You are on page 1of 25

JOINT OPERATING BODY

PERTAMINA-HESS
JAMBl MERANG

rn

Eg

pEuTamlNn

JOB NO

' 9468

DOC. NO.

REV.

SK- CL - C - 130

1 OF 25

PAGE :

PT. TRIPATRA
'rlxtlb.i,rf< ENGINEERS AND CONSTRUCTORS

CALCLILATION

JAMBl MERANG DEVELOPMENT


GAS PRODUCTION FACILITIES

STANDARD CALCULATION FOR


STEEL CONNECTION
(BEAM CONNEC'TION)

JOB - JAMBI MERANG

. .
:

FOR COMMENTIAPPROVAL

...

!.

#.
I ,

. , ..

'\.

.;...

Approved whh Comments

ENGR MGR

r
REV

DATE

PAGES

DESCRIPTION

PREP'D

CHK'D

By

Date

APP'D
CLIENT

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

CALCULATION FOR STEELCONNECTION

TABLE OF CONTENTS

Page
1

GENERAL ................. .
.
.
......................................................................

1.1

Purpose ...........................................................................................

1.2

Code and Standard ...........................................................................

1.3

Document Reference .........................................................................

MATERIALS ...........................................................................................

BEAM TO COLUMN MOMENT CONNECTION .............................................

. .

3.1

Abbrev~at~on
.........
............................................................................

3.2

Detail Beam to Column Moment Connection .................................................

3.3

Calculation of Allowable Shear ................................................................

3.4

Calculation of Allowable Moment ............................................................

3.5

Example Calculation ............................................................................

I0

BEAM TO COLUMN PIN CONNECTION WITH GUSSET PLATE ...........................


.

15

4.1

Abbrev~at~on
........
.
.....
.
.
........................................................................................

15

4.2

Detail Beam Column IJin Connection With Gusset Platc ...................................

16

4.3

Calculation Of Allowable Shear ...............................................................

17

4.4

Calculation Of Allowable Tension.. ..........................................................

21

4.5

Example Calculation ...........................................................................

22

Table 1

Beam to Column Moment Connection Capacity

Table 2

Beam Pin Connection

9468-SK-CL-130-C

Page 2 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

CALCULATION FOR STEELCONNECHON

GENERAL
1.1. Purpose
This calculation is to determine the allowable forces of standard connection for steel structure for EPC
Gas Production Facilities Ja~nbiMerang Pro.ject. This manual is intended to guide the engineer about
the iterns that shall be checkedlconsidered in calculating steel member connection capacity

1.2. Codes and Standards


- AWS D1.l, Structural Welding Code - Steel, American Welding Society.
- AISC 9"' Edition. ASD Manual of Steel Construction,
American Institute of Steel Constr~~ction
- ASTM, American Societ) for Testing and Materials

1.3. Documents Reference


General Specification for Civil and Structure
Specification for Structural Steel

GL, SP C 100
GL SP S 600

MATERIALS

Structural Steel ASTM - A36 or JIS G3 101-SS400 or equivalent.


F, = 2400 kglcm2
Specified minimum yield stress :
Allowable shear stress :
F, = 4070 kglcm2 ( net area )
= 960 kglcm2 ( gross area )
Specified minimum tensile strength :
F,, = 4070 hgIcm2

- Steel Pipe ASTM - A53 Grade-B


Specified minimum yield stress :

I.',

= 2400

kglcm7

- High Strength Bolt ASTM A-325 Type-[, Black Oxide


F,,, = 1470 kgIcm2
Allowable shear stress :
Allowable tension stress :
F,I, = 3090 kglc1n2
- Ordinar) Bolt ASTM A-307 Grade-A, Black Oxide.
= 700 kglc1n2
Allowable shear stress :
F,I,= 1400 kglcm
Allowable tcnsion stress :

