You are on page 1of 3

Dulaang UP

Tisoy Brown: Hari ng Wala


Direction: Jose Estrella
Scope of Work:
(As of January 12, 2016)
METAL WORK
SET PIECE
1. Fabrication of Oceans Bar Table Frame
2. Fabrication of Street Sign with Cone Stand
3. Fabrication of Triangle Sign
4. Fabrication of Tree A
5. Fabrication of Cross Road B
6. Fabrication of Bilanggo Bridge

SPECIFICATIONS
2 x 2 metal frame
8 x 2 metal pole
8 x 2 metal pole with base covered with plywood
9 x 1 metal pole with base covered with plywood
8 x 1 metal pole with base covered with plywood

QTY
2
1
3
1
3
1

SPECIFICATIONS
6 x 6 wooden frame
4 x 6 wooden frame
6 x 6 wooden frame
2 x 1 covered with plywood
1 x 3 wooden frame with plywood
1 x 3 x 3 wooden frame with plywood
thick plywood, 2 x 2 platform
thick plywood, 7 x 3 decorative door
3 x 2 wooden frame
4 x 15 wooden frame (carved) plywood
1 x 4 wooden frame
7x 7 wooden frame with platform
6 6x 6 6 wooden frame with hinges
1ft. 1/2 ht, (2ft.1/2 ht, head board) 3ft. X 6ft.
3 x 4 (front), 3 x 3 (side A), 3 1 (side B) wooden
frame covered with thick plywood
7 x 6 curved wooden frame
7 x 6 curved wooden frame
7 x 8 with 3 width opening
8 x 2 wooden pole
7 x 2 wooden pole
6 x 2 wooden pole
4 x 2 wooden pole

QTY
2
1
1
3
5
3
2
1
2
1
2
1
2
1
1

CARPENTRY
SET PIECE
1. Fabrication of Kubo ni Tasing (front)
2. Fabrication of Kubo ni Tasing (side)
3. Fabrication of Kubo ni Tasing (top)
4. Fabrication of Cone Stand
5. Fabrication of Oceans Bar Chair
6. Fabrication of Oceans Bar Stool
7. Fabrication of Oceans Bar Table
8. Fabrication of Oceans Bar Door
9. Fabrication of Oceans Bar High Stool
10. Fabrication of Oceans Bar Signage
11. Fabrication of Bench Seat and Back Rest
12. Fabrication of Circular Bed
13. Fabrication of Bahay ni Tisoy
14. Fabrication of Papag
15. Fabrication of Airplane Bar
16.
17.
18.
19.
20.
21.
22.

Fabrication of Airplane Window


Fabrication of Airplane Door
Fabrication of Cockpit Entrance
Fabrication of Tree B
Fabrication of Tree C
Fabrication of Tree D
Fabrication of Tree E

INSTALLATION AND ASSEMBLY


1. Installation and assembly of Bilanggo Bridge
2. Installation of Cyclorama
3. Installation of Oceans Bar Signage (fly system)
4. Installation of Payong (fly system)
5. Installation of Death Scene Cradles (fly system)
6. Assembly of Kubo ni Tasing (frame + sawali and pawid)
7. Assemby of Kubo ni Tisoy (Frame + Branches)
8. Assembly of Foam Bed + Katsa
9. Assembly of Circular Foam + Katsa

1
1
1
1
2
2
1

10. Assembly of Rosa Bed + Katsa

DETAILING AND FINISHING


1. Cross Road A detail
2. Oceans Bar Signage detail
3. Triangle Signage detail
4. Bench Seat and Back Rest detail
5. Payong Leaves and finishing touches
6. Airplane Set Pieces detail
a. Cockpit Entrance
b. Window
c. Bar
7. Jute Sack Tree detail
8. Vine detail
9. Estandarte detail
10. Sugo Throne detail
11. Sign Montage detail
12. Sibuyasan detail

PAINTING
1. Paint all set pieces
a. Furniture
b. Signage
c. Tree
2. Paint floor
3. Paint Guerrero Stage

OTHERS
1. Oceans Bar Signage Wiring and lighting

INGRESS/ EGRESS
1. Ingress of the set.
2. Strike after the last show.
* Total of Six (6) crew per construction day
(1 foreman / 2 skilled welders for metal work / 2 skilled carpenters and one helper for carpentry)
* Total of 14 days of work.
(7 days of metal work and carpentry, 1-day ingress, 5 days for installation, assembly and
detailing. 1-day for egress)

Prepared by:

GABO TOLENTINO
Technical Director
Tisoy Brown: Hari ng Wala
ENZO B. ABUSTAN
Deputy Production Manager for Backstage
Tisoy Brown: Hari ng Wala
Noted by:
MELITON CATAHAN ROXAS JR.
Resident Technical Director

Dulaang UP