TOROYACO 4

Elevations (ft)

Schema
1734
Gr
1

KB

1718.6

17 1/2" Hole @ 1468'


13 3/8" Csg. @ 1381.3'
13 3/8"Float collar@1383.2'
13 3/8" Csg. @ 1465.9'
13 3/8" Shoe @ 1468'

Kb-Gr

15.4

1
2
1
2
1
1
1
1
1
1

3
12 1/4" Hole @ 6858'
9 5/8" Csg. @ 6858'
9 5/8" Shoe @ 6858'
Cement

Country
Region
Field

0
0

V
V

1
2
3
4
5
6
7
8
9
10
11
12

V
V

9
12

Contract

Dates
CPR Santana

N
603.507.91
E
1.063.324.21
X-mas Tree Desing
Equipment
Description
Tubing Head
FP-TC 13 5/8" 3M R-57 x 11" 5M R-54 and W/2 2 1/1
Gate Valve
2 1/16" 5M R-24 marca Bartn
Companion Flange
2 1/16" 5M x 2" LP
Gate Valve
2 9/16" 5M R27 marca Bartn S/N13440-0003 (mast
Gate Valve
2 1/16" 5M R24 marca Bartn
Tee studded
2 9/16" 5M R27 x 2 1/16" 5M
Bottom hole test adapter 2 9/16" 5M R-27 x 2 7/8" EUE S/N 95112494
Companion Flange
2 1/16" 5M x 2" LP
Needle valve MF
0-10.000 psi x 1/2" npt
Pressure gauge
0-3000 x 1/2" npt

Equipment

Colombia
Putumayo
Toroyaco

Tubing Hanger
Tubing
Pup joint
X-over
Y-Tool
Discharge
ESP
Intake
Upper seal
Lower seal
Motor
Instrument tube

Coords.
Bogot

O.D.
(inch)
11
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2

I.D.
(inch)
2.9844

1 1/2

13 EZ Bridge plug
14 EZ Bridge plug

Completion String
Drift
From
To
(inch)
(ft)
(ft)
15
16
16 6487.3
6487.3 6491.3
6491.3 6492.0
6492.0 6496.9
6496.9 6498.5
6498.5 6523.4
6523.4 6527.4
6527.4 6533.7
6533.7 6540.0
6540.0 6566.5
6497.9 6566.0
9334.0 9336.0
9350.0 9352.0

10
A Hanger

8 2/3

6,602

11

V
Perforations:
U Sand
9060 - 9100
T Sand
9234 - 9274

Cable No.
Size
Cable Type
Splice cable

Length (ft)

Location

Cable date
Motor lead serial
Size
Motor lead type

Caballos
9370 -

Comments
Splice at 4800ft with new cable

9390

"U"

Dec/96. Frac U + T sands


Change from Hydraulic pump to ESP
Feb/97. PLT
Jul/97. PLT
Nov/97. Change to ESP
String Data
Weight Up

"T"
Weight Down
Torque

Special Works
Jul/99. Change to ESP
Sep/00. Change to ESP
Dic/00. PLT
Feb/01. Change ESP
Casing Data

Surface
Intermediate
Liner

13
8 1/2" Hole @ 9474'
A 8 11/16" Hanger @ 6602'
7" Csg. Liner Top @ 6602'
7" Csg. Liner Bottom @ 9474'
7" Shoe @ 9474'
Cement

Formation
U Sand (Villeta)
T Sand (Villeta)
Caballos

14

Cab
T.D.

9474'

Remarks:

Si

Type

Intervals
9060
9100
9234
9274
9370
9390

O.D.
13 3/8
9 5/8
7

I.D.

Perforations
Thick
Shots/ft
40
4
40
4
20
4

Feb 16 / 01
Dates
CPR Santana
603.507.91
1.063.324.21

Spud
Finish Drl.
On Prod.

May 02/96
Aug 02/96
Aug 29/96

as Tree Desing

Description
R-57 x 11" 5M R-54 and W/2 2 1/16" 5M R-24 S/N96052987
arca Bartn

rca Bartn S/N13440-0003 (master) S/N13440-0002 (suabo)


rca Bartn
1/16" 5M
2 7/8" EUE S/N 95112494

npt

mpletion String
To
Leng.
Properties
(ft)
(ft)
16
0.9
11-5M x 3 1/2" EUE x 2 7/8" EUE
6487.3 6471.4 9.3#/ft, N-80, EUE, 216 jnts.
6491.3
4
9.3#/ft, N-80, EUE, 1 jnt.
6492.0
0.7
3 1/2" x 3 1/2" NU x 3 1/2" EUE
6496.9
4.9
6498.5
1.6
6523.4 24.9 150 GL-2200 OIG-01136
6527.4
4.0
GPINTAR 41G-17699
6533.7
6.3
GSC2HL 31G-87854
6540.0
6.3
GSC2LT 31G-87853
6566.5 26.5 KME 21K-34544
6566.0 68.07
9336.0
9352.0