9468-SK-CL-130-C

Page 3 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

BEAM TO COLUMN MOMENT CONNECTION

3.1

Abbreviation

v1
v2
v3
v4
MI
M2
M3
N,M
11,m
Fv
A bolt
d
tf
tw
twb
Fy
Pu
Fp
Ft
Fv
Lv
k!

s
k
tP
1
db
bp
Pec
Pe
Me
ff
Ff
Pf
Bfb
Wx
2 Ab
Af
Aw
K1
Ca
Cb

9468-SK-CL-130-C

:
:
:
:
:
:
:

:
:
:
:

:
:
:
:
:
:

:
:

Allowable shear of bolt


Allowable shear of connected beam
Allowable shear of welding
Allowable bolt bearing on end plate
Allowable Inoment due to bolt tension
Allowable moment of end plate
Allowable moment of connected beam
length and width of end plate (bearing)
number of bolt
allowable shear per one bolt
cross section area of bolt
depth of steel shape proper-ties
thickness of flange steel shape properties
thickness of web steel shape properties
thickness of beam web
Specified rnini~nu~n
yield strength of steel
Specified Tensile strength of the connected material
Allowable bearing stress
Allowable tension stress
Allowable shear stress
distance center of hole to edge of end plate
leg of fillet weld on web of beam requirement due to shear stress
minimum spacing
distance f r o n ~outer face of flange to web toe of fillet
end plate thickness
moment inertia
bolt diameter
effective column flange length
effective horizontal bolt distance analogous to Pe for end plate
effective bolt drstancc from top of beam flange
extreme iibred bending monient in end plate
thickness of colurnn flange
flange force
bolt distance from top of beam flange
beam flange width in end plate
section ~nodulusof beam
total area of bolt tension
section area of tension flange
section area of web, clear of llangc
effective length factor
coellicient used of numerical values
bending coefficient dependent upon Inolilent gradient

Page 4 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

9468-SK-CL-130-C

Page 6 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

3.2

9468-SK-CL-130-C

Detail Beam To Colun~nMoment Connection

Page 5 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

3.3

Calculation Of Allowable Shear


Allowable shear of this connection is the srnallest value among V I , V2, V3, V4 and is shown
as follows :
Allowable shear of bolt "VI"
VI

n . Fv , A bolt

where :
n
Fv

=
=

number of bolts
allowable shear per one bolt

(AISC 9th Ed. Table 53-2)

Allowable shear of connected beam "V2"


V2

(d - 2tf - 2Sc) s twb . 0 . 4 x Fy

Allowable shear of welding "V3

where :
E70= 0.3 x 62x 70.31 = 1300 kglcm'
g = leg offillct weld on web of beam requirement due to shear stress
Allowable bolt bearing on end plate "V4"

whcre :
Fp
Pp
Fp
Fp
Lv

=
=
=

=
=

allowable bearing strcss


1.2 Fu; if Lv 2 1.5db and s 2 3db
0.5 Fu (sldb - 0.5); ifLv 2 1.5db and s < 3 db
( L v . F u ) / 2 d b I 1 . 2 F u ; L v < 1.5db
distance center of hole to edge of end plate

(AISC 9th Ed. 33-1)


(AISC 9th Ed. 33-5)
(AISC 9th Ed. 33-3)

Minimum column flange thickness wlo stiffener requirement


Effective column flange length = bp
= 2.5 (2Pf + tlb)
bp
Effective horizontal bolt distance Pcc
Pec
=(gl2)-kl-(db/4)use:kl=0.75"

where

a In= CaCb . (A~IAW)"'. ( ~ e c l d b ) " ~


Ca
9468-SK-CL-130-C

1.13
Page 7 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Ff' =
tfc

3.4

M
('l - H )

+ 0.5P

d[6~e1(0.75Fy.
bp)]]

LqI-";"'

Calculation of Allowable Momcnt

Allowable nio~nentof this connection part is the smallest value among M I . M2, ~ 3 , & 4 ( ~ 4
-.
and shown as follows:
'7

