You are on page 1of 4

REVISION HISTORY

0A

2016/06/13

FOR Approve

wang

xuehui

zhangxiaoping

CRN.

DATE

PURPOSE OF REVISION

PERF..

VERIF.

APPROV.

PROJECT:

TYPE OF DOCUMENT:

CONTRACT NUMBER:

PAMPA SUL Coal Fired Power Plant Project

Inspection and Test Plan


TITLE:

ITP of steel structure


PREPARED BY:

Wang peilei

VERIFIED BY:

APPROVED BY:

Xue hui

NUMBER DOCUMENT CONTRACTED COMPANY:

TECHNICAL IN CHARGE CREA NUMBER:

Zhang xiaoping
NUMBER DOCUMENT CLIENT:

REVISION CLIENT:

PA5-PI-DB-02-M01-003
NUMBER DOCUMENT PROJECT/MANUFACTURE

DATE OF ISSUE

00
SHEET:

COMPANY:

2016-06-13

1/4

1/1

ITP of PAMPA SUL Coal Fired Power Plant ProjectSteel Structure


PAMPA SUL 1X340MW
Project NamePAMPA SUL 1*340MW Coal Fired Power Plant Project

Dongfang Boiler Group Co., LTD.


Supplier

Shandong YiJiehongfeng Steel Structure Co.,Ltd.


/
04899
Manufacturer /location
No.04899 Haifeng Road, Binhai Economic Zone Weifang, Shandong,
China-261108

W117432
LUDIAN Project No
ITP No./
PA5-PI-DB-02-M01-003/0B
Revision

Equipment Name

Equipment No

SN

Steel Structure
(Flue Air duct, fixture device; Air duct, fixture device, Buckstay,Ash bucket)

Inspection items and test


content

Raw material quality


certificate(including
welding
material,paint,high
strength bolt)

The surface quality check and


dimension check for steel

Equipment
Quantity

Inspection
Reference

Acceptance
criteria

GB/T1591-2008

GB/T1591-2008

GB/T700-2006

GB/T700-2006

GB/T8162-2008

GB/T8162-2008

GB/T700-2006

GB/T700-2006

quality

GB/T1231-2006

GB/T1231-2006

certificate

GB50205-2001

GB50205-2001

drawing

According to the
drawings

Quantity of inspection
Manufacture

LUDIAN/ S

Supervision method

Remark

Manufacture LUDIAN/ S Owner

Raw

100%

100%

100%

Spot check

material

Check
recode

WPS
3

WPSPQRWPQ

AWS D1.1 2010

AWS D1.1 2010

100%

100%

PQR
WPQ
Certificate

NDT personnel qualification


examination

of NDT

SNT-TC-1A

SNT-TC-1A

100%

100%

personnel
qualificatio
n

Heat treatment report, curve

inspection (carbon steel 36


mm/ low alloy steel 32 mm

Heat

PWHT Procedure

PWHT Procedure

100%

100%

butt weld or higher)

welding visual inspection

inspection

report,
curve

AWS D1.1 2010


Table 6.1&
Drawing

Welding NDE report

treatment

AWS D1.1 2010


Table 6.1&
Drawing

100%

100%

According to the
drawings

100%

100%

According to the
drawings

100%

Spot check

Sa2.5

100%

Spot check

Technical
agreement
drawing

Check
recode
NDE
report

For vertical Shaft beam

Main dimension check and


dimension check of high

drawing

Check
recode

strength bolt hole

Sand blasting quality

Technical

inspection

agreement

Check
recode

Technical
10

The paint quality inspection

agreement

Painting procedure

100%

Spot check

ASTM A123
Drawing

100%

Spot check

Technical
agreement

100%

Spot check

Painting procedure
The galvanized quality

11

inspection; Coating thickness


measurement

12

Final inspection

ASTM A123
Drawing
Technical
agreement

Check
recode

Check
recode

documetn

Remarks:
1. The clause Supervision method refers to R/W/H (Review/ Witness/ Hold);
2. S Refer to supervision sub-contractor of LUDIAN.
H: /
Holding Point: Customer and Organization will witness the inspection/test beyond which this work can not proceed without the Customer/Organization
approval in written.
W:
Witness Point: Organization (may also including Customer) shall witness the inspection/test beyond which the work can proceed.
R: /
Review Point: The inspection/test shall be implemented, witnessed and recorded by Suppliers, but these Records may be checked by Customer or
Organization.
3
IF there are any differences between the inspection Reference and the standard of drawing please take the standard of drawing as the standard
4
TESE sequence is subjected to the standarddrawing and process requirements and process requirements.