You are on page 1of 264

s ub ma r in e cabl e

ALMANAC

18
I S S U E

Voice

of the
Industry

While all reasonable steps to verify information from the public domain have
been taken, based on changing circumstances and dynamic factors, incomplete
information subject to change may exist. Our goal is to periodically update
and modify such information. If you have a correction, please let us know by
completing our Submarine Almanac Update Form, available by clicking here, or
by emailing almanac@subtelforum.com.

FOREWORD

elcome to the eighteenth edition of the Submarine Cable Almanac, one of


our most popular reference tools. In this issue we updated 154 systems
and added 1 new system.

Coinciding with the recent release of our new interactive Submarine Cables of the
World online map, we have added a News field, where you can find the current
news related to a cable system, if available.
If youre interested in finding a specific system, or wish to see all systems in a
region, simply type that name or region into the search function. We hope that
you, our readers, will participate in this almanac as youve done with our previous
products.
There is always room for additional data, so let us know if there is something
else we should include in future editions. Please let us know by completing our
Submarine Almanac Update Form, available by clicking here, or by emailing
almanac@subtelforum.com.

Submarine Cable Almanac

Finally, I want to thank all of the sponsors, staff and dedicated readers that
contributed to this Almanac. Your feedback has been invaluable.

Issue 18 | May 2016

Copyright 2016 by Submarine Telecoms Forum, Inc.


Kristian Nielsen
+1 703.444.0845
Vice President
www.subtelforum.com

All rights reserved. No part of this book may be used or reproduced by any means,
graphic, eletronic, or mechanical, including photocopying, recording, taping or by
any information storage retrieval system without the written permission of the
publisher except in the case of brief quotations embodied in critical articles and
reviews.
Submarine Telecoms Forum, Inc.
21495 Ridgetop Circle
Suite 201
Sterling, Virginia 20166
USA
www.subtelforum.com

Hotellneset

Greenland

Quint
illion Subs

ea

Svalbard

Barrow
Wainwright

Prudhoe
Bay

Andoy

Harstad

Point
Hope

Seydisfjordur

Iceland

Fa

ric

Sweden

e-

Landeyjarsandur

Umea
Vaasa

Danice

Finland

Den
mar
k
-Ru
ssia

Lio
n
Se
a

Aranci

Otranto

MINE

HSC
S

Pontianak

eMa

GOKI

PPC-1

Papua

SMPCS

I-ME

W
-3
SM

RF
WA

OM

SKKL-JS

Makassar

Madang

Papua New
Guinea

Jakarta

Dar es
Salaam

MA
TA

Surabaja
Jember

RA

Mataram

M-K

UP
AN

Noro

Point
Moresby

Waingapu

Van

uatu

AP

Zambia

Sy

LIO

Luganville
Port
Vila

Mauritius-Rodrigues

Mouli
Island

Port
Hedland

Jacotet

Poindimie

IS
UR

Go

-1

AT

wa

NN

LA

NT

IS

SA

-2

Ha

Melkbosstrand
Cape
Town

TA

UN

Perth

AT

SA

SAFE

Brookvale
Sydney
Oxford
Falls

Adelaide

APX-Central
ur
lbo

SAFE

ne

Bass
Strait 1

Boat
Harbour

Austral

Hobart

Santa
Cruz
Tierra
del Fuego

Map Key

Black Line =
In Service

Antarctica

Whe
Auckla

h int
erloc Po
Inv ndy
Sa

Stanley

Blue Line =
Upgraded System

iki

APX-East
TASMAN 2

Southern Cross
Tasman Global
Access

Me

Bass
Strait 2

Puerto
Montt

Red Line =
Planned/Under
Construction

iki

Mtunzini
Durban

AN

Las
Toninas

Punta
Arenas

r
ou
av st
s
Ea
X- Cros
AP rn
iki
uthe Hawa

de

En

So

Maldonado
TE

ICN1

wa

Australia

Ha

-2
NG

AP

Maputo

Uruguay

Lifou

Noum'ea

Onslow

AW

iki

Baie du

Walvis
Bay

South
Africa

Argentina

wa
Ha

EAS

st

SEA

W-3

Toliary

-We
APX
ASC

as

ag

ad

r
ca

IC

ent

Zimbabwe
Botswana

Swakopmund

-PN

CN

AJC

Lucira

Mayotte

Florianopolis

Valparaiso

Auki

Kupang

Mozambique

SM

Chile

Maluku

eM

Toweli
Sulawesi
sin

2LaD

Trid

Santos

Marshall
Islands

Micronesia

Bandjerma
JaKa

ON-

Angola

Namibia

Sao
Paulo

aD

Pangkalanbun

Tomasina

Paraguay

Manado

Tandjoeng Ja
Ka
Sangatta
2L

Indonesia

Ketapang

LI

Benguela

Arica

Rio de
Janeiro

EAC-C2C

E1

Kuching

re

Luanda

Namibe

Papeete
Moorea

RU

-1

Bintulu

Malaysia

apo

Porto
Amboim

Reagan
Test Site

Ebeye

NT

Solomons

SAC

Monet

Seabras-1

AMX
Globenet

HA

Bolivia

Vaitape
Uturoa
Huahine

il

esiaCS

nd
wa
na
-1

PANAM

una
Fut

Wa

llis&

Pago
Pago

SAC

iji

SAM-

a-F

mo

n Sa

ca

eri

raz

CS

Micron

US

Best

Davao

Katong
Sing

COM

ARC
OSSAM 1
-1

SAC

ana
Mo

n-B

SA

Tanzania

A-

SE

Kota
Kinabalu

Kuantan
Me
rsing
Dumai

Kenya

Mombasa

Nzeto

roo

SA

ADONES

st

ss

Ea

Cro

XAP

ern

iki

uth

ss

wa

So

Cro

Ha

ern

uth
So

AS

me

-1

Salvador

Penang

Mogadishu

Rwanda
Burundi

Piti

Palau

la

Medan

JASUKA

Ca

Brazil

SAPL

iji

Am

Democratic
Republic of
the Congo

Cabinda
Soyo

Lima
Lurin

Colombo

Uganda

Congo

Pointe
Noire

Yap

gkh

ON

ASC

Gabon

lau

Pa

Philippines

on

Honotu

Samoa

a-F

Libreville

Fortaleza

Peru

mo

na

nta

Salinas

Samoa

Son

FALC

Kribi

Sa

dor

Ecua

rum

nd

va

Tri

Tum
m

ua

-G

SC

DD

Male

Bata

Puerto
Mncora

Somalia

Ethiopia

South
Sudan

Central
African
Republic

Cameroon
Douala

FE

Eu

Port
Harcourt
On

SC

SA

lali

nk

Main
NC

EA
SS
AA
y
E1
TE
AM
S

ta Gord

Nigeria

Cotonou
Lagos
Lome

AC

Accra

G-P

an

law

AJ

PCCS

Abidjan

SEA-US
AAG

Capepisa
Batangas
Pa

PPC-1

C-BUS

cas I

-1

OS-1

SA

ARC

Ameri

CFX-1

PCC

Pun

1
SAM-

de

av

ou

IS-2

En

Cte
d'Ivoire

SE

Monrovia

Sihanoukville
Vung Tau

G
AP MCT

-1

CS

-2

Cayenne

TPC-5

La Union

ay-

rac

Bo

H
VG
AA CN
AP

Freetown

-3

ANT
ATL

GLO

WA

SAT

CS

Cochin

SJC
APCN
2

T-

Ghana Benin
Togo

Conakry

-S

Georgetown

Djibouti

AAG

AA

SMW
-3
APG

Cambodia

Sri
Racha

M-T

s II

ne

Da Nang

APCN2

Petchaburi

i2i

AAE-1

China-US
C
C
SJ C-C2 N-IA C
EA TGC-C2
EA E
AS

Ballesteros

Pyapon

TG
N
TIS TIC
ICS

To

APC

he

uc

Shantou

Laos

Thailand

Guinea

be

ica

Kh

Chennai

er

SG

Venezuela

Glo

Am

Puerto
dad
Viejo Trini

Colombia

Manta

-C

ulna

BB

ri

/SE
Eurasia -5
SMW

Aden
AAE-1

cas Camu

Cara

TGN

CON
FAL

Al Hudaydah

SMW-3

na

Al Ghaydah

Yemen

Eritrea

Sudan

Chad
Burkina
Faso

SMW-4
FEA

ge

msta

SAT

Tolu

Wille

ch

Mali

Senegal

Sucujaque

ACE

Ustupo

nquill

Dakar

Banjul

n One

tt
y Pra
Batterama City
Pan

rra

rta

wn

Mai

Puerto
Limon

ha

Ba

Ca

PCCS

to

SMW-

ge

-US

PC-

China-US

N2

KI

id

X
AM
et s-1
on
M abra et
Se oben
I
Gl M-1 s
SA erica
C
Am SA

SAP

Praia
Br

Tong
Fuk

Vietnam

ng

GO

Japan

Okinawa

Cox's
Bazaar

Myanmar
ai

nn

he

NCP
TPE

China-US

-3

C-

ECFS

Americas II

Pacific Light

TP

PAC
Rio

Khulna

Mumbai

ACO

NA

PA

TPC-5

Faster

sia

a-1

India

ON

TGN Transpacific
UNITY

-5
TPC C
-C2
AL
RN
G
AP
-2
A
FE APCN

AJC

ne

Alb

PAC
SAC

A-

Bangladesh

LC

-1

AAE

TGN Transpacific

AJC

be

AY

FA

Muscat

East-West

Glo

AM

Bluefields

Al Seeb

Oman

Port
Sudan

Niger

an

PL

Puerto Puerto Trojillo Puerto


Puerto Barrios Cortes
Lempira
San Jose
Puerto
Cabezas

AMX

Nouakchott

g Kw

Fibralink
SA

PA

UAE

Jeddah

Mauritania
San
Juan

Pali

un

ble

Montego Ocho
Bay Rios

Tse

o Ca

Ladyville

CJFS

ra
jai

am

AMX

Half-Moon
Bay

Karachi

Japan-US

Emi

Wada

EAC

Fuzhou
TWA-1

Toyohashi
Shima

SM

Chabahar
Dubai

Kochi

Miyazaki

Bhutan

Halul

Saudi
Arabia

Kitakyushu

C-J FOS

Nepal

Fu

Tulum
Samuel L
Spencer
Beach

Al-Khobar
Manama

Japan

Fukuoka

PC-1

Sendai
Niigata
Naoetsu
Kitaibaraki
Matsutou Ajigaura
Ibaraki

Bandar
Abbas

Egypt

Cancun

Oah

Libya

II

tan

X-

Algeria

Sardinia
Alta
Vista

s
ica

an

CF

El Medano

III

er
Am

OS-

Gu

bus

Colum

Hamada

Chongming
Shanghai

Pakistan
Kharg
Bushehr

Kuwait
City

Akita

RJ

Kumihama

Pusan
Keoje

TP

China

Iran
Al Faw

Aqaba

Zafarana

et

bu
lum C
MA

Co

ARC

Mazatlan
Havana

la

Keawau

Se

Globen

BIC

bus

um

Col

AM
Mo X
ne
t
ab
ras
-1

s II

Freeport
Boca Raton
Hollywood
Miami

Mexico

M-1

SA

ast

X-E

AP

Am

Vero
Beach

CS

ITY

UN

eri

BP-GOM

Ras Sidr

TP

Afghanistan

Iraq

Tel Aviv

Israel

Alexandria

AA

Darnah
Benghazi

hazi

TP
E
RN
AP AL
CN

Beirut
Haifa

Tripoli-Beng

Tripoli

na
Ca

Tunisia

Qingdao

Syria

AP

Tartus

an

sh

MINERVA

Morocco

Link

HAW

RO

RJK

ng

XA ND

South
Korea

Fa

ha

nc

Fu

II

CN

Tajikistan

TGN Intra-A

Ingleside

sI

ca

RJ

North
Korea

Uzbekistan

on
he
Inc n
ea
Ta

Suez

Jacksonville

Carac

Cro

PC

-US
SEA

ern

Turkmenistan

ALE

Teutan

Casablanca
St.
David's

Pascagoula
uth

So

Kyrgyzstan

Armenia

Turkey
Marmaris

RVA

ss

an-US
Jap
AAG
-5
TPC

Georgia

Istanbul

UR

IT

Greece
Lechaina Koropi

EMOS-1
Pozallo
Klibia

C2

As

et

Corfu

W5

Oran
ilah

Durres

Bari

SM

Annaba

AAE
-1

E-

Med Cable

Poti

System

AS

AA

us Cable

C-

RS

Ses
Covetes

Ishikari

Nakhodka
Caucas

EA

Orv

in
BU
i
be Berm S
ne
t uda

BA

Algiers El Djemila

Sochi

SUB

Com
Sea

gal
Lis
bon

Valencia

OCS

TE
AM
TG EIG S
N GU
LF

MAC

s
xu
l Ne
ba

Gl

PC-1

Barcelona

Spain

Cadiz

lo

G
lo

os
s

iki

Cr
rn

wa

he

Ha

ut

Ponta
Delgada

Nevelsk

Mongolia
Novorossiysk
BSF

Varna

ilus

So

Graciosa

en

ob

Tijuana

C-

Bulgaria

Bar

MedNaut

em

Dubrovnik
Ajaccio

AV

Kazakhstan

Odesa

Romania
Mangalia

EIG

-1

China-US

FL

Faial

San Luis
Grover
Obispo
Beach
Morro
Hermosa
Bay
Beach

Light

S-

RE

Flores

ICA

Tuckerton

CB

Pacific

RV

CO

Corvo

Manasquan

Virginia Beach

Ukraine

Slovakia
Hungary

Slovenia

Savona

Bilbao

Vigo

FR

TPC-5

S-1

NU

CA

RA

United
States

Point
Arena

NCP

China-US
Faster

Lynn

O-1

EU

Japan-US

C
ha
Br rle
oo st
kh ow
av n
en
Northport
Island Park

GL

Mys
Levashova

Far East

R
ITU
BSFOCS

Tran

Austria
Italy

Bordeaux

Okha

Belarus

Czech
Republic

France

St.
Hilaire

Lithuania

Poland

ille

Bandon

Plerin

Sventoji

Dueodde

Penmarch

N
TG rn
ste e
We rop
Eu

Magadan

Latvia

Liepaja

rse

Florence
ific

Guernsey
Lannion

AEC
ntic
ia-Atla
Hibern
FA-1 atlantic
TGN Trans atlantic
TGN Trans
AC-2
Apollo
TAT-14 ss
ia Expre
Hibern
AC-1
Apollo
FA-1
c
Fibre Atlanti
AEC-2

Hibe

Halifax

Bro
ad
sta
irs
Ca
ye
Sa
ux
Va int
-s
le
ur
ry
-M
-e
er
nCa
ux

Kingisepp

Ventspils

Germany

Domburg

Ma

TGN

Pennant
Point

Logi

Norden
De Marne
IJmuiden

Pevensey
Bay

al

Nedonna
Beach

ntic
Atla

rnia-

Milton

Warrenton

spac

Portu

Harbor
Pointe

TUN

NEP

spacific

TPE

Highbridge
Whitesand Bay
Widemouth Bay
no
Porthcur

Russian
Federation

Kotka

Tallin

Estonia

Mielno
Ribnitz-Damgarten Kolobrzeg

Gedser

TGN NE

Southport

United Lowestoft
Kingdom

Oxwich Bay

T-1
TA

PC-1

TGN

head

Holy

Kilmore
Quay

-1

AC

hagen

Copen
Westerland

Redcar
Humanby

Ireland
Dublin

Cork

Port
Alberni

Denm

PAN

Coleraine
Killala

Tran

Gothenburg

ark

Thisted
GEA

Nor

ntic

rnia-Atla

Hibe

Ala
sk
Ala a Un
sk
a Un ited
W
No ited es
rth
Ea t
AK St
st
OR ar
N

Ardendal

Hango

EE-S1

Stockholm
Stavsnas

-1

Banff

LA

Ketchikan

Kristiansand

AT

AK

SE

Petersburg
Wrangell

Tysvaer

Dunnet
Bay

Juneau
Greenland Connect

Hawk
Inlet
Sitka

Kodiak
Narrow
Cape

Angoon

ak
di i
Ko na
Ke

Ayre of
Cara

Helsingfors

Vaddo

Mariehamn

Canada

ALPAL-2

Seward
Homer

BCS
East-Wes
Interlink t

Sandviken

Maywick

Far East

Norway

W-

A-

SM

EF

W-5

SH

Conn

SM

Gree

SMW-3

nland

Qaqortoq

-WE

Valdez

Whittier
Kenai

ect

SMW-5

Nuuk

Anchorage

GB
I
MEN
A
SMW
-5

Nome

Submarine Cables
of The World

New
Zealand

AAE-1.....................................................10

ASC........................................................80

C-BUS...................................................152

FASTER................................................224

AAG.......................................................12

ASE.........................................................82

CEIBA-2...............................................154

FEHMARN BELT...............................226

AC-1.......................................................14

ASH........................................................84

CELTIXCONNECT............................156

FIBRALINK.........................................228

AC-2.......................................................16

ATHENA...............................................86

CFX-1...................................................158

FIBRE ATLANTIC..............................230

ACE........................................................18

ATLANTIS-2.........................................88

CHINA-US..........................................160

FLAG EUROPE-ASIA........................232

ADONES...............................................20

ATLAS OFFSHORE.............................90

CIOS.....................................................162

FLORES-CORVO................................234

ADRIA-1................................................22

AUSTRAL..............................................92

CJFS......................................................164

FOG......................................................236

AEC........................................................24

AWE.......................................................94

C-LION1..............................................166

GBICS...................................................238

AJC.........................................................26

BAHAMAS-2........................................96

COLUMBUS II....................................168

GCN.....................................................240

AKORN.................................................28

BALTICA...............................................98

COLUMBUS III..................................170

GEMINI BERMUDA..........................242

ALASIA.................................................30

BAR-SAV.............................................100

CONCERTO-1.....................................172

GEORGIA-RUSSIA............................244

ALASKA UNITED EAST....................32

BASS STRAIT 2...................................102

CORFU-BAR.......................................174

GLO-1...................................................246

ALASKA UNITED WEST...................34

BBG.......................................................104

DANICA NORTH..............................176

GLOBENET.........................................248

ALBA-1..................................................36

BCS EAST............................................106

DANICA SOUTH...............................178

GO-1.....................................................250

ALETAR.................................................38

BCS EAST-WEST INTERLINK.........108

DANICE..............................................180

GOKI....................................................252

ALEXANDROS....................................40

BCS NORTH.......................................110

DDSCN................................................182

GONDWANA-1.................................254

ALONSO DE OJEDA...........................42

BDM.....................................................112

DENMARK-NORWAY 5...................184

GREENLAND CONNECT...............256

ALPAL-2................................................44

BEST CABLE SYSTEM......................114

DENMARK-NORWAY 6...................186

GUANTNAMO BAY CABLE........258

AMERICAN SAMOA-FIJI..................46

BHARAT-LANKA..............................116

DENMARK-POLAND 2...................188

GWEN..................................................260

AMERICAS I.........................................48

BICS......................................................118

DIDON................................................190

HANNIBAL........................................262

AMERICAS I SOUTH..........................50

BIN.......................................................120

DMCS...................................................192

HANTRU-1.........................................264

AMERICAS II.......................................52

BIOS / JONAH...................................122

EAC-C2C.............................................194

HAWAIKI............................................266

AMERIGO VESPUCCI........................54

BLAST..................................................124

EASSY..................................................196

HAWK CABLE SYSTEM...................268

AMX-1....................................................56

BORACAY-PALAWAN......................126

EAST-WEST........................................198

HIBERNIA ATLANTIC.....................270

ANTEL...................................................58

BOTNIA...............................................128

ECFS.....................................................200

HIBERNIA EXPRESS.........................272

ANTILLES CROSSING.......................60

BRCS....................................................130

EIG........................................................202

HONOTUA.........................................274

APCN 2..................................................62

BRUSA.................................................132

ENDEAVOUR.....................................204

HSCS....................................................276

APG........................................................64

BSCS.....................................................134

ESTEPONA-TETOUAN....................206

HUGO..................................................278

APHRODITE 2.....................................66

BSFOCS................................................136

EULALINK.........................................210

I2I..........................................................280

APNG-2.................................................68

CADMOS............................................138

EUROPA..............................................212

ICN1.....................................................282

APOLLO................................................70

CAMEROON-BRAZIL......................140

FA-1 NORTH/SOUTH......................214

ICN2 (INTERCHANGE II)...............284

APX-CENTRAL....................................72

CANALINK........................................142

FALCON..............................................216

I-ME-WE..............................................286

APX-EAST.............................................74

CANTAT-3...........................................144

FAR EAST............................................218

ITALY-ALBANIA................................288

APX-WEST............................................76

CAUCASUS CABLE SYSTEM.........148

FARICE-1.............................................220

ITALY-GREECE..................................290

ARCOS-1...............................................78

CB-1......................................................150

FARLAND...........................................222

ITALY-LIBYA.......................................292

ITALY-MONACO...............................294

NEPTUNE CANADA........................364

SEA-ME-WE 5.....................................434

TUBROK-EMASED...........................506

JAKA2DELEMA.................................296

NORSEA COM-1................................366

SEA-US................................................436

TWA-1..................................................508

JAKABARE.........................................298

NORTHSTAR......................................368

SG-SCS.................................................438

UGARIT...............................................510

JAPAN-US...........................................300

ORVAL.................................................370

SHEFA 2...............................................440

UNISUR...............................................512

JASUKA...............................................302

PAC.......................................................372

SILPHIUM...........................................442

UNITY..................................................514

KAFOS.................................................304

PALAU-GUAM..................................374

SJC........................................................444

VENTSPILS-GOTLAND...................516

KATTEGAT-2......................................306

PAN-AM..............................................376

SKR1M.................................................446

VMSCS.................................................518

KELTRA-2...........................................308

PANGEA..............................................378

SMPCS.................................................448

WACS...................................................520

KHULNA-CHENNAI.......................310

PC-1......................................................380

SMPR-1................................................450

WARF...................................................522

KJCN....................................................312

PCCS....................................................382

SOCC....................................................452

WESTERN VISAYAS-PALAWAN....524

KODIAK KENAI................................314

PEC.......................................................384

SOLAS..................................................454

KUWAIT-IRAN..................................316

PLCN...................................................386

SOUTHERN CROSS..........................456

LEV.......................................................318

PPC-1...................................................388

SVALBARD.........................................458

LION....................................................320

QATAR-UAE.......................................390

TANGERINE.......................................460

LION-2.................................................322

QUINTILLION SUBSEA...................392

TANNAT.............................................462

MAC.....................................................324

RJCN....................................................394

TASMAN GLOBAL ACCESS...........464

MAIN ONE.........................................326

RNAL...................................................398

TAT 14..................................................466

MAIN ONE EXPANSION.................328

SAC......................................................400

TE NORTH..........................................468

MATRIX...............................................330

SACS....................................................402

TEAMS.................................................470

MAYA-1...............................................332

SAFE.....................................................404

TGN EURASIA...................................472

MBDC..................................................334

SAM-1..................................................406

TGN GULF..........................................474

MCT.....................................................336

SAMOA-FIJI........................................408

TGN INTRA-ASIA.............................476

MED CABLE NETWORK.................338

SAPL.....................................................410

TGN NORTHERN EUROPE............478

MEDNAUTILUS................................340

SAPL CX..............................................412

TGN TRANSATLANTIC..................480

MELITA-1............................................342

SAS-1....................................................414

TGN TRANSPACIFIC.......................482

MENA..................................................344

SAT-3....................................................416

TGN WESTERN EUROPE................484

MIC-1...................................................346

SCAN...................................................418

TGN-TATA INDIACOM...................486

MICRONESIA CABLE SYSTEM......348

SCF-CN................................................420

TGN-TIC..............................................488

MINERVA............................................350

SCOTLAND-ORKNEY-

TIERRA DEL FUEGO........................490

MKCS...................................................352

SHETLAND........................................422

TIS.........................................................492

MOANA..............................................354

SEABRAS-1.........................................424

TONGA-FIJI........................................494

MONET...............................................356

SEACOM.............................................426

TPE.......................................................496

HUAWEI MARINE............................208

MYTHIC..............................................358

SEAK....................................................428

TRIDENT.............................................498

OFS.......................................................146

NCP......................................................360

SEA-ME-WE 3.....................................430

TRINIDAD-CURAAO....................500

STF ANALYTICS................................502

NCSCS.................................................362

SEA-ME-WE 4.....................................432

TSE-1....................................................504

WFN STRATEGIES............................396

SPONSORS

AAE-1

Project Completion Phases:

Ba
rce
Ma lona
rse
ille
s

Pre-Engineering
Survey
System Manufacture

Pa
ler
mo

System Installation
Commissioning & Acceptance

lat Zafrana
Abu Ta

Shanghai
Fujairah

Hong
Kong

Cox Bazaar
Mumbai

Myanmar

Djibouti
Sri Lanka
Kenya
System Name:

Asia Africa Europe [Planned]

Landing Points: Barcelona (Spain), Marseilles (France),


Palermo (Italy), Abu Talat (Egypt), Zafrana
(Egypt), Djibouti, Oman, Fujairah (UAE),
Mumbai (India), Kenya, Sri Lanka, Cox
Bazaar (Bangladesh), Myanmar, Singapore,
Hong Kong, Shanghai (China)
RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$): 600,000,000


Total Length (kms): 25,000
News:

http://subtelforum.com/articles/tag/aae-1/

Singapore
Design Capacity:
Fiber Pairs:

40 Tbps
5

Channels: 80
Channel Capacity:
Owners:

100 Gbps
British Telecom, China Unicom, Chuan Wei,
Djibouti Telecom, Etisalat, HKT (PCCW
Global), Mobily, Omantel, Ooredoo, PTCL,
Telecom Egypt, Telecom Yemen, Vittel,
OTEG, Reliance Jio, Time.com, TOT

System Supplier:

TE SubCom, NEC

System Installer:

TE SubCom

Marine Surveyor: Fugro


Region: Indian Ocean Pan-East Asian

San Luis
Obispo

AAG

Lantau
Sri
Racha Vung
Tau
Mersing
Changi

La Union
Tungku

Keawaula
Tanguisson

System Name:

Asia-America Gateway

Landing Points: Changi (Singapore), Keawaula (Hawaii),


Lantau (Hong Kong), La Union
(Philippines), Mersing (Malaysia), Grover
Beach (USA), Sri Racha (Thailand),
Tanguisson (Guam), Tungku (Brunei), Vung
Tau (Vietnam)
RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2034
500,000,000
20,547
2.88 Tbps
AT&T Inc., Bayan, Bharti, BT Global
Network Services, CAT Telecom, ETPI,
FPT Telecom, the Government of Brunei
Darussalam, PT Indosat, PLDT, Saigon
Postel Corporation, StarHub, Telcotech,
TELKOM Indonesia, Telstra, Telekom
Malaysia, TNZL, Viettel, VNPT

System Supplier:

Alcatel Submarine Networks, NEC

System Installer:

Alcatel Submarine Networks, ASEAN


Cableship, NEC, Orange Marine

Cableship:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Rene Descartes
AT&T, PLDT, Starhub Ltd, Telstra
International, TM Berhad
Mitsubishi, Ciena
2011, 2014
40 Gbps, 100 Gbps

Region: Transpacific
News:

http://subtelforum.com/articles/tag/aag/

AC-1

Westerland
Beverwijk
Whitesands
Bay

Brookhaven

System Name:

Atlantic Crossing 1

Landing Points: Beverwijk (Netherlands), Brookhaven


(USA), Westerland (Germany), Whitesands
Bay (UK)
RFS Year: 1999
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Fiber Pairs:
Owners:

2024
875,000,000
13,377
40 Gbps
1 Tbps
4 Fiber Pairs
Level 3 Communications

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Level 3 Communications
Xtera Communications
2010
20 Gbps

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/ac-1/

AC-2

Widemouth Bay

Bellport

System Name:

Atlantic Crossing 2

Landing Points: Bellport (USA), Widemouth (UK)


RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2025
700,000,000
6,185

Initial Capacity:

320 Gbps

Design Capacity:

640 Gbps

Owners:

Level 3 Communications

System Maintainer:

Level 3 Communications

Upgrader:
Upgrade Year:
Upgraded Capacity:

Infinera
2010
10 Gbps

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/ac-2/

ACE

System Name:

Africa Coast To Europe

Landing Points: Abidjan (Ivory Coast), Accra (Ghana),


Asilah (Morocco), Banjul (The Gambia),
Bata (Equatorial Guinea), Cape Town
(South Africa), Conakry (Guinea), Cotonou
(Benin), Dakar (Senegal), Freetown (Sierra
Leone), Kribi (Cameroon), Lagos (Nigeria),
Libreville (Ga

Penmarch

Lisbon

RFS Year: 2012

Asilah

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):
Channel Capacity:

100 Gbps
Benin Telecoms, Cable Consortium of
Liberia, Canalink Africa SL, Cte dIvoire
Telecom, Dolphin Telecom JLT, Gambia
Submarine Cable, Guinenne de Large
Bande, International Mauritania Telecom,
MEO, MTN, Orange (France), Orange
Cameroun, Orange Mali, Orang

System Supplier:

Alcatel-Lucent Submarine Networks (Main


contractors), TE SubCom (Sub contractors)

System Installer:

Orange Marine

System Maintainer:

Muanda

17,000
12.8 Tbps

Marine Surveyor:

Fugro
Orange, PT Comunicaes S.A., Sonatel,
Gestor de Infraestructuras de Guinea
Ecuatorial (GITGE)

Region: EMEA

Luanda

News:

Swakopmund

To
w

Santana

Kribi
Bata
Libreville

700,000,000

Design Capacity:
Owners:

Ca
pe

D
Su Ba ak N
cu nj ar ou
ak
Fr Con jaq ul
ch
u
e
a
ot
M eto kr e
t
on
w y
ro n
vi
a
A
Ac bi
cr dja
a n
Lo
C me
La oto
go no
s u

Tenerife

2037

http://subtelforum.com/articles/tag/ace/

ADONES

System Name:

Angola Domestic Network System

Landing Points: Benguela (Angola), Cabinda (Angola),


Luanda (Angola), Lucira (Angola), Namibe
(Angola), Nzeto (Angola), Porto Amboim
(Angola), Soyo (Angola)
RFS Year: 2009
Est. End of Service Date:

Cabinda

Est. System Cost (US$):

Soyo

Total Length (kms):

Nzeto
Luanda

Benguela
Lucira

Namibe

35,000,000
1,800

Initial Capacity:

30 Gbps

Design Capacity:

80 Gbps

Owners:

Angola Telecom

System Supplier:

Ericsson

System Installer:

Elettra

Cableship:

Teleri

Region: EMEA
News:

Porto Amboim

2034

http://subtelforum.com/articles/tag/
adones/

ADRIA-1

System Name:

ADRIA-1

Landing Points: Corfu (Greece), Dubrovnik (Croatia),


Durres (Albania)
RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

13,400,000
430
622 Mbps
Deutsche Telekom AG, OTE

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

System Maintainer:

Dubrovnik

2025

Hellenic Telecommunications Organization


S.A.

Region: EMEA

Durres

Corfu

AEC

System Name:

America Europe Connect

Landing Points: Shirley, New York (United States); Killala,


Ireland
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2041
300,000,000
5,536
52 Tbps
6 Fiber Pairs
130
100 Gbps
AquaComms

System Supplier:

TE SubCom

System Installer:

TE SubCom

Cableship:

Reliance

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/aec/

Killala

Shirley

AJC
Maruyama
Shima

System Name:

Australia-Japan Cable

Landing Points: Maruyama (Japan), Oxford Falls


(Australia), Shima (Japan), Sydney
(Australia), Tanguisson (Guam), Tumon
(Guam)
RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$): 520,000,000

Tumon

Tanguisson

Total Length (kms): 12,224


Initial Capacity: 320 Gbps
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

System Supplier:

25.6 Tbps
4 Fiber Pairs
64
100 Gbps
Australia Japan Cable Limited,
Communications Global Network
Services Limited, NTT Communications
Corporation, SOFTBANK Telecom Corp.,
Telstra Holdings (Bermuda) No. 1 Limited,
Worldcom Global Networks Limited
Ocean Cable Company, Tyco
Telecommunications

System Installer: FCR, KDD


Cableship:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Fresnel, Subaru
Australia Japan Cable, SoftBank Telecom
Corp
Ciena, Infinera
2012, 2014
40 Gbps, 100 Gbps
Transpacific
http://subtelforum.com/articles/tag/ajc/

Oxford
Falls
Sydney

AKORN

Anchorage

System Name:

Akorn

Landing Points: Anchorage (USA), Florence (USA)


RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Supplier:
System Maintainer:

2034
100,000,000
2,968
10 Gbps
4 Fiber Pairs
Alaska Communications
Tyco Telecommunications
ACS Cable Systems

Region: Americas

Florence

ALASIA

System Name:

Alasia

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)


RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:

2037
15,000,000
350
25.6 Tbps
8 Fiber Pairs
Cyprus Telecommunications Authority,
Syrian Telecommunications Authority

Region: EMEA

ALASKA UNITED EAST

Valdez

Whittier

Juneau

System Name:

Alaska United East

Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez


(USA), Whittier (USA)
RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$): 100,000,000


Total Length (kms): 3,751
Initial Capacity: 2.5 Gbps
Design Capacity:
Fiber Pairs:
Owners:
System Supplier:
System Maintainer:
Region:

10 Gbps
2 Fiber Pairs
GCI
NEC
General Communication Incorporated
Americas

Harbor
Pointe

ALASKA UNITED WEST

Whittier

Ketchikan

System Name: Alaska United West


Landing Points: Ketchikan (USA), Warrenton (USA),
Whittier (USA)
RFS Year: 2004
Est. End of Service Date:

2029

Est. System Cost (US$): 30,000,000


Total Length (kms): 2,483
Initial Capacity: 10 Gbps
Design Capacity: 640 Gbps
Fiber Pairs: 4 Fiber Pairs
Owners: GCI
System Supplier:

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI


Cableship: Global Sentinel
System Maintainer: General Communication Incorporated
Region:

Americas

Warrenton

ALBA-1

System Name:

ALBA-1

Landing Points: Camuri (Venezuela), Ocho Rios (Jamaica),


Santiago De Cuba (Cuba), Siboney (Cuba)
RFS Year: 2013

Havana

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):

Santiago
de Cuba
Morant
Point

Initial Capacity:
Owners:

2038
72,000,000
1,600
640 Gbps
Telecom Venezuela, Transbit SA

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Shanghai Bell,


Telecomunicaciones Gran Caribe

Marine Surveyor:

EGS

Survey Boat: RV Ridley Thomas


Region: Americas
News:

Camuri

http://subtelforum.com/articles/tag/
alba-1/

ALETAR

Tartus

System Name:

Alexandria

Aletar

Landing Points: Alexandria (Egypt), Tartus (Syria)


RFS Year: 1997
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2022
23,000,000
733
5 Gbps
1 Fiber Pair
Lebanese Ministry of Telecom (6.25%),
Syrian Telecom (46.875%), Telecom Egypt
(46.875%)

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship:
System Maintainer:

Vercors
Telecom Egypt

Region: EMEA

ALEXANDROS

System Name:

Alexandros

Landing Points: Alexandria (Egypt), Marseille (France),


Pentaskhinos (Cyprus)
RFS Year: 2010
Est. End of Service Date:

2035

Total Length (kms):

3,500

Design Capacity:

Marseille

10 Tbps

Owners:

Cyprus Telecommunications Authority,


Telecom Egypt

System Maintainer:

Cypress Telecommunications Authority

Region: EMEA
News:

http://subtelforum.com/articles/tag/
alexandros/

Pentaskhinos

Alexandria

ALONSO DE OJEDA

System Name:

Alonso De Ojeda

Landing Points: Oranjestad (Aruba), Willemstad


(Netherlands Antilles)
RFS Year: 1999
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2024
8,700,000
128

Initial Capacity:

15 Gbps

Design Capacity:

100 Gbps

Owners:

Antelecom NV

System Supplier:

Alcatel Submarine Networks

System Installer:

IT International Telecom

System Maintainer:

Setar NV, United Telecommunications


Services

Region: Americas

Oranjestad
Willemstad

ALPAL-2

System Name:

Alpal-2

Landing Points: El Djemila (Algeria), Ses Covetes (Majorca)


RFS Year: 2002
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

312
10 Gbps

Design Capacity:

160 Gbps

Owners:

4 Fiber Pairs
APT, France Telecom, Telefonica

System Supplier:

Pirelli

System Installer:

Global Marine Systems Limited

Cableship:

El Djemila

17,600,000

Initial Capacity:
Fiber Pairs:

Ses Covetes

2027

System Maintainer:

Maersk Responder
Telefonica de Espaa, S.A.U.

Region: EMEA

AMERICAN SAMOA-FIJI

System Name:

American Samoa-Fiji [Planned]

Landing Points: Pago Pago (American Samoa), Fiji


RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Initial Capacity:
Owners:

2041
35,000,000
40 Gbps
American Samoa Hawaii Cable

Region: AustralAsia
News:

http://subtelforum.com/
articles/?s=american+samoa+fiji

American
Samoa

Project Completion Phases:

Fiji

Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

AMERICAS I

System Name:

Americas I

Landing Points: Magens Bay (Virgin Islands), Vero Beach


(USA)

Vero
Beach

RFS Year: 1994


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

220,000,000
2,013

Initial Capacity:

120 Gbps

Design Capacity:

320 Gbps

Owners:

Magens
Bay

2019

AT&T, CANTV (Venezuela), Embratel,


TSTT

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

AT&T, Telecom Services Trinidad & Tobago


Xtera Communications
2010
20 Gbps

Region: Americas
News:

http://subtelforum.com/
articles/?s=americas+I

AMERICAS I SOUTH

System Name:

Americas I South

Landing Points: Camuri (Venezuela), Fortaleza (Brazil),


Macqueripe (Trinidad), Magens Bay (Virgin
Islands)
RFS Year: 1994
Est. End of Service Date:

2019

Total Length (kms):

6,014

Initial Capacity:
Owners:

Magens
Bay

560 Mbps
AT&T, CANTV (Venezuela), Embratel,
TSTT

System Supplier:

Alcatel Submarine Networks, Tyco


Telecommunications SSI

System Installer:

C&W (Marine)

Cableship:

Cable Installer, Agile, Fresnel

Region: Americas

Camuri

Macqueripe

Fortaleza

AMERICAS II

System Name:

Americas II

Landing Points: Camuri (Venezuela), Cayenne (French


Guiana), Chaguaramas (Trinidad),
Fortaleza (Brazil), Hollywood (USA),
Lamentine (France), Miramar (Puerto Rico),
St Croix (US Virgin Islands), Willemstad
(Netherlands Antilles)

Hollywood

RFS Year: 2000


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Miramar
St Croix

Design Capacity:

210 Gbps

Willemstad

Antelecom NV, AT&T, Brazil Telecom,


CANTV (Venezuela), Embratel, France
Telecom, GT&T, Sprint, Telecom Italia,
Telefonica, Telesur, Telintar, Trescom Int.,
TSTT, Verizon

System Supplier:

ASN Australia, Tyco Telecommunications

System Installer:

Tyco Telecommunications SSI

Cableship:

Cayenne

8,373
80 Gbps

Owners:

Chaguaramas

350,000,000

Initial Capacity:

Le Lamentin

Camuri

2025

System Maintainer:

Global Link
AT&T, Orange, Telecom Services Trinidad
& Tobago, United Telecommunications
Services

Region: Americas
News:

Fortaleza

http://subtelforum.com/
articles/?s=Americas+II

AMERIGO VESPUCCI

System Name:

Amerigo Vespucci

Landing Points: Bonaire (Netherlands), Curacao (Curacao)


RFS Year: 1999
Est. End of Service Date:
Est. System Cost (US$):

2024
15,000,000

Total Length (kms):

84

System Maintainer:

United Telecommunication Services

Region: Americas

Bonaire
Curaao

AMX-1

System Name:

Landing Points: Jacksonville (United States), Miami


(United States), San Juan (Puerto Rico),
Puerto Barrios (Guatemala), Barranquilla
(Colombia), Cartagena (Colombia),
Fortaleza (Brazil), Salvador de Bahia
(Brazil), Rio de Janeiro (Brazil), Puerto Plata
(Dominican Repub

Jacksonville
Maimi

RFS Year: 2014


Est. End of Service Date:

Cancun
Puerto
Barrios

America Movil Submarine Cable System-1

Est. System Cost (US$):

Puerto
Plata

Barranquilla
Cartagena

Total Length (kms):

San
Juan

Initial Capacity:
Owners:

2039
700,000,000
17,800
100 Gbps
America Movil

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro, EGS

Region: Americas
News:

http://subtelforum.com/articles/tag/
amx-1/

Fortaleza

Rio de
Janeiro

ANTEL

Maldonado

Las Toninas

System Name: Antel


Landing Points: Las Toninas (Argentina), Maldonado
(Uruguay)
RFS Year: 2010
Est. End of Service Date:

2035

Est. System Cost (US$): 15,000,000


Total Length (kms): 250
Initial Capacity: 50 Gbps
Design Capacity: 3.84 Tbps
Owners: Antel (Uruguay), Telecom Argentina
System Supplier:

Alcatel-Lucent Submarine Networks

System Installer: IT Telecom


Region:
News:

Americas
http://subtelforum.com/articles/tag/
antel/

ANTILLES CROSSING

System Name:

Antilles Crossing

Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin


Islands), Port Castries (St Lucia)
RFS Year: 2006
Est. End of Service Date:

Hams Bluff

Total Length (kms):

952

Initial Capacity:

40 Gbps

Design Capacity:

80 Gbps

Owners:

Antilles Crossing, Barbados Light & Power,


Leucadia, Telebarbados

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:
Upgrade Year:
Upgraded Capacity:

Port Castries

2031

Ciena
2013
40 Gbps

Region: Americas
News:

Bridgetown

http://subtelforum.com/
articles/?s=antilles+crossing

raki

Kitaiba

APCN 2
Pusan

Chongming

kura

Chi

System Name:

Asia-Pacific Cable Network 2

Landing Points: Batangas (Philippines), Chikura (Japan),


Chongming (China), Katong (Singapore),
Kitaibaraki (Japan), Kuantan New Port
(Malaysia), Lantau (Hong Kong), Pusan
(South Korea), Shantou (China), Tanshui
(Taiwan)

Shantou
Lantau

Tanshui

RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$):


Total Length (kms):

160 Gbps

Design Capacity:

25.6 Tbps

Channels:
Channel Capacity:
Owners:

ton

Ka

Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:

40 Gbps, 100 Gbps


AustralAsia

News: http://subtelforum.com/articles/tag/
apcn2/

100 Gbps
China Telecom, Chunghwa Telecom
International, CTM, France Telecom, KDDI,
KT Coropration, NTT Communications,
PLDT (Philippines), Reach NHK, Singtel,
Telekom Malaysia

System Installer:

Global Marine Systems Limited

NEC
2011, 2014

64

Ocean Cable Company

Ku

4 Fiber Pairs

System Supplier:
Cableship:

n
nta

19,000

Initial Capacity:
Fiber Pairs:

Batangas

1,100,000,000

Marine Surveyor:
System Maintainer:

Cable Retriever, Bold Endurance, Fu Lai,


Asean Restorer, Maersk Recorder, Maersk
Repeater, Maersk Responder, Maersk
Reliance, Subaru, Kuroshio Maru, Cable
Installer. Barges, Networker, Elbe, Chin
Ann 3
C&C Technologies
China Telecommunications Corporation,
Chunghwa Telecom Co., KDDI, KT
Corporation, NTT Communications
Corporation, PLDT, Singapore
Telecommunications Ltd, TM Berhad

APG

Pusan

Shima

Maruyama

Project Completion Phases:

Chongming

Pre-Engineering

Nanhu

Survey
System Manufacture
System Installation
Commissioning & Acceptance

Toucheng
Lantau

System Name:

Asia Pacific Gateway [Planned]

Landing Points: Chongming (China), Da Nang (Vietnam),


Kuantan (Malaysia), Tseung Kwan (Hong
Kong), ShinMaruyama (Japan), Nanhui
District (China), Busan (South Korea),
Shima (Japan), Songkhla (Thailand),
Toucheng (Taiwan), Tanah Merah
(Singapore)

Da Nang

RFS Year: 2016


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Channel Capacity:
Owners:

Songkhla
Kuantan
Tuas

2041
313,000,000
10,400
38.4 Tbps
40 Gbps
China Telecom, China Unicom, Chunghwa
Telecom International, Facebook, KT
Coropration, NTT Communications,
PLDT (Philippines), StarHub (Singapore),
Telekom Malaysia, TIME dotCom, VNPT

System Supplier:

NEC

System Installer:

NTT Com, S.B. Submarine Systems, NEC

System Maintainer:

China Telecommunications Corporation,


Chunghwa Telecom Co.

