You are on page 1of 4

Analysis Of Work Diary Sheets For Students in Quantity Surveying Programme

Note: Write total hrs per day/week work on certain area.

STUDENT NAME:
AREA OF APPROVED INDUSTRIAL TRAINING EXPERIENCE
FEASIBILITY STAGE
Preparation and use of cost analysis
Preparation of estimate from sketch plan to detailed drawing
Preparation and use of cost plan
Value management/engineering including comparative design
economics
Cost checking during the development of design
Contractual and tendering arrangements in the context of early advice
TOTAL
PRE-CONTRACT STAGE
Preparation of documentation of B.Q and other Tender Documents
for Main Contracts, Sub-Contract or Contracts of Supply
Measurement, Estimating and Pricing for Tenders
Value management/engineering including comparative design
economics
Preparation of specification and/or schedule of rates
Data processing associated with the preparation of documentation
Detailed compilation and analysis of unit rates/preliminaries
Selection and evaluation of tenders and reporting on tenders
Project liaison meeting with employers and consultants
Prequalification, evaluation and registration of contractors
TOTAL
POST CONTRACT STAGE
Preparation and documentation of B.Q and other tender documents for
main contracts, sub-contracts or contracts of supply including
rationalization of contract rates
Application of cost control during the progress of works
Value management/engineering including preparation of cost /benefit
reports upon alternative construction methods
Analysis of contracts pricing relative to cost recording methods.
Preparation of interim valuations
Preparation of variation order and final accounts
Project liason meeting with employers and consultants
Site surveys and measurement and attendance at site meetings
TOTAL

Matrix no: BEQ


Code of
training
area
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.3.7
1.3.8

Training Weeks
2
3

Total for
4 weeks

Training Weeks
2
3

Total for
4 weeks

Training Weeks
2
3
4

Total for
4 weeks

Grand Total

Analysis Of Work Diary Sheets For Students in Quantity Surveying Programme (contd)

Note: Write total hrs per day/week work on certain area.

STUDENT NAME:

Matrix no: BEQ

AREA OF APPROVED INDUSTRIAL TRAINING EXPERIENCE


CONSTRUCTION MANAGEMENT AND RESOURCE PROCUREMENT
Planning and programming of construction activities
Site planning
Management of resources and supervision works
Liaisons with employers, consultants, statutory and service authorities
Resource determination, scheduling and purchasing
Procurement of labour, plant and material
Negotiation with and ,arrangement of sub contractors and suppliers
TOTAL
MISCELLANEOUS
Computer software development relating to Quantity Surveying
Production of cost/quality control/time standard and operational methods
Arbitration/litigation/mediation/alternative dispute resolution
Insurances
Management and maintenance of buildings
Training
Office management including resources, allocation and fees
Technical seminars and symposiums
Facilities management
Risk management
Environmental impact studies
Oil, gas and heavy industry
Other specialization (students to specify specialization below :)

TOTAL

Code of
training
area
1.4
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
1.4.6
1.4.7
1.5
1.5.1
1.5.2
1.5.3
1.5.4
1.5.5
1.5.6
1.5.7
1.5.8
1.5.9
1.5.10
1.5.11
1.5.12

Training Weeks
2
3

Total for
4 weeks

Training Weeks
2
3

Total for
4 weeks

Training Weeks
2
3
4

Total for
4 weeks

Grand Total

EXAMPLE of FILLED LOG BOOK


WEEK NO:
Date
7-05-2007

8-05-2007

1
8.30am
11.30am
2.30pm
8.30am
2.00pm

DATE:
Time
10.30am
1.00pm
6.30pm
1.00pm
6.00pm

Diary Log Sheet


Nature Of Professional Work Carried Out
Site visit to Damansara Project site
Assessing additional works for Damansara project.
Quantification and preparing list of material on site for Damansara Project
Continuing quantification and preparing list of material on site for
Damansara Project
Estimation for Kementerian Pertahanan Project.

Code Of Training Area


1.3.8
1.3.6
1.3.5
1.3.5

Remarks/Comments

1.2.2

Supervisors /Employers Remark

Supervisors/Employers
Name and Signature

Students Signature
WEEK NO:

DATE:

to

Diary Log Sheet

Date

Time

Nature Of Professional Work Carried Out

Code Of Training Area

Supervisors /Employers Remark

Supervisors/Employers
Name and Signature

Students Signature

Remarks/Comments

You might also like