
2. Open the carton, and remove the foam pads.

l
l

Caution!
Avoid breaking the antistatic bags during unpacking, which can be recycled for
storing spare parts and packing return-for-repair parts.
Dispose of the desiccant in the cartons properly. Keep it out of the reach of
children.

3. Verify that the number of boards is the same number as listed on the carton label.
Then take out the boards with their antistatic bags.
4. Open the antistatic bag, and take out the board, as shown in Figure 3-2.

3-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 3-2 Taking Out the Board

End of Steps

3.5 Inspection and Handover


Checking the Goods
After unpacking the crate and cartons, verify that the goods are complete against the
packing list.

Inspecting the Goods


Goods inspection includes cabinet inspection and board inspection.
Check the cabinet and make sure that:
l
l
l
l
l
l

There is no dent, protrusion, scratch, peeling, blister, or stain on the cabinet surface.
No fastening screws are loosened, dropped, or dislocated.
No slots in the shelves of the cabinet are deformed, and no guide rails are damaged
or broken.
The fittings and accessories required for installation of the cabinet are complete and
matched to the cabinet.
All slot marks are intact and clear.
The copper grounding strap on the cabinet is not damaged or deformed, and no
ground wire is loosen or broken.

Check the boards and make sure that:


l

Board surface is not scratched or damaged. No components on the boards are


damaged or missing. The board number and version of each board accord with the
packing list.
3-4

SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 3 Unpacking and Inspection

For the devices and components that are prone to damage, the vendor should play a
dominating role in the inspection. Separate the inspected goods by category.

Handing Over the Goods


After inspection, both parties should sign the Unpacking and Inspection Report with each
party keeping a copy. After that, the goods are handed over to the customer. The project
supervisor should inform the inspection result in the Unpacking and Inspection Report to
ZTE within seven days.

Caution!
If any packages are found damaged, or any items are found missing or delivered in error,
note the damages and conditions on the Unpacking and Inspection Feedback Form.

3-5
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

This page intentionally left blank.

3-6
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4

Cabinet Installation
Table of Contents
Overview ....................................................................................................................4-1
Cabinet Installation Flow ............................................................................................4-1
Installing the Rain Cap ...............................................................................................4-2
Installing the Cabinet Base .........................................................................................4-3
Installing the Cabinet on the Base ..............................................................................4-6
Stacking the Cabinet ................................................................................................4-10
Grounding the Cabinet .............................................................................................4-14

4.1 Overview
This chapter describes how to install the cabinet of the ZXSDR BS8900A GU360.

4.2 Cabinet Installation Flow


Figure 4-1 shows the flow for installing the cabinet.

4-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-1 Cabinet Installation Flow

Note:
Because the ZXSDR BS8900A GU360 supports three combinations of four cabinet types,
installation personnel must know the quantity of cabinets to be installed and how the
cabinets are to be installed, stand-alone or stacked, before installation. If the installation
personnel are not clear about the cabinet combination, they should consult the project
supervisor immediately.

4.3 Installing the Rain Cap


This section describes how to install the rain cap on the top of the cabinet.
A rain cap is required to cover the top of a stand-alone cabinet or the upper cabinet
stacked on a cabinet to prevent rainwater. In consideration of three recommended cabinet
combinations described in Section 1.2 Product Overview, a rain cap is required to cover
the top of the BC8910A and PC8910A cabinets.

4-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Steps
1. Put the rain cap on the top of the cabinet.
2. Fix the rain cap with four steel washers and four M12 Allen bolts, as shown in Figure
4-2.
Figure 4-2 Fixing the Rain Cap

End of Steps

4.4 Installing the Cabinet Base


This section describes how to install the cabinet base.

Note:
The cabinet base must be installed before installation of the cabinet.

Steps
1. Determine the location of the cabinet base according to the site plan.
2. Make a drill template according to Figure 4-3 and then use the template to mark the
location of the fastening holes, or mark the location directly according to the size in
Figure 4-3.

4-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-3 Location of Fastening Holes (for Side-by-Side Cabinets)

3. Drill the fastening holes, and then mount the expansion anchor bolts, as shown in
Figure 4-4.
Figure 4-4 Drilling Holes and Mounting Expansion Anchor Bolts

4-4
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Caution!
Use a vacuum cleaner to suck up the generated dust after drilling the fastening holes.

4. Unpack the cabinet base, and remove the front panel from the cabinet base, as shown
in Figure 4-5.
Figure 4-5 Removing the Front Panel of the Cabinet Base

5. Align the base holes with the fastening holes on the concrete ground, and then secure
the cabinet base with four bolts, as shown in Figure 4-6.
Figure 4-6 Securing the Cabinet Base

6. Use a multimeter to verify that the cabinet base is insulated from the earth.
To verify the insulation between the cabinet base and the earth, first set the multimeter
to the diode scale. Press one probe against the head of an expansion anchor bolt,
and press the other probe against the exposed metal part on the cabinet base (such
as a metal rivet), as shown in Figure 4-7. A beep indicates the continuity between the
cabinet base and the earth, that is, the cabinet base is not insulated from the earth. In
this case, it is required to reinstall the cabinet base.
4-5
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-7 Verifying the Insulation

7. Mount the front panel to the cabinet base.


8. Repeat the previous steps when more cabinet bases are to be installed.
End of Steps

4.5 Installing the Cabinet on the Base


4.5.1 Installing the BC8910A/PC8910A Cabinet
This section describes how to install the BC8910A/PC8910A cabinet on the cabinet base.

Steps
1. Place the cabinet on the base.
2. Open the front door, and then secure the cabinet on the base with four rubber washers
and four M12 Allen bolts, as shown in Figure 4-8.

4-6
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Figure 4-8 Securing the Cabinet on the Base

Note:
The accessory of the BC8910 and PC8910 cabinets includes the M12 Allen bolts used
to fasten the cabinets on the base.

End of Steps

4.5.2 Installing the RC8910A/RC8911A Cabinet


This section describes how to install the RC8910A/RC8911A cabinet on the cabinet base.

Note:
The RC8910A and RC8911A cabinets are secured on the base with a pair of latches. The
latches must be mounted on the base before cabinet installation.

Steps
1. Align the holes on the latches with the fastening holes on the base, and fasten the two
latches with M6 Allen bolts, as shown in Figure 4-9.

4-7
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-9 Mounting the Latches on the Base

Caution!
Keep the latches vertical to the base when fastening the Allen bolts. Or else, it will be
difficult to install the cabinet.

2. Lay the cabinet on the base, and push it until the latches are fully inserted into the
aligning holes on the rear of the cabinet, as shown in Figure 4-10. The borders on the
bottom of the cabinet are aligned with those of the base.

4-8
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Figure 4-10 Pushing the Cabinet

Warning!
Prevent toppling over when pushing the cabinet. The toppling over of the cabinet may
cause injury to personnel and damage to the cabinet.

3. Open the front door, and then secure the cabinet on the base with two rubber washers
and two M12 Allen bolts, as shown in Figure 4-11.

4-9
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-11 Securing the Cabinet

End of Steps

4.6 Stacking the Cabinet


This section describes how to stack the cabinet.

Note:
As described in Section 1.2 Product Overview, the BC8910A cabinet can be stacked on
the RC8910 or RC8911 cabinet.