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/apg/

APHRODITE 2

System Name:

Aphrodite 2

Landing Points: Chania (Greece), Yeroskipos (Cyprus)


RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

System Supplier:
Cableship:

2019
30,000,000
868
1.12 Gbps
AT&T, Belgacom, British Telecom, Cyprus
Telecommunications Authority (62%),
France Telecom, OTE, Sprint, Verizon
Alcatel Submarine Networks
Skandi Hav

Region: EMEA

Chania
Yeroskipos

APNG-2

Point Moresby

System Name: Australia Papua New Guinea 2


Landing Points: Port Moresby (Papua New Guinea), Sydney
(Australia)
RFS Year: 2006
Est. End of Service Date:

2031

Est. System Cost (US$): 11,000,000


Total Length (kms): 3,400
Initial Capacity: 1.12 Gbps
Fiber Pairs: 2 Fiber Pairs
Owners: Telikom PNG, Telstra (Australia)
System Supplier:

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks


Cableship: Ile de Re
System Maintainer: Telstra International
Region:

AustralAsia

Sydney

APOLLO
Widemouth Bay
Lannion

Brookhaven
Manasquan
System Name:

Apollo

Landing Points: Brookhaven (USA), Lannion (France),


Manasquan (USA), Widemouth (UK)
RFS Year: 2003
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2028
350,000,000
12,700

Initial Capacity:

10 Gbps

Design Capacity:

25 Tbps

Fiber Pairs:
Channel Capacity:
Owners:

4 Fiber Pairs
100 Gbps
Alcatel, Apollo SCS Limited, C&W

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Ile de Batz, Ile de Brehat, Ile de Sein, Skandi


Neptune
Alcatel-Lucent Submarine Networks
2012, 2014
40 Gbps, 100 Gbps

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/
apollo/

APX-CENTRAL

System Name:

Asia Pacific Express Central [Planned]

Landing Points: Adelaide (Australia), Hobart (Australia),


Melbourne (Australia), Perth (Australia)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:

2041
150,000,000
4,800
32 Tbps
4 Fiber Pairs
80
100 Gbps

Owners:

SubPartners

System Supplier:

TE SubCom

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/apxcentral/

Perth
Adelaide
Project Completion Phases:
Pre-Engineering

Melbourne

Survey
System Manufacture
System Installation
Commissioning & Acceptance

Hobart

APX-EAST

Hermosa Beach

Oahu

System Name:

Asia Pacific Express East [Planned]

Landing Points: Auckland (New Zealand), Hermosa Beach


(United States), Oahu, Hawaii (United
States), Sydney (Australia)
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Channels:
Channel Capacity:

2042
350,000,000
12,700
40 Tbps
4 Fiber Pairs
100
100 Gbps

Owners:

SubPartners

System Supplier:

TE SubCom

Region: Transpacific
News:

http://subtelforum.com/articles/?s=APXEast

APX-WEST

System Name:

Landing Points: Jakarta (Indonesia), Christmas Island


(Australia), Perth (Australia), Singapore

Singapore

RFS Year: 2018


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Jakarta

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

Christmas
Island

System Supplier:
News:

Pre-Engineering

System Manufacture
System Installation
Commissioning & Acceptance

2041
150,000,000
4,600
20 Tbps
2 Fiber Pairs
100
100 Gbps
SubPartners, Singtel, Telstra
TE SubCom

Region: AustralAsia

Project Completion Phases:


Survey

Asia Pacific Express West [Planned]

Perth

http://subtelforum.com/articles/?s=APXWest

ARCOS-1

System Name:

Landing Points: Bluefields (Nicuragua), Cancun (Mexico),


Cartagena (Columbia), Cat Island
(Bahamas), Crooked Island (Bahamas),
Hollywood (USA), Ladyville (Belize), Maria
Chiquita (Panama), Nassau (The Bahamas),
Providenciales (Turks and Caicos Islands),
Puerto Barrios (G

Hollywood
Nassau

Cat Island

Crooked
Island

Cancun

Tulum

RFS Year: 2001

Providenciales

Est. End of Service Date:


Est. System Cost (US$):

Pu
Pu ert
er o B
to ar
lo
Co rio
rte s
s

Puerto Plata

Total Length (kms):

Punta Cana

Ladyville

an

nJ

Sa

Tr
oj
il

Initial Capacity:
Design Capacity:

Puerto Lempira

Owners:

Puerto Cabezas

on

ta

iq

ui

Li

Ch

to
M

ar

ia

er
Pu

sta

m
ille
Riohacha Punto W
Fijo
Cartagena

Bluefields

Arcos-1

2026
250,000,000
8,700
80 Gbps
1 Tbps
Alestra (Mexico), AT&T, Axtel (Mexico),
BTC (Bahamas), BTL (Belize), CANTV
(Venezuela), Codetel (Dominican Republic),
Colombus Networks, Enitel (Nicaragua),
Hondutel (Honduras), ICE (Costa Rica),
Impsat (USA), Internexa (Colombia),
Orbinet SA (Colombia),

System Supplier:

Norddeutsche Seekabelwerke (Tyco


Telecommunications, Partial)

Marine Surveyor:

Fugro

Ustupo

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Colombus Networks USA Inc., United


Telecommunications Services
Xtera Communications
2008, 2016
40 Gbps, 100 Gbps

Region: Americas
News:

http://subtelforum.com/articles/?s=arcos

ASC

System Name:

Australia-Singapore Cable [Planned]

Landing Points: Perth (Australia), Tanah Mera (Singapore),


Anyer (Indonesia)

Singapore

RFS Year: 2017


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Anyer

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2042
160,000,000
4,600
36 Tbps
3 Fiber Pairs
120
100 Gbps
Australia-Singapore Cable International
Limited

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia
News:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Perth

http://subtelforum.com/
articles/?s=australia-singapore+cable

ASE
Japan

Hong Kong

System Name:

Asia Submarine-cable Express

Landing Points: Japan, Philippines, Hong Kong, Malaysia,


Singapore, Cambodia

Philippines

RFS Year: 2013


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:

Malaysia
Singapore

Channel Capacity:
Owners:

2038
412,000,000
7,200
15.36 Tbps
6 Fiber Pairs
128
40 Gbps
NTT Communications (Japan), PLDT
(Philippines), StarHub (Singapore),
Telekom Malaysia

System Supplier:

Fujitsu Limited, NEC Corporation

System Installer:

S.B. Subarine Systems, NTT, NEC

System Maintainer:

NTT Communications Corporation, PLDT,


StarHub, TM Berhad

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/ase/

ASH

System Name:

Keawaula

America Samoa Hawaii

Landing Points: Keawaula (Hawaii), Pago Pago (American


Samoa)
RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2034
100,000,000
4,680
1.2 Gbps
2 Fiber Pairs
ASH Cable Company

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Cableship:
System Maintainer:

Ile de R
Telecom New Zealand

Region: AustralAsia
News:

Pago Pago

http://subtelforum.com/articles/tag/ash/

ATHENA

System Name:

Athena

Landing Points: Koropi (Greece), Pentaskhinos (Cyprus)


RFS Year: 2011
Est. End of Service Date:
Total Length (kms):
Owners:

2036
600
Cypress Telecommunications Authority,
Telecom Italia Sparkle

Region: EMEA

Koropi

Pentaskhinos

ATLANTIS-2

System Name:

Atlantis-2

Landing Points: Conil (Spain), Dakar (Senegal), El Medano


(Spain), Fortaleza (Brazil), Funchal
(Portugal), Las Toninas (Argentina), Lisbon
(Portugal), Praia (Cape Verde), Rio de
Janeiro (Brazil)

Lisbon

Conil

Funchal
El Medano

RFS Year: 2000


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

40 Gbps
160 Gbps

Channel Capacity:
Owners:

2 Fiber Pairs, Initial: 2 wavelengths, Design:


8 wavelengths
2 to 8
40 Gbps
Cabo Verde Telecom, Deutsche Telekom
AG, Embratel, France Telecom, Marconi,
Sonatel, Telecom Argentina, Telecom
Italia, Telefonica, Telefonica de Argentina,
Telintar, Verizon

System Supplier:

Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer:

FCR

Cableship:

Fortaleza

13,100

Design Capacity:

Channels:

Dakar

370,000,000

Initial Capacity:
Fiber Pairs:

Praia

2025

System Maintainer:

Raymond Croze, Fresnel, Vercors, Teneo,


Teliri, Maersk Defender
PT Comunicaes S.A., Sonatel, Telefonica
de Espaa S.A.U., Telefonica International
Wholesale Services

Region: Transatlantic

Rio de Janeiro

Las Toninas

ATLAS OFFSHORE

Marseille

System Name:

Atlas Offshore

Landing Points: Asilah (Morocco), Marseille (France)


RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Asilah

2032
31,000,000
1,634

Initial Capacity:

40 Gbps

Design Capacity:

320 Gbps

Owners:

Maroc Telecom of Morocco

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: EMEA

AUSTRAL

System Name:

Austral [Planned]

Landing Points: Puerto Montt (Chile), Punta Arenas (Chile)

Puerto
Montt

RFS Year: 2017


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2042
100,000,000
1,800
AUSTRAL University of Magellan,
Magellan CPC

System Supplier:

Huawei Marine Networks

System Installer:

IT International Telecom

Region: Americas

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture

Punta
Arenas

System Installation
Commissioning & Acceptance

AWE

System Name:

Australia West Express [Planned]

Landing Points: Perth, Australia; Djibouti


RFS Year: 2017

Djibouti

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2042
300,000,000
10,100
20 Tbps
2 Fiber Pairs
100
200 Gbps
GoTo Networks

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: Indian Ocean Pan-East Asian


News:

http://subtelforum.com/
articles/?s=australia+west+express

Perth

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

BAHAMAS-2

System Name:

Bahamas-2

Landing Points: Eight Mile Rock (Bahamas), Nassau (The


Bahamas), Vero Beach (USA)
RFS Year: 1997
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2022
25,000,000
478
2.5 Gbps
AT&T, Balteco, Verizon

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Marine Surveyor:
System Maintainer:

C&C Technologies
AT&T, Bahamas Telecommunications
Company

Region: Americas

Vero Beach

Eight Mile
Rock

Nassau

BALTICA

System Name:

Baltica

Landing Points: Dueodde (Bornholm), Gedser (Denmark),


Kolobrzeg (Poland), Ystad (Sweden)
RFS Year: 1997
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:

2022
16,000,000
437
5 Gbps
6 Fiber Pairs
Polish Telecom, TDC, Telecom Finland,
Telenor, Teliasonera
Orange Polska S.A., TDC A/S, TeliaSonera
International Carrier AB

Region: EMEA

Ystad
Dueodde
Gedser
Kolobrzeg

BAR-SAV

Savona

Barcelona

System Name:

BAR-SAV

Landing Points: Barcelona (Spain), Savona (Italy)


RFS Year: 1996
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:
System Maintainer:

2021
39,000,000
760
5 Gbps
Telecom Italia, Telefonica
Alcatel Submarine Networks
Telecom Italia Sparkle, Telefonica de
Espaa S.A.U.

Region: EMEA

BASS STRAIT 2

System Name:

Bass Strait 2

Landing Points: Inverloch (Australia), Stanley (Tasmania,


Australia)
RFS Year: 2003
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2028
17,000,000
240
10 Gbps
Telstra (Australia)

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship:

Ile de Batz

Region: AustralAsia

Inverloch

Stanley

BBG

System Name:

Bay of Bengal Gateway

Landing Points: Sri Lanka, Singapore, Oman, UAE


RFS Year: 2014
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2039
30,000,000
8,000
100 Gbps
30 Tbps
3 Fiber Pairs
100
100 Gbps
Bay of Bengal Consortium

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Cableship:
Marine Surveyor:

Ile De Brehat
EGS

Survey Boat: Northern Endeavour


Region: Indian Ocean Pan-East Asia
News:

http://subtelforum.com/articles/tag/bbg/

BCS EAST

System Name:

BCS East

Landing Points: Liepaja (Latvia), Sventoji (Lithuania)


RFS Year: 1997
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2022
15,000,000
98
2.5 Gbps
Teliasonera

Region: EMEA

Liepaja
Sventoji

BCS EAST-WEST INTERLINK

System Name:

BCS East-West Interlink

Landing Points: Sandviken (Sweden), Sventoji (Lithuania)


RFS Year: 1997
Est. End of Service Date:

Sandviken

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

2022
20,000,000
218
2.5 Gbps
Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:

Pleijel

Region: EMEA

Sventoji

BCS NORTH

System Name:

BCS North

Landing Points: Hango (Finland), Haraldsholm (Finland),


Helsingfors (Finland), Kotka (Finland),
Mariehamn (Finland), Stavsnas (Sweden)
RFS Year: 2003
Est. End of Service Date:
Helsingfors
Mariehamn Haraldsholm
Hango
Stavsnas

Kotka

Est. System Cost (US$):


Logi

Total Length (kms):


Initial Capacity:
Owners:

2028
30,000,000
793
10 Gbps
Rostelecom, Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:
System Maintainer:

Pleijel
TeliaSonera International Carrier AB

Region: EMEA

BDM

System Name:

Batam-Dumai-Melaka

Landing Points: Batam (Indonesia), Dumai (Indonesia),


Melaka (Malaysia)
RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Fiber Pairs:
Channels:

Melaka

Channel Capacity:
Owners:

Dumai
Batam

2036
76,000,000
400
80 Gbps
2.56 Tbps
4 Fiber Pairs
64
10 Gbps
PT Mora Telematika, PT XL Axiata,
Telekom Malaysia

System Supplier:

Huawei Marine Networks

System Installer:

Huawei Marine Networks

System Maintainer:

TM Berhad

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/
bdm/

BEST CABLE SYSTEM

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation

Guam

Commissioning & Acceptance

Malaysia

Philippines

Palau

Yap

Brunei

Indonesia

System Name:

Best Cable System [Planned]

Landing Points: Brunei; Sabah; Malaysia; Southern


Philippines; Kalimantan, Indonesia;
extension to Guam
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2041
150,000,000
5,092
Best Cable Corp. Pte. Ltd.

Region: AustralAsia

BHARAT-LANKA

System Name:

Bharat-Lanka

Landing Points: Dehiwala-Mount Lavinia (Sri Lanka),


Tuticorin (India)
RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

40,000,000
338

Initial Capacity:

40 Gbps

Design Capacity:

960 Gbps

Channel Capacity:

Tuticorin

2032

Owners:

40 Gbps
BSNL, Sri Lanka Telecom Limited (SLT), Sri
Lanka

System Supplier:

NEC

System Installer:

NEC

System Maintainer:

Sri Lanka Telecom

Region: Indian Ocean Pan-East Asian


News:

Dehiwala-Mount
Lavinia

http://subtelforum.com/articles/tag/
bharat-lanka/

BICS

System Name:

Boca
Raton

Crown
Haven
Riding Point
Freeport

Bahamas Internet Cable System

Landing Points: Boca Raton (USA), Crown Haven


(Bahamas), Freeport (Bahamas), Marsh
Harbour (Bahamas), Nassau (The
Bahamas), Riding Point (Bahamas), Rock
Sound (Bahamas), Sandy Point (Bahamas),
Upper Bogue (Bahamas)
RFS Year: 2001

Marsh Harbour
Sandy Point
Upper Bogue

Nassau

Rock Sound

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):

2026
31,000,000
1,000

Initial Capacity:

10 Gbps

Design Capacity:

12 Tbps

Channel Capacity:

10 Gbps

Owners:

Carribbean Crossings

Region: Americas

BIN

System Name:

Balkans-Italy Network

Landing Points: Bari (Italy), Durres (Albania)


RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2036
21,700,000
276

Initial Capacity:

40 Gbps

Channel Capacity:

40 Gbps

Owners:

Unifi

Region: EMEA

Bari

Durres

BIOS / JONAH

System Name:

BIOS/Jonah

Landing Points: Tel Aviv (Israel), Bari (Italy)


RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2036
15,000,000
2,300
Bezeq International

System Supplier:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Elettra

Region: EMEA

Bari

Tel Aviv

BLAST

Ofu
Aunu'u

Luma

Tutuila
System Name:

Broadband Linking the American Samoa


Territory

Landing Points: Fogagogo, Tutuila (American Samoa), Ofu


Harbor, Ofu (American Samoa), Luma, Tau
(American Samoa), Aunuu Warf, Aunuu
(American Samoa)
RFS Year: 2015
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2040
11,000,000
250
ASTCA (American Samoa)

System Supplier:

IT International Telecom

System Installer:

IT International Telecom

Marine Surveyor:

IT International Telecom

Region: AustralAsia

BORACAY-PALAWAN

System Name:

Boracay-Palawan

Landing Points: Taytay (Philippines), San Jose (Philippines),


Coron (Philippines); Boracay (Philippines),
Caticlan (Philippines)
RFS Year: 2013
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:

Coron
Taytay

San Jose
Boracay
Caticlan

Owners:
System Supplier:

2038
20,000,000
332
4.8 Tbps
12 Fiber Pairs
40
10 Gbps
Globe Telecom
Huawei Marine Networks

Region: AustralAsia

BOTNIA

System Name:

Botnia

Landing Points: Umea (Sweden), Vaasa (Finland)


RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2019
8,500,000
77
1.2 Gbps
6 Fiber Pairs
Teliasonera

System Supplier:

NKT

System Installer:

AKN

Cableship:
System Maintainer:

Pleijel
TeliaSonera International Carrier AB

Region: EMEA

Umea

Vaasa

BRCS

System Name:

Batam-Rengit Cable System

Landing Points: Batam (Indonesia), Sungai Rengit


(Malaysia)
RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2032
10,000,000
63
10 Gbps
Excelcom

Region: AustralAsia

Sungai Rengit
Batam

BRUSA
Virginia Beach

San Juan

Fortaleza

Rio de Janeiro

System Name:

Brazil-USA [Planned]

Landing Points: Rio de Janeiro, Brazil; Fortaleza, Brazil; San


Juan, Puerto Rico; Virginia Beach, Virginia,
USA

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

RFS Year: 2018


Est. End of Service Date:
Total Length (kms):
Owners:

2043
1,1000
Telefonica

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: Americas

BSCS

System Name:

Batam Singapore Cable System

Landing Points: Batam (Indonesia), Changi (Singapore)


RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2034
13,100,000
73
80 Gbps
3 Fiber Pairs
Telekom Indonesia

System Supplier:

Ocean Cable Company

System Installer:

Stena Offshore, ASEAN Cableship, NEC

Cableship:

Northern Installer

Region: AustralAsia

Changi
Batam

BSFOCS

Odesa

Novorossiysk

Varna

System Name:

Black Sea Fibre Optic Cable System

Landing Points: Novorossiysk (Russia), Odesa (Ukraine),


Varna (Bulgaria)
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2026
51,000,000
933
2.5 Gbps
2 Fiber Pairs
Armentel, AT&T, BTC, Cypress
Telecommunications Authority, DTAG, HT,
KDDI, OTE, Rostelecom, Telecom Slovenia,
Ukrtelecom

System Supplier:

Alcatel Submarine Networks, Tyco


Telecommunications SSI

System Installer:

Global Marine Systems Limited

Cableship:
System Maintainer:

Maersk Fighter
Cyprus Telecommunications Authority,
Hellenic Telecommunications Organization
S.A., OJSC Rostelecom

Region: EMEA

CADMOS

System Name:

Cadmos

Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus)


RFS Year: 1995
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:

System Supplier:
System Maintainer:

2020
8,000,000
262
622 Mbps
2 Fiber Pairs
Cyprus Telecommunications
Authority (62%), Lebanese Ministry of
Telecommunications (38%)
Tyco Telecommunications
Cyprus Telecommunications Authority

Region: EMEA

Pentaskhinos

Beirut

CAMEROON-BRAZIL

Cameroon

Fortaleza
System Name:

Cameroon-Brazil [Planned]

Landing Points: Fortaleza, Brazil; Kribi, Cameroon


RFS Year: 2018
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Channel Capacity:
Owners:

2043
487,000,000
5,900
32 Tbps
4 Fiber Pairs
80
100 Gbps
CamTel, China Unicom

System Supplier:

Huawei Marine

System Installer:

Global Marine

Region: Transatlantic
News:

http://subtelforum.com/
articles/?s=cameroon-brazil

CANALINK

Cadiz

System Name:

Canalink

Landing Points: Cadiz (Spain), Tenerife (Spain)


RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2036
157,000,000
2,000
5.12 Tbps
4 Fiber Pairs
128
10 Gbps
Isalink, IT3

System Supplier:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro, Elettra

Region: EMEA
News:

Tenerife

http://subtelforum.com/articles/tag/
canalink/

CANTAT-3

Vestmannaeyjar

Tjrnuvik

Blaabjerg
Redcar Westerland

Pennant
Point

System Name:

CanTaT-3

Landing Points: Blaabjerg (Denmark), Pennant Point


(Canada), Redcar (United Kingdom),
Tjrnuvk (Faroe Islands), Vestmannaeyjar
(Iceland), Westerland (Germany)
RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2019
385000000
6450
7.5 Gbps
Tata Communications

System Supplier:

Alcatel Submarine Networks

System Installer:

BT Marine, TeleDanmark, Orange Marine

Region: Transatlantic

From shore to shore . . .

TeraWave

OFS complete portfolio of ocean fiber solutions


enables industry-leading performance
through high signal power and low-loss.

