CDU Installation Guideline


Input Power
FAN
L9CA-B4H

385mm

UAMA-E4H

434mm
482.6mm

88mm

[Top View]

[Front View]

[Rear View]

[Right View]

Installation Tool list


Tool Box

Driver Set (+/-/Torx)

To keep all the tool items in the box

Basic Tool / To open the RRU Install Window

M2~M6, T20H

Hacksaw Frame/Blade

Level

Basic Tool

for horizontality of RRU, etc

Normal/HIS

Normal

Heating Gun

Power Extension Cable

Shrinking Feeder cable tube

Basic Tool

50~300 C

30m/50m

Tape Measure

Cable Cutter

Basic Tool

Basic Tool

5m/50m

6mm~325mm

Ladder

Hammer/Drill/Bit Set

In case of GBM site,

In case of Wall mount type for RRU mount, need


to use.

Height: 3m

Still/Rubber/PVC

Handheld Compressor

Nipper/Pliers

Basic Tool

Basic Tool

5.5,8,14,22mm2(JIS) / 6,10,16,25mm2(DIN)

Normal

LAN Tool

Knife

Basic Tool

Basic Tool

RJ11/45 Crimper

Cutter Knife

Industrial Scissor

Helmet / Safety Shoes

Basic Tool

Basic Safety Equipment

Common

Safety Belt

Clamping Tool

Basic Safety Equipment

To assemble GPS connector

50 x 2.0 x 1200mm, W/Simple buckle

Hexagon 0.429in.

Torque Driver(26RTD: TOHNICHI)

Torque Driver(50RTD: TOHNICHI)

Torque : 12.0kgf.cm
Torque bit : T20H

Torque Range: 10 kgf.cm ~ 50 kgf.cm


Torque Bit: (+)

To fasten the RRU Install Window

To fixing M4,M5,M6 bolt on RRU & CDU

Torque Wrench (120CL4 : TOHNICHI)

Torque Wrench (500CL3 : TOHNICHI)

It is necessary to tighten of feeder connector,


Optic, & Power cable grand nut of RRU

It is necessary to tighten of feeder connector &


fixing RRU bracket

Torque Body Range : 20 kgf.cm ~ 120 kgf.cm


Torque Header Range : 10mm, 19mm, 22mm,
27mm

Torque Body Range : 100 kgf.cm ~ 500 kgf.cm


Torque Header Range : 13mm, 19mm, 32mm

Megger

Digital Camera

To measure insulation of RRU Unit

Take a picture all installation point

+/- 0.08 %, 40 M Ohms

over the five million pixels

Rope / Pulley

Multi Tester

Pull up the Antenna & eNB Unit

To measure DC, AC Power

50m, 100m / 3in. 4in. 5in.

DC,AC measurement 1.0~60 kgf.cm

Compass

Tilt Measure

To align antenna direction according to the RF


design

To align antenna tilt according to the RF design

Common

Common

Permanent Pen(Black)

Multi master (VSWR & RF Power)

To mark the site ID, Name on the name plate,


etc.. (Not to erase permanently)

To measure VSWR & RF Power on RRU

Should be marked "Permanent" on the pen

VSWR Test & RF Power Test


- JD724C(with USB port ) Power sensor

Rain Cover

Open spanner set

To protect eNB materials & Unit from rain

It is necessary to tighten of feeder connector ,


Optic, & Power cable grand nut of RRU

Minimum 500mm X 500mm

10mm, 13mm, 14mm,17mm, 19mm, 21mm,


22mm, 24mm, 25mm, 27mm, 32mm

TD-LTE System Cable Diagram


* Comment : If you do not have the IGB, MGB Connect.
[GPS Antenna]

[Rectifier or DCDB]

GPS Cable-2,
CNT-400 Cable

[IGB]
or
[MGB]
[GPS Arrestor]
[L2-Switch]
GPS Arrestor
Ground Cable
F-GV 6.0 x 1C 1Line
Backhaul Cable
(Switch to CDU)
(Optic cable)

CDU Ground Cable


F-GV 4.0 x 1Core 1Line

GPS Cable-1,
RG-316D, 1m
DC Power Cable
(CDU to DCDB)
UL 1015-LF 2.5 x 2Core 1Line

[External UDA Cable


Alarm
Device]

DC Power Cable (DCDB to RRU)


F-CV 6.0 x 2Core 3Line(3-RRU)

CPRI Cable (CDU to RRU)


Optic 2Core 3Line(3-RRU)

* Comment : If you do not have the TGB, OGB Connect.


[RF Antenna]
[RF Antenna]

[RRU]

Main
Radiation
Direction

Jumper Cable
4Lines per each Sector

RET Cable
RRU Ground Cable
F-GV 6.0 x 1C 3Line(3-RRU)

[TGB]
or
[OGB]

CPRI Ground Cable


Optic 2Core 3Line(3-RRU)
CPRI Cable (RRU to CDU)
Optic 2Core 3Line(3-RRU)

DC Power Cable (RRU to DCDB)


F-CV 6.0 x 2Core 3Line(3-RRU)

To RF Cable
Jumper Cable
Eath Sector x 4Line

TGB or OGB
Ground Cable

Materials Packing List (CDU)


Packing No. :
NO

SEC CODE

D-01

EB80-09366A

D-02

EB80-09379A

D-03

EB80-09385A

D-04

*
DESCRIPTION

SEMS(M6x15L)
2

UNIT

Q'TY

REMARK

EA

Rack Dependent

EA

EB80-09417A

F-GV Cable 4mm x 1C, Green


Pressure Terminal
(2Hole, 4mm2, Hole Dist : 16mm, Hole Size: 6.3mm)
Pressure Terminal (1Hole, 6mm2, Hole Size: 6.3mm)