Steps
1. Remove the end caps from the cable troughs of the lower-layer cabinet, as shown in
Figure 4-12.

4-10
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Figure 4-12 Removing the End Caps From the Cable Troughs

2. Hoist the BC8910A cabinet, and lay it on the lower-layer cabinet. Align the fastening
holes on the four corners, and then secure the BC8910A cabinet with four rubber
washers and four M12 bolts, as shown in Figure 4-13.

Warning!
Always use a hoisting tool to avoid injury to personnel because the cabinet is heavy,
being about 82 kg.

Caution!
Lay the hoisted cabinet with care to prevent damage to cabinets.

4-11
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-13 Securing the Stacked Cabinet

Note:
The preinstalled components in the BC8910A cabinet, such as the power distribution
unit and front panel, are omitted in the above figure for clearly showing how to secure
the cabinet.

3. Remove two plates covering the cable holes, which are used for vertical cabinet
cabling, on the bottom of the upper-layer cabinet, as shown in Figure 4-14.

4-12
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Figure 4-14 Removing the Plates From Cable Holes (Upper-Layer Cabinet)

4. Remove two plates covering the corresponding cable holes on the top of the
lower-layer cabinet, as shown in Figure 4-15.
Figure 4-15 Removing the Plates From Cable Holes (Lower-Layer Cabinet)

5. Mount an assembled plate, which has a waterproof plug, on each cable hole with
the previously-detached screws, nuts, spring washers, and flat washers, as shown in
Figure 4-16.

4-13
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 4-16 Mounting the Assembled Plates on Cable Holes

Caution!
Fasten and seal the assembled plates to prevent water ingress. For information about
waterproofing of the cabinets, refer to Section 6.1.4 Cable Holes and Waterproof
Modules.

End of Steps

4.7 Grounding the Cabinet


The method of grounding cabinets varies with different combinations of the ZXSDR
BS8900A GU360 cabinets.
l

Grounding of stand-alone cabinets


In the case that no cabinet is stacked, each cabinet of the ZXSDR BS8900A GU360
should be grounded separately.

Grounding of stacked cabinets


In the case that two cabinets are stacked, the upper-layer cabinet should be connected
to the earth, and the lower-layer cabinet is grounded through he protective grounding
cable connected to the grounding strap in the upper-layer cabinet.
4-14

SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

4.7.1 Grounding the Stand-Alone Cabinet


This section describes how to connect the stand-alone cabinet to the earth.
In the case of a single cabinet installed on the concrete base, the protective grounding
wire should be routed through an appropriate cable hole on the bottom of the cabinet and
connected to the nearest outdoor grounding bar.

Steps
1. Connect one end of the protective grounding wire to a ground terminal on the
grounding strap in the cabinet, route the wire through an appropriate cable hole on
the bottom of the cabinet and then out of the cabinet base from the left cable hole, as
shown in Figure 4-17. Then connect the other end of the protective grounding wire to
the outdoor grounding bar.
Figure 4-17 Grounding the Stand-Alone Cabinet

Note:
The grounding wire must be routed through an appropriate cable hole. For the
information about cable holes, refer to Section 6.1.4 Cable Holes and Waterproof
Modules.

End of Steps

4-15
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

4.7.2 Grounding the Stacked Cabinet


This section describes how to ground the stacked cabinet. Generally, the BC8910A cabinet
is stacked on the RC8901A or RC8911A cabinet.

Steps
1. Connect one end (OT terminal) of a internal protective grounding wire to the ground
terminal in the RC8910A (or RC8911A) cabinet, route the wire up through an
appropriate cable hole, and then connect the other end of the internal protective
grounding wire to the grounding strap in the BC8910A cabinet, as shown in Figure
4-18. The following figure shows an example of the BC8910A cabinet that is stacked
on the RC8910A cabinet.
Figure 4-18 Grounding the RC8910A Cabinet

2. Connect one end of another external protective grounding wire to the grounding strap
in the BC8910A cabinet, route the wire down through an appropriate cable hole, and
then connect the other end of the external protective grounding wire to the outdoor
grounding bar, as shown in Figure 4-19.

4-16
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 4 Cabinet Installation

Figure 4-19 Grounding the BC8910A Cabinet

Note:
The grounding wire must be routed through an appropriate cable hole. For the
information about cable holes, refer to Section 6.1.4 Cable Holes and Waterproof
Modules.

End of Steps

4-17
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

This page intentionally left blank.

4-18
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 5

Hardware Component
Installation
Table of Contents
Overview ....................................................................................................................5-1
Installing an RF System Unit ......................................................................................5-3
Installing the Batteries ................................................................................................5-5
Installing Heaters .......................................................................................................5-6

5.1 Overview
Most hardware components of the ZXSDR BS8900A GU360 have been installed before
delivery. This chapter only describes the installation of hardware components that need to
be installed on site. They are:
l
l
l

RF System Unit (RSU)


Battery
Heater

Note:
The ZXSDR BS8900A GU360 may be delivered with all these hardware components
(RSU, battery, and heater) installed. You can install the component(s) that have not been
installed by referring to this chapter.

5-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Caution!
Before installing a hardware component, wear an ESD wrist strap, and connect it to the
ESD jack on the cabinet, as shown in the following figure.
Connecting the ESD Wrist Strap

Caution!
The installation is carried out with the cabinet door open. An unexpected external force
may cause the cabinet door closed during installation, which results in injury to personnel.
Therefore, be sure to fix the cabinet door with the door-stop bar on the lower part of the
cabinet before installing hardware components in the cabinet.
The following figure shows the hold-open arm on the lower part of the cabinet.
Door-Stop Bar of the Cabinet

5-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 5 Hardware Component Installation

5.2 Installing an RF System Unit


This section describes how to install an RF System Unit (RSU) in the cabinet.

Context
At most six RSUs can be installed in the RC8910A cabinet, and at most three RSUs can
be installed in the RC8911A cabinet.
The ZXSDR BS8900A GU360 provides a series of RSUs, including RSU40 U216,
RSU60E, and RSU82. More models are available depending on customer demands. The
methods of installing different RSUs are similar.
The slot where the RSU is to be installed must be determined according to the site
plan. Installation personnel should consult the project supervisor if there is any question
regarding RSU installation.

Steps
1. After wearing a grounded ESD wrist strap, hold the handle of the RSU with one hand,
and hold the bottom of the RSU with the other hand. Then align the RSU with the slot,
and push the RSU slowly into the slot.

Caution!
Because the RSU is heavy, being about 15 kg, and may drop down and result in
injury to personnel and damage to the component, hold the bottom of the RSU during
installation.

Caution!
Hold the RSU with its power interface pointing downwards and the ANT interface
pointing upwards.

2. Fasten the five screws on the panel of the RSU, as shown in Figure 5-1.

5-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 5-1 Installing the RF System Unit

3. Connect the RSU to the ground, and then install the power cable and the monitoring
cable in sequence, as shown in Figure 5-2.
a. To ground the RSU, use the grounding plate to connect the middle screw on the
lower part of the RSU panel and the lower ground screw on the cabinet. Then
fasten the two screws.
b. To install the power cable, plug the connector of the power cable into the POWER
socket on the lower part of the panel, and then fasten the screws of the connector.
c. To connect the monitoring cable, plug the connector of the monitoring cable into
the MON socket on the lower part of the panel, and then fasten the screws of the
connector.

