Standards ensure that materials, methods, and results are specified rather than left to discretionary
practices.
Pa
g
All [CompanyName] construction activities comply with generally accepted good workmanship practices
and industry standards.
ed
Regulatory Codes that may apply to this project include those listed below.
ct
ACI MCP-2
03
ACI 318M
03
Reinforcement Placement
ACI 318M
03
Reinforcement Splices
ACI 318M
03
03
ASTM C 1116/C
1116M
03
03
ASTM C 494/C
494M
03
ACI 305R
03
Se
Description
le
Reference
Standard No.
Division
ACI 305R
03
ACI 117
05
AWS A3.0M/A3.0
05
AWS D1.1/D1.1M
05
Welding standards
AWS B2.1/B2.1M
05
SDI DDP
05
SDI 31
Design Manual for Composite Decks, Form Decks, and Roof Decks
05
AISI SG02-KIT
05
NFPA 211
05
05
CFSEI
26
NFPA 70
26
ICC/ANSI A117.1
26
NFPA 70
26
NFPA 70
26
Workmanship
NFPA 70
26
Telecommunications grounding
TIA-569
26
Telecommunications pathways
TIA J-STD-607
26
NFPA 70E
26
NFPA 780
31
AWWA C600
31
AWS D1.1/D1.1M
31
ASTM D 4873
31
Shoring installation
EM 385-1-1
31
PCI JR-382
es
03
Pa
g
RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts"
ed
ct
le
Se
J. DESIGN CONTROL
Design controls are in place to assure the quality of designs for this project. A design plan is used to
document the design control process. The Design Plan is included as an exhibit in this subsection.
The first control point will be of the review of design inputs. The Design Manager will assure that all
necessary information is available to perform the required design work. The Design Manager will also
assure that expectations for design outputs are well defined.
Intermediate reviews will be carried out as indicated on the design control plan. The last review is the
design output review.
A record of all reviews will be recorded on the Design Review form. A Design Review form exhibit is
included in this subsection.
es
The President has appointed [DesignManagerName] as the Design Manager. [DesignManagerName] will
control the design process with specific quality responsibilities, duties, and the authority to carry them
out. A record of the Design Managers appointment appears in this plan.
Pa
g
DESIGN PLAN
ed
ct
le
Se
The Design Manager reviews the design process project plan with the customer and other interested
parties. The customer approves the plan after any discrepancies are resolved and the plan is agreed upon.
Design work may begin only after the customer approves the plan.
DESIGN REVIEWS
DESIGN INPUT REQUIREMENTS REVIEW
The Design Manager ensures that the information in design inputs clearly defines customer expectations
and that the necessary details are provided to set requirements for design.
The Design Manager obtains design specifications from the customer and conducts a customer design
input review to ensure that:
[CompanyName]
Project Design Process Plan
Version August 14, 2012
Project Name
[ProjectNumber]
Preparer
[ProjectName]
Pa
ge
Design Appointments
Date
Project ID
Design Manager
Designer(s)
Design QC Reviewer
Work in Process
Review:
Final Design Review:
ct
Work in Process
Review:
le
Work Task
Se
Ref#
ed
Review participants
QUALITY MANUAL
TABLE OF CONTENTS
1. Quality System Management and Responsibilities ............................................................................... 6
1.1. Overview .............................................................................................................................................. 6
1.2. [CompanyName] Quality Policy ........................................................................................................... 6
1.3. Quality Duties, Responsibilities, and Authority ................................................................................... 6
1.4. Quality System Performance Measures .............................................................................................. 9
1.5. Customer Satisfaction Performance Measures ................................................................................... 9
1.6. Exceptions............................................................................................................................................ 9
es
ct
ed
Pa
g
le
Se
Pa
g
es
ct
ed
le
Se
es
Pa
g
Se
le
ct
ed
7. PROCESS CONTROLS
HOW WORK IS CARRIED OUT
7.1. OVERVIEW
The construction process plan defines how project work is to be done and approved for the overall
project. The construction process plan is communicated to all key personnel, subcontractors and suppliers
in a startup meeting. As the project proceeds, work task plans provide additional details of how each
individual work task is carried out. Work tasks planning meetings are used to communicate expectations
of the work task plan to key personnel responsible for carrying out the work task.
es
ct
ed
le
Pa
g
Prior to the commencement of work, the Project Manager holds a meeting to discuss and coordinate how
project work will be performed and controlled. Key personnel from [CompanyName], subcontractors and
suppliers meet to review expectations for project quality results as well as quality assurance and quality
control policies and procedures including:
Se
In preparation for the start of an upcoming work task, the Superintendent reviews an integrated and
coordinated set of documents that collectively define quality requirements for the work task including:
Pa
g
ed
ct
es
During the meeting, the Superintendent communicates the work task quality requirements and reinforces
heightened awareness for critical requirements. Topics for a work task quality plan meeting include:
le
Se
The Superintendent conducts a meeting with key company, subcontractor and supplier personnel
responsible for carrying out, supervising, or inspecting the work, and interested customer representatives.
The meeting is held on a nominal weekly schedule. During the meeting, the Superintendent facilitates
coordination among the participants, communication among the participants, and reinforces heightened
awareness for critical requirements.
The Superintendent maintains a record of the meeting event on the Daily Quality Control Report.