1 2

Force equilibrium :

Weff, -d,

ZAbhY

wi

5
where :

8. ff
bj
=thickness of column flange
= location ol' neutral axis from bottom edge of plate
d
(input data, by trial and error)
Y= c.g of bolt tension from neutral axis
Z Ab =total area of bolt tension.
Weff

Moment Inertia of bolt :


--

lyb

9468-SK-CL-130-C

Z Ab.dy

Weff , d 3
-

Page 8 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Section Modulus :

Allowable moment due to bolt tension "MI"


MI

=Ft. Sb'

where
Ft
fv

= (442 =

4.39f~')"~
Vmin I ( n . Abolt)

(AISC 9th Ed. table 53-3)

Allowable moment of end plate "M2"

Maximum tension at flange due to Me

M2

= (Ff -

0.5 P) . (d - tt)

where :

. ( ~ f l ~ w ) ". (~eldb)"'
'

a In

= CaCb

Ca
Cb
bp
Fb
Pe
tP
bp
Ff
Me
Pe
Pf
bfb

= constant =

1.13
I bp)Ii2
= bfb + 2.5 cm (maximi~nieffective width)
= 0.75Fy
= Pf - (d bl4)
= end plate thickness
= end plate width
= Flange lbrce
= extreme fibrc bcnding moment in end plate
= effective bolt distance liom top of bearn flange
bolt distance Fro111top of bean1 flange
= beam flange width in end plate
= (bfb

(AISC 9th Ed. F2-1)

Allowable moment of connected beam "M3"

Wx = section ~nodulusof beam

9468-SK-CL-1304

Page 9 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Check of minimum spacing and minimum edgc distance


Minimum spacing 2 213db ( m m ) < s

Minimum edge distance

(AISC 9th Ed. table 53-5)

3.5

Example Calculation
MH 148 with properties :
d = 148 mm, tf = 9 mm, tw = 6 mm, bf = I00 mm, Ix = 1.02E+05
with type connection type A
llSB : m = 4, n = 2 M 22
Allowable shear of this connection is the s~nallestvalue among V1, V2, V3, V4 and is show11
as follows:
Allowable shear of bolt "VI"
V1

. Fv . A bolt
=1nxnx~vxx14xd~~
= 4 * 2 * 700 * 3.1414 * (2.2)'
= 21276 kg
=n

Allowable shear of co~inectedbeam "V2"

Allowable bolt hearing on end plate "V3"

F p = 1.2Fu; i f L v 2 1 . 5 d b a n d s 2 3 d b
Fp = 0.5 Fu (sldb - 0.5); if Lv 2 1.5db and s < 3 db
F p = ( L v . F u ) l 2 d b < 1.2Fu;Lv<1.5db

9468-SK-CL-130-12

(AISC 9th Ed. 53-1)


(AISC 9th Ed. 53-5)
(AISC 9th Ed. 53-3)

Page 10 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Allowable shear of welding "V4"

where :

Allowable force Vmax is V minimun~among V l , V2, V3, V4. So V n ~ a x= 5184 kg


For completed othcr shapes can be seen on the table of beam to colun~nmoment connection.
Allowable moment of this connection is the smallest value among MI,M2,M3 and is shown as
follows :

Allowable moment due to bolt tcnsion "M I "

where :
Ft

= (442 -

= (44'

4.39f~*)"~

= 43.71

fv

(AISC 9th Ed. table 53-3)

4.39* 2.43 ) ' I 2


ksi

Vmin I (n . Abolt)

[51841(n14 * 2.22 *2*4)]*7.54' * 2.204611000

- 2.43 hsi
y

= M - b d l =308-40-90=

Iyb

x 1 4 * d2 [2y'

1781nm

+ 2 (y-al -a212]+(br"d 1 )'I3

x I 4 * 222 [2* 1 7g2 + 2 (1 78-40-50)']+( 100*90)'/3

Allowable moment due to bolt tension "M2"


