Professional Documents
Culture Documents
39
Geographical Site
Bhagwanpur
Situation
Time defined as
Latitude
Legal Time
Albedo
Bhagwanpur
Meteo data:
Simulation variant :
Country
30.1N
Time zone UT+5.5
0.20
Synthetic - Solar GIS
Longitude
Altitude
India
77.8E
309 m
36 MWp SGIS
Simulation date
30/07/16 14h27
Simulation parameters
Azimuth
Summer Tilt
Models used
Transposition
Horizon
Free Horizon
Near Shadings
No Shadings
PV Array Characteristics
PV module
Si-poly
Model
Manufacturer
Number of PV modules
Total number of PV modules
Array global power
Array operating characteristics (50C)
Total area
In series
Nb. modules
Nominal (STC)
U mpp
Module area
Model
Manufacturer
Operating Voltage
Inverter
Characteristics
Inverter pack
Nb. of inverters
0
5
Winter season
Winter Tilt
Perez
Diffuse
O-N-D-J-F-M
25
Erbs, Meteonorm
TP672P-310
Talesun Solar (Zhongli)
20 modules
116140
36003 kWp
646 V
225358 m
In parallel
Unit Nom. Power
At operating cond.
I mpp
Cell area
5807 strings
310 Wp
31987 kWp (50C)
49488 A
203483 m
1250KW_SOLAR PCS
HITACHI
525-900 V
Unit Nom. Power
1250 kWac
24 units
30000 kWac
Total Power
External transformer
0.22 mOhm
Loss Fraction
1.5 % at STC
1 - bo (1/cos i - 1)
Loss Fraction
Loss Fraction
Loss Fraction
bo Param.
2.0 %
0.0 %
1.0 % at MPP
0.05
33 kV
9142 m
35484 W
0.1 mOhm
Loss Fraction
Loss Fraction
Loss Fraction
0.8 % at STC
0.1 % at STC
1.8 % at STC
Time fraction
2.0 %
IAM =
Grid Voltage
Wires: 3x700.0 mm
Iron loss (24H connexion)
Resistive/Inductive losses
2.0 %
0.0 W/mK / m/s
29.0 W/mK
Loss Fraction
Uv (wind)
Uc (const)
PVSYST V6.39
User's needs :
Auxiliaries loss
0W
0.0 kW
PVSYST V6.39
Simulation variant :
36 MWp SGIS
System type
Seasonal tilt: summer/winter
Model
Nb. of modules
Model
Nb. of units
Unlimited load (grid)
Produced Energy
Performance Ratio PR
Grid-Connected
5/25
azimuth
TP672P-310
Pnom
116140
Pnom total
1250KW_SOLAR PCS
Pnom
24.0
Pnom total
55400 MWh/year
78.7 %
Specific prod.
1539 kWh/kWp/year
Performance Ratio PR
1.0
0
310 Wp
36003 kWp
1250 kW ac
30000 kW ac
Performance Ratio PR
0.8
6
0.6
0.4
2
0.2
1
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
0.0
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
36 MWp SGIS
Balances and main results
GlobHor
T Amb
GlobInc
GlobEff
EArray
E_Grid
EffArrR
EffSysR
kWh/m
kWh/m
kWh/m
MWh
MWh
January
89.0
12.20
117.7
111.9
3758
3401
14.17
12.82
February
116.0
15.60
147.4
140.7
4609
4448
13.87
13.39
March
172.0
21.50
198.9
189.8
5984
5780
13.35
12.90
April
190.0
28.10
194.0
184.2
5635
4864
12.89
11.13
May
203.0
32.40
204.0
193.5
5807
5618
12.63
12.22
June
170.0
33.30
169.6
160.4
4862
4706
12.72
12.31
July
145.0
30.10
144.8
136.6
4245
4107
13.01
12.59
August
147.0
28.10
148.2
139.8
4389
4245
13.14
12.71
September
145.0
26.10
149.1
141.0
4430
4281
13.19
12.74
October
150.0
22.20
185.5
177.3
5581
5387
13.35
12.89
November
113.0
17.20
155.5
148.4
4829
4665
13.78
13.31
December
97.0
12.89
140.0
133.5
4440
3899
14.07
12.35
1737.0
23.34
1954.7
1857.2
58571
55400
13.30
12.58
Year
Legends:
GlobHor
EArray
T Amb
Ambient Temperature
E_Grid
GlobInc
EffArrR
GlobEff
EffSysR
Nov
Dec
PVSYST V6.39
Simulation variant :
36 MWp SGIS
System type
Seasonal tilt: summer/winter
Model
Nb. of modules
Model
Nb. of units
Unlimited load (grid)
Grid-Connected
5/25
azimuth
TP672P-310
Pnom
116140
Pnom total
1250KW_SOLAR PCS
Pnom
24.0
Pnom total
0
310 Wp
36003 kWp
1250 kW ac
30000 kW ac
1737 kWh/m
PV conversion
-0.4%
-8.6%
66967324 kWh
-2.0%
-1.0%
-1.0%
58573016 kWh
-1.5%
0.0%
0.0%
0.0%
0.0%
0.0%
-2.1%
System unavailability
57698748 kWh
55400081 kWh
-0.4%
AC ohmic loss
-1.5%