8

Cumulative
Oustanding

Cleared
TOTAL

closed

Warranty
Punch List
Issued

closed

Operational
Handover PL
Issued

closed

SCADA /
TELECOM
Issued

closed

MECH /
PIPING
Issued

closed

INST /
AUTOMATION
Issued

closed

HVAC / BLDG
SERVICES
Issued

closed

Issued

closed

Issued
8

TOTAL

2/5/2016

Cumulative
AS Oustanding
BUIL
T

RLM

TOTAL
Cleared
AS
BUIL
T

RLM

AS
BUIL
T

SCADA /
TELECOM
RLM

AS
BUIL
T

SAFETY / LOSS
PREVENTION
RLM

AS
BUIL
T

PROCESS

RLM

AS
BUIL
T

MECH /
PIPING
RLM

AS
BUIL
T

INST /
AUTOMATION
RLM

HVAC / BLDG
SERV
AS
BUIL
T

ELECTRICAL

RLM

CIVIL /
STRUCT

AS
BUIL
T

ARCHITECTURE

RLM

Contract Start date


7/5/2014

DISCPLINE WISE RED LINE MARK UPS & AS BUILTs REVIEWED & Endorsed

AS
BUIL
T

Al Musaine

673

ELECTRICAL

RLM

Security Bldgs /Boundary LS

CONTRACTOR

580

CIVIL /
STRUCT

AS
BUIL
T

PROJECT / CONTRACT

2/5/2016

WEATHER: Sunny & Hot

TOTAL

5/8/2016

Sr
No

Actual Period on
30 June 2015
(days)

7/5/2014

Contract Period
(days)

Al Musaire

DATE: 30-June-2015
DISCIPLINEWISE PUNCH ITEMS

RLM

Security Bldgs /Boundary LS

CONTRACTOR

Completion date
(post
VTC)

PROJECT / CONTRACT

Completion date
(post VTC)

Sr
No

Contract Start
date

DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 1)

Security Bldgs /Boundary LS

Al Musaire

Cumulative
Oustanding

Cleared
TOTAL

Closed

SCADA / TELECOM
Received

Closed

SAFETY / LOSS
PREVENTION
Received

Closed

PROCESS
Received

Received

Closed

Received

MECH / PIPING
Received

INST /
AUTOMATION
Closed

HVAC / BLDG
SERVICES
Closed

ELECTRICAL
Closed

2/5/2016

30-June-2015

Received

7/5/2014

CIVIL / STRUCT
Closed

CONTRACTOR

DATE:
DISCIPLINEWISE Daily RFIs Inspection

Received

PROJECT / CONTRACT

Completion date
(post VTC)

Sr No

Contract Start date

DAILY CONSTRUCTION PROGRESS REPORT ESR DIVISION - RAS LAFFAN (summary sheet 2)

39

TOTAL

AS
BUILT

RLM

Closed

TOTAL
Cleared
Receive
d

Closed

SCADA / TELECOM

Receive
d

Closed

SAFETY / LOSS
PREVENTION
Receive
d

Closed

PROCESS

Receive
d

Closed

MECH / PIPING

Receive
d

Closed

INST /
AUTOMATION
Closed

HVAC / BLDG SERV

Receive
d

Closed

Receive
d

Closed

Al Musaire
TOTAL

Receive
d

Security Bldgs /Boundary LS

ELECTRICAL

CONTRACTOR
Closed

PROJECT / CONTRACT

Receive
d

Sr No

CIVIL / STRUCT

Receive
d

ARCHITECTURE

Cumulative
Oustanding

DAILY DOSSIERS & DOCUMENT (in ASSAI) REVIEWED & Endorsed


DISCIPLINE

DAILY CONSTRUCTION REPORT (Contractor : AL MUSAIRIE)

DATE: 30-

Contract No. GC - 13 111100 EPIC for Security Buildings and Boundary & Landscaping Works

CIVIL / STRUCTURAL
Sr. Staf

3
1

Sr. Supervisor

Foreman

MANPOWER
Chargehand Skilled Labour

10
7
5
32
Temporary works (Milestone 1)

Operators /
Drivers

Unskilled
Labour

15

54

Work Completed

Gate Security Building (Milestone 2)


Rock excavation up to blinding level in progress. 96% complete

Dewatering in progress
Boundary Fence
Setting-out of line posts in progress (280 nos. out of 946 nos.)

4
5

Excavation/compaction of line post footing in progress (87 nos. out of 946 nos.)
PCC Completed for Fence Boundary Line post foundations ( 50 nos. out of 946 nos.)
Curing is going on in Lean concrete of said casted area ( from Pt.8 to Pt.9)
Ground Improvement
Site grading in progress (800 meters out of 2849 meters)
Canopy Area
Removal of existing interlock paving in progress (70% Completed)

Next Day Activity(01-07-2015):


a. Compaction and Subgrade preparation of Line post footings(50 nos)
b. Excavation and site preparation for Plate load bearing test on GS Building.
c. Removal and shifting of interlock in Canopy area(15% has to be finished)
d. Excavation of line post foundations from Pt. 9 to Pt.12.(40 Nos)
e. Excavation of fence gate foundation in MS02.

Note:
1. Excavator was breakdown @10 A.M., that's why we could not complete excvation in GSB area.
Areas of Concern:

RIE)

10

DATE: 30-June-2015

caping Works

MANPOWER
Subcontractor

TOTAL

126

87 nos. out of 946 nos.)


ns ( 50 nos. out of 946 nos.)
( from Pt.8 to Pt.9)

s)

1-07-2015):
ootings(50 nos)
g test on GS Building.
% has to be finished)
2.(40 Nos)

mplete excvation in GSB area.