TrueWave
AllWave ZWP Ocean Fibers

Coherent Transport
High Signal Power
Outstanding Bend Performance
Simplified Network Design
Long-term Reliability

A Furukawa Company
To learn more, ask your cabler about OFS
or visit www.ofsoptics.com

/ofsoptics

/ofs_telecom

/company/ofs

/OFSoptics

CAUCASUS CABLE SYSTEM

Varna
Poti

System Name:

Caucasus Cable System

Landing Points: Poti (Georgia), Varna (Bulgaria)


RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$): 76,000,000


Total Length (kms): 1,187
Design Capacity:
Fiber Pairs:
Owners:
System Supplier:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

1.2Tbps
2 Fiber Pairs
Caucasus Online
Tyco Telecommunications
TE SubCom
2016
100 Gbps
EMEA
http://subtelforum.com/articles/tag/
caucasus-cable-system/

CB-1

System Name:

Charlestown

Challenger Bermuda-1

Landing Points: Bermuda (Bermuda), Charlestown, Rhode


Island (United States)
RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2034
50,000,000
1,448

Initial Capacity:

20 Gbps

Design Capacity:

320 Gbps

Owners:
System Supplier:
System Maintainer:

Cable Company Ltd, Verizon


Alcatel-Lucent Submarine Networks
Cable Co Ltd, Verizon Ltd

Region: Americas

Bermuda

C-BUS
Manasquan

System Name:

Caribbean-Bermuda US

Landing Points: Manasquan (USA), Tortola (British Virgin


Islands)
RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$): $10,000,000


Total Length (kms): 1,609
Owners:
System Supplier:

LIME
Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI, IT


International Telecom
Upgrader:
Upgrade Year:

Xtera Communications
2016

Upgraded Capacity:

100 Gbps

Region:

Americas

News:

http://subtelforum.com/articles/?s=cbus

Tortola

CEIBA-2

System Name:

Ceiba-2 [Planned]

Landing Points: Malabo, Equatorial Guinea; Bata, Equatorial


Guinea; branching unit to Kribi, Cameroon
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Owners:
System Supplier:

2042
15,000,000
290
8 Tbps
Republic of Equatorial Guinea
Huawei Marine

Region: EMEA

Malabo

Kribi
Bata

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

CELTIXCONNECT

Dublin

Holyhead

System Name:

CeltixConnect

Landing Points: Dublin (Ireland), Holyhead (UK)


RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2036
22,000,000
131
960 Gbps
72 Fiber Pairs
Sea Fibre Networks

System Supplier:

Alcatel Submarine Networks

System Installer:

Global Marine Systems Limited

Region: EMEA
News:

http://subtelforum.com/articles/tag/
celtixconnect/

CFX-1
Boca
Raton

System Name:

Colombia-Florida Subsea Fiber

Landing Points: Boca Raton (USA), Cartagena (Columbia),


Morant Point (Jamaica)
RFS Year:

2008

Est. End of Service Date:

2033

Total Length (kms):

2,439

Morant
Point

Initial Capacity: 110 Gbps


Design Capacity:

2 Tbps

Fiber Pairs: 2.5 Tbps per Fiber Pair


Owners:
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Columbus Networks
Tyco Telecommunications
Colombus Networks USA, Inc.
TE SubCom
2011
40 Gbps, 2.5 Tbps per fiber pair
Americas
http://subtelforum.com/articles/?s=cfx-1

Cartagena

CHINA-US

Bandon
San Luis Obispo

Fa
n

gs

ha

Pusan Chikura
Chongming
Okinawa
Shantou
Tanguisson

System Name:

China-US

Landing Points: Bandon (USA), Chikura (Japan),


Chongming (China), Fangshan (Taiwan),
Okinawa Prefecture (Japan), Pusan (South
Korea), Grover Beach (USA), Shantou
(China), Tanguisson (Guam)
RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Fiber Pairs:
Channels:
Channel Capacity:

1100,000,000
30,444
80 Gbps
4 Fiber Pairs
8
2.5 Gbps

Owners:

China-US Consortium (KDD (Japan),


NTT Worldwide Network (Japan), AT&T
(USA), MCI Communications (USA),
Sprint (USA), Teleglobe USA (USA), SBC
Communications (USA), China Telecom
(China), HongKong Telecom (Hong Kong),
Chunghwa Telecom (Taiwan), Korea Telec

System Supplier:

Alcatel Submarine Networks, Fujitsu,


Ocean Cable Co, Tyco Telecommunications

Cableship:
Marine Surveyor:
System Maintainer:

Region:

Flexservice III, Kuroshio Maru, Cable


Innovator
C&C Technologies
AT&T, China Telecommunications
Corporation, Chunghwa Telecom
Co., KDDI, KT Corporation, NTT
Communications Corporation
Transpacific

CIOS

System Name:

Cyprus-Israel Optical System

Landing Points: Ayia Napa (Cyprus), Nahariya (Israel)


RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:
System Maintainer:

Ayia Napa

2018
16,000,000
262
622 Mbps
1 Fiber Pair
Bezeq, Cypress Telecommunications
Authority
Cyprus Telecommunications Authority

Region: EMEA

Nahariya
Nahariya

CJFS

Half-Moon
Bay
Montego
Bay

System Name:

Cayman Jamaica Fibre System

Landing Points: Half-Moon Bay (Cayman Islands), Montego


Bay (Jamaica)
RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:
Region:

6,500,000
870
2.5 Gbps
LIME
Americas

Helsinki

C-LION1

System Name:

C-Lion1

Landing Points: Helsinki, Finland; Rostock-Ribnitz,


Germany

Rostock-Ribnitz

RFS Year: 2016


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channel Capacity:
Owners:

2041
74,000,000
1,172
144 Tbps
8 Fiber Pairs
300 Gbps
Cinia Group

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro

Region: EMEA
News:

http://subtelforum.com/articles/tag/clion1/

o
m
Pa
le
r

COLUMBUS II

Funchal

West Palm
Beach
Cancun

Sardinia

Magens Bay

System Name:

Colombus II

Landing Points: Cancun (Mexico), Funchal (Portugal),


Magens Bay (Virgin Islands), Palermo
(Italy), Sardinia (Gran Canaria), West Palm
Beach (USA)
RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2019
600,000,000
12,165

Initial Capacity:

560 Mbps

Design Capacity:

2.5 Gbps

Owners:
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Columbus II Consortium
Alcatel Submarine Networks, Tyco
Telecommunications SSI, Pirelli
AT&T, Telecom Italia Sparkle
Xtera Communications
2012
100 Gbps

Region: Transatlantic
News:

http://subtelforum.com/
articles/?s=columbus+II

ar
az

ol
ly
w

oo

Lisbon
Conil

Ponta
Delgada

COLUMBUS III

System Name:

Colombus III

Landing Points: Miami, Florida (USA); Ponta Delgada,


Azores Islands (Portugal); Lisbon, Portugal;
Conil, Spain; Mazara del Vallo, Sicily (Italy)
RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):


Total Length (kms):

236,000,000
9,833

Initial Capacity:

40 Gbps

Design Capacity:

160 Gbps

Fiber Pairs:
Owners:
System Supplier:
Cableship:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

2 Fiber Pairs
Columbus III Consortium
Alcatel Submarine Networks, Pirelli, Tyco
Telecommunications
Vercors, Skandi Hav
AT&T, PT Comunicaes S.A., Telecom
Italia Sparkle, Telefonica de Espaa S.A.U.
Xtera Communications
2012
100 Gbps
Transatlantic
http://subtelforum.com/
articles/?s=columbus+III

CONCERTO-1

System Name:

Concerto-1

Landing Points: Bruges (Belguim), Thorpeness (United


Kingdom), Zandvoort (Netherlands)
RFS Year: 1999
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

Zandvoort

2024
25,000,000
574
2.5 Gbps
96 Fiber Pairs
Flute

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Region: EMEA

Thorpeness

Bruges

CORFU-BAR

System Name:

Corfu-Bar

Landing Points: Bar (Montenegro), Corfu (Greece)


RFS Year: 1998
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:

2023
19,000,000
320
622 Mbps
3 Fiber Pairs
Crngorski Telecom, OTE
Hellenic Telecommunications Organization
S.A.

Region: EMEA

Bar

Corfu

DANICA NORTH

System Name:

Danica North

Landing Points: Barseback (Sweden), Tuborg (Denmark)


RFS Year: 1998
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

25
10 Gbps
96 Fiber Pairs
Teliasonera
Ericsson

System Installer:

AKN

System Maintainer:
Upgrader:
Upgrade Year:

Barseback

10,000,000

System Supplier:
Cableship:

Tuborg

2023

Upgraded Capacity:

Pleijel
TeliaSonera International Carrier AB
Ciena
2013
40 Gbps

Region: EMEA

DANICA SOUTH

System Name:

Danica South

Landing Points: Bjarred (Sweden), Copenhagen (Denmark)


RFS Year: 1998
Est. End of Service Date:
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2023
20
10 Gbps
24 Fiber Pairs
Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Pleijel
TeliaSonera International Carrier AB
Ciena
2013
40 Gbps

Region: EMEA

Copenhagen

Bjarred

DANICE

Landeyjarsandur

System Name:

Danice

Landing Points: Blaabjerg (Denmark), Landeyjarsandur


(Iceland)
RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$): 76,000,000


Total Length (kms): 2,291
Initial Capacity: 1000 Gbps
Design Capacity:
Fiber Pairs:
Owners:
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

5.1 Tbps
4 Fiber Pairs
Farice Ltd.
Tyco Telecommunications
Farice ehf
Ciena
2013
100 Gbps
EMEA
http://subtelforum.com/
articles/?s=Danice

Blaabjerg

DDSCN

Colombo

Hulhumal

System Name:

Dhiraagu Domestic Submarine Cable


Network

Landing Points: Colombo (Sri Lanka), Hulhumale


(Maldives)
RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2037
27,000,000
1,000
Dhiraagu

System Supplier:

NEC

System Installer:

NEC

Region: Indian Ocean Pan-East Asian


News:

http://subtelforum.com/articles/tag/
ddscn/

DENMARK-NORWAY 5

System Name:

Denmark-Norway 5

Landing Points: Ardendal (Norway), Hjrorring (Denmark)


RFS Year: 1992
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Maintainer:

2017
9,560,000
123
2 Gbps
Norway PTT, TDC
TDC A/S

Region: EMEA

Ardendal

Hjorring

DENMARK-NORWAY 6

System Name:

Denmark-Norway 6

Landing Points: Kristiansand (Norway), Thisted (Denmark)


RFS Year: 1992
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Maintainer:

2017
8,950,000
124
1.5 Gbps
Norway PTT, TDC
TDC A/S

Region: EMEA

Kristiansand

Thisted

DENMARK-POLAND 2

System Name:

Denmark-Poland 2

Landing Points: Gedebak Odde (Denmark), Mielno (Poland)


RFS Year: 1991
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Maintainer:

2016
4,500,000
110
2.5 Gbps
Polish Telecom, TDC
Orange Polska S.A., TDC A/S

Region: EMEA

Gedebak Odde

Mielno

DIDON

System Name:

Didon

Landing Points: Klibia (Tunisia), Mazara del Vallo, Sicily


(Italy)
RFS Year: 2014
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Channel Capacity:

2039
15,000,000
173
18 Tbps
100 Gbps

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

System Maintainer:

France Telecom

Region: EMEA
News:

Mazara del Vallo

Klibia

http://subtelforum.com/articles/tag/
didon/

DMCS

System Name:

Dumai-Melaka Cable System

Landing Points: Dumai (Indonesia), Melaka (Malaysia)


RFS Year: 2005
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Dumai

Melaka

2030
15,000,000
150

Initial Capacity:

20 Gbps

Design Capacity:

320 Gbps

Owners:

PT Telekom, Telekom Malaysia

System Supplier:

NEC

System Installer:

ASEAN Cableship

System Maintainer:

TM Berhad

Region: AustralAsia

EAC-C2C

System Name:

EAC-C2C

Landing Points: Capepisa (Philippines), Changi (Singapore),


Chikura (Japan), Chung Hom Kok (Hong
Kong), Fangshan (Taiwan), Nanhui District
(China), Nasugbu (Philippines), Pali
(Taiwan), Pusan (South Korea), Shima
(Japan), Singapore (Singapore), Taean
(South Korea), Tansh
RFS Year: 2009
Est. End of Service Date:
Taean
Pusan

Ajigaura
Chikura
Shima

Est. System Cost (US$):


Total Length (kms):
Design Capacity:
Owners:

Nanhui

850,000,000
35,429
30 Tbps
PACNET

System Supplier:

NEC

Marine Surveyor:

C&C Technologies

System Maintainer:
Upgrader:

n
sha
ng
Fa

O
ah ok
Kw K
ng Hom
eu
Ts ung
Ch

Pali

Tanshui

2034

Upgrade Year:
Upgraded Capacity:

Pacnet Global (Singapore) Pte.


Infinera
2013
100 Gbps

Region: AustralAsia
News:
Capepisa
Nasugbu
Vung Tau

Changi

http://subtelforum.com/articles/?s=EACC2C

EASSY

System Name:

Eastern Africa Submarine Cable System

Landing Points: Dar es Salaam (Tanzania), Djibouti


(Republic of Djibouti), Maputo
(Mozambique), Mogadishu (Somalia),
Mombasa (Kenya), Moroni (Comoros),
Mtunzini (South Africa), Port Sudan
(Sudan), Toliary (Madagascar)

Port
Sudan

RFS Year: 2010


Est. End of Service Date:
Est. System Cost (US$):

Djibouti

Total Length (kms):


Design Capacity:

10 Tbps

Owners:

Mombasa
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:

Moroni

Upgraded Capacity:

Maputo
Mtunzini

2 Fiber Pairs
100 Gbps
Bharti Airtel, Botswana
Telecommunications Corporation, British
Telecom, Comores Telecom, Etisalat,
France Telecom, Mauritius Telecom, MTN
Group, Neotel, Saudi Telecom Company
(STC), Saudi Arabia, SPV2, Sudan Telecom
Limited, Sudatel, Tanzania Telecommuni
Alcatel-Lucent Submarine Networks
Telkom SA Limited
Alcatel-Lucent Submarine Networks
2014
100 Gbps

Region: EMEA
News:

Toliary

9,900
30 Gbps

Channel Capacity:

Dar es Salaam

247,000,000

Initial Capacity:
Fiber Pairs:

Mogadishu

2035

http://subtelforum.com/articles/tag/
eassy/

EAST-WEST

Santo Domingo

Tortola

Morant Point

System Name:

East-West

Landing Points: Morant Point (Jamaica), Santo Domingo


(Dominican Republic), Tortola (British
Virgin Islands)
RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2036
35,000,000
1,700

Initial Capacity:

120 Gbps

Design Capacity:

720 Gbps

System Installer:

Orange Magine

Upgrader:
Upgrade Year:
Upgraded Capacity:

Xtera Communications
2016
100 Gbps

Region: Americas
News:

http://subtelforum.com/articles/tag/eastwest-cable/

ECFS

System Name:

East Caribbean Fiber System

Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe),


Basseterre (St. Kitts & Nevis), Bridgetown
(Barbados), Canefield (Dominica),
Dickenson Bay (Antigua), Kingstown
(St. Vincent), Martinique (Martinique),
Montserrat (Montserrat), Port Salines
(Grenada), St. Lucia (S
RFS Year: 1995

Tortola

Est. End of Service Date:

Anguilla
St. Martin

Est. System Cost (US$):


Total Length (kms):

Basseterre
Dickenson Bay
Montserrat

Initial Capacity:
Owners:

Baliff

Kingstown
Port Salines
Trinidad

AT&T, BET (Barbados), C&W, France


Telecom, TSTT
C&W (Marine)

Upgrade Year:
Upgraded Capacity:

Bridgetown

2.5 Gbps

System Installer:

Upgrader:

St. Lucia

1,875

Alcatel Submarine Networks

System Maintainer:

Martinique

56,000,000

System Supplier:
Cableship:

Canefield

2020

Mercury
Orange, Telecom Services Trinidad &
Tobago
Xtera Communications
2009, 2013, 2016
10 Gbps, 40 Gbps, 100 Gbps

Region: Americas
News:

http://subtelforum.com/articles/?s=ECFS

EIG

Bude

Monaco
Sesimbra
Gibraltar
Tripoli

Abu Talat
Zafarana

Fujairah
Muscat

Jeddah
System Name:

Europe India Gateway

Landing Points: Abu Talat (Egypt), Bude (United Kingdom),


Djibouti (Republic of Djibouti), Fujairah
(United Arab Emirates), Gibraltar
(Gibraltar), Jeddah (Saudi Arabia), Monaco
(Monaco), Mumbai (India), Muscat (Oman),
Zafarana (Egypt), Sesimbra (Portugal),
Tripoli (Libya
RFS Year:

2011

Est. End of Service Date:

2036

Djibouti

System Supplier:

Tyco Telecommunications, Alcatel-Lucent


Submarine Networks

Marine Surveyor:

Fugro, UTEC, GEMS

Est. System Cost (US$): 700,000,000


Total Length (kms): 15,000
Initial Capacity: 3.84 Tbps
Channel Capacity:
Owners:

Mumbai

System Maintainer:

100 Gbps
AT&T, Bharti Airtel, British Telecom, BSNL,
C&W, Djibouti Telecom, Du, Gibtelecom,
Libyan Post, Telecom, and Information
Technology Company, MTN Group,
Omantel, PT Comunicaes, Saudi Telecom
Company (STC), Telekom SA, Verizon,
Telecom Egypt

Upgrader:
Upgrade Year:

Oman Telecommunications Company,


Telecom Egypt, Verizon Ltd., Vodafone
Limited
Ciena
2014

Upgraded Capacity: 100 Gbps


Region: EMEA
News: http://subtelforum.com/articles/tag/eig/

ENDEAVOUR

Keawaula

System Name:

Endeavour

Landing Points: Keawaula (Hawaii), Sydney (Australia)

Sydney

RFS Year:

2008

Est. End of Service Date:

2033

Total Length (kms):

9,125

Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

80 Gbps
2 Fiber Pairs
Telstra (Australia)
Telstra International
Infinera
2014
100 Gbps
AustralAsia
http://subtelforum.com/
articles/?s=endeavour

ESTEPONA-TETOUAN

System Name:

Estepona-Tetouan

Landing Points: Estepona (Spain), Tetouan (Morocco)


RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2019
10,000,000
113
3.7 Gbps
Telefonica

System Supplier:

STC Submarine Systems

System Installer:

FCR

Cableship:
System Maintainer:

Vercors
Telefonica de Espaa S.A.U.

Region: EMEA

Estepona

Teutan

The Power of Submarine


Information Transmission

Theres a new power under ocean uniting the world in a whole


new way. With unparalleled development expertise and
outstanding technology, Huawei Marine is revolutionizing
trans-ocean communications with a new generation of repeaters
and highly reliable submarine cable systems that offer greater
transmission capacity, longer transmission distances and faster
response to customer needs. Huawei Marine: connecting the
world one ocean at a time.

Lisbon

ad
eir
a

EULALINK

Gran Canaria

Praia

Fortaleza

System Name:

Eulalink [Planned]

Landing Points: Fortaleza, Brazil; So Paulo, Brazil; Sines,


Portugal
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2042
250,000,000
5,875
30 Tbps
3 Fiber Pairs
100
100 Gbps
Telebras, Islalink

Region: Transatlantic
News:

http://subtelforum.com/
articles/?s=eulalink

EUROPA

System Name:

Europa

Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon)


RFS Year: 2013
Est. End of Service Date:
Fiber Pairs:
Owners:

2038
8 Fiber Pairs
CYTA, Lebanese ministry of
Telecommunications

Region: EMEA
News:

Pentaskhinos

Tripoli

http://subtelforum.com/articles/tag/
europa/

FA-1 NORTH/SOUTH

Porthcurno

Plerin

Northport
Island
Park

System Name:

FLAG Atlantic 1 North/South

Landing Points: Island Park (USA), Northport (USA), Plerin


(France), Porthcurno (United Kingdom)
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2026
900,000,000
12,820
4.68 Tbps
6 Fiber Pairs
Global Cloud Xchange

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Marine Surveyor:

Svitzer, SAIC

Survey Boat: Vessel of Opportunity


System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Global Cloud Xchange


Infinera, Ciena
2010, 2011, 2013
10 Gbps, 100 Gbps

Region: Transatlantic
News:

http://subtelforum.com/articles/?s=fa-1

FALCON

Owners:
System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

System Maintainer:
Upgrader:

Aqaba

Region:

Kuwait
City

ba

ha

D
Khuba
as i
ab

Jeddah

Al Seeb

Port Sudan

Mumbai
Al Hudaydah

Al Ghaydah

System Name: Falcon


Landing Points: Al Ghaydah (Yemen), Al Hudaydah
(Yemen), Al-Khobar (Saudi Arabia), Al
Seeb (Oman), Aqaba (Jordan), Bandar-E
Abbas (Iran), Chabahar (Iran), Colombo
(Sri Lanka), Dubai (UAE), Hulhumal
(India), Jeddah (Saudi Arabia), Kuwait City
(Kuwait), Manama (Bahrain),
RFS Year: 2006
Est. End of Service Date:

2031

Est. System Cost (US$): 900,000,000


Total Length (kms): 12,181
Initial Capacity: 90 Gbps
Design Capacity: 2.56 Tbps
Fiber Pairs: 8 Fiber Pairs

E-marine PJSC, Oman Telecommunications


Company, Reliance Globalcom Ltd
Infinera
Indian Ocean Pan-East Asian

News: http://subtelforum.com/
articles/?s=Falcon

Bandar
Abbas Cha

Al
M -Kh
Su an ob
m am ar
ai a
sm
a

Suez

Global Cloud Xchange

Trivandrum
Colombo
Hulhumal

FAR EAST

Magadan

Okha

Mys Levashova

System Name:

Far East

Landing Points: Mys Levashova (Russia), Okha (Russia),


Magadan (Russia)
RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):


Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

50,000,000
1,844
1.6 Tbps
2 Fiber Pairs
8
100 Gbps
Rostelcom

System Supplier:

Huawei Marine Networks

System Installer:

Global Marine Systems Limited

Cableship:
Region:
News:

Cable Innovator
AustralAsia
http://subtelforum.com/articles/tag/fareast/

FARICE-1

System Name:

Farice-1

Landing Points: Dunnet Bay (Scotland), Funningsfjr_ur


(Faroe Islands), Sey_isfjr_ur (Iceland)
RFS Year:

2004

Est. End of Service Date:

2029

Est. System Cost (US$): 25,000,000


Total Length (kms): 1,395
Initial Capacity: 20 Gbps
Owners:
System Supplier:
Cableship:
Marine Surveyor:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Farice Ltd., Iceland Telecom Ltd.


