A. Project tittle: Waste/recycling within barangay four
B. Project manpower: Michael Jhnosep B. tulang
C. School/College/unit: Bukidnon State University
D. Co-operators: Barangay Four
E. Clientele: Barangay Four
F. Target area/SPE: Barangay Four Malaybalay City, Bukidnon
G. Project duration: Start in June 10, 2016 end on June 30, 2016

H. Abstract
The study had mainly focused within the garbage/waste recycling within
barangay four. This study determined problems that may harm or affect the
people within the community. The wastes that is segregated properly, will
dangerously affect not only the community but the people who lives there.
However, these wastes such as recyclable materials can be reused and
transform it into a useful product by recycling it, that will really help a lot the
people in the community. This presentation gives an overview of the project
proposal within the community, and the products that will be made out of the
recycled materials that will give them extra income for their living.

I. Context
Nowadays the community was highly disturbed by the proper waste
disposal within the community. Based on the survey, the number one problem
that the community is facing was all about the waste disposal. This rapid
growth of wastes, that the community officials is very concerned. On how they
will segregate the wastes materials. So that they would be able to get income
and be able to help the people who needs extra income in the community.

J. Rationale
This project was primarily made because it will make the environment
clean and green, it is also the way to keep the wastes that can be recycled
useful and would be able to help the people with in the community earn for
their living. Recyclable materials include many kinds of glass, paper, metal,
plastic, tires, textiles and electronics. The barangay is said to have a program
that was planned to help the people in the community in making handicrafts
such as plastic bags converted from the sacks.

There are so many ways to recycle materials if the barangay would have
enough fund for the people living there run the said program that would help
them earn and provide for their living. Recycling a material can also produce a
fresh supply of the same material. For example, used office paper can be
converted into new office paper like the papers sold in the market that has
been through in a long process. However, this is often difficult or too expensive,
compared with producing the same product from raw materials or other
sources.

K. Objectives
Main Objective:
- Help the people with in the community earn money for their living by
running a program with using recyclable materials;
- To reduce the wastes materials within the community and recycle it into
a useful materials;
- To withhold environment clean and green.

L. Project Description
The project is a container or garbage bin which is safe or danger free,
because the process of making these containers or garbage bin was fully
secured by the chemicals that can cause diseases to the people in the
community, and also making of these containers or garbage bin made sure that
it will not be the reason to the mosquitos to live. In every garbage bin that will
be made will cost 8,464 for a total of 33,856 in four garbage bin. The garbage
bin that will be made is 64 feet, it will last for five years and its capacity for
the bottles that will be collected is 10-15 kg.

M. Blueprint

N. Expected Output

Hazardous Waste Pickup- This kind of project is one of the separated


containers or garbage bin the program will have, it separates the hazardous
wastes from the other that can be used for recycling.
Recycling Services- The barangay is now implementing a livelihood program
in which the collected garbages that can be recycled will be used as the main
material in making the livelihood outputs that the community and the people
behind the program will benefit with the said project and will serve the greater
environment.
Portable Storage- Portable storage solutions give you a safe, cost-effective way
to store and protect your materials, equipment, and valuable assets.

O. Gantt Chart

Q1
Jan

Feb

March

Giving entry letter to barangay 4


making CNAs questionnaire
Conduct survey
Gathering of CNAS results
Identifying the problem
Making project proposal tittle, Abstract and Gantt
chart
Finishing all part of the project proposal

Q2
April
Canvass of Materials

May

June

Buying of Materials
Materialsof Materials
Quantity
Checking

Unit Cost

Amount

Specification
Implementation
of the4 project (start
Angel Bar
410and End) 1640
Plain sheet and Evaluation of the210
Monitoring
project and 3600
18 the barangay
turnover the project to
Welding rod
1
70
70
Tie Wire
1
70
70
Labor Cost
2 labor/welder

250

6750

P. Budget
ESTIMATED COST OF PROPOSED WORK

Total Material Cost = 12,130

Q. Partner (Acknowledgement)
The researcher would like to extend his heartfelt gratitude to the following people who in
one way or another helped and supported him in accomplishing this study.
First and foremost, to the Almighty God who never failed to hear every prayer uttered by
the researcher and for the love and blessings showered upon him.
To Mr. Jose Benito Ronolo for his advice, corrections, suggestions, constant support and
guidance in editing this paper, and for the wisdom he had imparted to the researcher.
To my parents Mr. and Mrs. Tulang for their guidance, encouragement, financial and
moral support.
To the barangay captain, Mr. Crispin Pepito for his encouragement and for the approval
they had given to the researcher to conduct the study in Barangay 4, Malaybalay City.
To the researchers friends for the support, prayers, compliments and encouragement.

Bukidnon State University


College of Community Education and Industrial Technology
Bachelor of Science in Community Development

Project Proposal

Waste/recycling within barangay four


In partial fulfillment of the subject CD 113

(Program Development and Feasibility Study)

Submitted by:
Michael Jhonsep B. Tulang
Submitted to:
Jose Benito C. Ronolo
Date: March 15, 2016

You might also like