EA

D-05

EB80-09352A

Hex. Bolt (Brass), M6 x 20L

EA

D-06

EB80-09353A

Hex. Nut (Brass), M6

EA

D-07

EB80-09360A

Plain Washer (Brass), ID: 6.3mm

EA

D-08

EB80-09361A

Plain Washer (Brass), ID: 8.4mm

EA

D-09

EB80-09367A

Spring Washer (Brass), ID: 6.3mm

EA

D-10

EB80-09354A

Heat Shrink Tube (Green), D:12mm

0.3

D-11

EB80-09386A

F-GV Cable 6mm x 1C, Green

D-12

EB80-09365A

Pressure Terminal (Ring Type, 6mm2, Hole Size: 17mm)

EA

D-13

EB80-09417A

Pressure Terminal (1Hole, 6mm , Hole Size: 6.3mm)

EA

D-14

EB80-09352A

Hex. Bolt (Brass), M6 x 20L

EA

D-15

EB80-09353A

Hex. Nut (Brass), M6

EA

D-16

EB80-09360A

Plain Washer (Brass), ID: 6.3mm

EA

D-17

EB80-09361A

Plain Washer (Brass), ID: 8.4mm

EA

D-18

EB80-09367A

Spring Washer (Brass), ID: 6.3mm

EA

D-19

EB80-09354A

0.2

D-20

EB80-09394A

SET

D-21

EB80-09439A

Heat Shrink Tube (Green), D:12mm


CDU DC Power Cable Assembly, 2.5mm2X2C L:6M,
Black/White
Pressure Terminal (1Hole, 2.5mm2, Hole Size: 2mm)

EA

D-22

EB80-09356A

Heat Shrink Tube (Blue), D: 6mm

0.6

D-23

EB80-09355A

0.6

D-24

EB80-09401A

SET

D-25a)

EB80-09396A

Heat Shrink Tube (Red), D: 6mm


Optical Patch Code, LC/UPC to LC/UPC,L:2M Indoor
Duplex
GPS Antenna (GA-1575 CR)

EA

GG42-10502A

GPS Antenna (GA-1575)

EA

D-26

EB80-09383A

TNC Straight Cable Plug

EA

D-27

EB80-09419A

GPS Cable (CNT-400)

D-28

EB80-09392A

GPS Arrestor (N-Fe to N-Fe)

EA

D-29

EB80-09382A

N Straight Cable Plug

EA

D-30

EB80-09381A

GPS Cable Assembly (SMA-M to N-M), 1000mm

SET

D-31

EB80-09359F

Name Plate (Aluminum), 80mm x 25mm x 0.2t / 2EA-1SET

SET

D-32

EB80-09371A

GPS Fixing Pipe (Universal Type)

SET

D-33

EB80-09369A

Rubber Tape, Black

EA

D-34

EB80-09370A

Insulation Tape (Vinyl Tape), Black, 20m

EA

D-35

EB80-09376A

Weather Resistant Cable Tie

PA

D-25a

a)

* Comment : a) The D-25 and D-25a, all are available, only one of them is used.

CDU
Grounding

GPS Ground

CDU Power

Backhaul

GPS

ETC

01

Ground Cabling

Follow the below steps to connect the ground cable.


* Comment : If you do not have the IGB, MGB Connect.
[IGB]
or
[MGB]

CDU Rear
View

[D-02] Ground Cable

Ground Cabling

IGB or MGB Connecting

Connect the ground cable

[D-02] Ground Cable

(AWG10, F-GV 4.0 1C)

[D-10] Heat Shrink Tube

from the ground bar to the


pressure terminal on the

Insulator

[D-04] ~ [D09]
Connection of ground cables

rear side of the CDU.


Main Ground Bar

* M6 Brass Bolt/Nut Torque : 29.98 kgf.cm (Tolerance 10%)

Connecting to CDU system

Connect the 4 pressure terminal and


the heat shrink tube at the end of the

CDU Rear Side


Heat Shrink Tube
[D-10]
Pressure Terminal

Ground Cable
[D-02]

[D-03]

ground cable.

[Pressure terminal]
4, 2 holes, hole diameter: 6.3mm,
hole gap 16mm

Align the pressure terminal connected


on the CDU-side ground cable to the
SEMS(M5x15L)
* The screw is included in CDU

ground terminal mounting hole on the


rear side of the CDU and fix it with the

* M5 SEMS Torque : 20~30 kgf.cm

M5 SEMS.

02
04

CDU Fixation (Currently not in use)

Follow the below steps to fix the CDU system.

[D-01] SEMS

Fix CDU system to 19 inch rack.

Place the CDU on the top of the unit support bracket and
firmly fix it using M6 SEMS.
* M6 SEMS Torque : 33.28~49.92 kgf.cm

[D-01] SEMS

03

CDU Fixation (Outdoor)

Follow the below step to fix the CDU system.

CDU fixed

CDU
L2 Switch

Vertical fixation for CDU system

Air OUT Top

[D-01] SEMS

NOTE : When the CDU system is fixed vertically,


it should be placed after consideration for air flow.
* M6 SEMS Torque : 33.28~49.92 kgf.cm

Horizontal Installation Front View

Air IN Bottom

Vertical Installation Front View


Cabinet/Rack

> 80 mm

> 80 mm
Fan
> 80 mm

Fan

Air Filter
> 80 mm
Air Filter
Cabinet/Rack

04

DC Power Cabling

Follow the below steps to connect the DC Power cable.

[DCDB]

[D-20] DC Power Cable Assembly

Power Cabling
Connect the power cable

Connecting to DCDB
[CDU]

assembly from the CDU to the

[DCDB]

rectifier(DCDB).
Ensure that the assembled side
of the power connector faces the

[D-20]
DC Power Cable Assembly

[D-22]
Heat Shrink Tube

CDU.

