COMMITTEE TOTAL Rehab MASJID AL Jami - Ikhsan

VILLAGE CIKEDONDONG Kec. BANTARSARI KAB. CILACAP


Jl Bj Gedang Cikedondong RT.07/01 Imam. Hp. 085728405012
No: 06 / PPMI / V / 2009
Attachments: 1 Bendel
Subject: Request for help
To:
Designation. Moslems and Moslem
In place

Salam Sejahtera.
We hereby Development Committee Jami Masjid Al-Ikhsan Village District
Cikedondong Bantarsari Cilacap District pleaded to help fund the total merehab
Buildings Jami Masjid Al-Ikhsan existing buildings because it does not allow
for the occupied as a means of worship and a decent infrastructure, so that it can
reduce seriousness / kehusuan process of worship in GOD Almighty.
Therefore the committee agreed to dismantle and rebuild the Masjid Jami AlIkhsan accordance with the agreed bestek picture together. For the rebuilding of
Jami Mosque in Al-Ikhsan expected to cost USD 703 725 000, - (Seven
Hundred Three Million Seven Hundred Twenty Five Thousand), while funds
that have been collected now as much as USD 107 545 000, - (Seven Hundred
Million Five Hundred Forty-five thousand rupiah) we already spend.
No matter how charitable diberika extremely valuable to the construction of the
mosque, Allah would respond with a reply in kind, and we will be harvesting
them in akherat complaint amen.
Top wish come true this petition we thank you.

Cikedondong, May 15, 2009


Clerk to the Committee Chairman

Ust. Imam Mujib) Slamet Sudiarto

COMMITTEE TOTAL Rehab MASJID AL Jami - Ikhsan


VILLAGE CIKEDONDONG Kec. BANTARSARI KAB. CILACAP
I. INTRODUCTION
Praise be to Allah SWT, Nabiyulloh sholawat and salutations upon Muhammad
SAW and his Companions and all his people.
Our entire society Cikedondong Village District Bantarsari Cilacap district
realizes how important facilities and infrastructure of worship in congregation
activities and ammah mahdloh good.
For that to say we are all citizens BISMILLAHIRROHMANNIRROHIM
Cikedondong Village Sub District Bantarsari Kilacap will dismantle and rebuild
the Masjid Jami Al-Ikhsan as a manifestation of participating / participated
build a complete Indonesian man particularly in the field of mental / spiritual.
II. BACKGROUND
1. Increasing public awareness of the Village District Cikedondong Bantarsari
congregation in worship activities more and more real.
2. The situation and condition of the existing mosque is less qualified, because
kondisinnya are already alarming.
3. With the support of community spirit and desire together to implement
activities meronvasi mosque to worship in congregation place that qualifies the
completeness of a mosque.
III. PURPOSE AND OBJECTIVES
1. Improve syia'ar Islam in the Village District Cikedondong Bantarsari
especially in the region and centralize Bojong Gedang activities that have been
going well especially the character of jama'a (was conducted jointly) as one of
the symbols of Islam mirrors.
2. To meet the needs of this cultural facilities religious facilities, with adequate
reference to the actual function of the mosque.
3. Due to the central government is also near the village (Village Hall)
Cikedondong, to have available sufficient places of worship.
IV. INVESTMENT ACTIVITY
Development committees Jami Masjid Al-Ikhsan intend to dismantle and
replace it with a whole new look and image fit the blueprint has been agreed by
the village chief and takmir Jami Masjid Al-Ikhsan Cikedondong Village.
V ESTIMATED COST

TOTAL PLANNING Rehab MASJID AL-Ikhsan Jami CIKEDONDONG


VILLAGE
SUB DISTRICT BANTARSARI CILACAP

NO JOB DESCRIPTION TOTAL COST


I INTRODUCTION 3,454,855.00
SUB OCCUPATION STRUCTURE FOUNDATIONS II 64,709,075.63
JOB STRUCTURE III 238,983,252.04
IV WORK WALLS AND stucco 83,466,164.20
V jamb WORK AND WINDOWS 126,300,000.00
VI stairs 3,553,004.10 WORK
Plumbing WORK VII 24,580,219.25
SANITATION WORK VIII 1,200,000.00
48,307,451.20 CERAMIC FLOOR WORK IX
X 20,062,239.10 CEILING WORK
XI OCCUPATION AND WATER Proofing 53,933,058.96 Painting
XII lightning rod 8,416,600.00 WORK
XIII WORK electrical 17,910,000.00
XIV WORK OUTSIDE THE BUILDING 500,000.00
INTERIOR WORK XV 8,350,000.00
A NUMBER OF PHYSICAL 703,725,919.47
B rounded 703,725,000.00
Amount: THREE MILLION SEVEN hundred and seven hundred twenty five
thousand rupiah

Cikedondong, 15 May 2009


Approved By: Knowing: Created By:

(SATUM) (Slamet Sudiarto) (faqih Rohman, ST)


Mosque Management Committee of the Village Head and designer instructure
VI. COMPOSITION OF THE COMMITTEE
Al-Jami Mosque Development Committee - Village Ikhsan Cikedondong:
1. Responsible: Mr. Village Head Cikedondong (Satum)
2. Advisor: 1. K. Anwarudin
: 2. H. Sulaiman
3. K. Mujahidin
3. Committee Chairman: Slamet Sudiarto
4. Secretary: Ust Imam Mujib
5. Treasurer: Edi Karsono
6. Planning Technique: Faqih Rohman, ST
7. Section - section:
Procurement funds: Slamet Sudiarto, Ust. Taufik Hidayat
Hardware: Ust. Rohehan
Kosumsi: Ny, Fatonah, Ny, Siti Zaetun
PR: Tursino, S. Pd, K. Mujahidin, Muhibin
VII. LOCATION MASJID AL Jami Ikhsan
Jl. Bojong Gedang Rt. 7.1 Cikedondong Village Kec. Bantarsari Kab. Cilacap,
Central Java, West Village Hall Cikedondong.
VIII. CLOSING
Thus this proposal we made. Wish come true is our hope for our application.
Thanks
Cikedondong, 15 May 2009
Clerk to the Committee Chairman
(Ust. Imam Mujib) (Slamet Sudiarto)