Pirelli
Pertinacia
Fugro
Farice ehf
Ciena
2013
100 Gbps
EMEA
http://subtelforum.com/articles/tag/
farice-1/

Dunnet
Bay

FARLAND

System Name:

Farland

Landing Points: Aldeburgh (United Kingdom), Domburg


(Netherlands)
RFS Year: 1994
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:
System Maintainer:

2019
10,000,000
149
18 Gbps
British Telecom
Tyco Telecommunications
British Telecommunications PLC

Region: EMEA

Aldeburgh

Domburg

Oregon

FASTER

Shima Chikura
China

System Name:

Faster [Planned]

Landing Points: China; Chikura, Japan; Shima, Japan;


Oregon, USA; Los Angeles, California, USA
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2041
350,000,000
11,629

Initial Capacity:

28 Tbps

Design Capacity:

60 Tbps

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

Project Completion Phases:

6 Fiber Pairs
100
100 Gbps
Google, China Telecom, China Mobile,
Global Transit, KDDi, SingTel, TIME
dotCom

Pre-Engineering

System Supplier:

NEC

Survey

System Installer:

Orange Marine

Cableship:

Ren Descartes

System Manufacture
System Installation
Commissioning & Acceptance

Region: Transpacific
News:

http://subtelforum.com/articles/tag/
faster/

FEHMARN BELT

System Name:

Fehmarn Belt

Landing Points: Puttgarden (Germany), Rdbyhavn


(Denmark)
RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2025
10,000,000
20
2.5 Gbps
Teliasonera

System Supplier:

Ericsson

System Installer:

Nexans

Cableship:
System Maintainer:

Pleijel
TeliaSonera International Carrier AB

Region: EMEA

Rdbyhavn
Puttgarden

FIBRALINK

Ki

ng
sto
n

Montego
Bay

Ocho Rios

Puerto
Plata

System Name:

FibraLink

Landing Points: Kingstown (St. Vincent), Montego Bay


(Jamaica), Ocho Rios (Jamaica), Puerto Plata
(Dominican Republic)
RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Design Capacity:
Fiber Pairs:
Owners:

30,000,000
2,438
40 Gbps
320 Gbps per fiber pair
2 Fiber Pairs
Columbus Networks

System Supplier:

Alcatel

System Installer:

International Telecom

Cableship:
Region:
News:

IT Intrepid
Americas
http://subtelforum.com/articles/tag/
fibralink/

FIBRE ATLANTIC

Bordeaux

Virginia Beach

System Name:

Fibre Atlantic [Planned]

Landing Points: Bordeaux (France), Virginia Beach, Virginia


(USA)
RFS Year:

2018

Est. End of Service Date:

2043

Est. System Cost (US$):

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Total Length (kms):


Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:
Region:

250,000,000
6,250
60 Tbps
6 Fiber Pairs
100
100 Gbps
SemanticNet BV
Transatlantic

FLAG EUROPE-ASIA

Keoje

Said
Alexandria Port
Aqaba
Fujairah
Jeddah

Nanhui

ez

Estepona

Palermo

Su

Hong
Kong

Est. System Cost (US$): 720,000,000


Total Length (kms): 27,433
Initial Capacity: 20 Gbps
Design Capacity: 80 Gbps
Owners: Global Cloud Xchange
System Maintainer: China Telecommunications Corporation,
E-marine PJSC, Reliance Globalcom Ltd
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Ciena
2012
100 Gbps
Indian Ocean Pan-East Asian, EMEA
http://subtelforum.com/articles/?s=FLAG

So

Penang Ban
Pak
Para

2022

tu

RFS Year: 1997

ng

kh

la

Mumbai

Sa

System Name: FLAG Europe-Asia


Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben
Pak Para (Thailand), Estepona (Spain),
Fujairah (United Arab Emirates), Hong
Kong (China), Jeddah (Saudi Arabia), Keoje
(South Korea), Miura (Japan), Mumbai
(India), Nanhui District (China), Ninomiya
(Japan), Palerm
Est. End of Service Date:

N
M ino
iu mi
ra ya

Porthcurno

FLORES-CORVO

System Name:

Flores-Corvo

Landing Points: Flores (Azores), Corvo (Azores), Graciosa


(Azores), Faial (Azores)
RFS Year: 2014
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2039
20,000,000
685
0.96 Tbps
6 Fiber Pairs
16
10 Gbps
Viatel (Azores)

System Supplier:

Huawei Marine Networks, Nexans

System Installer:

Huawei Marine Networks

Region: EMEA
News:

Corvo
Flores

Graciosa
Faial

http://subtelforum.com/articles/tag/
flores-corvo/

FOG

System Name:

Fiber Optic Gulf

Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City


(Kuwait), Manama (Bahrain)
RFS Year: 1998
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:

Kuwait
City

Fiber Pairs:
Owners:

System Supplier:
System Maintainer:

2023
80,000,000
1,286
20 Gbps
4 Fiber Pairs
Bahrain Telephone Co., Kuwait
Ministry of Communications, Qatar
Telecommunication Company, UAE
Telecommunications Company
Fujitsu
E-marine PJSC

Region: EMEA

Manama
Doha

Dubai

um

ba

Fu
ja
Al irah
Se
eb

Al
K
Al ho
H b
D idd ar
oh
a

Al

Kuwait
City

F
Bu aw
sh
eh
r

Mazara

Za Ale
x
fa
ra and
na
ria

GBICS

System Name: Gulf Bridge International Cable System


Landing Points: Alexandria (Egypt), Al Hidd (Bahrain),
Al-Khobar (Saudi Arabia), Al Seeb (Oman),
Bushehr (Iran), Doha (Qatar), Dubai
(United Arab Emirates), Fujairah (United
Arab Emirates), Jeddah (Saudi Arabia),
Kuwait City (Kuwait), Mazara (Italy),
Mumbai (India), Zafa

Owners:

Gulf Bridge International

RFS Year: 2011

System Supplier:

TE SubCom

2036

System Installer:

e-Marine

Est. End of Service Date:

Est. System Cost (US$): 445,000,000


Total Length (kms): 4,719
Design Capacity: 2.5 Tbps
Fiber Pairs: 4 Fiber Pairs express route, 2 Fiber Pairs
other landings
Channels: 128
Channel Capacity: 10 Gbps

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:

Gulf Bridge International Inc., Oman


Telecommunications Company
Xtera Communications
2012
100 Gbps
EMEA

News: http://subtelforum.com/articles/tag/gbi/

GCN

Hams
Bluff

Galisbay
Gustavia

Basseterre
Dickenson Bay
Baie-Mahault
Baliff
Canefield

System Name: Global Caribbean Network


Landing Points: Baie-Mahault (Guadeloupe), Baliff
(Guadeloupe), Basseterre (St. Kitts &
Nevis), Bridgetown (Barbados), Canefield
(Dominica), Dickenson Bay (Antigua),
Galisbay (St Martin), Hams Bluff (Virgin
Islands), Kingstown (St. Vincent), Le
Lamentin (Martinique), Mac
RFS Year: 2007
Est. End of Service Date:

2032

Le Lamentin
Port Castries
Kingstown

Bridgetown

Port Salines

Est. System Cost (US$): 17,520,000


Total Length (kms): 1,926
Initial Capacity: 1.2 Tbps
Owners: Global Carribean Network
System Supplier:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Alcatel Submarine Networks


Ciena
2013
40 Gbps
Americas
http://subtelforum.com/articles/tag/gcn/

Macqueripe

GEMINI BERMUDA

System Name:

Gemini Bermuda

Landing Points: Manasquan, NJ (USA), Bermuda


RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:
System Installer:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

2032
40,000,000
1,500
C&W, Verizon
Orange Marine
Verizon
Xtera
2016
100 Gbps

Region: Americas
News:

Bermuda

http://subtelforum.com/articles/tag/
gemini-bermuda/

GEORGIA-RUSSIA

Novorossiysk

Sochi

System Name: Georgia-Russia


Landing Points: Novorossiysk (Russia), Poti (Georgia),
Sochi (Russia)
RFS Year: 2000
Est. End of Service Date:

2025

Est. System Cost (US$): 20,000,000


Total Length (kms): 280
Initial Capacity: 2.5 Gbps
Fiber Pairs: 4 Fiber Pairs
Owners: DanTelco, FOPTNET, Rostelecom
System Maintainer: OJSC Rostelecom
Region:

EMEA

Poti

Bude

GLO-1

Vigo
Sesimbra
Casablanca

System Name:

Globacom-1

Landing Points: Accra (Ghana), Bude (United Kingdom),


Casablanca (Morocco), Dakar (Senegal),
Lagos (Nigeria), Nouakchott (Mauritania),
Sesimbra (Portugal), Vigo (Spain)
RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$): 260,000,000


Total Length (kms): 8,717
Initial Capacity: 640 Gbps
Design Capacity:
Fiber Pairs:
Owners:
System Supplier:

2.5 Tbps

Marine Surveyor:
System Maintainer:
Region:
News:

Dakar

2 Fiber Pairs
Globacom Ltd.
Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks, IT


International Telecom
Cableship:

Nouakchott

Ile de Batz, IT Intrepid


Alcatel Submarine Networks
IT International Telecom Canada
EMEA
http://subtelforum.com/articles/tag/glo-1/

Accra

Lagos

GLOBENET

System Name:

GlobeNet

Landing Points: Bermuda (Bermuda), Boca Raton (USA),


Fortaleza (Brazil), Maiquetia (Venezuela),
Rio de Janeiro (Brazil), Tuckerton (USA)
RFS Year: 2001
Est. End of Service Date:

Tuckerton

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:

Bermuda

610,000,000
22,690
40 Gbps

Design Capacity:

1.28 Tbps

Owners:

Globenet

System Supplier:

Boca Raton

2026

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

TE SubCom
IT International Telecom Canada
Xtera Communications
2010
100 Gbps

Region: Americas
News:

Punta
Gorda

Fortaleza

Rio de
Janeiro

http://subtelforum.com/articles/tag/
globenet/

GO-1

System Name:

GO-1

Landing Points: Cantina (Sicily), Mazara (Italy), St Georges


Bay (Malta), St Pauls Bay (Malta)
RFS Year: 1995
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2020
10,000,000
290
20 Gbps
GO

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Elettra

Cableship:

Teliri

Region: EMEA

Mazara

Catania

St.
Pauls St.
Bay
Georges
Bay

GOKI

System Name:

GOKI

Landing Points: Incheon (Korea), Kita-Kyushu (Japan),


Okinawa Prefecture (Japan), Tumon
(Guam)

Incheon

RFS Year: 2013


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Kita-Kyushu

Owners:

2038
120,000,000
4,200
80 Gbps
AT&T

System Supplier:

Xtera Communications

System Installer:

Kokusai Cable Ship

Region: AustralAsia

Okinawa

Tumon

GONDWANA-1

System Name:

Gondwana-1

Landing Points: Lifou (New Caledonia), Mouli Island (New


Caledonia), Noumea (New Caledonia),
Poindimie (New Caledonia), Sydney
(Australia)
RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$): 57,500,000


Total Length (kms): 2,152
Initial Capacity: 640 Gbps
Owners:
System Supplier:

Post and Telecommunications Office of


New Caledonia
Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region:

OPT - Nouvelle Caledonie


AustralAsia

dn
ey

System Maintainer:

Ile de Re

Sy

Cableship:

Poindimie

Mouli Island
Lifou

Noumea

GREENLAND CONNECT

Nuuk

Landeyjarsandur

Qaqortoq

System Name:

Greenland Connect

Landing Points: Landeyjarsandur (Iceland), Milton


(Canada), Nuuk (Greenland), Qaqortoq
(Greenland)
RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

126,000,000
4,733

Initial Capacity:

20 Gbps

Design Capacity:

960 Gbps

Fiber Pairs:
Owners:

Milton

2034

2 Fiber Pairs
Tele Greenland

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Cableship:
Marine Surveyor:
System Maintainer:

Maersk Responder, Blue Castor, Ile de Sein


Elettra
TELE Greenland A/S

Region: Americas

GUANTNAMO BAY CABLE

System Name:

Guantnamo Bay Cable

Landing Points: Guantnamo Bay (Cuba), Florida (USA)


RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Channel Capacity:

South Florida

Owners:

2041
31,000,000
1,500
100 Gbps
US Government

System Supplier:

Xtera Communications, NSW

System Installer:

IT International Telecom

Marine Surveyor:

US Government

Region: Americas
News:

http://subtelforum.com/articles/tag/
guantanamo/

Guantnamo Bay

GWEN

System Name:

Greece to Western Europe Network

Landing Points: Bari (Italy), Corfu (Greece)


RFS Year: 2004
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Fiber Pairs:
Owners:

2029
20,000,000
647
4 Fiber Pairs
OTE

Region: EMEA
News:

Bari

Corfu

http://subtelforum.com/articles/tag/
gwen/

HANNIBAL

System Name:

Hannibal

Landing Points: Kelibia (Tunisia), Mazara (Italy)


RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2034
10,000,000
180
9.6 Tbps
3 Fiber Pairs
80
40 Gbps
Tunisie Telecom (Tunisia)

System Supplier:

Huawei Marine Networks

System Installer:

Global Marine Systems Limited, Huawei


Marine Networks

Cableship:
Marine Surveyor:

Sovereign
UTEC

Region: EMEA
News:

Mazara

Kelibia

http://subtelforum.com/articles/tag/
hannibal/

HANTRU-1

System Name:

Hantru-1

Landing Points: Ebeye (Kwajalein), Majuro (Marshall


Islands), Pohnpei (Micronesia), Reagan Test
Site (Kwajalein), Tumon (Guam)
RFS Year: 2010
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2035
130,000,000
2,908
Hannon Armstrong

System Supplier:

TE SubCom

System Installer:

TE SubCom

System Maintainer:

Truestone LLC

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/
hantru-1/

Tumon

Ebeye

Pohnpei

Reagan Test Site


Majuro

HAWAIKI
Oregon

Hawaii

Wallis
Vanuatu Fiji

New
Caledonia
Sydney

Samoa
American
Samoa

Norfolk Island
Whangarei

System Name:

Hawaiki [Planned]

Landing Points: Oregon (USA), Sydney (Australia), Hawaii


(USA), Norfolk Island, New Caledonia, Fiji,
Samoa, American Samoa, Whangarei (New
Zealand)
RFS Year: 2018
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Channel Capacity:
Owners:

2043
300,000,000
14,000
12.8 Tbps
2 Fiber Pairs
64
100 Gbps
Hawaiki Submarine Cable

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: Transpacific
News:

http://subtelforum.com/articles/tag/
hawaiki/

HAWK CABLE SYSTEM

Marseille

System Name:

Anatoliko

Hawk Cable System

Landing Points: Alexandria (Egypt), Anatoliko (Cyprus),


Marseille (France)
RFS Year:

2011

Est. End of Service Date:

2035

Est. System Cost (US$): 250,000,000


Total Length (kms): 3,181
Initial Capacity: 2.72 Tbps
Fiber Pairs:
Channels:
Channel Capacity:
Owners:
System Supplier:

4 Fiber Pairs
68
10 Gbps
Global Cloud Xchange
Fujitsu

System Installer: Elettra, Orange Marine


Marine Surveyor:
Region:
News:

Fugro
EMEA
http://subtelforum.com/articles/tag/
hawk/

Alexandria

HIBERNIA ATLANTIC

Ly
n

er
r
Co ing
ve

Dublin

So
ut
hp
or
t

Coleraine

System Name:

Hibernia Atlantic

Landing Points: Coleraine (Ireland), Dublin (Ireland),


Herring Cove (Canada), Lynn (USA),
Southport (United Kingdom)
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2026
320,000,000
12,111
10.16 Tbps
Columbia Ventures Corporation

System Supplier:

Tyco Telecommunications SSI

System Installer:

FCR

Cableship:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Vercors, Iberus, Nordic King, Teneo, Dock


Express 20, Global Mariner, Atlantida
Hibernia Netoworks
Huawei Marine Networks
2011
100 Gbps

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/
hibernia-atlantic/

HIBERNIA EXPRESS

System Name:

Hibernia Express

Landing Points: Halifax, Nova Scotia (Canada); London,


UK; Cork, Ireland
RFS Year: 2015
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2040
120,000,000
4,600
53 Tbps
6 Fiber Pairs
100
100 Gbps, 200 Gbps on select segments
Hibernia Atlantic

System Supplier:

TE SubCom

System Installer:

TE SubCom

Marine Surveyor:

EGS

Survey Boat: RV Ridley Thomas


Region: Transatlantic
News:

http://subtelforum.com/articles/tag/
hibernia-express/

Cork

New York

London

HONOTUA

System Name:

Honotua

Landing Points: Huahine (French Polynesia), Moorea


(French Polynesia), Papeete (French
Polynesia), Spencer Beach, Hawaii (USA),
Uturoa (Raiatea, French Polynesia), Vaitape
(Bora Bora, French Polynesia)
RFS Year: 2009

Spencer
Beach

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:

2034
122,000,000
4,634
640 Gbps
OPT French Polynesia
Alcatel-Lucent Submarine Networks

Region: AustralAsia

pe
et
e

H
ua

re
a
Pa

oo

tu

ro
a

Vaitape

hi
ne

News:

http://subtelforum.com/articles/tag/
honotua/

HSCS

System Name:

Hokkaido-Sakhalin Cable System

Landing Points: Ishikari (Japan), Nevelsk (Russia)


RFS Year: 2008
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Owners:

Ishikari

20,000,000
559
640 Gbps
NTT Communications, TTK

System Supplier:

NEC

System Installer:

KDD

Cableship:

Nevelsk

2033

System Maintainer:

Subaru
NTT Communications Corporation, TTK

Region: AustralAsia

HUGO

System Name:

Hugo

Landing Points: Guernsey (Guernsey), Lannion (France),


Porthcurno (United Kingdom)
RFS Year: 2006
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

11,960,000
426
3.3 Tbps
C&W

System Supplier:

Alcatel Submarine Networks

System Installer:

Tyco SSI

Cableship:

Porthcurno

2031

System Maintainer:

Tycom Reliance
Vodafone Limited

Region: EMEA

Guernsey
Lannion

News:

http://subtelforum.com/articles/tag/
hugo/

I2I

Chennai

System Name:

i2i

Landing Points: Chennai (India), Tuas (Singapore)


RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$): 90,000,000


Total Length (kms): 3,100
Initial Capacity: 160 Gbps
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:
Marine Surveyor:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

42 Tbps
8 Fiber Pairs
105
100 Gbps
Bharti Airtel
C&C Technologies
Ciena
2014
100 Gbps
Indian Ocean Pan-East Asian
http://subtelforum.com/articles/tag/i2i/

Tuas

ICN1

System Name:

Interchange I

Landing Points: Port Vila (Vanuatu), Suva (Fiji)


RFS Year: 2014
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2039
32,000,000
1,259

Initial Capacity:

20 Gbps

Design Capacity:

320 Gbps

Owners:

Interchange Limited

System Supplier:

TE SubCom, Alcatel-Lucent Submarine


Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia
News:

Port Vila

http://subtelforum.com/articles/tag/
icn1/

Suva

ICN2 (INTERCHANGE II)

System Name:

Interchange II [Planned]

Landing Points: Port Moresby (Papau New Guinea), Port


Vila (Vanuatu), Luganville (Vanuatu),
Honiara (Solomon Islands)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2041
72,000,000
3,500
1.28 Tbps
1 Fiber Pair
32
40 Gbps
Interchange Limited

Region: AustralAsia

Port Moresby

Honiara
Luganville
Port Vila

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

I-ME-WE
Marseille

Catania
Tripoli
Alexandria Suez
Fujairah

Karachi

Jeddah
Mumbai
System Name:

India-Middle East-Western Europe

Landing Points: Alexandria (Egypt), Catania (Italy),


Fujairah (United Arab Emirates), Jeddah
(Saudi Arabia), Karachi (Pakistan),
Marseille (France), Mumbai (India), Suez
(Egypt), Tripoli (Lebanon)
RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$): 320,000,000


Total Length (kms): 13,000
Initial Capacity: 520 Gbps
Design Capacity:
Owners:

System Supplier:

3.84 Tbps
Bharti Airtel, Etisalat, France Telecom,
Ogero (Lebanon), PTCL (Pakistan), STC
(Saudi Arabia), Tata Communications,
Telecom Egypt, Telecom Italia Sparkle
Alcatel-Lucent Submarine Networks

System Installer: S.B. Submarine Systems, NEC

Cableship:
Marine Surveyor:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Cable Innovator
Fugro
Orange, TATA Communications, Telecom
Egypt, Telecom Italia Sparkle
Mitsubishi
2012
40 Gbps

Region: EMEA
News: http://subtelforum.com/articles/tag/ime-we/

ITALY-ALBANIA

Durres

Bari

System Name:

Italy-Albania

Landing Points: Bari (Italy), Durres (Albania)


RFS Year:

1998

Est. End of Service Date:

2023

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
Region:

10,000,000
236
2.5 Gbps
1 Fiber Pair
Telecom Italia Sparkle
EMEA

ITALY-GREECE

Otranto
Corfu

System Name:

Italy-Greece

Landing Points: Corfu (Greece), Otranto (Italy)


RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
Region:

10,000,000
161
1.69 Gbps
4 Fiber Pairs
Telecom Italia
EMEA

ITALY-LIBYA

System Name:

Italy-Libya

Landing Points: Mazara (Italy), Tripoli (Libya)


RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

570
2.5 Gbps

Design Capacity:

40 Gbps

Owners:
System Maintainer:
Upgrade Year:
Upgraded Capacity:

Tripoli

10,000,000

Initial Capacity:
Fiber Pairs:

Mazara

2025

2 Fiber Pairs
Telecom Italia
Telecom Italia Sparkle
2011
40 Gbps

Region: EMEA

ITALY-MONACO

Savona
Monaco

System Name:

Italy-Monaco

Landing Points: Monaco (Monaco), Savona (Italy)


RFS Year: 1995
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:

2020
10,000,000
162
565 Mbps
1 Fiber Pairs
Telecom Italia
Telecom Italia Sparkle

Region: EMEA

JAKA2DELEMA

Sangatta
System Name: JaKa2DeLeMa
Landing Points: Bandjermasin (Indonesia), Benculuk
(Indonesia), Jember (Indonesia), Ketapang
(Indonesia), Mataram (Indonesia),
Pangkalanbun (Indonesia), Pontianak
(Indonesia), Sangata (Indonesia), Toweli
(Indonesia)
RFS Year: 2010
Est. End of Service Date:

2035

Pontianak
Toweli
Ketapang
Pangkalanbun
Bandjermasin

Est. System Cost (US$): 116,000,000


Total Length (kms): 1,800
Initial Capacity: 960 Gbps
Design Capacity: 9.6 Tbps
Fiber Pairs: 3 Fiber Pairs
Channels: 32
Channel Capacity: 100 Gbps
Owners: PT Telekomunikasi Indonesia
System Supplier:

NSW, Fujitsu

System Installer: Fujitsu, Orange Marine


Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:

Fujitsu
2013
100 Gbps
AustralAsia

Jember Benculuk

Mataram

JAKABARE

System Name:

JAKABARE

Landing Points: Batam (Indonesia), Jakarta (Indonesia),


Pontianak (Indonesia), Tuas (Singapore)
RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Tuas

Batam

40,000,000
1,330

Initial Capacity:

160 Gbps

Design Capacity:

1.28 Tbps

Owners:

Pontianak

2034

Indosat

System Supplier:

NEC

System Installer:

NEC, ASEAN Cableship, Orange Marine

Cableship:

Cable Innovator

Region: AustralAsia
News:

Jakarta

http://subtelforum.com/articles/tag/
jakabare/

JAPAN-US

i
ak a
ar m
ib ya
ta ru
Ki Ma

Point Arena
Morro Bay

Shima

Makaha
System Name:

Japan-US

Landing Points: Kitaibaraki (Japan), Makaha (Hawaii),


Maruyama (Japan), Morro Bay (USA), Point
Arena (USA), Shima (Japan)
RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$): 590,000,000


Total Length (kms): 21,880
Initial Capacity: 640 Gbps
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:
System Supplier:

6.4 Tbps
4 Fiber Pairs
16
100 Gbps
AT&T, Japan Telecom, KDDI, MCIWorldCom, NTTWN
Alcatel Submarine Networks, Fujitsu,
Ocean Cable Company

System Installer: Global Marine Systems Limited


Cableship:
System Maintainer:

Subaru, Cable Innovator


AT&T, KDDI, NTT Communications
Corporation, Softbank Telecom Corp,
Verizon Ltd

Upgrader:

Ciena

Upgrade Year: 2012


Upgraded Capacity: 100 Gbps
Region: Transpacific
News: http://subtelforum.com/articles/tag/
japan-us/

JASUKA

System Name:

Jasuka

Landing Points: Batam (Indonesia), Jakarta (Indonesia),


Pontianak (Indonesia), Tanjung Pandan
(Indonesia)
RFS Year: 2006
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Batam

280,000,000
354

Initial Capacity:

20 Gbps

Design Capacity:

320 Gbps

Owners:

Pontianak

2031

PT Telekom

System Supplier:

Nokia Siemens Networks

System Installer:

Nokia Siemens Networks

Marine Surveyor:

Nokia Siemens Networks

Upgrader:

Nokia Siemens Networks

Upgrade Year:
Upgraded Capacity:

2011
40 Gbps

Region: AustralAsia

Tanjung
Pandan

Jakarta

KAFOS

System Name:

Karadeniz Fiber Optik Sistemi

Landing Points: Istanbul (Turkey), Mangalia (Romania),


Varna (Bulgaria)
RFS Year: 1997
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

Varna

Istanbul

20,000,000
4,640
1.2 Gbps
BTC, Turk Telecom

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship:

Mangalia

2022

Vercors

Region: EMEA

KATTEGAT-2

System Name:

Kattegat-2

Landing Points: Lyngsa, Denmark; Osterby, Denmark;


Skalvik, Sweden; Vestero, Denmark
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2026
10,000,000
75
TDC