[D-23]
Heat
Shrink
Tube

Heat Shrink Tube

Connecting to CDU system


Connect the power connector
(combination D-sub connector)
Power Cable
Connector
SPD
M6 SEMS

assembled on the cable to the power


input connector on the front left of the
CDU.

Connect the power cable assembly to


the power connector with the correct

[D-20]
DC Power Cable
Assembly

polarity (RTN, -48V).

Heat shrink tube color:


RTN_red/-48V_blue.
* M6 SEMS Torque : 33.28~49.92 kgf.cm

05

DCDB Connection

Follow the below steps to connect the DCDB.


Delta DCDB
(4CL/8NCL)

to CDU

GE DCDB
(4CL/8NCL)

Emerson DCDB
(4CL/8NCL)

[D-20]
DC Power Cable Assembly

(Note)
Do not remove common cable.
-48V cable(black/blue shrink) should be installed with Common cable.

[DCDB]

[DCDB Side] Installation for DC Power Cable


To -48[V] Circuit Breaker

Power Cable
(AWG 12, UL 1015-LF 2.5mm2 x 2C)

To RTN (GND Port)


200mm

To -48[V] Circuit Breaker


To RTN (GND Port)

Power Cable
(AWG 12, UL 1015-LF 2.5mm2 x 2C)
12 mm

200mm

To -48[V] Circuit Breaker

Power Cable
(AWG 12, UL 1015-LF 2.5mm2 x 2C)

To RTN (GND Port)

Installation for DCDB

Critical

Non - Critical

MAIN
CDU

RRU#1

RRU#0

RRU#2

The capacity of circuit breaker is


required as below.
- CDU : 16 [A]
- Each RRU : 16[A]

06

Backhaul Cabling

Follow the below steps to connect the interface cable.


[Switch/Router]

[D-24]
OJC, LC/UPC to LC/UPC

Connecting to backhaul cable (Optic)


Connect the backhaul cable (optic-single
mode) from the switch/router to BH2 and
BH3 ports of the CDU UAMA board.

Connect the CDU-side connectors (LC/UPC)


of the cable to the BH2 and BH3 ports of the
CDU UAMA board.

General Case : Optic single cable

[CSS ~ CDU : Backhaul Cable Connection]

[CSS Connection Port]


(Note)
CSS Port might
be changed.

Backhaul Cable(2M)

CSS Connection Port

07

GPS Connection & Cabling

Follow the below steps to connect the GPS cable.

[D-25] GPS Antenna

[IGB]
or
[MGB]
[D-11] ~ [D19]
Connection of GPS Ground Cable

[D-30] RG-316D Cable-1

[D-27] GPS Cable(CNT-400)

[D-28] GPS Arrestor

Connection of GPS Assembly

Installation for GPS Arrestor


GPS Cable(CNT-400)
[D-27]

SMA-Female

[D-28]
GPS Arrestor

[D-30]
RG-316D Cable-1

SMA-Male
N-Male Connector
[D-30]
RG-316D Cable-1

[D-12]
Pressure Terminal

Installation for GPS Antenna


TNC-Female
Heat Shrink Tube
(Jelly Type)
Clamp

[D-25] GPS Antenna


[D-26] TNC-Male Connector
[D-27] GPS Cable(CNT-400)
GPS Fixing Pipe

Clamp Fixing Screw

More than 200 mm


Insulator

Binder Cable

GPS Fixing Pipe

[D-27]
GPS Cable(CNT-400)

[GPS cable with banding loss]

CNT-400 Cable(GPS Arrestor ~ GPS Antenna)


(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)

Two types of GPS antennas as below can be used.


[D-25]

GA-1575CR
(Cone Type)

[D-25a]
GA-1575
(Dome Type)

* SMA-Male Connector Torque : 2.5 kgf.cm


* N-Male Connector Torque
: 20 kgf.cm
* TNC-Male Connector Torque : 9 kgf.cm
(Tolerance 10%)

08

GPS Arrestor & GPS Antenna

Follow the below steps to the GPS Antenna


Installation for GPS Arrestor

Installation for GPS Antenna - Universal Type

[Case#1] Did not fasten

[Case#2] Do fasten the

the GPS Arrestor

GPS Arrestor

[D-32] GPS Fixing Pipe


(Universal Type)

Notes for GPS Antenna Installation


Note : If the height of the structure from the ground is <= 30M, the RF antenna has to be installed under the
protection angle of 45 degree of the lightning rod.
Lightning Rod
45

45

GPS
Antenna

However, if the height of the structure from the ground is more than 30M, it should be installed within protection
angle (the center axis left/right each 23 degree) of lightning rod.
If it is difficult to satisfy the above conditions, installation angle should be set to the nearest value that can
accommodate all the equipments.
Lightning Rod

23

23

GPS Antenna

09

GPS Antenna Installation(1)

Installation point of GPS Antenna

Note : It is prohibited to installation of GPS antenna on the


back side of RF antenna.

RF Antenna center axis


Not allowed area for GPS Antenna

Installation point of GPS antenna can be classified


into top and bottom point. It is recommended that
GPS antenna is installed at top point of RF antenna.

RF
Antenna

GPS Antenna

Case#1) Mount on the top position of RF antenna


[Top View]

1) GPS antenna should be installed higher than the RF antenna.

GPS Antenna
RRU

It should have sky clearance

RF Antenna

2) GPS antenna should be 110apart from main lobe axis of


the RF antenna in the horizontal plane.
3) It should be installed within the lightning protection umbrella.
4) Minimum distance between RF antenna top point
and GPS antenna head should be 500mm.
5) It is recommended that GPS antenna to be installed in the
south direction.
6) In case the height of structure is more than 30M from the
RF Antenna center axis

ground, protection angle should be applied to 23 degree.


