Professional Documents
Culture Documents
V
L
Cw
Cf
T
D
h0
C
s
l
Ka2
Ka
f
Psl
t0
At field
V
L
Cw
Cf
T
D
h0
C
s
l
Ka2
Ka
f
Psl
t0
10 knots
235
10.23
4
34
8m
22.6 m
14.6 m
0.53
0.85
1
0.85
0.79
355
426.9
10.13228
0 knots
235 m
10.23
2.5
34
15 m
22.6 m
7.6 m
1.00
0.9 m
0.9 m
1
0.72
355 N/mm2
397.6
9.496846
Zg
Sg
np
fy
Km
Psl
0.85
0.8
355
12
600 kN/m^2
Delta
L
B
T
127461 MT
234 m
42 m
14.97 m
Cw
h0
C
alpha
beta
V
Cv
Cv1
10.21381
0.742
1
0.994838 rad
0.59341 rad
8 knots
0.2
0.8
a0
Cb
theta
0.290946
0.845214
0.086057 rad
kr
GM
Tr
k
c
phi
13.47
3.86
13.7121
1
0.907198
0.387691 rad
gamma
Cf
0.147813
3.28675
psl
659.9975 kN/m2
67.27804 Mt/m2
11
22.21307
0.273
10 0.174533
116.25
S
5.15
V
8
D
0.273
Where ,
Displacement,
L
B
T
Load Point
z
h0
Top of ship side
f
y
127461 MT
234 m
42 m
14.97 m
22.6 m
14.97 m
7.63 m
22.6 m
7.63 m
14.6 m
a
Cb
ks
Cw
kf
1.00
0.85
6.98
10.21
7.63
Pl
78.95 kN/m2
Pdp
95.80 kN/m2
P1
54.62 kN/m2
Local Scantlings as per DNV Rules for ships Pt.3 Ch.1 Sec.10
Plate Thickness
Ka
s
f1
1
0.825 m
1.39
222.4 N/mm2
54.62 kN/m2
t
C
6 mm
P1
<given, 15mm, Ok
l
s
Z
3.02 m
0.825 m
185 cm^3
S
b
wk
3.02 m
2m
447 cm^3
1
<given,1410.56 cm^3, ok
coservative design )
Where ,
Displacement,
L
B
T
Load Point
z
h0
Top of ship side
f
y
127461 MT
234 m
42 m
15.3 m
22.07 m
15.3 m
6.77 m
22.12 m
6.82 m
12.98 m
a
Cb
ks
Cw
kf
0.80
0.83
5.50
10.21
6.82
Pl
63.04 kN/m2
Pdp
78.01 kN/m2
P1
34.78 kN/m2
Local Scantlings as per DNV Rules for ships Pt.3 Ch.1 Sec.10
Plate Thickness
Ka
s
f1
1
0.306 m
1
160 N/mm2
34.78 kN/m2
t
C
2 mm
P1
<given, 17mm, Ok
l
s
Z
4m
0.306 m
106 cm^3
Green water and wave run up forces acting on the Offloading Hose
Platform structure shall be considered (structure goes more than
4275 mm below main deck and at this point green water and run
up forces acts on the structure).
Green sea loads and Wave slamming loads on the riser balcony
structure are considered as presented in the document-"TO-TMSTR-207-A0 TECHNICAL MEMO ON OFFLOADING HOSE
PLATFORM SLAMMING AND GREEN SEA LOADS". The revised
design report will be updated accordingly.
AVS to include "P1501-TOS-70000-MO-CL-0030 Offloading Hose Noted. The revised drawing will be updated accordingly.
Platform Structural Analysis" as reference document in both pages
of the drawing