- 0.5 P) . (d - tf)
= I : f ( m 2 . b - 2 . a l -10
= 19909 (308 - 2*40 - 2*40 - 9)llO
= 276734 kg-cm
Where :
= 4 Me / (am. I'c)
Ff
= 4 * 162.450 / ( I .054049*30.965)
= 19909 kglcrn
Me = N * te2 * 0.75 Fyl6
= 150 * 19' *0.75 * 24001(6* 100)
= 162.450 kg-cm

M2

9468-SK-CL-130-C

= (Ff

Page 1 I of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Ca.Cb . ( ~ f l ~ w . )(l'eldb)"'
"~
1.13 * 0.8165 (I 1538.5)"' (30 965122)'
= 1 054049
Pc
l'f - (dbl4) al db/4 - 0.707 *g
= 40-2214 0 707 5
= 30 965 cm
Ca = 1.13 (constant)
Cb = (bfm)' = (1001150)"' = 0.8165
(AflAw) = [bf * tf ] I [ (d - 2 *tf) tw]
= [100*9] I [(I48 - 2 * 9) * 61
= 1.15385
am

'

Allowable moment of connection beam '.M3"

M3

= 0.617y .

, where : Ws = Ss- section ~nodulusof beam


Wx
0.6 *2400 * 1.38E+0.5
198720 kg-cm

Allowable moment M ~ n a xis M minimum among MI, M2. M3.


So Mmax = 198720 kg-cm
For completed other shapes can bc seen on the table attached of beam to colu~nnmoment
connection.

9468-SK-CL-130-C

Page 12 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Table 1. BEAM TO COLUMN MOMENT CONNECTION


Fy = 2400 kgicm2
Fu = 4070 kgicm2
Weld electrode = 62 ksi (grade 60 E60XX)
Fvbolt= 700 kg/cm2
Ftbolt
= 1400 kg/cm2

9468-SK-CL-130-C

Page 13 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

9468-SK-CL-130-C

Page 14 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

CONNECTION BEAM COLUMN PIN CONNECTION WITH GUSSET PLATE

4.1

Abbreviation

v1
v2
v3
v4
v5
V6
v7
T1
T2
T3
N, M
n. m
Fv
A bolt
d
tf
tw
tg
twb
FY
Iu
Fp
Ft
Fv
Lv
g
S

I(
tP
I
db
bp
PCC
Pe
Me
ff
1:s
Pf
13tb
Wx
z Ab
e

9468-SK-CL-130-C

Allowable shear of bolt


Allowable bolt bearing on gusset plate
Allowable shear of beam weblgusset platc tcar out (blocl; shcar)
Allowable shear on beam webigusset plate
local bending strcss on gusset plate
Allowable bearing capacity of beam web
Allowable capacity bascd on gussct welding shcar capacity
Allowable tension capacity due to bolt shear
Allowable tension capacity duc to bearing on plate
Gross tension capacity of gusset plate and beam web
length and width of end plate (bearing)
number of bolt
allowable shear per one bolt
cross section area of bolt
depth of steel shape properties
thickness of flange steel shape properties
thickness of web steel shape properties
thickness of g ~ ~ s splate
ct
thickness of bcam wcb
Specified minimum yield strength of steel
Specified Tensile strength oS the connccted material
Allowable bearing stress
Allowable tension strcss
Allowable shear stress
distance center ol'hole to edge of end plate
leg of fillet weld on web of beam require~nentdue to shear stress
minimurn spacing
distance from outer face of flange to web toe of tillet
end plate thickness
moment incrtia
bolt diameter
effective column flange length
effective horizontal bolt distance
effective bolt distance Prom top of beam flange
extreme tibred bending molllent in end plate
thickness of column Ilange
flange forcc
bolt distance from top oP bca~nflange
beam flange width i n end plate
scction ~nodulusof bean1
total area of bolt tension
eccentricity

Page 15 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

4.2

Detail Connection Beam To Column Pin Connection With Gusset Plate

Page 16 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Detail Connection Beam To Beam IJin Connection With Gusset Plate

4.3

Calculation Of Allowable Shear


The capacity of the connection is the smallest value among : VI ,V2, V3,V4, V5,V6,V7.