2
2

6,602

Cable date
Motor lead serial

Rerun
Length (ft)

Motor lead type


Cable band material

Special Works
Jul/99. Change to ESP
Sep/00. Change to ESP
Dic/00. PLT
Feb/01. Change ESP
Casing Data
I.D.

Perforations
Shots/ft
4
4
4

Wt
54.5
47
29

Size
Grd
Thd
K-55 8RD LTC R3
P-110
BTC
N-80 8RD LTC R3

Gun Type

Jnts.
37
160
67

State
Producing
Producing
Abandoned

TOROYACO 4

Elevations (ft)

Schema
1734
Gr
1

KB

1718.6

17 1/2" Hole @ 1468'


13 3/8" Csg. @ 1381.3'
13 3/8"Float collar@1383.2'
13 3/8" Csg. @ 1465.9'
13 3/8" Shoe @ 1468'

12 1/4" Hole @ 6858'


9 5/8" Csg. @ 6858'
9 5/8" Shoe @ 6858'
Cement

Kb-Gr

15.4

Country
Region
Field

1
2
1
2
1
1
1
1
1
1

0
0

V
V

1
2
3
4
5
6
7
8
9
10
11

V
V

Contract

Tubing Hanger
Tubing
X-over
Y-Tool
Discharge
ESP
Intake
Upper seal
Lower seal
Motor
Instrument tube

Coords.
Bogot

O.D.
(inch)
11
3 1/2
3 1/2
7 5/7
3 1/2
5 1/8
5 1/8
5 1/8
5 1/8
5 5/8
2 3/8

I.D.
(inch)
2.992

1.925

12 EZ Bridge plug
13 EZ Bridge plug

Dates
CPR Santana

N
603.507.91
E
1.063.324.21
X-mas Tree Desing
Equipment
Description
Tubing Head
FP-TC 13 5/8" 3M R-57 x 11" 5M R-54 and W/2 2 1/1
Gate Valve
2 1/16" 5M R-24 marca Bartn
Companion Flange
2 1/16" 5M x 2" LP
Gate Valve
2 9/16" 5M R27 marca Bartn S/N13440-0003 (mast
Gate Valve
2 1/16" 5M R24 marca Bartn
Tee studded
2 9/16" 5M R27 x 2 1/16" 5M
Bottom hole test adapter 2 9/16" 5M R-27 x 2 7/8" EUE S/N 95112494
Companion Flange
2 1/16" 5M x 2" LP
Needle valve MF
0-10.000 psi x 1/2" npt
Pressure gauge
0-3000 x 1/2" npt

Equipment

Colombia
Putumayo
Toroyaco

Completion String
Drift
From
To
(inch)
(ft)
(ft)
15.0
15.9
2.867
15.9 6,487.1
6,487.1 6,487.7
6,487.7 6,492.1
6,492.1 6,492.6
6,492.6 6,517.5
6,517.5 6,518.5
6,518.5 6,524.8
6,524.8 6,531.1
6,531.1 6,557.6
1.925 6,492.1 6,559.0
9,334.0
9,350.0

9,336.0
9,352.0

11
9

A Hanger

8 2/3

6,602

10

V
Perforations:
U Sand
9060 - 9100
T Sand
9234 - 9274

Cable No.
Size
Cable Type
Splice cable

Length (ft)

Location

Cable date
Motor lead serial
Size
Motor lead type

Caballos
9370 -

Comments
Splice at 4800ft with new cable

9390

"U"

Dec/96. Frac U + T sands


Change from Hydraulic pump to ESP
Feb/97. PLT
Jul/97. PLT
Nov/97. Change to ESP
String Data
Weight Up

"T"
Weight Down
Torque

Special Works
Jul/99. Change to ESP
Sep/00. Change to ESP
Dic/00. PLT
Feb/01. Change ESP
Casing Data

Surface
Intermediate
Liner

13
8 1/2" Hole @ 9474'
A 8 11/16" Hanger @ 6602'
7" Csg. Liner Top @ 6602'
7" Csg. Liner Bottom @ 9474'
7" Shoe @ 9474'
Cement

Formation
U Sand (Villeta)
T Sand (Villeta)
Caballos

14

Cab
T.D.

