You are on page 1of 5

ESTIMATE OF AQUEDUCT

SL No.

Item of Work
Earthwork in excavation of foundation treanches in hard soil
(vide classification of soil item-A), disposal of excavated earth
so obtained to a distance upto 50m and average lift of 1.5m
including leveling, ramming and foundation treanches ,
removing the roots and shurbs etc all complete as per
specification and direction of E/I (7.1.17)

Earthwork in filling foundatioon trenches and back filling of


structures in layers not exceeding 150mm thick well watered,
rammed and compacted and finally dressed with suitable
earth obtained from excavation of foundation trenches and
placed in suitable profile within a lead of 30mm and lift of
1.50 m complete job as per specification and direction of E/I
(7.1.9)

Providing and laying PCC of RCC M200 with nominal mix of


1:1:5:3 in foundation of various components of canal or
embankment structures with approved quality of 40mm
graded course aggregate of required grade (as per design)
and approved quality of sand of requisite FM(2.5 to 3)
washed and screened including necessary tools and plants,
vibrating, curingroyalty and all taxes excluding cost of form
work as well reinforcement, its curing bending, bindingand
placing complete job as per specification and direction of E/I
(7.3.5)

Providing and laying PCC of RCC M-250 with nominal mix of


(1:1:2) in super structure of various components of canal or
embankment structures with approved quality of 40mm
graded course aggregate of required grade (as per design)
and approved quality of sand of requisite FM(2.5 to 3)
washed and screened but including necessary tools and
plants, vibrating, curing royalty and all taxes etc excluding
cost of form work as well reinforcement its curing bending
and placing complete job as per specification and direction of
E/I (7.3.11)

Providing TMTreinforcement as per approved design, drawing


removal of rust, cutting, bending, binding, including
supplying annealed wire, placing m.S. rods in position all
complete as per specification and direction of E/I
Supplying fitting and fixing rubber seal (water stop) of
approved quality of construction joints complete job as oer
specification and direction of EI (7.8.2)
Total
Dewatering @ 1%
Contingencies @ 1%
Grand total

canal discharge=0.9825 cumecs


high flood discharge=18 cumecs
Amount
Unit Quantity Rate
(in lakh)

m3

20.79

72

0.0149688

m3

7.1

72

0.005112

m3

68.6

6172.7 4.23448592

m3

24.43

7689.4 1.87851309

Tonnes

3.6519

46253 1.68910089

20

113

0.0226
7.8447807
0.07844781
0.07844781
8.0016763

Quantity of Aquaduct
Sl. No.
1(a)
1(b)
1( c)
2(a)

Description of Work
Earthwork for upstream &
downstream abutment
Earthwork for Piers
Total Earth Works

No.

L(m)

B(m)

H(m)

2
1

3
2.5

3.78
3.78

0.5
1

2.5

3.28

0.5

3.28

0.5

2(b)

RCC abutment below Ground Level


RCC Pier below ground level for
foundation (M-15)

2( c)

RCC Pier below ground level for


rectangular portion

1.28

0.5

2(d)

RCC pier below Ground Level for


semi-circular portion (2*3.14*r*h)

3.14

0.5

0.5

2(e)
2 (f)

Total RCC below Ground Level


Earth Filiing=1( c)-2(e)

3(a)

1.25

3.28

4.35

3(b)

RCC for Abutment above Ground


Level
RCC for Pier above Ground
Level(Rectangular Portion)

1.28

4.35

3( c)

RCC for Pier above Ground Level for


semi-circular portion

3.14

0.5

4.35

1
2

23
23

1.28
0.34

0.34
0.9

3 (d) Total RCC (M-20)


4 (a)
4(b)
4 (b)
4(d)

Quantity of base clab


Quantity of side wall
Total Volume of RCC (M25) in
upstream and downstream end of
flumed
canal of RCC M-25 for
Total Volume
canal portion (Details
attached)

Quantity m3 Remarks
11.34
9.45
20.79
8.2

M-15

3.28

M-15

0.64

M-20

1.57
13.69
7.1

M-20

35.67

M-20

5.568

M-20

13.659
54.897

M-20

10.0096
14.076

M25

0.34
24.4256

Sl. No.

Details of RCC Quantity in upstream and downstream in flumed canal


Description of Work
No.
L(m)
B(m) H(m)

Area of Flumed RCC Rectangular Channel


1
1(a) Area of vetical wall
1(b) Area of Base Slab
Total Area of Flumed RCC Rectangular
1( c) Channel (B1)= Area of Verticle wall + Base
Slab
2
Area of strip of Trapezoid
2 (a) Inner Area= (0.8+3.5)/2 * H(m)
2 (b) Outer Area = (0.845+3.77)/2 * H(m)
Total Area of strip of Trapezoid (B2)= 2(b)-2(a)
3

Volume of RCC concrete M-25 in upstream


side
B1 = Area of Rectangular portion
B2 = Area of Trapezoid portion
V1 = Volume of RCC in u/s of flumed canal
V2 = Volume of RCC in d/s of flumed canal
D1 = Distance between B1 and B2 in u/s= 0.2
V1 = (B1 + B2)/2 * D1
D2 = Distance between B1 and B2 in u/s= 0.3
V2 = (B1 + B2)/2 * D2
Total Volume of RCC(M25) in u/s & d/s of
flumed canal = V1 + V2
Approx (Volume)

2
1

0.34
1.28

1
1

2.15
2.3075

0.9
0.34

0.9
0.975

flumed canal
Area (m2) Volume
(m3)
0.612
0.4352
1.0472

1.935
2.249813
0.31481

0.135
0.2023

0.3373
0.34