Available area of GPS Antenna

(If it is difficult to satisfy the above conditions, installation angle should


be set to the nearest value that can accommodate all the equipments.)

[Front View]
[Less than 30M ]

[More than 30M ]


Lightning Rod

RRU

[ex: more than 30M GBM


Site]

RF Antenna

GPS Antenna

RRU

Minimum 500 mm

GPS Antenna

23 23
Minimum 500 mm

More than 30 M

45 45

RF Antenna

10

GPS Antenna Installation(2)

Installation point of GPS Antenna

Note : It is prohibited to installation of GPS antenna on the


back side of RF antenna.

RF Antenna center axis


Not allowed area for GPS Antenna

Installation point of GPS antenna can be classified


into top and bottom point. It is recommended that
GPS antenna is installed at top point of RF antenna.

RF
Antenna

GPS Antenna

Case#2) Mount on the bottom position of RF antenna


[Top View]

1) GPS antenna should be installed higher than the RF antenna.

GPS Antenna
RRU

It should have sky clearance


2) GPS antenna should be 110apart from main lobe axis of the

RF Antenna

RF antenna in the horizontal plane.


3) It should be installed within the lightning protection umbrella.
4) Minimum distance between RF antenna bottom
point and GPS antenna head should be 2m.
5) It is recommended GPS antenna to be installed to south
direction so that the GPS is located on the back side of
the structures
RF Antenna center axis

6) In case the height of structure is more than 30M from the


ground, protection angle should be applied to 23 degree.

Available area of GPS Antenna

(If it is difficult to satisfy the above conditions, installation angle should be


set to the nearest value that can accommodate all the equipments.)

[Front View]

[Less that 30M ]

[More than 30M]


Lightning Rod

[ex: more than 30M GBM


Site]

GPS Antenna

RF Antenna

23 23

RRU

Minimum 2M

RRU

Minimum 2M

More than 30 M

45 45

GPS Antenna

RF Antenna

11

UDA Cabling (Currently not in use)

Follow the below steps to connect the UDA cable.

[External Alarm Device]

UDA Cable Assembly

External Alarm Device to UDA Assembly Connecting

[Alarm Relay-side
Cable]
[CDU Connector]
Connect the CDU-side connector (AMP 787229-1,
68p-male & AMP 787131-3) of the cable to the
UDA port of the CDU UAMA Board.
Port Index

Label Name(Input)

Pin-Map

RX0

ALARM_IN0_COM

RX1

ALARM_IN1_COM

RX2

ALARM_IN2_COM

ALARM_IN3_COM

ALARM_IN4_COM

ALARM_IN5_COM

11

ALARM_IN6_COM

13

ALARM_IN7_COM

15

ALARM_IN8_COM

17

TX0

E_UDA_NO_OUT2

26

TX1

E_UDA_NO_OUT3

60

RX3
(AC input Fail)
RX4
(Rectifier Fail)
RX5
(Battery Low)
RX6
(Door Open)
RX7
(AC/DC SPD)
RX8
(FAN Fault)

Label Name(Input)
ALARM_IN0_NO
ALARM_IN0_NC
ALARM_IN1_NO
ALARM_IN1_NC
ALARM_IN2_NO
ALARM_IN2_NC
ALARM_IN3_NO
ALARM_IN3_NC
ALARM_IN4_NO
ALARM_IN4_NC
ALARM_IN5_NO
ALARM_IN5_NC
ALARM_IN6_NO
ALARM_IN6_NC
ALARM_IN7_NO
ALARM_IN7_NC
ALARM_IN8_NO
ALARM_IN8_NC
E_UDA_C_OUT2
E_UDA_NC_OUT2
E_UDA_C_OUT3
E_UDA_NC_OUT3

Pin-Map
2
36
4
38
6
40
8
42
10
44
12
46
14
48
16
50
18
52
27
28
61
62

12

[Backhaul]
Cisco Switch Side

Labeling & Tagging

CDU Backhaul/ GPS Labeling


Cable Name

Qty (ea)

Labeling Point
CDU DC Power

DCDB

CSS side end

CDU side end

CDU GPS Port

GPS Arrestor

DC Power cable

Backhaul cable

GPS Cable (RG-316D)

[Label folding point]

[CDU DC power]
CDU Power Side
[Backhaul]
Cisco Switch Side

CDU to DCDB / RJIL

CDU to DCDB / RJIL

DCDB to CDU / RJIL

CDU to DCDB / RJIL

CDU to CSS / RJIL

CDU to CSS / RJIL

CSS to CDU / RJIL

CSS to CDU / RJIL

[Backhaul]
CDU Side
[GPS]
GPS Cable

CDU to Arrestor / RJIL

CDU to Arrestor / RJIL

Arrestor to CDU / RJIL

Arrestor to CDU / RJIL

CDU Ground Cable Tagging


Cable name

Color Code

Tagging Plan

CDU Ground

Black

Two String
GPS(Arrestor) Ground

GPS Ground(Arrestor)

Black

Three String
CDU Ground

DCDB Labeling
Category

Type

Sector
-

CDU

Label Title
CDU

Critical

RRU

Alpha

RRU-0

Beta

RRU-1

Gamma

RRU-2

Non Critical

<For example>

11

Assembling the GPS Cable Connector

N Type-Male (CNT-400)
2

Clamp Ring

Heat Shrink
Tube

Clamp Ring
Prep/strip tool End2

Prep/strip tool End1

Heat Shrink
Tube
N type-Male Body

Deburring tool

Deburring Tool
CNT-400

Shield
CNT-400

TNC Type-Male (CNT-400)