5-4
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 5 Hardware Component Installation

Figure 5-2 Protective Grounding Wire, Power Cable, and Monitoring Cable Installed

1. Monitoring cable

2. Power cable

3. Grounding plate

End of Steps

5.3 Installing the Batteries


This section describes how to install the batteries.
Batteries can be installed in the PC8910A and RC8911A cabinets, as described in Section
2.2 Product Overview.
For the installation and cascade of batteries, refer to the installation instructions provided
by the battery vendor.

Battery Installation in the PC8910A Cabinet


Two battery groups can be installed in the PC8910A cabinet. The following lists the
requirements for the battery installation in the PC8910A cabinet.
l
l
l

All batteries must be installed orderly in the cabinet with their electrodes facing
outwards.
Both the upper layer and lower layer are installed with a battery group, each containing
four batteries.
Related cables such as the power cable and monitoring cable, should be properly
routed before battery installation, to ease later cable connection.

5-5
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Note:
If only one battery group is needed, it is recommended to install the battery group on
the lower layer of the cabinet. The unused cable connectors of the batteries should be
wrapped and insulated.

Battery Installation in the RC8911A Cabinet


One battery group (four batteries) can be installed in the RC8911A cabinet. The following
lists the requirements for the battery installation in the RC8911A cabinet.
l
l

Two batteries are installed on the upper layer, and the other two are installed on the
lower layer.
All batteries should be installed with their electrodes facing outwards.

5.4 Installing Heaters


5.4.1 Installing the Heater in the BC8910A Cabinet
This section describes how to install the heater in the BC8910A cabinet.

Context
A heater is required in the BC8910A cabinet if the temperature inside the cabinet may be
lower than -15.
The heater used in the BC8910A cabinet requires an AC power supply. The power
consumption of the heater is 100 W. The heater is installed on the lowest layer in the
BC8910A cabinet, occupying a space of 3/4U.

Steps
1. Turn off the AC power output (AC-OUT) of the ACPD subrack.
2. Assemble the heater.
The heater used in the BC8910A cabinet consists of a heating plate and a heater
chassis, which are delivered separately. Before installing the heater, assemble the
heater according to Figure 5-3.

5-6
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 5 Hardware Component Installation

Figure 5-3 Assembling the Heater

3. Install the heater assembly on the lowest layer of the BC8910A cabinet with the cooling
vents facing upwards, as shown in Figure 5-4.
Figure 5-4 Installing the Heater

4. Install the temperature controller on the left side in the cabinet. After that, connect
the power cable from the heater to the temperature controller and then the AC output
terminal of the ACPD subrack, as shown in Figure 5-5.

5-7
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 5-5 Routing the Power Cable for the Heating Films

Note:
After installation of the heater, a multimeter should be used to verify that the AC output
terminal of the ACPD subrack is not short-circuited with the cabinet body.

End of Steps

5.4.2 Installing Heating Films in the PC8910A Cabinet


This section describes how to install the heating films in the PC8910A cabinet.

Context
Two heating films are used in the PC8910A cabinet, each having a power consumption of
100 W. They are separately installed under two brackets of batteries with screws. When the
temperature in the cabinet is lower than the preset threshold, the temperature controllers
close the power circuits to turn on the heating films, which then heat the batteries on the
brackets.

Steps
1. Turn off the fans in the PC8910A cabinet, and then dismount two battery brackets.
2. Mount and secure a heating film on each bracket with combination screws, as shown
in Figure 5-6.

5-8
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 5 Hardware Component Installation

Figure 5-6 Mounting the Heating Film

3. Align the screw holes on the brackets with the mounting holes on the cabinet, and then
secure each bracket with six screws, as shown in Figure 5-7.
Figure 5-7 Securing the Battery Brackets

4. Install the temperature controllers according to Figure 5-8.

5-9
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 5-8 Installing the Temperature Controllers

5. Connect the power cables of the heating films to the temperature controllers and then
to appropriate power terminals in the PC8910A cabinet. After that, connect one end of
a power cable to the power distribution unit in the PC8910A cabinet, route the power
cable to the ACPD subrack in the BC8910A cabinet through an appropriate cable hole
on the left waterproof module in the PC8910A cabinet and the cable holes on the
cabinet bases. Finally connect the other end of the power cable to the AC output
terminal of the ACPD subrack. Figure 5-9 shows the route of the power cable from the
PC8910 cabinet to the BC8910A cabinet.
Figure 5-9 Routing the Power Cable for the Heating Films

End of Steps

5-10
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6

Cable Installation
Table of Contents
Overview ....................................................................................................................6-1
Installing External Cables .........................................................................................6-15
Installing Internal Cables ..........................................................................................6-26
Installing Internal Signal Cables ...............................................................................6-30

6.1 Overview
This chapter describes how to install external cables and internal cables for the ZXSDR
BS8900A GU360.
The installation of cables is divided into two parts: external cable installation and internal
cable installation. Internal cables are power cables and signal cables between different
cabinets of the ZXSDR BS8900A GU360.
For information about external cables, refer to Section 6.1.1 External Cables.
For information about internal power cables, refer to Section 6.1.2 Internal Power Cables.
For information about internal signal cables, refer to Section 6.1.3 Internal Signal Cables.

Caution!
Be sure to carry out the cable installation in accordance with the site plan. Consult the
project supervisor immediately if there is any question regarding the cable installation.

Caution!
The installation of power cables must be carried out by qualified electricians.

6.1.1 External Cables


External cables include the external cables connected to the BC8910A cabinet, and
those connected to the RC8910A and RC8911A cabinets. They are generally routed from
the bottom of the cabinets. After crossing waterproof modules, the external cables are
connected to appropriate interfaces.
6-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

In the RC8910A and RC8911A cabinets, cable troughs are available on both sides. When
the BC8910A cabinet is stacked on the RC8910A or RC8911A cabinet, cables connected
to the BC8910A cabinet must be routed through the cable troughs, as shown in Figure 6-1.
Figure 6-1 Cables Routed Through the Cable Trough

External Cables of the BC8910A Cabinet


The external cables of the BC8910A cabinet include:
l
l
l
l

External AC power cable


External DC power cable
GPS feeder
Transmission cables

E1/T1 cable

External optical fiber cable

Ethernet cable

Dry contact input cable

6-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Note:
If a Line Lightning Protection Unit (LPU) is installed in the BC8910 cabinet, the transmission
cables are connected to appropriate interfaces on the LPU. If no LPU is installed in the
BC8910A cabinet, the transmission cables are connected to appropriate interfaces on the
BBU.

External Cables of the RC8910A/RC8911A Cabinets


The external cables of the RC8910A/RC8911A cabinets are RF jumpers.

6.1.2 Internal Power Cables


This section describes power cable connections between the power distribution units in
different cabinets.

Power Cable Connection in the Case of AC Power Supply


When an AC power supply is used in the base station, the external AC power is input to the
B121 subrack in the BC8910A cabinet. The B121 subrack converts the AC power into DC
power and distributes the DC power to the other cabinets. In this case, power cables of
the batteries are connected to corresponding battery interfaces (BATT) on the B121 power
supply subrack.
Figure 6-2 shows the power distribution between cabinets in the case of AC power supply.
The power distribution and power cable connection inside cabinets are not displayed in
the following figure.