9474'

Type

Intervals
9060
9100
9234
9274
9370
9390

O.D.
13 3/8
9 5/8
7

I.D.

Perforations
Thick
Shots/ft
40
4
40
4
20
4

Remarks:
Bottom hole @ 9287 ft. from dummy run performed during PLT on February 2001.

Mar 03 / 01
Dates
CPR Santana
603.507.91
1.063.324.21

Spud
Finish Drl.
On Prod.

May 02/96
Aug 02/96
Aug 29/96

AEI

as Tree Desing

Description
57 x 11" 5M R-54 and W/2 2 1/16" 5M R-24 S/N96052987
ca Bartn

ca Bartn S/N13440-0003 (master) S/N13440-0002 (suabo)


ca Bartn
/16" 5M
7/8" EUE S/N 95112494

pt

mpletion String
To
(ft)
15.9
6,487.1
6,487.7
6,492.1
6,492.6
6,517.5
6,518.5
6,524.8
6,531.1
6,557.6
6,559.0

Leng.
(ft)
0.9
6,471.2
0.6
4.3
0.5
24.9
1.0
6.3
6.3
26.5
66.9

9,336.0
9,352.0

Properties
11-5M x 2 7/8" EUE x 3 1/2" EUE
9.3#/ft, N-80, EUE, 216 jnts.
3 1/2" NU x 3 1/2" EUE
Inspectioned by VA Tools
CTLF, Model BPDIS
150 GC-2200 01G-01136, new
GPINTAR 41G-17699, used
GSC2HLPFS, 31G-87854, used
GSB2LT, 31G-87853, used
KME 21K-34544, used

2.0
2.0

6,602

Cable date
Motor lead serial

Rerun
Length (ft)

Motor lead type


Cable band material

Special Works
Jul/99. Change to ESP
Sep/00. Change to ESP
Dic/00. PLT
Feb/01. Change ESP
Casing Data
I.D.

Perforations
Shots/ft
4
4
4

Size
Grd
Thd
K-55 8RD LTC R3
P-110
BTC
N-80 8RD LTC R3

Wt
54.5
47
29

Gun Type

during PLT on February 2001.

Jnts.
37
160
67

State
Producing
Producing
Abandoned

TOROYACO 4
May 01 / 03

Elevations (ft)

Schema
1734
Gr 1718.6 Kb-Gr
1
2

KB

17 1/2" Hole @ 1468'


13 3/8" Csg. @ 1381.3'
13 3/8"Float collar@1383.2'
13 3/8" Csg. @ 1465.9'
13 3/8" Shoe @ 1468'

15.4

Country
Region
Field

Colombia
Putumayo
Toroyaco

Dates
CPR Santana

Contract

Equipment
1 Tubing Head
2 Gate Valve
1 Companion Flange

Spud
May 02/96
N
Finish Drl.
Aug 02/96
603.507.91
E
On Prod.
Aug 29/96
1.063.324.21
X-mas Tree Desing
Description
FP-TC 13 5/8" 3M R-57 x 11" 5M R-54 and W/2 2 1/16" 5M R-24 S/N96052987
2 1/16" 5M R-24 marca Bartn
2 1/16" 5M x 2" LP

2 Gate Valve
1 Gate Valve
1 Tee studded

2 9/16" 5M R27 marca Bartn S/N13440-0003 (master) S/N13440-0002 (suabo)


2 1/16" 5M R24 marca Bartn
2 9/16" 5M R27 x 2 1/16" 5M

Coords.
Bogot

12 1/4" Hole @ 6858'


9 5/8" Csg. @ 6858'
9 5/8" Shoe @ 6858'

1 Bottom hole test adapter 2 9/16" 5M R-27 x 2 7/8" EUE S/N 95112494
1 Companion Flange
2 1/16" 5M x 2" LP
1 Needle valve MF
0-10.000 psi x 1/2" npt

Cement

1 Pressure gauge

0-3000 x 1/2" npt

Equipment

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Tubing Hanger
X-over
Tubing 2 7/8" Used
Tubing 2 7/8"
Cavity Jet Pump
Tubing 2 7/8"
Overshot Seal Div.
Tubing 2 7/8"
Hydraulic Packer
X-over
Tubing 2 3/8"
Sliding Sleeve Side
Tubing 2 3/8"
X-over
Shear Joint
Hydraulic Packer
X-over
Tubing 2 3/8"
Sliding Sleeve Side
Tubing 2 3/8"
Landing Nipple
WL Re-entry Guide