2

Clamp Ring

Heat Shrink
Tube

Clamp Ring
Heat Shrink
Tube

Prep/strip tool End2

Prep/strip tool End1

N type-Male Body

4
Deburring tool

SAMSUNG TD-LTE

Installation Guideline
2013 Samsung SNS Co., Ltd.
All rights reserved.
Information in this manual is proprietary to
SAMSUNG SNS Co., Ltd.
No information contained here may be copied,
translated, transcribed or duplicated by any form
without the prior written consent of SAMSUNG.
Information in this manual is subject to change
without notice.http://www.samsungsns.com

RRU Installation Guideline


398mm

101mm

340mm

[Top View]

425mm

340mm

[Left View]

[Front View]

[Bottom View]

RF Port(N-Fe) x 4
DC Power
CPRI(CDU Interface)
RET

[Right View]

Materials Packing List (RRU)


Packing No. :
NO

SEC CODE

DESCRIPTION

UNIT

Q'TY

R-01 EB80-09387A Unit Mounting Bracket Assembly

SET

R-02 EB80-09389A Pole Mount Bracket Assembly (Universal Bracket)

SET

R-02a EB80-09388A Pole Mount Bracket Assembly (U Clamp)

SET

R-02b NEW CODE

SET

3XL

EA

EA

R-06 EB80-09352A Hex. Bolt (Brass), M6 x 20L

EA

R-07 EB80-09353A Hex. Nut (Brass), M6

EA

R-08 EB80-09360A Plain Washer (Brass), ID: 6.3mm

EA

R-09 EB80-09361A Plain Washer (Brass), ID: 8.4mm

EA

R-10 EB80-09367A Spring Washer (Brass), ID: 6.3mm

EA

R-11 EB80-09354A Heat Shrink Tube (Green), D:12mm

0.3

Unit Mounting Bracket Assembly (Wall Type)

R-03 EB80-09386A F-GV Cable 6mm2 x 1C, Green


Pressure Terminal
R-04 EB80-09378A
(2Hole, 6mm2, Hole Dist : 16mm, Hole Size: 6.3mm)
R-05 EB80-09417A Pressure Terminal (1Hole, 6mm2, Hole Size: 6.3mm)

R-12
R-13
R-14
R-15
R-16

EB80-09390A F-CV Cable 6mm x 2C (-48V: Black, RTN: White)


EB80-09364A Pressure Terminal (Ring Type, 6mm2, Hole Size: 4.4mm)
EB80-09438A Pressure Terminal (1Hole, 6mm2, Hole Size: 6.5mm)
EB80-09356A Heat Shrink Tube (Blue), D: 6mm

3XL

EA
EA
M

6
3
0.6

EB80-09355A Heat Shrink Tube (Red), D: 6mm

0.6

R-17 EB80-09359B Name Plate (Aluminum), 80mm x 25mm x 0.2t / 6EA-1SET

SET

R-18 EB80-09384A Interface Cable (Armored Type)

SET

3XL

R-19 EB80-09359C Name Plate (Aluminum), 80mm x 25mm x 0.2t / 6EA-1SET

SET

R-20 EB80-09380A 1/2in Jumper Cable(2m)

EA

12

R-21 EB80-09357A Heat Shrink Tube - Jelly Type (Black), D: 31mm

2.4

R-22 EB80-09358A Heat Shrink Tube - Jelly Type (Black), D: 41mm

2.4

R-23 EB80-09368A Butyl Tape

EA

15

R-24 EB80-09377A Weather Resistant Cable Tie

PA

R-25 EB80-09369A Rubber Tape, Black

EA

R-26 EB80-09370A Insulation Tape (Vinyl Tape), Black

EA

R-27 EB80-09375A Insulation Tape (Vinyl Tape), Yellow

EA

R-28 EB80-09373A Insulation Tape (Vinyl Tape), Red

EA

R-29 EB80-09374A Insulation Tape (Vinyl Tape), Blue

EA

R-30 EB80-09372A Insulation Tape (Vinyl Tape), Green

EA

REMARK

Rack Dependent

Grounding

DC Power

CPRI
(CDU Interface)

Feeder

ETC

01

RRU Fixation (Universal Bracket)

Follow the below steps to fix the RRU (Universal Bracket)

[R-02]
Pole Mount Bracket
Assembly (Universal Bracket)

[R-01]
Unit Mounting Bracket Assembly
* M8 Hex. Bolt/Nut Torque : 122 kgf.cm (Tolerance 10%)
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

Unit Mounting Bracket(Universal Bracket) Fixation

M12 Stud Bolt


M12 Plain Washer
M12 Spring Washer
M12 Hex. Nut

M8 Insulation Bushing
M8 Plain Washer
M8 Spring Washer
M8 Hex. Nut

M12 Plain Washer


M12 Spring Washer
M12 Hex. Nut

[R-02] Universal Mount Bracket Assembly

[R-01] Unit Mounting Bracket Assembly

Installation for Unit Mounting Bracket Assembly


M12 Hex. Bolt
M12 Plain Washer

Unit Mounting
Bracket Hook
Pole Mounting
Bracket hook

M12 Hex. Nut


M12 Spring Washer
M12 Plain Washer

02

RRU Fixation (U Clamp)

Follow the below steps to fix the RRU (U Clamp)

[R-02a]
Pole Mount Bracket
Assembly (U Clamp)

[R-01]
Unit Mounting Bracket Assembly
* M8 Hex. Bolt/Nut Torque : 122 kgf.cm (Tolerance 10%)
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

Unit Mounting Bracket(U Clamp) Fixation

U-Bolt
Pole Mounting Bracket
M12 Plain Washer
M12 Spring Washer
M12 Hex. Nut
[R-02a] Pole Mount Bracket Assembly (U Clamp)