4.3.1

Allowable Bolt Shear V1.


For Connection Type I
fvh

= stress

frnb

= stress

on bolt "B" due to vertical load V l a

on bolt "B" due to moment M=Vla ( lh + sp )


= { ~ l a ( l h + s ~ ) r ) / ( .~Arhi) ~

fv
= d ( f ~ b ) ~ + ( f m b ) ~ 5 Fv
therefore :

Page 17 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

For Connection Tvpe 11

fvb

=
=

fiiib

=
=

fv

stress on bolt "B" due to vertical load Vl b


Vlb/(n.Ab)
stress on bolt "6"due to M = Vl b ( 111
Vlb(lh+sp+s/2)/(6.Ab)

+ sp + st?)

fvb + finb I Fv

therefore :

Vlb

4.3.2

f i * z* & ?
4
=-l/n+(117+sp+0.5*.s)/.s
-

Allowable Bolt Bearing On Gusset Plate V2


For Connection Type I :

I;II * dh * .tg

v2 =

d(1/n)'

where : sp = 15 ~ n m

+ [{(lh+ sp)r)/ x r i 2 r

(AISC 9"' Ed. 53-1)


(AISC 9"' Ed. 53-3)
(AISC 9"' Ed. 53-5)

For Connection Type 11 :

v2 =

4.3.3

Fp * dh * .tg
(1 I n ) + (lh + sp + 0,5 * .Y) I s

Beam Web / Gusset Plate Tear Out ( Block Shear) V3


Since in this type of connection the beam is not cooped then the beam web tear out is not
necessary to check. The tear out check will be applied only on gusset plate.

Page 18 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Shear are
--

Shear area
-

Tens~learea

-~- -~~

V3

Ih

eq

$ 1 ~

Av . Fv + A t . Ft
( 0.3 FLI) + At ( 0.5 Fu )

= Av

where

Fv
Fv

For Type I

; Av

At

4.3.4

= allow

shear rupture acting on net. Area Av

. tension rupture acting on net. Area At

; Av = {(n-I) ( s-dh)

At
For Type I1

= allow.

=(
=

+ (lv-0.5 dl1 ) ) tg

lh-0.5 dh ) tg

( lv-0.5 dl1 ) tg
s + 111 1 .5 dh ) tg

=(

Allowable Shear On Beam Web I Gusset Plat (V4)


Shear On Beam Web
V4a
V4b

= d.

tw. 0.4 Fy
= ( d - n . dh ) tw 0.3 Fu

(gross area)
(net.Area) ; n

1 for type 11 connection

Shear On Gusset Plate


V4c

=(

V4d

d - 2 k ) tg. 0.4 Fy

( gross area )

{( d -2 k ) - n dh) tg. 0.3 FLI (net.Area) ; n = 1 for type If connection

V4 is the smallest value among V4a, V4b. V4c, V4d

9468-SK-CL-130-C

Page 19 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

4.3.5

Local Bending Stress On Gusset Plate (V5)

For Type 1 Connection


V5a

tg * (d - 2k)* F'b
6 * (lh + .sp)

For Type 11 Connection

4.3.6

Allowable Bearing Capacity of Beam Web (V6)

Ford < 150


V6

Fp*db*t

x+z

Where :
e =Ih+sp+O.5s

Where :
e

=lh+sp

Zb = n x ( n + l ) x s / 6

4.3.7

Allowable Capacity Based on Gusset Welding Shear Capacity (V7) (for column)