6-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-2 Power Distribution In the Case of AC Power Supply

Power Cable Connection in the Case of DC Power Supply


When a DC power supply is used in the base station, the external DC power is input to
the DCPD5 subrack in the BC8910A cabinet. Then the DCPD5 subrack distributes the DC
power to the other cabinets. In this case, no battery is configured.
Figure 6-3 shows the power distribution between cabinets in the case of DC power supply.
The power distribution and power cable connection inside cabinets are not displayed in
the following figure.

6-4
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-3 Power Distribution In the Case of DC Power Supply

6.1.3 Internal Signal Cables


The internal signal cables include:
l

Monitoring cables between the BC8910A and PC8910A cabinets:

Battery temperature sensor cable

Battery cabinet access control cable

SFP cable between the BC8910A and RC8910A (or RC8911A) cabinets

6.1.4 Cable Holes and Waterproof Modules


This section describes the cable holes and waterproof modules in different cabinets of the
ZXSDR BS8900A GU360.
The cabinets of the ZXSDR BS8900A GU360 outdoor base station feature a fully
waterproof design. Each cable hole has a corresponding waterproof module, which
prevents water ingress into the cabinet.

6.1.4.1 Cable Holes on the BC8910A Cabinet


Four cable holes are available on the bottom of the BC8910A cabinet, as shown in Figure
6-4.
Two rectangle cable holes in the left and right parts are used for external cabling,
such as the horizontal cabling with another cabinet (PC8910A). They are covered with
corresponding waterproof modules. Two round cable holes in the front part are used
for vertical cabling between stacked cabinets. When batteries are configured in the
6-5
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

lower-layer cabinet, special vent plugs are required for the round cable holes to prevent
acid mist generated by batteries.
Figure 6-4 Positions of Cable Holes on the BC8910A Cabinet

Waterproof Modules
Three types of waterproof module pairs are optional for the left and right rectangle cable
holes on the BC8910A cabinet depending on the types and quantity of cables to be routed.
l

Waterproof Module Pair (Type One)

6-6
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Table 6-1 Apertures on the Waterproof Modules (Type One)


Waterproof Module

Aperture

Quantity

Diameter (mm)

9.5

13.5

6.5

14

13.5

15

Pair (Type One)


Left waterproof
module

Right waterproof
module

Waterproof Module Pair (Type Two)

Table 6-2 Apertures on the Waterproof Modules (Type Two)


Waterproof Module

Aperture

Quantity

Diameter (mm)

9.5

15.5

13.5

15

Pair (Type Two)


Left waterproof
module

Right waterproof
module

6-7
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Waterproof Module Pair (Type Three)

Table 6-3 Apertures on the Waterproof Modules (Type Three)


Waterproof Module

Aperture

Quantity

Diameter (mm)

9.5

17

19

9.5

17

Pair (Type Three)


Left waterproof
module

Right waterproof
module

Note:
Cables must be routed through appropriate apertures on the waterproof modules. If
a cable is routed through an aperture with smaller diameter, waterproof tapes must
be used to wrap the cable so that the diameter of the wrapped cable matches the
aperture.
If all the three types of waterproof modules cannot satisfy the cabling requirements,
glue seals should be used instead to seal the cable holes.

The following describes how to install a waterproof module on the BC8910A cabinet:
l

Remove the fastening screw on the waterproof module.


6-8

SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

l
l

Dismount the metal plate and the waterproof module. Route the cables through the
rectangle cable hole.
Mount the waterproof module with the cables properly clamped with
diameter-matching apertures. Then insert the metal plate and secure it with the
fastening screw, as shown in Figure 6-5.

Figure 6-5 An Installed Waterproof Module

Vent Plug for Acid Mist Prevention


Two types of vent plugs are optional for the round cable holes on the BC8910A cabinet
depending on the types and quantity of cables to be routed.
l

Vent Plug (Type One)

Table 6-4 Apertures on the Vent Plug (Type One)

Aperture

Quantity

Diameter (mm)

Vent Plug (Type Two)


6-9

SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Table 6-5 Apertures on the Vent Plug (Type Two)


Aperture

Quantity

Diameter (mm)

6.1.4.2 Cable Holes on the RC8910A Cabinet


Figure 6-6 shows the positions of cable holes on the RC8910A cabinet. Two round
cable holes on the top of the cabinet are used for cabling between stacked cabinets.
Two rectangle cable holes on the bottom of the cabinet are used for routing cabinet-top
jumpers and AISG control cables. Each rectangle cable hole has a corresponding
waterproof module.
Figure 6-6 Positions of Cable Holes on the RC8910A Cabinet

6-10
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Waterproof Module
Figure 6-7 shows the waterproof module covering the rectangle cable hole on the
RC8910A cabinet.
Figure 6-7 Waterproof Module on the RC8910A Cabinet

Table 6-6 Apertures on the Waterproof Module (RC8910A)


Aperture

Quantity

Diameter (mm)

6.5

12

12.5

illustrates the principle of the waterproof module.

1. Vertical sliding plug


2. Horizontal sliding plug

l
l

3. Cable sealing element


4. Aperture plug

The vertical sliding plug produces a vertical pressure under the force of the fastening
screw.
Under the vertical pressure, the left and right horizontal sliding plugs exert horizontal
pressure on both sides to squeeze the cable sealing elements of the waterproof
module. In this way, the cables through the apertures are tightly sealed.

6-11
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

6.1.4.3 Cable Holes on the RC8911A Cabinet


Figure 6-8 shows the positions of cable holes on the RC8911A cabinet.
l

l
l

The upper left cable hole is used for routing the cables connected to batteries when
a cabinet is stacked on the RC8911A cabinet. These cables include the power cable,
battery temperature sensor cable, and the protective grounding cable. A special vent
plug is required for this cable hole to prevent the ingress of acid mist generated by the
batteries.
The upper right cable hole is used for routing the cables connected to the RSU when
a cabinet is stacked on the RC8911A cabinet. These cables include the power cable,
and SFP cables.
The lower left cable hole is used for routing battery-related cables. A waterproof
module is mounted on this cable hole.
The lower right cable hole is used for routing RSU-related cables, such as cabinet-top
feeders, and the AISG control cable. A waterproof module is mounted on this cable
hole.

Figure 6-8 Positions of Cable Holes on the RC8910A Cabinet

Vent Plug for Acid Mist Prevention


A vent plug is required for the upper left cable hole to prevent acid mist because batteries
are installed on the left part of the RC8911A cabinet. This vent plug is the same as that
used in the BC8910A cabinet.

Lower Left Waterproof Module


Figure 6-9 illustrates the waterproof module covering the lower left cable hole on the
RC8911A cabinet.

6-12
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-9 Lower Left Waterproof Module on the RC8911A Cabinet

Table 6-7 Apertures on the Lower Left Waterproof Module


Aperture

Quantity

Diameter (mm)

Lower Right Waterproof Module


The waterproof module covering the lower right cable hole on the RC8911A cabinet is the
same as that installed on the RC8910A cabinet.