LIBRARYOFINCLUDEDQA/QCPLANFORMS
MILITARYFORMS:
PreparatoryPhaseChecklist
InitialPhaseChecklistForm
ContractorProductionReport
ContractorQualityControlReport
TestingPlanandLog
le
ct
ed
Pa
g
PointOfContactListForm
ProjectQualityCommunicationsPlanForm
QualityManagerAppointmentLetterForm
ProjectManagerAppointmentLetterForm
SuperintendentAppointmentLetterForm
ProjectPersonnelResumesForm
TrainingPlanForm
TrainingLogForm
ProjectDesignProcessPlanForm
DesignReviewForm
ControlledMaterialsForm
MetalsMaterialReceivingInspectionReportForm
MaterialInspectionandReceivingReportForm
QualityInspectionandTestPlanForm
TestEquipmentCalibrationPlanandLogForm
QualityControlledWorkTaskListForm
DailyProductionReportForm
WorkTaskInspectionForm
PunchListForm
ProjectLicenseandQualificationsForm
ProjectOrganizationChartForm
ProjectPersonnelQualificationForm
PersonnelCertificationsandLicensesForm
SubcontractorAndSupplierQualityCommunicationsPlanForm
ProjectQualityTrainingPlanForm
ProjectQualityRecordsPlanForm
ProjectSubmittalsScheduleandLogForm
ProjectSubmittalForm
ChangeOrderForm
ProjectDesignProcessPlanForm
ProjectRegulatoryBuildingCodesForm
Se
es
STANDARDFORMS:
es
LaboratoryQualificationForm
SubcontractorAndSupplierQualificationForm
SubcontractorAndSupplierCertificationsandLicensesForm
SubcontractorAndSupplierQualityControlPolicyRequirementsForm
ProjectStartupMeetingForm
WorkTaskQualityAssurance/QualityControlPlanForm
WorkTaskQualityControlPlanningMeetingForm
MonthlyQualityControlReportForm
InspectionandTestReportForm
ProjectCompletionInspectionForm
NonconformanceReportForm
NonconformanceReportControlLogForm
CorrectiveActionReportForm
TrainingRecordForm
JobsiteQualityReviewPlanningandLogSheetForm
QualitySystemAuditForm
SystemDocumentControlForm
ProjectRecordsControlForm
Pa
g
Se
le
ct
ed
[CompanyName]
Nonconformance Report
Nonconformance Report
Control ID
Project ID
Project Name
[ProjectNumber]
[ProjectName]
Replace
Repair
Use As-is
Pa
g
Disposition
Rework
es
No
ed
Corrective Actions
ct
No
Preventive Actions
Se
le
Name/Date:_________________________
Inspection Forms
Available by Division Sections
MASONRY
ed
ct
le
METALS
Metal Decking
Metal Railings
Metal Stairs
Structural Steel Framing
Se
WOOD/PLASTICS/AND COMPOSITES
Applied Fireproofing
Blanket Insulation
Board Insulation
Dampproofing and Waterproofing
Exterior Insulation and Finish Systems
Firestopping
Flashing and Sheet Metal
Joint Protection
Membrane Roofing
Thermal and Moisture Protection-Roof
Accessories
Thermal and Moisture Protection-Roof
and Deck Insulation
Thermal and Moisture Protection-Roof
Panels 07.41.00
Roof Tiles
Roofing and Siding Panels
Sheet Metal Roofing
Shingles and Shakes
Siding
Wall Panels
Weather Barriers
es
Pa
g
CONCRETE
Sep2011
Phase:
Contract#:
Organization:
Crew:
9101
Field Operations
FTQ 2TQ
stamps 1035
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
water 1038
ed
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
le
5 4 3 2 1
Se
Quality
ct
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
OPENINGS
Door Hardware
Doors and Frames
Glazing 08.80.00
Louvers and Vents
Unit Skylights
Windows
FINISHES
Pa
g
ct
le
FIRE SUPPRESSION
HVAC
ed
Access Flooring
Acoustic Treatment
Acoustical Ceilings
Backing Boards and Underlayments
Carpeting
Masonry Flooring
Painting and Coating
Plaster and Gypsum Board
Resilient Flooring
Stone Facing
Terrazzo Flooring
Textured Ceilings
Tiling
Wall Coverings
Wood Flooring
Se
es
PLUMBING
Phase:
Contract#:
Vendor:
Feb2012
Crew:
9101
Field Operations
FTQ 2TQ
1537
1538
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
Notes:
ct
5 4 3 2 1
Se
le
Quality
ed
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
COMMUNICATIONS
le
Audio-Video Communications
Cable Trays for Communications
Systems
Communications Backbone Cabling
Communications Equipment Room
Fittings
Data Communications
Structured Cabling
Voice Communications
Se
EARTHWORK
Pa
g
ed
ct
es
ELECTRICAL
Bored Piles
Caissons
Clearing and Grubbing
Driven Piles
Excavating and Fill
Grading
EXTERIOR IMPROVEMENTS
Base Courses
Curbs// Gutters// Sidewalks// and
Driveways
Fences and Gates
Flexible Paving
Irrigation
Planting
Retaining Walls
Rigid Paving
Feb2012
Phase:
Contract#:
Vendor:
Crew:
9101
Field Operations
FTQ 2TQ
waterproofed 1636
System 1637
connections 1640
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
Notes:
ct
5 4 3 2 1
le
Quality
ed
Se
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
UTILITIES
le
ct
ed
Pa
g
es
Culverts
Public Water Utility Distribution Piping
Sanitary Utility Sewerage Force Mains
Sanitary Utility Sewerage Piping
Storm Drainage Structures
Storm Utility Water Drains
Subdrainage
Water Utility Distribution Equipment