You are on page 1of 2

C8017 PL3 Architecture Programme updated on 28 Apr 16

Activity ID

Classic WBS Layout

Activity Name

Architecture Works
Procurement/Manufacturing/Fabrication
A1000
A1010
A1020
A1030
A1040
A1050
A1060
A1070
A1080
A1090
A1100
A1110
A1120

Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement

for Glass Doors&Pannels (Fire Rated 1Hr for shops)


for Louvres & Ventilation Pannels (VS)
for Cladding
for Ceiling System
for Tile (Homogenous Anti slip, Tactiles)
for Catladder, Grating, glass pannels
for Concrete masonary unit - Block wall
for 1.1m SS Hand Rail at STC2, Exit STC
for Roof pannels Linkway, Exit Staircase, Platform, Staircase 2, Escalator, Ramp area
for 1.5m High Tempered Laminated glass barrier
for Al.Framed Glass pannels(Windows)
for SS CAT Ladders
for Gutter with RWDP

Installation
Concourse Level
Non Public Area
A1130
[PL3-CON-NP] Floor Finishes
A1140
[PL3-CON-NP] Wall Finishes
A1150
[PL3-CON-NP] Ceiling Finishes
Public Area
A1160
[PL3-CON-PA] Floor Finishes
A1170
[PL3-CON-PA] Wall Finishes
A1180
[PL3-CON-PA] Ceiling Finishes
A1370
[PL3-LKR-PA] Signage Finishes
Linkway Ramp Area
Non Public Area
A1190
[PL3-LKR-NP] Floor Finishes
A1200
[PL3-LKR-NP] Wall Finishes
A1210
[PL3-LKR-NP] Ceiling Finishes
Public Area
A1220
[PL3-LKR-PA] Floor Finishes
A1230
[PL3-LKR-PA] Wall Finishes
A1240
[PL3-LKR-PA] Ceiling Finishes
A1360
[PL3-LKR-PA] Hand Rails, Signages Finishes
Underplatform Level
Non Public Area
A1250
[PL3-UPL-NP] Floor Finishes
A1260
[PL3-UPL-NP] Wall Finishes
A1270
[PL3-UPL-NP] Ceiling Finishes
Platform Level
Non Public Area
A1280
[PL3-PLT-NP] Floor Finishes
A1290
[PL3-PLT-NP] Wall Finishes
A1300
[PL3-PLT-NP] Ceiling Finishes
Public Area
A1310
[PL3-PLT-PA] Floor Finishes
A1320
[PL3-PLT-PA] Wall Finishes
A1330
[PL3-PLT-PA] Ceiling Finishes
A1340
[PL3-PLT-PA] 1.5m High Tempered Laminated glass barrier Finishes
A1350
[PL3-PLT-PA] RWDP and GUTTER Finishes
Exit Staircase
Public Area
A1400
[PL3-EST-PA] Floor Finishes
A1410
[PL3-EST-PA] Wall Finishes
A1420
[PL3-EST-PA] Ceiling Finishes
A1430
[PL3-EST-PA] Hand Rails, Signages Finishes
Covered Linkway at Ave4
Public Area
A1380
[PL3-CLW-PA] Floor Finishes
A1390
[PL3-CLW-PA] Ceiling/Roof Finishes
Actual Work

Critical Remaining Work

Remaining Work

Milestone

5d 01-Jun-16

05-Jun-16

147d

June 2016
July 2016
06
13
20
27
04
05-Jun-16, C8017 PL3 Architecture Programme upd

5d 01-Jun-16

05-Jun-16

147d

05-Jun-16, Architecture Works

5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d

05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16

147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
0d
0d
0d

05-Jun-16, Procurement/Manufacturing/Fabrication
Procurement for Glass Doors&Pannels (Fire Rated
Procurement for Louvres & Ventilation Pannels (VS
Procurement for Cladding
Procurement for Ceiling System
Procurement for Tile (Homogenous Anti slip, Tactile
Procurement for Catladder, Grating, glass pannels
Procurement for Concrete masonary unit - Block wa
Procurement for 1.1m SS Hand Rail at STC2, Exit S
Procurement for Roof pannels Linkway, Exit Stairca
Procurement for 1.5m High Tempered Laminated gla
Procurement for Al.Framed Glass pannels(Windows
Procurement for SS CAT Ladders
Procurement for Gutter with RWDP
05-Jun-16, Installation
05-Jun-16, Concourse Level
05-Jun-16, Non Public Area
[PL3-CON-NP] Floor Finishes
[PL3-CON-NP] Wall Finishes
[PL3-CON-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-CON-PA] Floor Finishes
[PL3-CON-PA] Wall Finishes
[PL3-CON-PA] Ceiling Finishes
[PL3-LKR-PA] Signage Finishes
05-Jun-16, Linkway Ramp Area
05-Jun-16, Non Public Area
[PL3-LKR-NP] Floor Finishes
[PL3-LKR-NP] Wall Finishes
[PL3-LKR-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-LKR-PA] Floor Finishes
[PL3-LKR-PA] Wall Finishes
[PL3-LKR-PA] Ceiling Finishes
[PL3-LKR-PA] Hand Rails, Signages Finishes
05-Jun-16, Underplatform Level
05-Jun-16, Non Public Area
[PL3-UPL-NP] Floor Finishes
[PL3-UPL-NP] Wall Finishes
[PL3-UPL-NP] Ceiling Finishes
05-Jun-16, Platform Level
05-Jun-16, Non Public Area
[PL3-PLT-NP] Floor Finishes
[PL3-PLT-NP] Wall Finishes
[PL3-PLT-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-PLT-PA] Floor Finishes
[PL3-PLT-PA] Wall Finishes
[PL3-PLT-PA] Ceiling Finishes
[PL3-PLT-PA] 1.5m High Tempered Laminated glas
[PL3-PLT-PA] RWDP and GUTTER Finishes
05-Jun-16, Exit Staircase
05-Jun-16, Public Area
[PL3-EST-PA] Floor Finishes
[PL3-EST-PA] Wall Finishes
[PL3-EST-PA] Ceiling Finishes
[PL3-EST-PA] Hand Rails, Signages Finishes
05-Jun-16, Covered Linkway at Ave4
05-Jun-16, Public Area
[PL3-CLW-PA] Floor Finishes
[PL3-CLW-PA] Ceiling/Roof Finishes

Original Start
Duration

C8017 PL3 Architecture Programme updated on 28 Apr 16

Summary

28-Apr-16 11:52

01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
Page 1 of 2

Finish

Total Float
02

0d

0d
0d

0d

0d
0d

0d
0d

0d

0d
0d

0d
0d

09

May 2016
16

23

30

TASK filter: All Activities


Oracle Corporation

C8017 PL3 Architecture Programme updated on 28 Apr 16


Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

New Roller Shutter (Remove Existing)


A1440
Demolishing Existing Roller shutter/ Shut off Automated system/Removal
A1450
Proposed new location install new Roller Shutter
A1460
Temperary Swing Gate Finishes

Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

5d
5d
5d
5d

01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16

Page 2 of 2

28-Apr-16 11:52
Finish

Total Float
02

05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16

0d

09

May 2016
16

23

30

June 2016
July 2016
06
13
20
27
04
05-Jun-16, New Roller Shutter (Remove Existing)
Demolishing Existing Roller shutter/ Shut off Autom
Proposed new location install new Roller Shutter
Temperary Swing Gate Finishes

TASK filter: All Activities


Oracle Corporation

You might also like