6.1.4.4 Cable Holes on the PC8910A Cabinet


On the bottom of the PC8910A cabinet, two round cable holes are distributed on the left and
right parts. Each cable hole has a waterproof module. The rubber plugs on the waterproof
modules should be dismounted before cabling and mounted after cabling. Figure 6-10
shows the positions of the two cable holes.

6-13
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-10 Positions of Cable Holes on the PC8910A Cabinet

Left Waterproof Module


Figure 6-11 illustrates the waterproof module covering the left cable hole on the PC8911A
cabinet.
Figure 6-11 Left Waterproof Module on the PC8910A Cabinet

Table 6-8 Apertures on the Left Waterproof Module


Aperture

Quantity

Diameter (mm)

6-14
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Right Waterproof Module


Figure 6-12 illustrates the waterproof module covering the right cable hole on the PC8911A
cabinet.
Figure 6-12 Right Waterproof Module on the PC8910A Cabinet

Table 6-9 Apertures on the Right Waterproof Module


Aperture

Quantity

Diameter (mm)

6.2 Installing External Cables


6.2.1 Installing External Cables for BC8910A
6.2.1.1 Installing the External AC Power Cable
This section describes how to install the external AC power cable, a 310mm2 outdoor
AC power cable, from the external AC power supply to the B121 subrack in the BC8910A
cabinet.

Steps
1. Route the external AC power cable into the BC8910A cabinet through the left cable
hole on the cabinet base, along the left cable trough in the RC8910A or RC8911A
cabinet, and then through the left waterproof module on the bottom of the BC8910A
cabinet, from the power cabinet. Figure 6-13 shows the route of the external AC power
cable.

6-15
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-13 Route of the External AC Power Cable

2. Strip the sheath of each wire at 1 cm to the wire end. After that, insert each wire into
the appropriate terminal of the AC input connector on the B121 subrack, and then
fasten the corresponding screw. The brown wire is connected to the L terminal. The
blue wire is connected to the N terminal. The black wire is connected to the ground
terminal.
End of Steps

6.2.1.2 Installing the External DC Power Cable


This section describes how to install the external DC power cable, a 2*16mm2 outdoor
shielded braid cable, from the external DC power supply to the CPD5 subrack in the
BC8910A cabinet.

Steps
1. Route the external DC power cable into the BC8910A cabinet through the left cable
hole on the cabinet base, along the left cable trough in the RC8910A or RC8911A
cabinet, and then through the left waterproof module on the bottom of the BC8910A
cabinet, from the power cabinet, as shown in Figure 6-14.

6-16
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-14 Power Distribution In the Case of DC Power Supply

2. Strip the sheath of each wire at 1 cm to the wire end. After that, insert each wire into
the appropriate terminal of the DC input connector on the DCPD5 subrack, and then
fasten the corresponding screw. The blue wire is connected to the -48 V terminal, and
the black wire is connected to the -48 V RTN terminal.

Note:
The power wires and protective grounding wire must be complete without joints.

Danger!
To prevent serious injury, ensure that the circuit breakers in the power cabinet are all
turned off before installing power cables.

End of Steps

6.2.1.3 Installing the GPS Feeders


This section describes how to install the GPS feeders, including the internal GPS feeder
and the external one.
6-17
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Context
The internal GPS feeder is used to connect the GPS lightning arrestor and the CC board
in the BC8910A cabinet. Through the internal GPS feeder, the GPS clock signal is input
to the CC board, which converts the clock signal into various clock signals required by the
system.
The external GPS feeder is routed out of the cabinet from the GPS lightning arrestor, and
then connected to the GPS antenna.

Steps
1. Insert the SMA connector on one end of the internal GPS feeder into the REF socket
on the CC board.
2. Route the internal GPS feeder to the GPS lightning arrestor along the left side of the
BC8910A cabinet.
3. Connect the SMA connector on the other end of the internal GPS feeder into the SMA
socket of the GPS lightning arrestor.
4. Connect one end of the external GPS feeder to the GPS lightning arrestor, route the
external GPS feeder to the GPS antenna through the left waterproof module on the
BC8910A cabinet, through the left cable trough in the RC8910A or RC8911A cabinet,
and out of the cabinet through the left cable hole on the cabinet base. Then connect
the other end of the external GPS feeder to the GPS antenna.
5. Bind the GPS feeder along the cable trough on the left side in the RC8910A or
RC8911A cabinet.
End of Steps

Example
Figure 6-15 shows the route of the GPS feeders.

6-18
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-15 Route of GPS Feeders

6.2.1.4 Installing the E1/T1 Cable


This section describes how to install the E1/T1 cable to provide a physical link for Iub
transmission.
Two types of E1 cables (75 ohm and 120 ohm) are optional depending on the actual
configuration of the base station.

Steps
1. Connect the wires of the E1/T1 cable to the external transmission equipment as
required.
2. Route the E1/T1 cable to the Lightning Protection Unit (LPU) in the BC8910A cabinet
through the right cable hole on the cabinet base, along the right cable trough in the
RC8910A or RC8911A cabinet, through the right waterproof module on the bottom of
the BC8910A cabinet, and along the cable trough on the right side of the BC8910A
cabinet.
3. Crimp the bare copper part of the wires on corresponding E1 ports of the LPU
according to the required order.
4. Bind the E1 cable along the cable trough or on the left side in the cabinets.
End of Steps

6-19
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Example
Figure 6-16 shows the route of the E1/T1 cable.
Figure 6-16 Route of the E1/T1 Cable

6.2.1.5 Installing the External Optical Fiber Cable


This section describes how to install the external optical fiber cable for Iub transmission.

Steps
1. Route the external optical fiber cable from the external transmission equipment to the
ETH0 interface on the CC board in the BC8910A cabinet through the left cable hole
on the cabinet base, along the left cable trough in the RC8910A or RC8911A cabinet,
and through the left waterproof module on the BC8910A cabinet.
2. Bind the optical fiber cable along the cable trough or on the left side in the cabinets.
End of Steps

Example
Figure 6-17 shows the route of the external optical fiber cable.

6-20
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-17 Route of the External Optical Fiber Cable

6.2.1.6 Installing the Ethernet Cable


This section describes how to install the Ethernet cable for Iub transmission.

Note:
The Ethernet cable must be connected to the LPU first for lightning protection, and then
connected to the BBU.

Steps
1. Mount appropriate connectors on both ends of the Ethernet cable.
2. Route the cable from the external transmission equipment to the Ethernet input
interface of the LPU in the BC8910A cabinet through the left cable hole on the cabinet
base, along the left cable trough in the RC8910A or RC8911A cabinet, through the
left waterproof module on the bottom of the BC8910A cabinet, and along the left
cable trough in the BC8910A cabinet.
End of Steps

Example
Figure 6-18 shows the route of the Ethernet cable.
6-21
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-18 Route of the Ethernet Cable

6.2.1.7 Installing the Dry Contact Input Cable


This section describes how to install the dry contact input cable.