O.D.
(inch)
11
3 1/2
2 7/8
2 7/8
4 1/4
2 7/8
5 1/2
5 7/8
5 7/8
2 7/8
2 3/8
2 3/8
2 3/8
2 7/8
3 5/9
5 7/8
2 7/8
2 3/8
2 3/8
2 3/8
2 3/8
3 1/4

I.D.
(inch)
2.441
2.441
2.441
2.290
2.441
2.441
2.360
2.360
1.995
1.995
1.995
1.995
1.995
2.375
2.360
1.995
1.995
1.995
1.995
1.791
1.990

Completion String
Drift
From
To
(inch)
(ft)
(ft)

Leng.
(ft)

Properties

15.00

15.40

0.40 11-5M x 3 1/2" EUE x 2 7/8" EUE

15.40

16.40

1.00 2 7/8" PIN x 3 1/2" PIN

16.40 4,251.69 4,235.29 6.5 #/ft, N-80, EUE, 137 jnt.


4,251.69 8,946.10 4,694.41 6.5 #/ft, N-80, EUE, 151 jnt.
8,946.10 8,953.66
8,953.66 8,985.30
8,985.30 8,986.70
8,986.70 9,018.30
9,018.30 9,022.63
9,022.63 9,023.36
9,023.36 9,052.50

7.56 WALS,
31.64 6.5 #/ft, N-80, EUE, 1 jnt.
1.40 HES, 2 7/8", EUE, 212SD700
31.60 6.5 #/ft, N-80, EUE, 1 jnt.
4.33 HES, 7" 23-29 X 2 7/8", 12RH7002-H
0.73 2 7/8" BOX x 2 3/8" PIN
29.14 4.7 #/ft, N-80, EUE, EW, 1 jnt.

9,052.50 9,056.53

4.03 HES, 2 3/8", 621XD1875 SSD

9,056.53 9,180.53

124.00 4.7 #/ft, N-80, EUE, EW, 4 jnt.

9,180.53 9,181.26

0.73 2 3/8" BOX x 2 7/8" PIN

9,181.26 9,181.91

0.65 HES, 2 7/8", 8 pines 5000 lbs c/u.

9,181.91 9,186.24

4.33 HES, 7" 23-29 X 2 7/8", 12RH7002-H

9,186.24 9,186.97
9,186.97 9,248.83

0.73 2 7/8" BOX x 2 3/8" PIN


61.86 4.7 #/ft, N-80, EUE, EW, 2 jnt.

9,248.83 9,252.86

4.03 HES, 2 3/8", 621XD1875 SSD

9,252.86 9,281.15

28.29 4.7 #/ft, N-80, EUE, EW, 1 jnt.

9,281.15 9,282.53

1.38 HES, 2 3/8", EUE, 711XN18701

9,282.53 9,283.33

0.80 HES, 2 7/8", EUE, 212M4

"U"
12
Perforations:
U Sand
9060 - 9100
T Sand
9234 - 9274
Caballos
9370 - 9390

23 EZ Bridge plug
24 EZ Bridge plug

A Hanger

9334.0

9336.0

9350.0

9352.0

8 2/3

6,602

15
16

19
"T"

Special Works
Jul/99. Change to ESP
Sep/00. Change to ESP
Dic/00. PLT
Feb/01. Change ESP
May/03. Change from ESP to Jet Pumping
Casing Data
Size
Type
O.D.
I.D.
Wt
Grd
Thd
Surface
13 3/8
54.5
K-55 8RD LTC R3
Intermediate
9 5/8
47
P-110
BTC
Liner
7
6.184
29
N-80 8RD LTC R3

Dec/96. Frac U + T sands


Change from Hydraulic pump to ESP
Feb/97. PLT
Jul/97. PLT
Nov/97. Change to ESP
String Data
Weight Up
Weight Down
Torque

23
8 1/2" Hole @ 9474'
A 8 11/16" Hanger @ 6602'
7" Csg. Liner Top @ 6602'
7" Csg. Liner Bottom @ 9474'
7" Shoe @ 9474'
Cement

Formation
U Sand (Villeta)
T Sand (Villeta)
Caballos

24

Cab
T.D.

9474'

Intervals
9060
9100
9234
9274
9370
9390

Perforations
Thick
Shots/ft
40
6
40
6
20
6

Remarks:
Bottom hole @ 9292 ft. from scrapper run on April 29/03.

Gun Type
HES, 4 5/8", 32 gr, DP
HES, 4 5/8", 32 gr, DP
HES, 4 5/8", 32 gr, DP

Jnts.
37
160
67

State
Producing
Producing
Abandoned