[R-01] Unit Mounting Bracket Assembly

Installation for Unit Mounting Bracket Assembly


M12 Hex. Bolt
M12 Plain Washer

Unit Mounting
Bracket Hook
Pole Mounting
Bracket hook

M12 Hex. Nut


M12 Spring Washer
M12 Plain Washer

03

RRU Fixation (Wall Type)

Follow the below steps to fix the RRU (Wall Type)


[R-01]
Unit Mounting Bracket Assembly

[R-02b]
Unit Mounting Bracket
(Wall Type)

* M8 Hex. Bolt/Nut Torque : 122 kgf.cm (Tolerance 10%)


* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

Unit Mounting Bracket(Wall Type) Fixation

Anchor Bolt
Hole( 14)

70mm

M12 Strong Anchor

M12 Washer
(Plain, Spring)

198mm

Drill bit : 17mm


Hole depth : 55mm

Unit Mounting
Bracket
M12 Hex. Bolt

Marking to anchor bolt position

[R-02b] Unit Mounting Bracket (Wall Type)

Installation for Unit Mounting Bracket Assembly


Bakelite(5T)
M830L Hex. Bolt
Unit Mounting Bracket
Unit Mounting
Bracket Upper furrow

Bakelite(5T)
M8 Insulation Bushing
M8 Plain Washer
M8 Spring Washer
M8 x 30L Hex. Bolt

04

Ground Cabling

RRU/CPRI Ground Cable connecting


* M6 SEMS Torque : 33.28~49.92 kgf.cm

[Connecting to RRU & CPRI Ground port]


SEMS(M6x12L, 2EA)
CPRI for
Pressure Terminal

RRU
Ground
Cable

RRU for
Pressure Terminal

Cable Tie
CPRI
Ground
Cable

[R-03] Ground Cable

[CDU] CPRI Cable

[TGB]
or
[OGB]

CPRI
Ground
Cable

CPRI Ground Cable


RRU Ground Cable

[R-03] ~ [R-11] Connection of Ground Cable


* Comment : If you do not have the TGB, OGB Connect.

RRU Insulation Test

[Strong Anchor fixing Hex. Bolt]


[RRU fixing Hex. Bolt]

[Stud Bolt]

[RRU fixing Hex. Bolt]

[U-Bolt]

[RRU fixing Hex. Bolt]

Indication standard :
more than 500V/100M

05

DC Power Cabling

Follow the below steps to connect the DC Power cable.


[DCDB]
[R-15] Heat Shrink Tube

[R-16]
Heat
Shrink
Tube

[R-12] DC Power Cable Assembly

Power Cabling & Connecting

RTN

Power Cable
(AWG8, F-CV 6mm2 x 2C)

-48V

80 mm

Fully insert the rain-proof


filler to the cable gland

Power Cable
(AWG8, F-CV 6mm2 x 2C)

body, and tighten the

73 mm

7 mm

cable gland nut using a


torque wrench with torque
value 30 kgf.cm.

3 RRU (1Sector / 1RRU)

[R-12] DC Power Cable Assembly


Power Cable
(AWG8, F-CV 6mm2 x 2C)

[RRU]

[R-13]
PRESSURE TERMINAL

Max. 13.5mm

Heat Shrink Tube

11mm

15 mm

64mm
90 mm

* Note: For RRU-DCDB connection please refer DCDB connection page

Connecting to RRU system


RTN -48V

Cable Gland Nut


RTN

-48V

Power Cable

Protrusion of
Rain-Proof Filler

[R-13] Pressure Terminal


SEMS (M4 X 10L)
[R-15] Heat Shrink Tube (Blue)
[R-16] Heat Shrink Tube (Red)
[R-12] DC Power Cable Assembly

* Note: When you close the install window,


screws should be tightened to the torque
value of 12.0kgf.cm specified in the order.

* M4 SEMS Torque
: 9.52~14.28 kgf.cm
* Install Window Screw Torque
: 12 kgf.cm (Tolerance 10%)
* Cable Gland(Power_M25) Torque : 30 kgf.cm (Tolerance 10%)

06

CPRI Cabling

Follow the below steps to connect the CPRI(CDU interface) cable.


3 RRU (1Sector / 1RRU)
-

[R-18] CPRI Cable

CDU

RRU

Connector
Color

Boot
Color

Connector
Color

Boot
Color

TX

Blue

Red

Blue

Blue

RX

Green

Blue

Green

Red

CPRI Optic Cabling(RRU)


[Rx]
LC/APC Red

60mm

[Tx]
LC/UPC Blue

[R-18]
CPRI Cable
(CDU Interface)

Waterproof Filler
Cable Gland Nut

Install Window
Screw

[R-18] CPRI Cable(CDU Interface)

Install Window

Connecting to CPRI cable(CDU)


Connector(LC/APC, Green)
Connector(LC/UPC, Blue)

L9CA L0~2 Port

CDU Port

* Note: When you close the install window,


screws should be tightened to the torque
value of 12.0kgf.cm specified in the order.

Port-0

Port-1

Port-2

Sector-A

Sector-B

Sector-C

* Install Window Screw Torque : 12 kgf.cm (Tolerance 10%)


* Cable Gland(CPRI_M20) Torque : 30 kgf.cm (Tolerance 10%)

To each sector (RRU)

07

Notes for RF Antenna Installation


Notes for GPS Antenna Installation

Note : The RF antenna has to be installed under the protection of lightning rod umbrella and this umbrella formed on
either side of lightning rod within 45 degree angle
Lightning Rod

45

45

RF Antenna

However, if the height of the structure from the ground is more than 30M, it should be installed within protection
angle (the center axis left/right each 23 degree) of lightning rod.
If it is difficult to satisfy the above conditions, installation angle should be set to the nearest value that can
accommodate all the equipments.
Lightning Rod

23

23

RF Antenna

08

Sector Antenna Installation

Upper Fixing Clamp


Upper Guide Clamp

Main
Radiation
Direction

Pole
Lower Guide Clamp
Lower Fixing Clamp
Antenna Input Port
RETu

Attaching Base station Antenna on Poles Using


Clamps

Mechanical down tilt (In the case of tilting)

40-90 mm

14 mm

14 mm

* Torque : 239.7 ~ 270.3 kgf.cm


(23.5~26.5 Nm)

* Torque : 239.7 ~ 270.3 kgf.cm


(23.5~26.5 Nm)

Indicators for Mechanical tilt

08

RF Jumper Cabling

Follow the below steps to connect the RF Jumper Cable.