Context
The dry contact input cable must be connected to the LPU first for lightning protection, and
then connected to the BBU.
The following provides the information of dry contacts related to the cabinets:
l

The alarms reported by the B121 power supply subrack in the BC8910A cabinet
are not transmitted by dry contacts. They are transmitted as messages through the
communication interface and displayed as system alarms after being translated.
The dry contact signals, such as access control alarm, moisture alarm, and smoke
alarm, in the BC8910A and RC8910A/RC8911A cabinets are sent to the B8200
through the FCE5 boards. The B8200 forwards all received dry contact signals to
the element management system.
The dry contact signals in the PC8910A cabinet are controlled by the FCE5 board in
the BC8910A cabinet because no FCE5 board is available in the PC8910A cabinet.

The corresponding relations between alarm signals and dry contacts on the FCE5 board
in the BC8910A cabinet are described in Table 6-10.

6-22
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Table 6-10 Dry Contacts and Corresponding Signals in the BC8910A Cabinet
Dry Contact

Alarm

Status

Lightning protection unit 1

Closed: normal
Open: alarm

Lightning protection unit 2

Closed: normal
Open: alarm

Cabinet access control (BC8910A)

Closed: normal
Open: alarm

Cabinet access control (PC8910A)

Closed: normal
Open: alarm

Moisture alarm

Closed: normal
Open: alarm

Smoke alarm

Closed: normal
Open: alarm

Unused

Unused

The corresponding relations between alarm signals and dry contacts on the FCE5 board
in the RC8910A/RC8911A cabinet are described in Table 6-11.
Table 6-11 Dry Contacts and Corresponding Signals in the RC8910A/RC8911A Cabinet
Dry Contact

Alarm

Status

Lightning protection unit 1

Closed: normal
Open: alarm

Lightning protection unit 2

Closed: normal
Open: alarm

Cabinet access control

Closed: normal

(RC8910A/RC8911A)

Open: alarm

Moisture alarm

Closed: normal
Open: alarm

Unused

Unused

Unused

Unused

Steps
1. Route the dry contact input cable from the external monitoring equipment to the dry
contact input interface on the LPU in the BC8910A cabinet through the right cable hole
6-23
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

on the cabinet base, along the right cable trough in the RC8910A or RC8911A cabinet,
and through the right waterproof module on the bottom of the BC8910A cabinet.
End of Steps

Example
Figure 6-19 shows the route of the dry contact input cable.
Figure 6-19 Route of the Dry Contact Input Cable

6.2.2 Installing External Cables for RC8910A/RC8911A


6.2.2.1 Installing RF Jumpers
This section describes how to install the RF jumpers for transmission of RF signals. One
end of an RF jumper is connected to the RSU in the RC8910A/RC8911A cabinet, and the
other end is connected to the feeder of the antenna system.

Steps
1. Route the RF jumpers into the cabinet base through the right cable hole, and then
into the RC8910A or RC8911A cabinet through the waterproof modules on the cabinet
bottom. After that, connect the RF jumpers to corresponding ANT interfaces on the
RSU from right to left in the RC8910A or RC8911A cabinet.
2. After every two RF jumpers are routed through a waterproof module, arrange the
corresponding cable sealing elements. Insert two horizontal sliding plugs after all
6-24
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

necessary RF jumpers are routed through the waterproof module with all cable sealing
elements in position.
3. Insert the vertical sliding plug, and then use an Allen wrench to fasten the screw on
the vertical sliding plug.

Note:
Ensure that all cable sealing elements are pressed with firm pressure, and all unused
apertures are sealed with plugs.

4. Adjust the plate, which used to cover the cable hole on the side of the cabinet base,
to a proper place so that the cable hole is small enough, and then fasten the screw to
fix the plate.
5. After all necessary cables are routed, mount the front panel of the cabinet base.
End of Steps

Example
Figure 6-20 shows the route of the RF jumpers.
Figure 6-20 Route of RF Jumpers

6-25
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

6.3 Installing Internal Cables


6.3.1 Installing the DC Power Cable in the RC8910A/RC8911A
Cabinet
This section describes how to install the DC power cable from the BC8910A cabinet to the
RC8910A/RC8911A cabinet.

Steps
1. Cut a segment of DC power cable with an appropriate length.
2. Connect one end of the DC power cable to the DC output terminal on the B121 subrack
in the BC8910A cabinet.
3. Route the power cable into the RC8910A/RC8911A cabinet through the right cable
hole on the bottom of the BC8910A cabinet.
4. Connect the other end of the power cable to the input terminal on the PDM in the
RC8910A/RC8911A cabinet.
End of Steps

Example
Figure 6-21 shows the route of the DC power cable from the BC8910A cabinet to the
RC8911A cabinet as an example.
Figure 6-21 Route of DC Power Cable to the RC8911A Cabinet

6-26
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

6.3.2 Installing the DC Power Cable for the PC8910A Cabinet


This section describes how to install the DC power cable from the BC8910A cabinet to the
PC8910A cabinet.

Context
Two 16mm2 black wires are used for supplying power to the PC8910A cabinet. The black
wire with both ends mounted with a red heat shrink is the -48 V RTN wire, and the other
black wire is -48 V power wire.

Steps
1. Cut a segment of DC power cable with an appropriate length, and crimp terminals on
both ends of each wire.
2. Connect one end of the power cable to the battery ports on the left of the B121 power
supply subrack in the BC8910A cabinet.
3. Route the power cable through the appropriate cable hole into the PC8910A cabinet.
4. Connect the other end of the power cable to the power terminals on the upper part of
the PC8910A cabinet.
End of Steps

Example
Figure 6-22 shows the route of the DC power cable from the BC8910A cabinet to the
PC8910A cabinet in the case of two different cabinet combinations.

6-27
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-22 Routes of the DC Power Cables to the PC8910A Cabinet

6-28
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

6.3.3 Installing the Power Cable for the Fan Subrack in the PC8910A
Cabinet
This section describes how to install the power cable from the BC8910A cabinet to the fan
subrack in the PC8910A cabinet.

Steps
1. Connect one end of the power cable to the DC-OUT port on the B121 subrack in the
BC8910A cabinet.
2. Route the power cable into the PC8910A cabinet through the left waterproof
module on the bottom of the BC8910A cabinet, along the left cable trough in the
RC8910/RC8911A cabinet, and through the cable hole on the cabinet base.
3. Connect the other end of the power cable to the power port on the fan subrack in the
PC8910A cabinet.
End of Steps

Example
Figure 6-23 shows the route of the power cable to the fan subrack.
Figure 6-23 Route of the Power Cable to the Fan Subrack in the PC8910A Cabinet

Figure 6-24 shows the route of external TEC power cable.

6-29
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-24 Route of external TEC power cable

6.4 Installing Internal Signal Cables


6.4.1 Installing the Battery Temperature Sensor Cable
This section describes how to install the battery temperature sensor cable from the
BC8910A cabinet to the PC8910A or RC8911A cabinet, in which the batteries are
installed.

Steps
1. Connect one end of the battery temperature sensor cable to the monitor unit in the
B121 subrack in the BC8910A cabinet.
2. Route the cable into the PC8910A or RC8911A cabinet through the left waterproof
module on the bottom of the BC8910A cabinet, along the left cable trough in the
RC8910 or RC8911A cabinet, and through the cable hole on the cabinet base.
3. Connect the other end of the cable to the battery temperature sensor, which is installed
on the outside of a battery.
End of Steps

Example
Figure 6-25 shows the route of the battery temperature sensor cable in the case of two
different cabinet combinations.
6-30
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-25 Route of the Battery Temperature Sensor Cable

6-31
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

6.4.2 Installing the Access Control Cable for the PC8910A Cabinet
This section describes how to install the access control cable from the BC8910A cabinet
to the PC8910A cabinet. The access control cable is used to transfer the access alarms
of the PC8910A cabinet to the BC8910A cabinet.