Region: EMEA

Jutland

Gothenburg

KELTRA-2

System Name:

Keltra-2

Landing Points: Kelibia (Tunisia), Trapini (Italy)


RFS Year: 2007
Est. End of Service Date:
Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:

2032
209
20 Gbps
6 Fiber Pairs
Telecom Italia, Tunisie Telecom (Tunisia)

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

System Maintainer:

Telecom Italia Sparkle

Region: EMEA

KHULNA-CHENNAI

Khulna

System Name:

Khulna-Chennai

Landing Points: Chennai (India), Khulna (Bangladesh)


RFS Year: 2010
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

Chennai

2035
48,000,000
115
Bangladesh Submarine Cable Company

Region: Indian Ocean Pan-East Asian

KJCN

System Name: Korea-Japan Cable Network


Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan),
Pusan (South Korea)
RFS Year: 2002
Est. End of Service Date:

2027

Total Length (kms): 500


Initial Capacity: 2.88 Tbps
Design Capacity: 28.8 Tbps

Pusan

Fiber Pairs: 12 Fiber Pairs


Channels: 24
Channel Capacity: 100 Gbps
Owners: KEPCO, KT Coropration, NTT
Communications, SOFTBANK Telecom
Corp
System Supplier:

Fujitsu

System Installer: Fujitsu


Cableship: Maersk Recorder
System Maintainer: KT Corporation, NTT Communications
Corporation, SoftBank Telecom Corp
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Ciena
2015
100 Gbps
AustralAsia
http://subtelforum.com/articles/?s=KJCN

Kitakyushu
Fukuoka

KODIAK KENAI

System Name:

Kodiak Kenai

Landing Points: Anchorage (USA), Homer (USA), Kenai


(USA), Kodiak (USA), Narrow Cape (USA),
Seward (USA)
RFS Year: 2006
Est. End of Service Date:

Anchorage
Kenai
Seward
Homer

Est. System Cost (US$):


Total Length (kms):

2031
30,000,000
971

Initial Capacity:

2.5 Gbps

Design Capacity:

10 Gbps

Fiber Pairs:
Owners:
Upgrader:
Upgrade Year:
Upgraded Capacity:

4 Fiber Pairs
Kodiak Kenai Cable Company
Infinera
2010
10 Gbps

Region: Americas

Kodiak

Narrow
Cape

News:

http://subtelforum.com/
articles/?s=kodiak

KUWAIT-IRAN

System Name:

Kuwait-Iran

Landing Points: Kharg (Iran), Soroosh (Iran), Failaka


(Kuwait)
RFS Year: 2006
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

System Installer:
System Maintainer:

Failaka
Soroosh

Kharg

2031
20,000,000
334
2.5 Gbps
6 Fiber Pairs
Ministry of Communication, Kuwait
and Telecommunication Infrastructure
Company, Iran
e-Marine
E-marine PJSC

Region: EMEA

LEV

Mazara

Yeroskipou

Tel Aviv

System Name:

LEV

Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos


(Cyprus)
RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Fiber Pairs:
Channels:
Owners:
System Supplier:
System Maintainer:
Region:

175,000,000
2,600
2.5 Gbps
2 Fiber Pairs
8 wavelengths of 1550 nm
Telecom Italia Sparkle
Alcatel Submarine Networks, Tyco
Telecommunications
Cyprus Telecommunications Authority
EMEA

LION

System Name:

Lower Indian Ocean Network

Landing Points: Sainte Marie (Reunion Island), Terre Rouge


(Mauritius), Toamasina (Madagascar)
RFS Year:

2009

Est. End of Service Date:

2034

Tomasina
Terre
Rouge

Est. System Cost (US$): 30,000,000


Total Length (kms): 1,091
Initial Capacity: 20 Gbps
Fiber Pairs:
Owners:
System Supplier:

2 Fiber Pairs
France Telecom, Mauritius Telecom, Orange
Madagascar
Alcatel-Lucent Submarine Networks

System Installer: FCR, Orange Marine


Cableship:
System Maintainer:
Region:
News:

Chamarel
Mauritius Telecom, Orange
Indian Ocean Pan-East Asian
http://subtelforum.com/articles/tag/
lion/

Sainte
Marie

LION-2

System Name:

Mombasa

Lower Indian Ocean Network 2

Landing Points: Mombasa (Kenya), Mayotte (Mayotte)


RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Owners:

System Installer:

2037
76,000,000
3,000
1.28 Tbps
France Telecom-Orange, Mauritius
Telecom, Orange Madagascar, Telkom
Kenya, Emtel Ltd
Alpha Logistics, Elettra, Orange Marine

Region: Indian Ocean Pan-East Asian


News:

Mayotte

Co
nn
to L ectio
ion n
-1

http://subtelforum.com/articles/tag/
lion-2/

MAC
System Name:

Brookhaven

Mid-Atlantic Crossing

Landing Points: Brookhaven (USA), Hollywood (USA), St


Croix (US Virgin Islands)
RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$): 200,000,000


Total Length (kms): 7,461
Initial Capacity: 20 Gbps
Fiber Pairs:
Owners:
System Supplier:

2 Fiber Pairs
Global Crossing
Alcatel Submarine Networks

System Installer: FCR


Cableship:
System Maintainer:

Fresnel
Level 3 Communications Ltd

Hollywood

Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:

Infinera
2010, 2011
10 Gbps, 40 Gbps
Americas

News: http://subtelforum.com/articles/?s=midatlantic+crossing

St. Croix

MAIN ONE

System Name:

Main One

Landing Points: Abidjan (Ivory Coast), Accra (Ghana),


Casablanca (Morocco), Dakar (Senegal),
Lagos (Nigeria), Port Harcourt (Nigeria),
Seixal (Portugal), Tenerife (Spain)

Seixal

RFS Year: 2010


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Channel Capacity:
Owners:

7,000
1.92 Tbps
10 Tbps
100 Gbps
Main One Cable Company
TE SubCom

System Installer:

TE SubCom

System Maintainer:

a La
r
c
Ac

240,000,000

System Supplier:
Cableship:

gos

2035

Upgrader:
Upgrade Year:
Upgraded Capacity:

Resolute
Main One Cable Company, Tyco Electronics
Subsea Communications LLC
Xtera
2015
100 Gbps

Region: EMEA
News:

http://subtelforum.com/
articles/?s=Main+One

MAIN ONE EXPANSION

System Name:

Main One Expansion [Planned]

Landing Points: Lagos (Nigeria), Port Harcourt (Nigeria)


RFS Year: 2017
Est. End of Service Date:

Seixal

Est. System Cost (US$):


Total Length (kms):
Owners:

2042
40,000,000
1,100
Main One

Region: EMEA

gos

a
cra L

Ac

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Port ourt
Harc

MATRIX

Batam Changi

Jakarta

System Name:

Matrix

Landing Points: Batam (Indonesia), Changi (Singapore),


Jakarta (Indonesia)
RFS Year:

2008

Est. End of Service Date:

2032

Est. System Cost (US$): 30,000,000


Total Length (kms): 1,438
Initial Capacity: 60 Gbps
Design Capacity:
Fiber Pairs:
Owners:
System Supplier:

2.56 Tbps
4 Fiber Pairs
Matrix Networks and NAP Info
TE Subcom

System Installer: Global Marine Systems Limited


Cableship:
Region:

Wave Mercury, Cable Networker (barge)


AustralAsia

MAYA-1

System Name:

MAYA-1

Landing Points: Cancun (Mexico), Hollywood (USA), Maria


Chiquita (Panama), Puerto Limon (Costa
Rica), Tolu (Colombia)
RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):

Hollywood

Total Length (kms):


Initial Capacity:
Owners:

120,000,000
4,506
10 Gbps
MAYA-1 Consortium

System Supplier:

Alcatel Submarine Networks, Tyco


Telecommunications

Marine Surveyor:

C&C Technologies

Upgrader:
Upgrade Year:

Cancun

2025

Upgraded Capacity:

Alcatel-Lucent Submarine Networks


2012
40 Gbps

Region: Americas
News:

Puerto Limon

Maria Chiquita

Tolu

http://subtelforum.com/
articles/?s=maya-1

MBDC

System Name:

Moratelindo Batam - Dumai Cable

Landing Points: Batam (Indonesia), Dumai (Indonesia)


RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2034
40,000,000
330
10 Gbps
Moratelindo

Region: AustralAsia

Dumai

Batam

MCT

System Name:

Malaysia-Cambodia-Thailand [Planned]

Landing Points: Cherating, Malaysia; Rayoung, Thailand;


branching unit to Sihanoukville, Cambodia
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Rayoung

Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:

Sihanoukville

Owners:

System Supplier:

2041
40,000,000
1,425
30 Tbps
6 Fiber Pairs
50
100 Gbps
Telekom Malaysia Berhad, Symphony
Communication Public Company Limited,
Telcotech limited
Huawei Marine Networks

Region: AustralAsia
News:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Cherating

http://subtelforum.com/articles/tag/mct/

MED CABLE NETWORK

System Name:

Med Cable Network

Landing Points: Algiers (Algeria), Annaba (Algeria),


Marseille (France)
RFS Year: 2005
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:

Marseille

Owners:
System Maintainer:

2030
40,000,000
1,300
20 Gbps
Med Cable
Middle East & North Africa (MENA)
Submarine Cable Systems

Region: EMEA

Algiers

Annaba

MEDNAUTILUS

System Name:

MedNautilus

Landing Points: Catania (Italy), Chania (Greece), Haifa


(Israel), Istanbul (Turkey), Koropi (Greece),
Tel Aviv (Israel)
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Istanbul

5,729
3.84 Tbps

Design Capacity:

38.4 Tbps

Channels:

Ca
ta
ni
a

190,000,000

Initial Capacity:
Fiber Pairs:
Channel Capacity:

Koropi

2026

Owners:

6 Fiber Pairs
64
100 Gbps
Telecom Italia Sparkle

System Supplier:

Alcatel Submarine Networks

System Installer:

Orange Marine

Chania

Haifa

Tel Aviv

Upgrader:

Infinera

Upgrade Year: 2011, 2012, 2013


Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps
Region: EMEA
News: http://subtelforum.com/
articles/?s=mednautilus

MELITA-1

System Name:

Melita-1

Landing Points: Pozallo (Italy), St Pauls Bay (Malta)


RFS Year: 2009
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2034
14,000,000
100
50 Mbps
Melita Infrastructure Ltd.

Region: EMEA

Pozallo

St. Pauls
Bay

MENA

Mazara

Alexandria Suez
Zafarana

um

ba

Jeddah

Al Seeb

System Name:

Middle East North Africa

Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah


(Saudi Arabia), Mazara (Italy), Mumbai
(India), Zafarana (Egypt)
RFS Year:

2014

Est. End of Service Date:

2039

System Supplier:

Alcatel Submarine Networks, TE SubCom

System Installer:

Alcatel Submarine Networks, TE SubCom,


e-Marine

Cableship:

Est. System Cost (US$): 210,000,000


Total Length (kms): 8,800
Initial Capacity: 57.6 Tbps
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

6 Fiber Pairs
96
100 Gbps
Orascom Telecom

Marine Surveyor:
System Maintainer:

Maersk Responder, Ile de Sein, Niwa,


Decisive
EGS, Blue Star, Elettra
Middle East & North Africa (MENA)
Submarine Cable Systems, Oman
Telecommunications Company

Region: EMEA
News: http://subtelforum.com/articles/tag/
mena/

MIC-1

System Name:

Moratel International Cable 1

Landing Points: Batam (Indonesia), Changi (Singapore)


RFS Year: 2008
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Installer:

2033
10,000,000
70
10 Gbps
Moratelindo
Global Marine Systems Limited

Region: AustralAsia

Changi
Batam

MICRONESIA CABLE SYSTEM

System Name:

Micronesia Cable System

Landing Points: Majuro (Marshall Islands), Kwajalein


(Marshall Islands), Pohnpei (Micronesia),
Guam
RFS Year: 2011
Est. End of Service Date:
Total Length (kms):
Owners:

2036
174
Federals States of Micronesia
Telecommunications Authority, Marshall
Island National Telecommunications
Authority

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: AustralAsia

Guam

Pohnpei

Majuro
Kwajalein

MINERVA

Mazara

Catania

Yeroskipou

System Name:

Minerva

Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos


(Cyprus)
RFS Year:

2007

Est. End of Service Date:

2032

Initial Capacity:
Channels:
Owners:
System Supplier:
Region:

10 Gbps
DWDM wavelengths
Telecom Italia Sparkle
Alcatel-Lucent Submarine Systems
EMEA

MKCS

System Name:

Mataram-Kupang Cable System

Landing Points: Mataram (Indonesia), Sumbawa Besar


(Indonesia), Ambalawi (Indonesia),
Saraemee (Indonesia), Waingapu
(Indonesia), Ende (Indonesia), Kupang
(Indonesia)
RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2036
94,000,000
1,318
1.8 Tbps
6 Fiber Pairs
30
10 Gbps
PT Telkom

System Supplier:

Huawei Marine Networks, Nexans

System Installer:

Huawei Marine Networks

Region: AustralAsia
News:

Sum
Mataram Besa bawaRaba
r
Waingapu
Kupang

http://subtelforum.com/articles/tag/
mkcs/

MOANA

Hawaii

Samoa
Cook
Islands
New Zealand
System Name:

Moana Submarine Cable System [Planned]

Landing Points: New Zealand; Hawaii; Cook Islands;


Samoa
RFS Year: 2018
Est. End of Service Date:

2043

Total Length (kms):

9,700

Design Capacity:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Channel Capacity:
Owners:

20 Tbps
200 Gbps
Bluesky Pacific Group

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/
moana/

MONET

System Name:

Monet [Planned]

Landing Points: Santos (Brazil), Fortaleza (Brazil), Boca


Raton, Florida (United States)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:

Boca
Raton

2041
280,000,000
10,556
64 Tbps
6 Fiber Pairs
Algar Telecom, Angola Cables, Antel,
Google

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: Americas

Fortaleza

Project Completion Phases:

Santos

Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

MYTHIC

System Name:

Mythic [Planned]

Landing Points: Myanmar branches to Malaysia and


Thailand
RFS Year: 2017
Est. End of Service Date:

2042

Total Length (kms):

1,600

Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

20 Tbps
2 Fiber Pairs
100
100 Gbps
Campana Group

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia

Myanmar

News:

http://subtelforum.com/articles/tag/
mythic/

Thailand

Malaysia

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

NCP

System Name:

New Cross Pacific [Planned]

Landing Points: Hillsboro, Oregon (USA); Chongming,


China; Nanhui, China; Lingang, China;
Busan, South Korea; Toucheng, Taiwan;
Maruyama, Japan
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Channel Capacity:

Korea
China

Japan

Taiwan

USA

Owners:

2042
350,000,000
14,000
80 Tbps
100 Gbps
China Mobile, China Telecom, China
Unicom, Chunghwa Telecom, KT
Corporation, Microsoft, Softbank Mobile
Corp

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: Transpacific
News:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

http://subtelforum.com/articles/tag/
NCP/

NCSCS

System Name:

Nigeria-Cameroon Submarine Cable


System

Landing Points: Kribi, Cameroon; Lagos, Nigeria


RFS Year: 2015
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Fiber Pairs:
Owners:

2040
30,000,000
1,100
40 Gbps
12.8 Tbps
6 Fiber Pairs
Cameroon Government, MainOne

System Supplier:

Huawei Marine Networks, Nexans

System Installer:

Huawei Marine Networks

Region: EMEA

s
ago

News:

Kribi

http://subtelforum.com/articles/tag/
ncscs/

NEPTUNE CANADA

System Name:

NEPTUNE Canada

Landing Points: Port Alberni (Canada)


RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2032
62,000,000
800
University of Victoria

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship:
Marine Surveyor:

Ile de Sein
NEPTUNE Canada

Region: Americas

Port Alberni

NORSEA COM-1

System Name:

Norsea Com-1

Landing Points: Lowestoft (United Kingdom), Tysvr


(Norway)

Tysvaer

RFS Year: 1999


Est. End of Service Date:
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:
System Maintainer:

2024
800
160 Gbps
North Sea Communications AS
Alcatel AKN
TeliaSonera International Carrier AB

Region: EMEA

Lowestoft

NORTHSTAR

System Name:

Northstar

Landing Points: Juneau (USA), Nedonna Beach (USA),


Valdez (USA), Whittier (USA)

Whittier

RFS Year: 1999

Valdez

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):

Juneau

Initial Capacity:
Owners:

2024
90,000,000
3,385
10 Gbps
Alaska Communications Systems

System Supplier:

Alcatel Submarine Networks

System Installer:

C&W (Marine)

Cableship:
System Maintainer:

Maersk Fighter, Fu Lai


ACS Cable Systems

Region: Americas

Nedonna
Beach

ORVAL

System Name:

Orval [Planned]

Landing Points: Oran, Algeria; Valencia, Spain


RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Channel Capacity:
Owners:

2041
20,000,000
560
20 Tbps
100 Gbps
Algerian Ministry of Post, Information
Technology and Communications

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: EMEA
News:

Valencia

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Oran

http://subtelforum.com/articles/tag/
orval/

PAC

Grover Beach
Tijuana

Mazatln
St. Croix

System Name: Pan-American Crossing


Landing Points: Colon (Panama), Fort Amadour (Panama),
Grover Beach (USA), Mazatln (Mexico),
Puerto Viejo (Venezuela), St Croix (US
Virgin Islands), Tijuana (Mexico)
RFS Year: 2001
Est. End of Service Date:

2026

Est. System Cost (US$): 350,000,000


Total Length (kms): 9,451
Initial Capacity: 10 Gbps
Owners: Global Crossing
System Supplier:

Tyco Telecommunications

Cableship: Agile
Marine Surveyor:

C&C Technologies

System Maintainer: Level 3 Communications Ltd


Upgrader:
Region:

Xtera Communications
Americas

Colon Fort
Amadour

Puerto Viejo

Guam

PALAU-GUAM

Palau

System Name:

Palau-Guam [Planned]

Landing Points: Palau, Guam


RFS Year: 2016

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Est. End of Service Date:


Owners:

2041
Palau Telecoms

System Supplier:

Xtera Communications

System Installer:

IT International Telecom

Region: AustralAsia
News:

http://subtelforum.com/
articles/?s=palau+guam

PAN-AM

System Name:

Magens Bay
Butlers Bay

Pan American

Landing Points: Arica (Chile), Baby Beach (Aruba),


Barranquilla (Colombia), Battery Pratt
(Panama), Butlers Bay (St. Croix), Lurin
(Peru), Magens Bay (Virgin Islands),
Panama City (Panama), Punto Fijo
(Venezuela), Salinas (Ecuador)
RFS Year: 1999
Est. End of Service Date:

Baby Beach
Battery
Pratt

Barranquilla Punto Fijo


Panama City

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

Marine Surveyor:
System Maintainer:

2024
260,000,000
6,867
>10 Gbps
Antel (El Salvador), AT&T, Cable Andino,
CANTV (Venezuela), CNT, C&W, Embratel,
Entel (Chile), Setar, Telecom Colombia,
Telmex
C&C Technologies
AT&T, Telefonica International Wholesale
Services

Region: Americas

Lurin

Arica

PANGEA

Mde
Fan

Redcar

Lowestoft

Beverwijk
System Name:

Pangea

Landing Points: Beverwijk (Netherlands), Fan (Denmark),


Lowestoft (United Kingdom), Mde
(Denmark), Redcar (United Kingdom)
RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

20,000,000
511
7 Tbps
Pangea Ltd

System Supplier:

Alcatel Submarine Networks

System Installer:

Nexans

Cableship:

Pleijel

Marine Surveyor:

Fugro

Region:

EMEA

PC-1

Harbor Pointe
Shima

Ajigaura

Grover Beach
System Name:

Pacific Crossing 1

Landing Points: Grover Beach (USA), Harbor Pointe (USA),


Shima (Japan), Shima (Japan)
RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Design Capacity:
Owners:

650,000,000
20,910
1.8 Tbps
3 Tbps
NTT Communications

System Supplier:

Tyco Telecommunications

Marine Surveyor:

C&C Technologies

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Alcatel-Lucent Submarine Networks


Infinera
2013
40 Gbps, 100 Gbps
Transpacific
http://subtelforum.com/articles/tag/pc1/ http://subtelforum.com/articles/tag/
pacific-crossing/

PCCS
Jacksonville

Isla
System Name:

Pacific Caribbean Cable System

Landing Points: Jacksonville, Florida (USA); Tortola, Virgin


Islands (UK); Isla Verde, Puerto Rico;
Hudishibana, Aruba; Cartagena, Colombia;
Maria Chiquita, Panama; Balboa, Panama;
Manta, Ecuador; Tera Cora, Curaao
Est. End of Service Date:

2040

Est. System Cost (US$): 160,000,000


Total Length (kms): 6,000
Design Capacity:
Owners:

80 Tbps
100 Gbps
Cable & Wireless Communications, Setar,
Telconet, Telefnica Global Solutions,
United Telecommunication Services

System Supplier:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

EGS

Survey Boat:
Region:
News:

Cartagena

Ch
iq
ui
ta

2015

RV Ridley Thomas
Americas
http://subtelforum.com/articles/tag/
pccs/

ana

ishib

Hud

M
ar
ia

RFS Year:

Channel Capacity:

de Tortola
Ver

Manta

Balboa

or

C
Tera

PEC

Broadstairs
Seaford

System Name:

Pan-European Crossing

Landing Points: Bredene (Belguim), Broadstairs (United


Kingdom), Seaford (United Kingdom),
Veules-les-Roses (France)
RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$): 20,000,000


Total Length (kms): 170
Initial Capacity: 10 Gbps
Owners:
System Maintainer:
Region:

Global Crossing
Level 3 Communications
EMEA

Veules-les-Roses

Bredene

PLCN

Los
Angeles
Hong Kong

System Name:

Pacific Light Cable Network [Planned]

Landing Points: Hong Kong; Los Angeles, USA


RFS Year: 2018
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

2043
400,000,000
12,800
120 Tbps
5 Fiber Pairs
240
100 Gbps
Pacific Light Data Communication

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: Transpacific

Piti

PPC-1

Madang
System Name:

Pipe Pacific Cable

Landing Points: Madang (Papua New Guinea), Piti (Guam),


Sydney (Australia)
RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$): 180,000,000


Total Length (kms): 7,185
Initial Capacity: 40 Gbps
Design Capacity:
Owners:
System Supplier:

2.56 Tbps
PIPE Networks Ltd.
Tyco Telecommunications

System Installer: Tyco Telecommunications


Cableship:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Durable, Decisive
Infinera
2012
100 Gbps
AustralAsia
http://subtelforum.com/articles/
tag/ppc-1/ http://subtelforum.com/
articles/?s=PPC-1

Sydney

QATAR-UAE

System Name:

Qatar-UAE

Landing Points: Das Island (UAE), Halul (Qatar)


RFS Year: 2004
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2029
10,000,000
208

Initial Capacity:

20 Gbps

System Installer:

e-Marine

Cableship:
System Maintainer:

Etisalat
E-marine PJSC

Region: EMEA

Halul
Das

QUINTILLION SUBSEA

Barrow
Wainwright

Prudhoe
Bay

Point Hope

Kotzebue
Nome
System Name:

Quintillian Subsea [Planned]

Landing Points: Oliktok (USA), Barrow (USA), Wainright


(USA), Kotzebue (USA), Point Hope (USA),
Nome (USA)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

2041
150,000,000
1,200
Quintillion Subsea Holdings

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro Pelagos

Survey Boat: Pacific Star, Dreamcatcher


Region: Americas
News:

http://subtelforum.com/articles/tag/
quintillion/

RJCN

System Name:

Russian-Japan Cable Network

Landing Points: Nakhodka (Russia), Naoetsu (Japan)


RFS Year: 2006
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Maintainer:

2031
50,000,000
1,795
640 Gbps
Rostelecom
KDDI, OJSC Rostelecom

Region: AustralAsia

Nakhodka

Naoetsu

.com

Telecoms consulting of submarine cable systems


for regional and trans-oceanic applications

RNAL

Pusan

Wada

System Name:

Toucheng
Tong Fuk

Reach North Asia Loop

Landing Points: Pusan (South Korea), Tong Fuk (Hong


Kong), Toucheng (Taiwan), Wada (Japan)
RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

900,000,000
9,792
80 Gbps
6 Fiber pairs
FLAG Telecom, Level 3 Communications
Global Cloud Xchange
Ciena, Infinera
2011, 2014
40 Gbps, 100 Gbps
AustralAsia
http://subtelforum.com/
articles/?s=reach+north+asia+loop

SAC

System Name:

South American Crossing

Landing Points: Fortaleza (Brazil), Fort Amadour (Panama),


Las Toninas (Argentina), Lurin (Peru),
Puerto Viejo (Venezuela), Rio de Janeiro
(Brazil), Santos (Brazil), St Croix (US Virgin
Islands), Valparaiso (Chile)

St. Croix

RFS Year: 2001


Est. End of Service Date:

Puerto
Viejo

Fort
Amadour

Est. System Cost (US$):


Total Length (kms):

15,983
100 Gbps

Design Capacity:

1.2 Tbps

System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Lurin

520,000,000

Initial Capacity:
Owners:

Fortaleza

2026

Global Crossing
Alcatel Submarine Networks
Level 3 Communications
Infinera
2010, 2011
10 Gbps, 40 Gbps

Region: Americas

Rio de Janeiro
Santos

Valparaiso
Las Toninas

SACS

System Name:

South Atlantic Cable System [Planned]

Landing Points: Luanda (Angola), Fortaleza (Brazil)


RFS Year: 2018
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2043
170,000,000
6,200

Initial Capacity:

40 Tbps

Design Capacity:

40 Tbps

Fiber Pairs:
Channels:
Channel Capacity:
Owners:

4 Fiber Pairs
100
100 Gbps
Angola Cables

System Supplier:

NEC

System Installer:

NEC

Region: Transatlantic
News:

http://subtelforum.com/articles/tag/
sacs/

Fortaleza
Luanda

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Cochin

SAFE

Penang

Sa

in

t-P

au

Baie du Jacotet

Durban
Cape Town

System Name:

South Africa-Far East

Landing Points: Baie du Jacotet (Mauritius), Cape Town


(South Africa), Cochin (India), Durban
(South Africa), Penang (Malaysia), SaintPaul (Reunion)
RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

350,000,000
13,669
440 Gbps
France Telecom, Tata Communications,
Telekom SA

System Supplier:

Tyco Telecommunications

System Installer:

FCR

Cableship:
System Maintainer:

Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:

Vercors
Mauritius Telecom, Orange, TATA
Communications, Telkom SA Limited, TM
Berhad
Alcatel-Lucent Submarine Networks
2014
40 Gbps
Indian Ocean Pan-East Asian

SAM-1

Boca
Raton

San Juan

Puerto Barrios

Puerto San Jose

Barranquilla

System Name:
Salinas
Mancora

Fortaleza

Lurin

Salvador
Arica

Landing Points: Arica (Chile), Barranquilla (Colombia),


Boca Raton (USA), Fortaleza (Brazil), Las
Toninas (Argentina), Lurin (Peru), Mancora
(Peru), Puerto Barrios (Guatemala), Puerto
San Jose (Guatemala), Rio de Janeiro
(Brazil), Salinas (Ecuador), Salvador
(Brazil), Sa
RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):


Santos

Valparaiso
Las Toninas

Rio de Janeiro

South America-1

Total Length (kms):

650,000,000
24,140

Initial Capacity:

160 Gbps

Design Capacity:

1.92 Tbps

Owners:

Telefonica

System Supplier:

Tyco Telecommunications

Marine Surveyor:

C&C Technologies

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Telefonica International Wholesale Services


Infinera
2009, 2010, 2012
10 Gbps, 40 Gbps, 100 Gbps
Americas
http://subtelforum.com/articles/?s=sam-1

SAMOA-FIJI

Samoa

System Name:

Fiji

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Samoa-Fiji [Planned]

Landing Points: Upola, Samoa; SavaiI, Samoa; Suva, Fiji


RFS Year:

2017

Est. End of Service Date:

2042

Est. System Cost (US$):


Total Length (kms):
Owners:
Region:
News:

57,400,000
1,300
Samoa Submarine Cable Company
AustralAsia
http://subtelforum.com/articles/tag/
samoa-fiji/

SAPL

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Oahu
Hilo
System Name: South America Pacific Link [Planned]
Landing Points: Oahu, Hawaii (USA); Balboa, Panama;
Valparaiso, Chile; Jacksonville, Florida
(USA); future connectivity to: Hilo, Hawaii
(USA); Manta, Ecuador; Lima, Peru; Arica,
Chile; Cuba; Dominican Republic
RFS Year: 2018
Est. End of Service Date:

2043

Est. System Cost (US$): 460,000,000


Total Length (kms): 14,200
Design Capacity: 30 Tbps
Fiber Pairs: 3 Fiber Pairs
Channels: 100
Channel Capacity: 100 Gbps
Owners: Ocean Networks
System Supplier:

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, IT


International Telecom
Region:
News:

Transpacific
http://subtelforum.com/articles/tag/sapl/

Balboa
Manta
Lima
Arica
Santiago

SAPL CX

System Name:

South America Pacific Link Caribbean


Express [Planned]

Landing Points: Jacksonville, Florida (USA); Panama

Jacksonville

RFS Year: 2017


Est. End of Service Date:

2042

Total Length (kms):

3,400

Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

60 Tbps
6 Fiber Pairs
100
100 Gbps
Ocean Networks, Inc.

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: Americas
News:

Panama

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

http://subtelforum.com/articles/tag/
sapl/

SAS-1

System Name:

Saudi Arabia-Sudan

Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan)


RFS Year: 2003
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:

2028
20,000,000
333
1.28 Tbps
4 Fiber Pairs
STC (Saudi Arabia)

Region: EMEA

Jeddah

Port
Sudan

SAT-3
Sesimbra
Chipiona

South Atlantic 3

Landing Points: Abidjan (Ivory Coast), Accra (Ghana),


Alta Vista (Spain), Chipiona (Spain),
Cotonou (Benin), Dakar (Senegal), Douala
(Cameroon), Lagos (Nigeria), Libreville
(Gabon), Luanda (Angola), Melkbosstrand
(South Africa), Sesimbra (Portugal)
RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$): 370,000,000


Total Length (kms): 14,350
Initial Capacity: 340 Gbps
Design Capacity:
Fiber Pairs:
Channel Capacity:
Owners:

System Supplier:
System Maintainer:

Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

800 Gbps

Alta Vista

Dakar

Ab
i
Ac dja
cr n
a
Co
La to
go no
s u

System Name:

Douala
Libreville

2 Fiber Pairs
40 Gbps
Angola Telecom, AT&T, British Telecom,
Camtel of Cameroon, CIT, Cote dIvoire
Telecom, CPRM, C&W, France Telecom
(12.08%), Ghana Telecom, Maroc Telecom
of Morocco, Mauritius Telecom, Nigerian
Telecommunications Ltd, Nitel (8.39%),
OPT Benin, OPT Gabon, PT

Luanda

Alcatel Submarine Networks


Angola Telecom, PT Comunicaes S.A.,
Sonatel, Telefonica de Espaa S.A.U.,
Telkom SA Limited, Vodafone Limited
Alcatel-Lucent Submarine Networks
2014
40 Gbps
EMEA
http://subtelforum.com/articles/tag/sat-3/

Melkbosstrand

SCAN

Hong
Kong

System Name:

Submarine Cable Asia Network

Landing Points: Hong Kong, Indonesia


RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Design Capacity:
Owners:
System Supplier:

2036
337,000,000
4,300
40 Gbps
1.92 Tbps
PT. Fangbian Iskan Corporindo, Telemedia
Pacific Inc.
NEC

Region: AustralAsia
News:

Jakarta

http://subtelforum.com/articles/tag/
scan/

SCF-CN

System Name:

SCF-CN

Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown


(Barbados), Kingstown (St. Vincent),
Martinique (Martinique), Port Castries (St
Lucia), Port Salines (Grenada), Macqueripe
(Trinidad and Tobago)
RFS Year: 2007

Basseterre

Est. End of Service Date:

2032

Total Length (kms):

1,186

Initial Capacity:
Owners:

1.28 Tbps
SCF (Group Loret)

Region: Americas

Martinique
Port
Castries

Kingstown Bridgetown
Port
Salines
Redcar

SCOTLAND-ORKNEY-SHETLAND

System Name:

Scotland-Orkney-Shetland

Landing Points: Scotland-Orkney-Shetland


RFS Year: 2013
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2038
12,000,000
400
British Telecom

Region: EMEA

Shetland

Orkney

Scotland

SEABRAS-1

Project Completion Phases:


Pre-Engineering

New York

Survey
System Manufacture
System Installation
Commissioning & Acceptance

System Name: Seabras-1 [Planned]


Landing Points: Sao Paolo, Brazil; New York, (USA);
branching unit to Fortaleza, Brazil
RFS Year: 2017
Est. End of Service Date:

2042

Est. System Cost (US$): 509,000,000


Total Length (kms): 10,750
Design Capacity: 72 Tbps

Fortaleza

Fiber Pairs: 6 Fiber Pairs


Channels: 120
Channel Capacity: 100 Gbps
Owners: Seaborn Networks, Microsoft
System Supplier:

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks


Marine Surveyor:
Survey Boat:
Region:
News:

Gardline
Sea Surveyor
Americas
http://subtelforum.com/articles/tag/
seabras-1/

Sao
Paulo

SEACOM

Mumbai

Djibouti

System Name:

Seacom

Landing Points: Abu Talat (Egypt), Dar es Salaam


(Tanzania), Djibouti (Republic of Djibouti),
Maputo (Mozambique), Mombasa (Kenya),
Mtunzini (South Africa), Mumbai (India),
Zafarana (Egypt)

Mombasa
Dar es Salaam

RFS Year: 2009


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

1.28 Tbps

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:

ap

ut

Upgrade Year:

Convergence Partners (12.50%), Herakles


Telecom LLC (25%), Industrial Promotion
Services (25%), Shanduka Group (12.50%),
VenFin Limited (25%)

System Supplier:

System Maintainer:

nz
in

13,601
110 Gbps

Cableship:

tu

600,000,000

Initial Capacity:
Owners:

2034

Upgraded Capacity:

Durable, Decisive, Dependable, Resolute,


Responder
Seacom Ltd, E-marine PJSC
Ciena
2013
100 Gbps

Region: Indian Ocean Pan-East Asian


News:

http://subtelforum.com/articles/tag/
seacom/

SEAK

Juneau
Hawk
Inlet
Angoon
Sitka
Petersburg
Wrangell

Ketchikan
System Name:

South East Alaska

Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau


(USA), Ketchikan (USA), Petersburg (USA),
Sitka (USA), Wrangell (USA)
RFS Year:

2008

Est. End of Service Date:

2033

Initial Capacity: 10 Gbps


Owners:
Region:

GCI
Americas

SEA-ME-WE 3

Owners:
System Supplier:
Cableship:

SEA-ME-WE 3 Consortium
Alcatel Submarine Networks, Fujitsu, Pirelli, KDDSCS, Tyco Telecommunications
Agile, Maersk Defender, Maersk Fighter, Fresnel,
Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond
Croze, Etisalat, Umm Al Anber

Marine Surveyor: C&C Technologies


System Maintainer:

nh

Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas


(Philippines), Chania (Greece), Cochin (India),
Da Nang (Vietnam), Deep Water Bay (Hong
Kong), Dehiwala-Mount Lavinia (Sri Lanka),
Djibouti (Republic of Djibouti), Fangshan
(Taiwan), Fujairah (United Arab Emira
1999

Est. End of Service Date:

2024

Pe Sat
na un D
ng a N
an
g

Mumbai

nt

eb

Se

Al
South East Asia-Middle East-Western Europe 3

Karachi
ou

Se

Djibouti

RFS Year:

Deep
Water
Bay

u
to a
an ip
Sh Ta

Fujairah
Jeddah

System Name:

Keoje

ui

Teutan

British Telecommunications PLC, China


Telecommunications Corporation, Chunghwa
Telecom Co., Cyprus Telecommunications
Authority, Deutsche Telekom AG, Hellenic
Telecommunications Organization S.A., KDDI, KT
Corporation, Oman Telecommunications Company,

Na

Mazara Marmaris
Yeroskipou
Chania
Alexandria Suez

Co
D chi
La ehi n
vi wa
ni la
a -M

sim

br
a

oo

nh

ill
y

Norden
Oostende
Penmarch

Pyapon

Medan

Tuas

Okinawa
Toucheng
Fangshan
Batangas

Tungku
Mersing

Est. System Cost (US$): 1,500,000,000


Total Length (kms):

39,622

Initial Capacity:

40 Gbps

Design Capacity:

55 Gbps

Fiber Pairs: 2 Fiber Pairs


Channels: 8
Channel Capacity:

2.5 Gbps, 10 Gbps

Perth
Region: EMEA, Indian Ocean Pan-East Asian,
AustralAsia
News:

http://subtelforum.com/articles/tag/seame-we-3/

SEA-ME-WE 4

System Name:

Landing Points: Alexandria (Egypt), Annaba (Algeria),


Bizerte (Tunisia), Chennai (India), Colombo
(Sri Lanka), Coxs Bazaar (Bangladesh),
Fujairah (United Arab Emirates), Jeddah
(Saudi Arabia), Karachi (Pakistan),
Marseille (France), Melaka (Malaysia),
Mumbai (India), Mu

Marseille
Palermo

An
n
Bi aba
ze
rte

South East Asia-Middle East-Western


Europe 4

RFS Year: 2005


Est. End of Service Date:

Alexandria
Suez

Est. System Cost (US$):


Total Length (kms):

2030
500,000,000
18,846

Karachi
Jeddah

Coxs Bazaar
Mumbai
Chennai

Colombo

el

Initial Capacity: 1.28 Tbps

Satun

a
ak

Design Capacity: 12.8 Tbps

Tuas

Fiber Pairs: 2 Fiber Pairs


Channels:

64

Channel Capacity: 100 Gbps


Owners:

Region:
News:

Algerie Telecom, Algeria, Bangladesh


Submarine Cable Company Limited
(BSCCL), Bangladesh, Bharti Airtel, CAT
Telecom (Thailand), Du, France Telecom,
Pakistan Telecommunication Company
Limited, Pakistan, Saudi Telecom Company
(STC), Saudi Arabia, Sri Lanka
EMEA, Indian Ocean Pan-East Asian
http://subtelforum.com/articles/tag/
sea-me-we-4/ http://subtelforum.com/
articles/?s=sea-me-we+4

System Supplier:

Alcatel Submarine Networks, Fujitsu

System Installer:

Orange Marine

Cableship:
System Maintainer:

Upgrader:
Upgrade Year:

Niwa, Descartes
E-marine PJSC, Orange, Singapore
Telecommunications Limited, Sri Lanka
Telecom Ltd, TATA Communications,
Telecom Egypt, Telecom Italia Sparkle, TM
Berhad, Verizon Ltd
Alcatel-Lucent Submarine Networks,
Mitsubishi Electric
2011, 2015

Upgraded Capacity: 40 Gbps, 100 Gbps

SEA-ME-WE 5

Project Completion Phases:


Pre-Engineering
Survey

Marseille

System Manufacture
System Installation

An
n
Bi aba
ze
rte

Palermo

Commissioning & Acceptance

Alexandria
Suez
Karachi
Jeddah

Mumbai

South East Asia-Middle East-Western


Europe 5 [Planned]

Landing Points: Marseille (France), Annaba (Algeria),


Palermo (Italy), Bizerte (Tunisia), Jedda
(Saudi Arabia), Fujairah (UAE), Karachi
(Pakistan), Mumbai (India), Chennai
(India), Colombo (Sri Lanka), Coxs Bazar
(Bangladesh), Satun (Thailand), Singapore
(Singapore), Ma
RFS Year:

2016

Est. End of Service Date:

2040

Chennai
Satun

Colombo

M
Sin alac
ga ca
po
re

System Name:

Coxs Bazaar

Est. System Cost (US$): 100,000,0000


Total Length (kms): 20,000
Design Capacity:
Channel Capacity:
Owners:

24 Tbps
100 Gbps
Bangladesh Submarine Cable Company
Ltd, China Mobile International Ltd, China
Global Telecommunications Limited, China
Network Communications Group Co Ltd,
Emirates Integrated Telecommunications
Co, Orange, Myanmar Post and Telecom,
PT Telekomunikasi Indo

System Supplier:

Alcatel-Lucent Submarine Networks, NEC

System Installer:

Alcatel-Lucent Submarine Networks, NEC

Marine Surveyor:

Elettra

Region: EMEA, Indian Ocean Pan-East Asian


News: http://subtelforum.com/articles/tag/seame-we-5/

SEA-US

Los Angeles
Hawaii
Davao Guam
City
Manado
System Name:

South East Asia-United States [Planned]

Landing Points: Manado (Indonesia), Davao (Phillippines),


Piti, Guam: Oahu, Hawaii (United States),
Los Angeles, California (United States)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Channel Capacity:

Project Completion Phases:

Owners:

Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

2041
250,000,000
15,000
20 Tbps
100 Gbps
Telekomunikasi Indonesia International
(Telin), Globe Telecom, RAM Telecom
International (RTI), Hawaiian Telcom, GTI
Corporation, Telkom USA, GTA

System Supplier:

NEC

System Installer:

NEC

Region: Transpacific
News:

http://subtelforum.com/articles/tag/sea-us/

SG-SCS

System Name:

Suriname-Guyana Submarine Cable System

Landing Points: Macqueripe (Trinidad), Georgetown


(Guyana), Totness (Suriname)
RFS Year: 2010
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

Chaguaramas

Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:

Georgetown

2035
54,000,000
1,249
1.28 Tbps
2 Fiber Pairs
64
10 Gbps
Guyana Telephone and Telegraph Co. Ltd,
Telesur of Suriname

System Supplier:

Huawei Marine Networks, Nexans

System Installer:

Global Marine Systems Limited, Huawei


Marine Networks

Cableship:

Sovereign

Region: Americas

Totness

News:

http://subtelforum.com/articles/tag/sg-scs/

SHEFA 2

Trshavn

System Name: Shetland-Faroese 2


Landing Points: Ayre of Cara (UK), Banff (UK), Maywick
(UK), Sandwick (Scotland), Trshavn
(Faroe Islands)
RFS Year: 2008
Est. End of Service Date:

2033

Maywick

Sandwick

Est. System Cost (US$): 27,000,000


Total Length (kms): 828
Initial Capacity: 20 Gbps
Design Capacity: 570 Gbps
Owners: Faroese Telecom
System Supplier:

Ayre of Cara

NSW

System Installer: International Telecom


Cableship: IT Intrepid
Marine Surveyor:

Fugro

System Maintainer: Faroese Telecom


Upgrader:
Region:
News:

Xtera Communications
EMEA
http://subtelforum.com/articles/?s=shefa

Banff

SILPHIUM

System Name:

Silphium

Landing Points: Chania (Greece), Darnah (Libya)


RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

426
70 Gbps

Design Capacity:

1.2 Tbps

Channels:
Channel Capacity:
Owners:

3 Fiber Pairs
40
10 Gbps
Libyan Post, Telecom, and Information
Technology Company

System Supplier:

Huawei Marine Networks, Nexans

System Installer:

Huawei Marine Networks

Region: EMEA
News:

Darnah

20,000,000

Initial Capacity:
Fiber Pairs:

Chania

2037

http://subtelforum.com/articles/tag/
silphium/

SJC

Chikura

Lantau

System Name:

Landing Points: Chikura (Japan), Lantau (Hong Kong),


Nasugbu (Philippines), Shantou (China),
Telisai (Brunei), Tuas (Singapore)
RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):


Total Length (kms):

Nasugbu

Initial Capacity:
Fiber Pairs:
Channel Capacity:
Owners:

400,000,000
8,986
28 Tbps
6 Fiber Pairs
100 Gbps
SJC Consortium (Brunei International
Gateway Sendirian Berhad, China Mobile,
China Telecom, China Telecom (Hong
Kong) International Ltd., Donghwa
Telecom Co., Ltd., Globe Telecom,
Inc., Google SJC Bermuda Ltd., KDDI
Corporation, Singapore Telecom, Telin,

System Supplier:

TE SubCom, NEC

System Installer:

S.B. Submarine Systems, NEC

Upgrader:

Tuas

South-East Asia Japan Cable

Upgrade Year:
Upgraded Capacity:
Region:
News:

TE SubCom
2014, 2016
100 Gbps
AustralAsia
http://subtelforum.com/articles/tag/sjc/

SKR1M

System Name:

Sistem Kabel Rakyat 1 Malaysia [Planned]

Landing Points: Peninsular Malaysia; Sabah, Malaysia;


Sarawak, Malaysia
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Owners:

2042
100,000,000
3,500
4 Tbps
TIME dotCom Bhd

System Supplier:

NEC

System Installer:

Telekom Malaysia

Region: AustralAsia

Sabah

Project Completion Phases:


Pre-Engineering
Survey

Peninsular

System Manufacture
System Installation
Commissioning & Acceptance

Sarawak

SMPCS

System Name:

Sulawesi-Maluku-Papua Cable System

Landing Points: Papua Provinces, New Guinea


RFS Year: 2015
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:

Maluku

Owners:

Papua

71,100,000
2,000
40 Gbps
PT Telekom (Indonesia)

System Supplier:

NEC, Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks, NTT,


NEC

Marine Surveyor:
Sulawesi

2040

Fugro

Survey Boat: Fugro Supporter


Region: AustralAsia
News:

http://subtelforum.com/articles/tag/
smpcs/

SMPR-1

System Name:

St. Maarten-Puerto Rico 1

Landing Points: San Juan (Puerto Rico), St Martin


(Netherlands Antilles)
RFS Year: 2004
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Maintainer:

2029
15,000,000
382
2.5 Gbps
Smitcoms
SMITCOMS

Region: Americas

San Juan

St. Martin

SOCC

System Name:

Solomons Oceanic Cable Network


[Planned]

Landing Points: Honiara (Solomon), Sydney (Australia),


Auki (Soloman), Noro (Soloman)
RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:
System Supplier:

2041
54,000,000
827
Solomons Oceanic Cable Company
TE SubCom

Region: AustralAsia
News:

Noro

http://subtelforum.com/articles/?s=SOCC

Auki
Honiara

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation

Sydney

Commissioning & Acceptance

SOLAS

System Name:

Solas

Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK)


RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2037
6,000,000
140

Initial Capacity:

5 Gbps

Owners:

Eircom

System Installer:
Cableship:
System Maintainer:

Global Marine Systems Limited


Wave Sentinel
Vodafone Limited

Region: EMEA

Kilmore Quay

Oxwich Bay

SOUTHERN CROSS CABLE NETWORK

System Name:

Southern Cross Cable Network

Landing Points: Alexandria (Australia), Brookvale


(Australia), Kahe Point (Hawaii), Morro
Bay (USA), Nedonna Beach (USA), Spencer
Beach (USA), Suva (Fiji), Takapuna (New
Zealand), Whenuapai (New Zealand)

Nedonna Beach
Morro Bay
Kahe
Point

Spencer
Beach

RFS Year: 2000


Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

3.6 Tbps
14 Tbps

Fiber Pairs:
Channels:

3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber


Pairs Segments D and F
16
100 Gbps
Southern Cross Cable Network

System Supplier:

Alcatel Submarine Networks, Fujitsu

System Installer:

Alcatel Submarine Networks

Cableship:

System Maintainer:

Takapuna
Whenuapai

30,000

Design Capacity:

Owners:

Brookvale
Alexandria

1,300,000,000

Initial Capacity:

Channel Capacity:

Suva

2030

Upgrader:
Upgrade Year:
Upgraded Capacity:

Cable Innovator laid 13761 km, Nexus laid


3306 km, Vercors laid 10007 km. Fresnel
laid 800 km
Southern Cross Cables Limited, Verizon
Ciena
2012, 2013
40 Gbps, 100 Gbps

Region: Transpacific
News:

http://subtelforum.com/articles/tag/
southern-cross/

SVALBARD

System Name:

Svalbard

Landing Points: Andy (Norway), Harstad (Norway),


Hotellneset (Norway)
RFS Year: 2004

Hotellneset

Est. End of Service Date:


Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

2029
80,000,000
2,800
4.8 Tbps
Telenor

System Supplier:

Tyco Telecommunications, Nexans

System Installer:

Global Marine Systems Limited

Cableship:

Innovator

Region: EMEA

Andy

Harstad

TANGERINE

System Name:

Tangerine

Landing Points: Broadstairs (United Kingdom), Oostende


(Belguim)
RFS Year: 2000
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Fiber Pairs:

2025
10,000,000
121
240 Gbps
96 Fiber Pairs

Owners:

Level 3 Communications

System Maintainer:

Level 3 Communications

Region: EMEA

Broadstairs

Oostende

TANNAT

Santos

System Name:

Tannat [Planned]

Landing Points: Santos (Brazil), Maldonado (Uruguay)


RFS Year:

2017

Est. End of Service Date:

2042

Est. System Cost (US$):


Total Length (kms):
Design Capacity:
Fiber Pairs:

Project Completion Phases:

Owners:

50,000,000
2,000
90 Tbps
6 Fiber Pairs
Google, Government of Uruguay

Pre-Engineering

System Supplier:

Alcatel-Lucent Submarine Networks

Survey

System Installer:

Alcatel-Lucent Submarine Networks

System Manufacture
System Installation
Commissioning & Acceptance

Maldinado

Marine Surveyor:
Region:
News:

EGS
Americas
http://subtelforum.com/articles/tag/
tannat/

TASMAN GLOBAL ACCESS

System Name:

Tasman Global Access [Planned]

Landing Points: Australia, New Zealand


RFS Year: 2016
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:
Channel Capacity:
Owners:

2041
60,000,000
2,300
20 Tbps
2 Fiber Pairs
100 Gbps
Spark New Zealand, Vodafone, Telstra

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia
News:

http://subtelforum.com/articles/tag/tga/

alia

tr
Aus

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

New
Zealand

TAT 14

Blaabjerg

an

as
qu

an

orden
th
N
u
o
ijk
em
Wid Bay
Katw
aux
C
n
e
alery
V
t
n
i
Sa

Tuckerton

System Name:

TAT-14

Landing Points: Blaabjerg (Denmark), Katwijk


(Netherlands), Manasquan (USA), Norden
(Germany), Saint-Valery-en-Caux (France),
Tuckerton (USA), Widemouth (UK)
RFS Year:

2001

Est. End of Service Date:

2026

Cableship:

Est. System Cost (US$): 400,000,000


Total Length (kms): 15,453
Initial Capacity: 160 Gbps
Design Capacity:
Fiber Pairs:
Channels:
Channel Capacity:
Owners:
System Supplier:

Marine Surveyor:
System Maintainer:

9.38 Tbps
4 Fiber Pairs
40
40 Gbps
TAT-14 Consortium
Mitsubishi Electric Corporation

System Installer: Global Marine Systems Limited

Upgrader:
Upgrade Year:
Upgraded Capacity:

Cable Innovator, Cable Endeavour, Bold


Endurance, Wave Sentinel, Subaru, Maersk
Recorder, Maersk Forwarder, Sir Eric Sharp,
Agile, Teliri, Fresnel, Vercors
Fugro
AT&T, British Telecommunications PLC,
Deutsche Telekom AG, KPN Telecom
International, Orange, TeliaSonera
International Carrier AB
Mitsubishi
2012
40 Gbps

Region: Transatlantic
News: http://subtelforum.com/articles/?s=tat-14

TE NORTH

Marseille

System Name:

Telecom Egypt North

Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of


Cyprus), Marseille (France)
RFS Year:

2011

Est. End of Service Date: 2036


Est. System Cost (US$): 150,000,000
Total Length (kms): 2,938

Cyprus

Initial Capacity: 10 Tbps


Design Capacity: 20 Tbps
Fiber Pairs: 8 Fiber Pairs
Channels:

25

Channel Capacity: 100 Gbps


Owners:
System Supplier:

Telecom Egypt
Alcatel-Lucent Submarine Networks

System Maintainer: Telecom Egypt


Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Infinera
2012
100 Gbps
EMEA
http://subtelforum.com/articles/tag/tenorth/

Alexandria

TEAMS
Fujairah

System Name:

The East African Marine System

Landing Points: Fujairah (United Arab Emirates), Mombasa


(Kenya)
RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):


Total Length (kms):

120 Gbps

Design Capacity:

1.28 Tbps

sa
ba

Etisalat (15%), TEAMS Ltd. (85%)

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

e-Marine

Cableship:

Niwa

Marine Surveyor:

Fugro

Region:

om

4,500

Initial Capacity:
Owners:

130,000,000

News:

Indian Ocean Pan-East Asian


http://subtelforum.com/articles/tag/
teams/

TGN EURASIA

Marseille

Alexandria
Ras Sidr

um

ba

Jeddah

System Name:

Djibouti

TGN Eurasia

Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti),


Jeddah (Saudi Arabia), Marseille (France), Mtunzini
(South Africa), Mumbai (India), Zafarana (Egypt)
RFS Year:

2009

Est. End of Service


Date:

2034

Est. System Cost (US$):


Total Length (kms):

250,000,000
9,240

Initial Capacity: 160 Gbps


Design Capacity: 1.28 Tbps
Owners:

SEACOM, Tata Communications, Telecom Egypt

System Maintainer:

TATA Communications, Tyco Electronics Subsea


Communications LLC

Region: Indian Ocean Pan-East Asian


News:

http://subtelforum.com/
articles/?s=TGN+Eurasia

TGN GULF

System Name:

TGN Gulf

Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE),


Kuwait City (Kuwait), Manama (Bahrain),
Sumaisma (Qatar)
RFS Year: 2011
Est. End of Service Date:
Est. System Cost (US$):

Kuwait
City

Total Length (kms):


Design Capacity:
Fiber Pairs:
Owners:
System Supplier:

Al-Khobar

an

am

System Maintainer:

Sumaisma

Dubai

2036
200,000,000
2,306
1.28 Tbps
2 Fiber Pairs
Tata Communications
TE SubCom
TATA Communications, Tyco Electronics
Subsea Communications LLC

Region: EMEA
News:

Co

ion to
nnect

Seaco

http://subtelforum.com/
articles/?s=TGN+Gulf

Toyohashi

TGN INTRA-ASIA

Deep
Water
Bay

Ballesteros

Piti
Vung Tau

Est. System Cost (US$):


Total Length (kms):

3.84 Tbps

Channel Capacity:

100 Gbps

or
e
ap
Si
ng
Landing Points: Ballesteros (Philippines), Deep Water Bay
(Hong Kong), Piti (Guam), Singapore
(Singapore), Toyohashi (Japan), Vung Tau
(Vietnam)
RFS Year:

2009

Est. End of Service Date:

2034

Tata Communications

System Supplier:

Tyco Telecommunications

System Installer:

Orange Marine

System Maintainer:
TGN Intra-Asia

6,485

Initial Capacity:
Owners:

System Name:

180,000,000

TATA Communications, Tyco Electronics


Subsea Communications LLC

Upgrader:

Ciena

Upgrade Year:

2014`

Upgraded Capacity:
Region:

100 Gbps
AustralAsia

News: http://subtelforum.com/
articles/?s=TGN+Intra-Asia

H

um

an

by

TGN NORTHERN EUROPE

De Marne

System Name:

TGN Northern Europe

Landing Points: De Marne (Netherlands), Humanby (UK)


RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):


Initial Capacity:
Fiber Pairs:
Owners:
System Maintainer:
Region:
News:

551
3.84 Tbps
4 Fiber Pairs
Tata Communications
TATA Communications, Tyco Electronics
Subsea Communications LLC
EMEA
http://subtelforum.com/
articles/?s=TGN+Northern+Europe

TGN TRANSATLANTIC

Highbridge
Saunton
Sands

Wall
Township

System Name:

TGN Transatlantic

Landing Points: Highbridge (UK), Saunton Sands (UK),


Wall Township (USA)
RFS Year: 2001
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

2026
340,000,000
12,670
2.56 Tbps
Tata Communications
Tyco Telecommunications
TATA Communications, Tyco Electronics
Subsea Communications LLC
Ciena
2013
100 Gbps

Region: Transatlantic

TGN TRANSPACIFIC

Nedonna
Beach

Emi
Toyohashi

Hermosa
Beach

System Name:

TGN Transpacific

Landing Points: Emi (Japan), Hermosa Beach (USA),


Nedonna Beach (USA), Toyohashi (Japan)
RFS Year: 2002
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2027
580,000,000
21,424

Initial Capacity:

5.12 Tbps

Channel Capacity:

100 Gbps

Owners:
System Supplier:
System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:

Tata Communications
Tyco Telecommunications
TATA Communications, Tyco Electronics
Subsea Communications LLC
Ciena
2014
100 Gbps

Region: Transpacific

TGN WESTERN EUROPE

Highbridge

System Name:

Bilbao

TGN Western Europe

Landing Points: Bilbao (Spain), Highbridge (UK), Seixal


(Portugal)
RFS Year: 2002
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:

Seixal

System Maintainer:

2027
100,000,000
3,487
3.84 Tbps
Tata Communications
Tyco Telecommunications
TATA Communications, Tyco Electronics
Subsea Communications LLC

Region: EMEA
News:

http://subtelforum.com/
articles/?s=TGN+WEstern+Europe

TGN-TATA INDIACOM

Chennai

System Name:

TGN-TATA IndiaCom

Landing Points: Chennai (India), Changi (Singapore)


RFS Year:

2004

Est. End of Service Date:

2029

Est. System Cost (US$): 90,000,000


Total Length (kms): 3,175
Initial Capacity: 640 Gbps
Fiber Pairs:
Owners:
Region:

8 Fiber Pairs
Tata Communications
Indian Ocean Pan-East Asian

Changi

TGN-TIC

Chennai

System Name:

TGN-TIC

Landing Points: Chennai (India), Tuas (Singapore)


RFS Year:

2005

Est. End of Service Date:

2030

Total Length (kms): 3,175


Initial Capacity: 5.12 Tbps
Owners:
System Maintainer:
Region:
News:

Tata Communications
TATA Communications
Indian Ocean Pan-East Asian
http://subtelforum.com/
articles/?s=TGN+TIC

Tuas

TIERRA DEL FUEGO

System Name:

Tierra del Fuego

Landing Points: Punta Dungeness (Argentina), Espiritu


Santo (Argentina)
RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2037
5,000,000
27
AR-SAT

System Supplier:

Boskalis, Alcatel-Lucent Submarine


Networks

System Installer:

Alcatel-Lucent Submarine Networks

Cableship:

Ile de Batz

Region: Americas
News:

Punta
Dungeness
Espiritu
Santo

http://subtelforum.com/articles/tag/
tierra-del-fuego/

TIS

System Name:

Thailand-Indonesia-Singapore

Landing Points: Batam (Indonesia), Songkhla (Thailand)


RFS Year: 2006
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:

Songkhla

2031
36,000,000
1,003
30 Gbps
CAT Telecom (Thailand), PT Telekom,
Singtel

System Supplier:

Tyco Telecommunications

System Installer:

ASEAN Cableship

System Maintainer:

Singapore Telecommunications Limited

Region: AustralAsia

Batam

TONGA-FIJI

System Name:

Tonga-Fiji

Landing Points: Nukualofa (Tonga), Suva (Fiji)


RFS Year: 2012
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2037
18,900,000
827
Tonga Cable Limited

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region: AustralAsia

TPE

Nedonna
Beach

Qingdao Keoje
Chongming
Fuzhou
Tanshui
System Name:

Trans-Pacific Express

Landing Points: Chongming (China), Shin-Maruyama


(China), Keoje (South Korea), Nedonna
Beach (USA), Qingdao (China), Tanshui
(Taiwan)
RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$): 440,000,000


Total Length (kms): 16,163
Initial Capacity: 1.28 Tbps
Design Capacity:
Owners:

System Supplier:

5.12 Tbps
AT&T, China Telecom, China Unicom,
Chunghwa Telecom International, KT
Coropration, Verizon, NTT Com
Tyco Telecommunications

System Installer: Global Marine Systems Limited, NTT


Cableship:
System Maintainer:

Cable Innovator
China Telecommunications Corporation,
Chunghwa Telecom Co., KT Corporation,
NTT Communications Corporation,
Verizon Ltd

Upgrader:

TE SubCom

Upgrade Year: 2013


Upgraded Capacity: 10 Gbps
Region: Transpacific
News: http://subtelforum.com/articles/
tag/TPE/ http://subtelforum.com/
articles/?s=TPE

TRIDENT

System Name:

Trident [Planned]

Landing Points: Perth, Onslow (Australia), Jakarta


(Indonesia)
RFS Year: 2017
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Design Capacity:
Fiber Pairs:

Jakarta

Channels:
Channel Capacity:
Owners:

2042
290,000,000
4,600
38 Tbps
2 Fiber pairs Perth-Singapore (8 Tbps), 1
fibre pair Perth-Jakarta (10 Tbps), 1 fibre
pair Onslow-Jakarta (10 Tbps) and 1 fibre
pair Perth-Onslow (10 Tbps)
Perth-Singapore 40, rest 100
100 Gbps
Trident Subsea Cable

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region: AustralAsia
News:

Onslow

Project Completion Phases:


Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance

Perth

http://subtelforum.com/articles/tag/
trident/

Tr
in

id

ad

Cu

ra

a
o

TRINIDAD-CURAAO

System Name:

Trinidad-Curaao

Landing Points: Curacao (Curacao), Trinidad (Trinidad)


RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms): 1,240


Initial Capacity: 1.875 Tbps
Owners:

Columbus Networks, New World Network

System Supplier:

Tyco Telecommunications SSI, Alcatel, NEC

System Installer: Tyco SSI


Cableship:
Region:

Tyco Durable, Ile de Sein, Ile de Batz, Fu


Hai, Segero, Cable Innovator
Americas

SUBMARINE CABLE SYSTEM REPORTING

Presenting the industrys most extensive collection of 375+ current


and planned submarine cable systems impacting financiers, carriers,
cable owners, system suppliers, component manufacturers and marine
contractors, and detailing more than 50 menu-based data fields and
maps in a customer-customizable report.

REPORTING IN 3-5 BUSINESS DAYS

For more information:


subtelforum.com/stfanalytics

Powered by the comprehensive and industry leading STF Submarine Cable Database

TSE-1

Fuzhou

New Taipei City

System Name:

Taiwan Strait Express

Landing Points: Changle, Fuzhou City, China; Tamsui


District, New Taipei City, Taiwan
RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):


Total Length (kms):
Design Capacity:
Fiber Pairs:
Owners:

System Installer:
Region:

10,000,000
270
6.4 Tbps
8 Fiber Pairs
Taiwan International Gateway Corporation,
China Mobile, Chunghwa Telecom, Taiwan
Mobile, Far EasTone Telecommunications,
China Unicom
Huawei Marine Networks, NTT, S.B.
Submarine Systems
AustralAsia

TUBROK-EMASED

System Name: Tubrok-Emased


Landing Points: Tobruk (Libya), El Quawef (Libya)
RFS Year: 2010
Est. End of Service Date:

2035

Est. System Cost (US$): 10,000,000


Total Length (kms): 180
Design Capacity: 25.6 Tbps
Fiber Pairs: 8 Fiber Pairs
Channels: 80
Channel Capacity: 40 Gbps
Owners: Libyan Post Telecommunications &
Information Technology Company
System Supplier:

Huawei Marine Networks

System Installer: Huawei Marine Networks, Orange Marine


Region:

EMEA

Tobrok

El-Quawef

TWA-1

Fujairah

Karachi
Al Seeb
System Name:

Transworld Associates

Landing Points: Al Seeb (Oman), Fujairah (United Arab


Emirates), Karachi (Pakistan)
RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

40,000,000
1,300
1.28 Tbps
Trans-World Associates

System Supplier:

Tyco Telecommunications

System Installer:

Tyco Telecommunications

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

E-marine PJSC, Oman Telecommunications


Company
Huawei Marine
2016
100 Gbps
EMEA
http://subtelforum.com/articles/tag/
twa-1/

UGARIT

System Name:

Ugarit

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)


RFS Year: 1995
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Initial Capacity:
Owners:
System Supplier:
System Maintainer:

2020
16,000,000
240
622 Mbps
Cypress Telecommunications Authority
Tyco Telecommunications
Cyprus Telecommunications Authority

Pe
nt
a

sk

hi

no

s

Region: EMEA

Tartus

UNISUR

Florianopolis

System Name:

Unisur

Landing Points: Florianopolis (Brazil), Las Toninas


(Argentina), Maldonado (Uruguay)

Maldonado

RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:

Las Toninas

System Maintainer:
Region:

74,000,000
1,720
560 Mbps
Antel (Uruguay), Embratel, Telecom
Argentina, Telefonica de Argentina
Telefonica International Wholesale Services
Americas

UNITY

Chikura

Hermosa
Beach

System Name:

Unity

Landing Points: Chikura (Japan), Los Angeles (USA)


RFS Year: 2010
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2035
300,000,000
9,486

Initial Capacity:

1.92 Tbps

Design Capacity:

4.8 Tbps

Fiber Pairs:
Owners:

5 Fiber Pairs
Bharti Airtel, Global Transit, Google, KDDI,
PACNET, Singtel

System Supplier:

Tyco Telecommunications

System Installer:

NEC, Kokusai Cable Ship

System Maintainer:

KDDI

Upgrader:

Ciena

Upgrade Year:
Upgraded Capacity:

2013
100 Gbps

Region: Transpacific
News:

http://subtelforum.com/articles/tag/
unity/

VENTSPILS-GOTLAND

System Name:

Vetnspils-Gotlan

Landing Points: Frsund (Sweden), Stockholm (Sweden),


Ventspils (Latvia)
RFS Year: 2004
Est. End of Service Date:
Total Length (kms):
Initial Capacity:
Fiber Pairs:
Owners:
System Supplier:

2029
175
2.5 Gbps
34 Fiber Pairs
Baltcom
TE SubCom

Region: EMEA

Stockholm

Stavsnas

Frsund
Ventspils

VMSCS

Catania

St. Georges
Bay

System Name:

Vodafone Malta-Sicily Cable System

Landing Points: Balluta (Malta), Catania (Italy)


RFS Year:

2004

Est. End of Service Date:

2029

Est. System Cost (US$):


Total Length (kms):
Initial Capacity:
Owners:
Region:

10,000,000
250
10 Gbps
Vodafone Malta
EMEA

Whitesand
Bay

WACS

System Name:

West Africa Cable System

Sesimbra

Landing Points: Accra (Ghana), Alta Vista (Spain), Cape


Verde (Cape Verde), Douala (Cameroon),
Lagos (Nigeria), Lome (Togo), Luanda
(Angola), Muanda (DRC), Pointe Noire
(Congo), Sesimbra (Portugal), Walvis Bay
(Namibia), Whitesands Bay (UK)
RFS Year:

2012

Est. End of Service Date:

2037

Alta
Vista

Est. System Cost (US$): 600,000,000


Total Length (kms): 14,350
Initial Capacity: 5.12

Channel Capacity:
Owners:

4 Fiber Pairs
32
100 Gbps
Angola Cables, Broadband Infraco, Congo
Telecom, C&W, MTN Group, Office
Congolais de Poste et Telecommunication,
PT Comunicaes, Tata Communications,
Telecom Namibia, Telekom SA, Togo
Telecom, Vodacom

System Supplier:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro

System Maintainer:
Upgrader:
Upgrade Year:
Upgraded Capacity:
Region:
News:

Cape
Verde

Angola Cables, Telecom Nambia, Telkom


SA Limited

m
La e
go
s

Channels:

14.5 Tbps

cr
a
Lo

Fiber Pairs:

Ac

Design Capacity:

Douala

Pointe Noire
Muanda
Luanda

Huawei Marine Networks


2015
100 Gbps
EMEA
http://subtelforum.com/articles/
tag/wacs/ http://subtelforum.com/
articles/?s=WACS

Walvis
Bay

WARF

Cochin

Hulhumal

System Name:

WARF

Landing Points: Cochin (India), Hulhumal (India)


RFS Year: 2007
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):

2032
20,000,000
680

Owners:

WARF Telecom International

System Supplier:

Alcatel Submarine Networks

Marine Surveyor:

Fugro

Region: Indian Ocean Pan-East Asian

WESTERN VISAYAS-PALAWAN

System Name:

Western Visayas-Palawan

Landing Points: Taytay, Palawan; San Jose de Buenavista,


Iloilo (Philippines)
RFS Year: 2014
Est. End of Service Date:
Est. System Cost (US$):
Total Length (kms):
Owners:

2039
20,000,000
300
PLDT (Philippines)

Region: AustralAsia

Taytay

San Jose de Buenavista


Iloilo