[RRU]

[Antenna]

Cable Tie

[R-20]

1/2" Jumper Cable

Cable Tie

RF Jumper Cabling & Connecting


RF Antenna
N Type-Male Connector
[R-20] 1/2" Jumper Cable

Din Type-Female
7/16 in. Din Type-Male Connector
[R-20] 1/2" Jumper Cable

* N Type-Male Connector Torque : 20 kgf.cm (Tolerance 10%)


* Din Type-Male Connector Torque : 200 kgf.cm (Tolerance 10%)

RF Jumper Cable Connection at Antenna Connection Area


RF Antenna

Connect a 1/2 in. Jumper line to the RF antenna.

Min. radius
of curvature

Straight cable
section

- If excessive force is applied to the connector assembled to the


antenna port or cable, it may cause poor contact or damage
because the straight cable section is not long enough.
R

Min. Radius

Manufacturer

1/2 in. Feeder Line

125 mm

LS

09

Jumper Cabling & Labeling

RF Jumper cabling

RF Jumper Cable Tagging


Alpha Sector

Beta Sector

Sector

RF Cable

Color Code

Alpha

Path#0

Blue / Yellow(One String)

Path#1

Blue / Yellow(Two String)

Path#2

Blue / Yellow(Three String)

Path#3

Blue / Yellow(Four String)

Path#0

Red / Yellow(One String)

Path#1

Red / Yellow(Two String)

Path#2

Red / Yellow(Three String)

Path#3

Red / Yellow(Four String)

Path#0

Green / Yellow(One String)

Path#1

Green / Yellow(Two String)

Path#2

Green / Yellow(Three String)

Path#3

Green / Yellow(Four String)

Beta

Gamma

Gamma Sector

10

RRU Ground / AISG Cable Tagging

RRU Ground / AISG Cable Tagging


Sector

Cable

Color Code

Alpha

Ground, AISG(RET)

Blue

Beta

Ground, AISG(RET)

Red

Gamma

Ground, AISG(RET)

Green

Alpha Sector(RRU)
(GND, AISG)

Beta Sector(RRU)
(GND, AISG)

Gamma Sector(RRU)
(GND, AISG)

Alpha Sector(Antenna)
(AISG cable)

Beta Sector(Antenna)
(AISG cable)

Gamma Sector(Antenna)
(AISG cable)

Ground Cable Tagging

11

[Backhaul]
Cisco Switch Side

Name Plate
Cable name

Tagging point

Qty (ea)

RRU POWER

Alpha / Beta / Gamma , End to End

6 (3Sector)

RRU CPRI

Alpha / Beta / Gamma , End to End

6 (3Sector)

GPS FEEDER

CNT-400 Cable, End to End

Length & Site name should be written by using a permanent marking pen.
Name plate should be lapped on the label sticker.

Length & Site name should be written by using a permanent marking pen.
Name plate should be lapped on the label sticker.

Length & Site name should be written by using a permanent marking pen.
Name plate should be lapped on the label sticker.

[GPS Antenna]
[L8HU]

Name Plate [R-16]

Name Plate [D-30]

Power Cable (L8HU)


Optic Cable (CPRI)

GPS
CNT-400 Cable

Name Plate [R-18]


[GPS Arrestor]

RG-316D Cable
(GPS)

[DCDB Panel]

12

RETu Connection & Cabling (Optional)

Follow the below steps to cabling the RET cable.


The RETu installation must be performed on the ground for convenient installation before
the antenna pull-up to the pole.

RET Connector

[RF Antenna]

RETu
RET Cable
Assembly

Install for RETu


(1)

RF Antenna
RET Protective Cap

(2)

RET Protective Cap

(3)

Dont remove the


RET knob.

RETu
RET Knob
(Black Color)

(4)

(5)
RET Knob
(Black Color)

RET Knob
(Black Color)
RETu

RETu Shell

Tighten the RETu shell with used torque wrench or included mini-wrench(41 mm).
* Torque setting: 183.6~204 kgf.cm (18~20 N.m)

Install for RET Cable

RET Connector

RET Cable Assembly

14

Waterproof

Follow the below steps to install the waterproof.


[RRU]

[Antenna]

Cable Tie

[R-20] Jumper Cable

Cable Tie

* N Type-Male Connector Torque : 20 kgf.cm (Tolerance 10%)


* Din Type-Male Connector Torque : 200 kgf.cm (Tolerance 10%)