Steps
1. Connect one end of the access control cable to the TEC/DOOR port of the BC8910A
cabinet.
2. Route the cable into the PC8910A cabinet through the left waterproof module on the
bottom of the BC8910A cabinet, along the left cable trough in the RC8910 or RC8911A
cabinet, and through the cable hole on the cabinet base.
3. Connect the other end of the cable to the access control sensor on the upper right
corner of the PC8910A cabinet.
End of Steps

Example
Figure 6-26 shows the route of the access control cable.
Figure 6-26 Route of the Battery Cabinet Access Control Cable

Figure 6-27 shows the route of the PC8910A (TEC) Access Control Cable.

6-32
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 6 Cable Installation

Figure 6-27 Route of the PC8910A (TEC) Access Control Cable

6.4.3 Installing SFP Cables


This section describes how to install an SFP cable between the BBU in the BC8910A
cabinet and the RSU in theRC8910A or RC8911A cabinet.

Steps
1. Connect one end of the SFP cable to the TX/RX port on the FS board of the BBU in
the BC8910A cabinet
2. Route the cable into the RC8910A or RC8911A cabinet through the cable holes in the
front part on the bottom of the BC8910A cabinet.
3. Connect the other end of the SFP cable to the corresponding TX/RX port on the RSU
board.
End of Steps

Example
Figure 6-28 shows the routes of SFP cables.

6-33
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 6-28 Routes of SFP Cables

6-34
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 7

Installation Checklists
Table of Contents
Overview ....................................................................................................................7-1
Cabinet Installation Check..........................................................................................7-1
Module Installation Check ..........................................................................................7-2
Cable Installation Check.............................................................................................7-2
Other Checks .............................................................................................................7-3

7.1 Overview
This chapter provides the checklists to guide the installation check of the ZXSDR BS8900A
GU360.

7.2 Cabinet Installation Check


Item

Check

Cabinet installation

All bolts and screws in the cabinets, including BC8910A, RC8910A/RC8911A,


and the other auxiliary cabinets, are fastened.
All cabinets are horizontally laid and vertical to the concrete base. The
horizontal and vertical errors are within the allowed range.
The spacing between cabinets and the space reserved for cabinet maintenance
meet the space requirements.
All cabinets, including BC8910A, RC8910A/RC8911A, and the other auxiliary
cabinets, are properly secured without shake.
The rain cap on the top of the cabinet is secured.
The BC8910A cabinet, when it is stacked on the RC8910A/RC8911A cabinet,
has its protective grounding wire connected to the RC8910A/RC8911A cabinet,
and the fastening bolt secured.

Insulation between

All cabinets, including BC8910A, RC8910A/RC8911A, and the other auxiliary

the cabinet and the

cabinets, are insulated from the earth. A multimeter can be used to verify

earth

the insulation.

7-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

7.3 Module Installation Check


Module

Check

Power distribution

All power distribution subracks are properly installed.

subrack
RSU

The RSU is properly installed and secured with fastening screws.


The power wires are firmly connected to appropriate power terminals of the
RSU.
The monitoring cable is firmly connected to the MON interface on the fist RSU
from right to left.
The grounding plate is firmly connected to the RSU.

BBU

The BBU is secured with all bolts fastened.


The green-yellow grounding wire is firmly connected to the ground terminal.
The special power cable is firmly connected to the BBU.

LPU

The LPU is secured with all bolts fastened.


The green-yellow grounding wire is firmly connected to the ground terminal.

7.4 Cable Installation Check


Item

Check

Power wires and

The power wires and grounding wires are properly laid and bound at the

grounding wires

required spacing.
The external AC power wires, which are used in the case of AC power supply,
are properly connected to corresponding power terminals in the BC8910A
cabinet, and secured with fastened screws.
The -48 V power wire and -48 V RTN wire, which are used in the case of DC
power supply, are firmly connected to the PM2 terminal and the PM2 RTN
terminal.
The power cables are fixed and bound through the cable trough inside the
cabinets.
The -48 V DC terminal on the PDM is firmly connected with the blue wire, and
the RTN terminal is firmly connected with the red wire.
The protective grounding wire is firmly connected to the grounding strap.

7-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 7 Installation Checklists

Item

Check

Batteries and ca-

All cables in the cabinet are properly routed and laid.

bles in the RC8910


A/RC8911A cabinet

The red power wire is firmly connected to the positive terminal of the battery,
and the blue power wire is firmly connected to the negative terminal of the
battery.
The monitoring cable is stuck on the surface of the battery with one end firmly
connected to the corresponding interface of the power distribution module.
The heaters (if installed) are properly installed with power wires correctly
connected.

SA cable

The SA cable is firmly connected to the SA interface of the BBU.


The grounding wire of the SA cable is firmly connected to the ground terminal
of the BBU.
The other end of the SA cable is firmly connected to the BBU interface on
the LPU module.

RF jumpers

The RF jumpers are firmly connected to corresponding ANT interfaces.

Optical fiber cables

All optical fiber cables are properly routed and laid.


The optical fiber cable between the BBU and the RSU is properly connected.

RS232 monitoring

One end of the RS232 cable is firmly connected to the RS232/485 interface on

cable

the LPU, and the other end is firmly connected to the X22 interface.

Transmission

The E1 cable is firmly connected to the corresponding interface on the LPU.

cables

The 75 ohm E1 cable with its connector well soldered is properly connected
to the DDF.
The 120 ohm E1 cable (if used) is properly connected to the DDF.
The FE cables, which are used in the case of IP transmission, are properly and
firmly connected. One FE cable is connected to the ETH_0 port of the LPU.
One end (RJ45 connector) of the other FE cable is connected to the BBU_A0
port on the LPU, and the other end (RJ45 connector) is connected to the ETH0
port on the CC board.

7.5 Other Checks


Item

Check

ESD wrist strap

The ESD wrist strap is connected to the jack on the righ of the cabinet.

Labels

All labels with correct contents are properly stuck on the required positions.

Cable holes

All cable holes are well sealed.

7-3
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

This page intentionally left blank.

7-4
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Chapter 8

Ending Works
Before leaving the site, complete the following ending works:
l
l
l
l
l

Clean waste cartons, packing bags, and leftover pieces of cables.


Dispose waste materials according to the local laws and regulations.
Complete the site installation report, and submit the report to the person in charge of
the installation.
If the base station is installed for a running site, inform the OMC or NMC maintenance
personnel of the installation completion.
Lock the door.

8-1
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

This page intentionally left blank.

