You are on page 1of 4

Page 1 of 4

Client
Contractor
Procedure No.

M/S. INDIAN OIL CORPN. LTD. PJPL PROJECT, PANIPAT


M/S. INDCON PROJECTS & EQUIPMENT LTD., NEW DELHI

INDCON-PJPL-STN-PNP-CIVIL-07

PROCEDURE
FOR
ANTITERMITE TREATMENT

20.08.07

Anuj

Vijay

GSB

REV. NO.

DATE

DRN. BY

CHKD.BY

APPV.BY

Approved (IOCL)
Page 2 of 4

PROCEDURE FOR ANTITERMITE TREATMENT


CONTACT NO: -

17614132 dated 28-07-2007 for combined Civil, Mechanical,


Electrical, & Instrumentation works at Kohand, Nabha and
Jalandhar stations of PJPL project.

PROCEDURE NO: - INDCON-PJPL-STN-PNP-CIVIL-07


Antitermite treatment shall be carried out as per I.S. 6313 (part-1981) and as mentioned
herein below:

Materials:Any one of the following chemical in water emulsion shall be used.


Name of chemical

Concentration by volume

Chloropyrifos
Emulsion concentrate

1.0

Pre-construction chemical treatment:


This is a process in which chemical treatment is applied to a building in the early stages
of construction. Hand operated pressure pump shall be used for uniform spraying of the
chemical. To have proper check for uniform spraying of chemical, graduated containers
shall be used, proper check shall be kept that the specified quantity of chemical is used
for the required area during the operation.

Treatment for masonry foundations & Basement:


The bottom surface and the sides of the excavations made for masonry foundations &
basements shall be treated with the chemical at the rate of 5 liters per sq.m of the surface
of the sub-structure for each side. If water is used for ramming the earth fill, the chemical
treatment shall be carried out after the ramming operation is done by rodding the earth at
150 mm centers close to the wall surface and spraying the chemical with the above
dosage. The earth is usually returned in layers and the treatment shall be carried out in
similar stages. The chemical emulsion shall be directed towards the concrete surfaces of
the columns and the walls so that the earth in contact with these surfaces is well treated
with the chemicals.

Page 3 of 4

Treatment for RCC Foundation and Basements:


In the case of R.C.C framed structures with columns and plinth beams and R.C.C
basement the concrete mix is rich and dense so the treatment shall start at a depth of 500
mm below finished ground level. From this depth the back-fill around the columns,
beams and R.C.C. Basement walls shall be treated at the rate of 7.5 litres/sqm of the
vertical surface.

Treatment of top surface of plinth level:


The top surface of the filled earth with in plinth walls shall be treated with chemical
emulsion at the rate of 5 liters per sq.m of the surface before the sand is laid. Holes up to
50 to 75 mm deep at 150 mm centers both ways shall be made with crow bars on the
surface to facilitate saturation of the soil with chemical emulsion.

Treatment of junction of wall and the floor:


To achieve continuity of the vertical chemical barrier on inner wall surfaces from the
ground level, small channel 30 x 30 mm shall be made at all the junctions of wall and
columns with the floor and rod holes made in the channel up to ground level 150 mm
apart and the chemical emulsion poured along the channel @ 7.5 litres/sqm of the vertical
wall or column surface so as to soak the soil to bottom. The soil shall be tamped back in
to place after this operation.

Treatment of soil along external perimeter of building:


After the building is constructed, treatment of surrounding shall be antitermite protection
by providing holes in the soil with iron rods along the external perimeter of the buildings
at intervals of about 150 mm and depth 300 mm and filling these holes with chemical
emulsion at the rate of 7.5 liters per square meters of vertical surfaces.

Page 4 of 4

INSPECTION & TEST PLAN FOR ANTITERMITE TREATMENT


Project
: Panipat Jalandhar Pipeline Project.
Client
: M/S. INDIAN OIL COPRN. LTD. ( Pipeline Division, NRPL )
Contractor : M/s. Indcon Projects & Equipment Ltd., New Delhi.
Doc. No.: INDCON-PJPL-STN-PNP-CIVIL-07
S.N
O.
1.
2.

Activity Description
Identification of antitermite chemical
Check surface

W
RM
R

Verification by
IOCL

W
W

R
W

Records to be
maintained
by INDCON
Register
Register

- Witness
- Random Check
- Review Documents

07.09.07

Rev.

Date

Inspection by
INDCON

For review &


Approval
Description

Prepared by
(INDCON)

Checked by
(INDCON)

Approved
by
(INDCON)

Reviewed &
approved by IOCL