Antenna

RRU

[R-26] Insulation Tape

[R-26] Insulation Tape

[R-23] Butyl Tape

[R-23] Butyl Tape

Connector Nut
Connector
Heat Shrink Tube

Butyl
Tape

10~20mm

Connector Nut
Connector
Heat Shrink Tube

Butyl
Tape

10~20mm

Butyl Tape

[R-26] Insulation Tape

Butyl Tape

[R-26] Insulation Tape

Cable Tie
Cable Tie

Cable Tie

Cable Tie
Cable Tie

Cable Tie

Safety Concerns
Watches, rings, and other metallic accessories.
(Do not wear accessories such as watches and rings in order to prevent electrical shock.)
Power Switch Off
Make sure the power switch of power supplier is off when installing the system. Installing the system with power
switch on may cause system damage or fatal human injury when cables are not correctly connected.
Connecting Ground Cable
When connecting the cables, always connect the ground cable first. If worker contacts the equipment, connect a
cable or perform maintenance without connecting the ground cable, the system can be damaged or a worker may
be injured due to static electricity and short circuit.
Turning Off the Circuit Breaker before Connecting the Power Cable
Since power is applied to the system where the power cable is connected by manipulating the circuit breaker of the
rectifier, be sure to check the rectifiers breaker and the system switch are turned off (open) before connecting the
power cable to the power connector. If the system is installed while the circuit breaker and system switch is on, the
worker may be critically injured as soon as the cable is connected in the wrong way.
Warning for Laser Beam Running through Optical Cables
In the system, the laser beam emitting light runs through the optical cable.
The exposure of the laser beam on workers eye may cause serious injury so that it should be handled with care.
Warning for Workers Injury
When installing cables in a small area, do not apply excessive force. Worker may bump against a wall or equipment.
Protection gloves and goggles
Make sure that worker wears protection gloves and goggles to prevent damages from debris while drilling holes in a
wall or ceiling.

Caution on Power Testing


After system installation, make sure the DC output switch that is allocated to RRU-F4S from the rectifier is off before
starting power test.
Precautions While Measuring Insulation Resistance
Observe the followings to prevent any system damage when measuring insulation resistance because there is a
very high voltage.
- Before measuring insulation resistance, disconnect all the cables connected
to the system.
- Do not measure insulation resistance when power is on.
- Do not measure insulation resistance at any other positions such as system
internal units or parts other than the targeted insulation resistance measuring points..
Precautions When Cutting Power Cable
Install the power cable to the power port of system by considering the radius of curvature of its cable specification
and then cut the cable.
If you install the cable after cutting, there may be length difference among the core wires at the end of the cable
because of cable curvature. This may result in poor contact after the cable is connected to the power port.
Installing the Antenna
When you install the antenna, the antenna must be within the protective angle (left/right side 45 each from the
central axis) to prevent the antenna from lightning damage.
Radius of Curvature of Feeder Line
When installing a feeder line, the radius of curvature of the sections where cables bent should be larger than the
allowed radius of curvature. If the radius of curvature for the feeder line installation is less than the allowed radius of
curvature, it may affect the performance of the system.
Connection of Feeder Cable Connector
Connecting the feeder cable connector is critical process, so the qualified workers who finished the related
education should perform.
Caution When Connecting the Optical Cable
Check whether there is dust or foreign material on the cutting section of the connector core before connecting the
optic cable, and keep this away from dust or foreign material.
If the cable is soiled with foreign material, do not blow to remove them. Make sure to clean the connector in
accordance with the cleaning directions in ANNEX D.

Construction Situation Checklist


Construction Situation Checklist
Category

Check Items

Criteria

Appearance of equipment and


mechanical parts

Equipment damage such as Dent, scratch


and crack, etc.

Placement of equipment and


mechanical parts

Maintenance and horizontal/vertical


placement

Leveling condition of equipment and


mechanical parts

Horizontal/vertical fixing
(level, weight, rubber hose, etc.)

Installing
Validity of status and specifications of Visual inspection and magnet check
Equipment
tightening bolt/nut/washer, etc.
Compliance with tightening torque value
Board/blank panel installation status

Checking assembly status

Insulation status

Checking electrical contact between


insulators (insulation resistance tester)

Other works (cable duct installation


status, etc.)

Checking position and installation status

Status of ground bar installation per


usage

Checking the separation of


communication/power/lightning grounding

Cable Size

Checking specifications such as thickness,


etc.

Cabling and binding status

Cable damage/properness installation


route. Checking binding interval and the
condition of used materials

Installation status of cable tag

Checking position, marking, and tag


installation type

Grounding

Installation status of power supply and Power supply capacity/input voltage


circuit breaker
Checking circuit breaker type and capacity
Cable Size

Checking thickness and length limitation

Cabling and binding status

Cable damage/properness installation


route. Checking binding interval and the
condition of used materials

Cable connection

Cable damage/properness installation


route. Checking binding interval and the
condition of used materials

Power

Installation status of cable tag

Checking position, marking, and tag


installation type

Result
PASS

FAIL

Construction Situation Checklist


Construction Situation Checklist
Category

Check Items
Cable size

Checking cable specifications per usage

Cabling and binding status

Checking cable damage/properness


installation route, binding distance and
condition of used materials

Cable connection

Checking cable connection (Pin Map),


assembly and tightening status of a
connector and compliance with tightening
torque value

Installation status of cable tag

Checking position, marking, and tag


installation type

Antenna receive status

More than six satellites (C / N 40 and over)


In, Out-Band Availability measurements

Antenna installation status

Checking specifications, installation


position, fixing status, and gap between
antennas

Installation status of arrestor/line


amplifier/splitter, etc.

Checking specifications, installation


position, and fixing status

Cabling and binding status

Checking cable damage/properness of


installation route/binding distance and the
condition of used materials

Cable connection

Checking cable connection status,


connector assembly and tightening status,
compliance with tightening torque value,
and finishing

Installation of cable tag

Checking position, marking, and tag


installation type

Other data
cables

GPS
&
RF

Criteria

Reserved ports and cable inlet status Finishing (dust cap, etc.)

Others

Opinion

Connection of equipment I/O port


(Conduit/Cable Gland)

Checking tightening status

Installation of cable installation route

Installation of cable tray and duct, etc.

Status of inside/outside of the


equipment and system surrounding
area

Checking the stocking condition of waste


parts, waste materials, packing materials,
etc.

Result
PASS

FAIL