8-2
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Figures
Figure 2-1 Cabinet Combination (BC8910A + RC8910A + PC8910A) ....................... 2-2
Figure 2-2 Cabinet Combination (BC8910A + RC8911A) .......................................... 2-3
Figure 2-3 Cabinet Combination (BC8910A + RC8910A) .......................................... 2-4
Figure 2-4 The Minimum Dimensions of Concrete Base............................................ 2-5
Figure 2-5 Space Requirements ............................................................................... 2-5
Figure 2-6 Installation Workflow ................................................................................ 2-8
Figure 3-1 Disassembly of the Crate ......................................................................... 3-2
Figure 3-2 Taking Out the Board ............................................................................... 3-4
Figure 4-1 Cabinet Installation Flow .......................................................................... 4-2
Figure 4-2 Fixing the Rain Cap ................................................................................. 4-3
Figure 4-3 Location of Fastening Holes (for Side-by-Side Cabinets) ......................... 4-4
Figure 4-4 Drilling Holes and Mounting Expansion Anchor Bolts ............................... 4-4
Figure 4-5 Removing the Front Panel of the Cabinet Base........................................ 4-5
Figure 4-6 Securing the Cabinet Base ...................................................................... 4-5
Figure 4-7 Verifying the Insulation............................................................................. 4-6
Figure 4-8 Securing the Cabinet on the Base............................................................ 4-7
Figure 4-9 Mounting the Latches on the Base ........................................................... 4-8
Figure 4-10 Pushing the Cabinet............................................................................... 4-9
Figure 4-11 Securing the Cabinet............................................................................ 4-10
Figure 4-12 Removing the End Caps From the Cable Troughs ............................... 4-11
Figure 4-13 Securing the Stacked Cabinet.............................................................. 4-12
Figure 4-14 Removing the Plates From Cable Holes (Upper-Layer Cabinet) ........... 4-13
Figure 4-15 Removing the Plates From Cable Holes (Lower-Layer Cabinet) ........... 4-13
Figure 4-16 Mounting the Assembled Plates on Cable Holes .................................. 4-14
Figure 4-17 Grounding the Stand-Alone Cabinet..................................................... 4-15
Figure 4-18 Grounding the RC8910A Cabinet......................................................... 4-16
Figure 4-19 Grounding the BC8910A Cabinet ......................................................... 4-17
Connecting the ESD Wrist Strap.................................................................................. 5-2
Door-Stop Bar of the Cabinet ...................................................................................... 5-2
Figure 5-1 Installing the RF System Unit ................................................................... 5-4
Figure 5-2 Protective Grounding Wire, Power Cable, and Monitoring Cable
Installed .................................................................................................. 5-5
I
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

ZXSDR BS8900A GU360 Hardware Installation

Figure 5-3 Assembling the Heater............................................................................. 5-7


Figure 5-4 Installing the Heater ................................................................................. 5-7
Figure 5-5 Routing the Power Cable for the Heating Films ........................................ 5-8
Figure 5-6 Mounting the Heating Film ....................................................................... 5-9
Figure 5-7 Securing the Battery Brackets.................................................................. 5-9
Figure 5-8 Installing the Temperature Controllers .................................................... 5-10
Figure 5-9 Routing the Power Cable for the Heating Films ...................................... 5-10
Figure 6-1 Cables Routed Through the Cable Trough ............................................... 6-2
Figure 6-2 Power Distribution In the Case of AC Power Supply ................................ 6-4
Figure 6-3 Power Distribution In the Case of DC Power Supply ................................ 6-5
Figure 6-4 Positions of Cable Holes on the BC8910A Cabinet .................................. 6-6
Figure 6-5 An Installed Waterproof Module ............................................................... 6-9
Figure 6-6 Positions of Cable Holes on the RC8910A Cabinet ................................ 6-10
Figure 6-7 Waterproof Module on the RC8910A Cabinet......................................... 6-11
Figure 6-8 Positions of Cable Holes on the RC8910A Cabinet ................................ 6-12
Figure 6-9 Lower Left Waterproof Module on the RC8911A Cabinet ....................... 6-13
Figure 6-10 Positions of Cable Holes on the PC8910A Cabinet .............................. 6-14
Figure 6-11 Left Waterproof Module on the PC8910A Cabinet ................................ 6-14
Figure 6-12 Right Waterproof Module on the PC8910A Cabinet.............................. 6-15
Figure 6-13 Route of the External AC Power Cable ................................................ 6-16
Figure 6-14 Power Distribution In the Case of DC Power Supply ............................ 6-17
Figure 6-15 Route of GPS Feeders......................................................................... 6-19
Figure 6-16 Route of the E1/T1 Cable..................................................................... 6-20
Figure 6-17 Route of the External Optical Fiber Cable ............................................ 6-21
Figure 6-18 Route of the Ethernet Cable................................................................. 6-22
Figure 6-19 Route of the Dry Contact Input Cable................................................... 6-24
Figure 6-20 Route of RF Jumpers........................................................................... 6-25
Figure 6-21 Route of DC Power Cable to the RC8911A Cabinet ............................. 6-26
Figure 6-22 Routes of the DC Power Cables to the PC8910A Cabinet.................... 6-28
Figure 6-23 Route of the Power Cable to the Fan Subrack in the PC8910A
Cabinet ................................................................................................. 6-29
Figure 6-24 Route of external TEC power cable...................................................... 6-30
Figure 6-25 Route of the Battery Temperature Sensor Cable .................................. 6-31
Figure 6-26 Route of the Battery Cabinet Access Control Cable ............................. 6-32
Figure 6-27 Route of the PC8910A (TEC) Access Control Cable ............................ 6-33
Figure 6-28 Routes of SFP Cables ......................................................................... 6-34
II
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Tables
Table 2-1 ZXSDR BS8900A GU360 Cabinets ........................................................... 2-1
Table 2-2 Cabinet Combinations of the ZXSDR BS8900A GU360............................. 2-2
Table 2-3 Tools and Meters ....................................................................................... 2-6
Table 6-1 Apertures on the Waterproof Modules (Type One) ..................................... 6-7
Table 6-2 Apertures on the Waterproof Modules (Type Two) ..................................... 6-7
Table 6-3 Apertures on the Waterproof Modules (Type Three) .................................. 6-8
Table 6-4 Apertures on the Vent Plug (Type One) ..................................................... 6-9
Table 6-5 Apertures on the Vent Plug (Type Two) ................................................... 6-10
Table 6-6 Apertures on the Waterproof Module (RC8910A)..................................... 6-11
Table 6-7 Apertures on the Lower Left Waterproof Module...................................... 6-13
Table 6-8 Apertures on the Left Waterproof Module ................................................ 6-14
Table 6-9 Apertures on the Right Waterproof Module .............................................. 6-15
Table 6-10 Dry Contacts and Corresponding Signals in the BC8910A
Cabinet .................................................................................................. 6-23
Table 6-11 Dry Contacts and Corresponding Signals in the RC8910A/RC8911A
Cabinet .................................................................................................. 6-23

III
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Tables

This page intentionally left blank.

IV
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential

Glossary
AC
- Alternating Current
AISG
- Antenna Interface Standards Group
ANT
- Antenna
BBU
- BaseBand Unit
DC
- Direct Current
ESD
- Electrostatic Discharge
GPS
- Global Positioning System
LPU
- Line Lightning Protection Unit
NMC
- Network Management Center
OMC
- Operation & Maintenance Center
RSU
- RF System Unit

V
SJ-20110330173733-002|2013-04-26(R1.3)

ZTE Proprietary and Confidential