V7

0.3 * Fu

Where :
Aw

=2

x 0.707 x a x Lw

Page 20 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

4.4

Calculation Of Allowable Tension

4.4.1

Tension Capacity due to Bolt Shear, 'l'l


Resultant stress, ft = ftl

ft 1
ft2
Fv
eY

4.4.2

on bolt "A" due to horirontal force = TI / n


on bolt"A" due to eccentric moment = TI x ey / Zb
= single shear capacity of bolt
= vertical eccentric distance between the bolt group
center and centerline of connecting bean1
= stress

Tension Capacity due to Bearing on I'late, T2

+ ft2

_<

1.2Fu

T2

=Fpxdbxt/(l /n+ey/Zb)

= thickness

of beam web or gusset plate : mi11( tw, tg )

Gross Tension Capacity of Gusset Plate and Beam Web, T3


T3
where :
Ag

4.4.4

Fv

= stress

Resultant stress, ft = ftl

4.4.3

+ ft2 <

0 . 6 1 ; ~I ( 1 / Ag + ey / Zgross )

= gross

sectional arca of gusset plate or beam web

Zg

= section

Ag
Zg
Ag
Zg

= Lg

n~odulusof gusset plate or beam web

x tg
( for gusset plate )
x Lg / 6 ( for gusset plate )
=dxtw
( for beam )
= tw x d 1 6
( for beam )
= tg

Checking of actual stress against allowable stress

where:
Va

= allowable
= smallest

shear capacity
of V1, V2, V3, V4, V5, V6, V7

hence,

Ta = allowable tension capacity


smallest of 1'1. '1'2. T3
V = actual shear force
T = actual tensile force

9468-SK-CL-130-C

Page 21 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

4.5

Example Calculation
C-75 with properties :
d = 75 mm, bf = 40, tw = 50 mm. tf = 7, tg = 9 mm, a = 7 mm, k = 7.5 mm, Iv = 30 mm, Ih = 35
mm, s = 60 mm
with type connection type I I

HSB : n = 2 M 2 2
Allowable shear of this connection is thc s~nallestvalue among VI, V2, V3, V4,V5,V6,V7 and is
shown as follows :

Vlb

2.914 ton

Fp * db * .tg

, where :
(lln)+(lh+.sp+0,5*s)/s
= Iv. Fu 12db I 1.2 l'u
; if Iv < 1.5 db
= 30*4.07 I (2*22) =2.775 ton
=
=

(2.775/100*22*9)/(1/2 +(40+15+0.5*60)160]
2.867 ton
[(n-l)(s-dh)+(lv

0.5 dh)].tg . 0.3 Fu -f- ( Ih

05 dh ) tg (0.5 Fu)

d . tw . 0 . 4 . Fy
75 * 50 * 0.4 * 2.411 000
= 3.6 ton
= (d - 11. d l ~ tw
) 0.3 FLI
= (75
1 *23.5) * 50 * 0.3 * 4.0711000
= 3.144 ton
=(d-2k) tg 0.4 Fy
= (75 - 2 * 7.5) * 9 * 0.4 * 2.41100
=5.184ton
= [(d - 2 k) - n . dh] tg . 0.3 . Fu
= [(75 - 2*7.5) - 1 . 23.51 * 9 * 0.3 * 4.0711 000
= 4.01 1 ton
=
=

lR(d - 2k)2~h
6(1h + sp + s 12)
= [9*(75 - 2 * 7.51~
* 1.441 I [6*(40+ 15 + 6012)l
= 0.91 ton
-

9468-SK-CL-130-C

Page 22 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

= 12.775 * 22 * 51 1 [(112)+ (8.5/(60110))]


= 1.59 ton

+ (8.5 1 34.7)2]1'2

= [0.3*4.07] 1 [(1/14.4)~
= 4.79

Where :

ton
Aw = 2 x 0.707 x a x Lw = 2

* 0.707 * 7 *

14.5 = 14.4

Allowable shear Vall,, is V 1nini111~11n


among V I , V2, V3, V4.V5,V6.V7 So V,II,w= 0.91 ton
For completed other shape can be seen on the table of beam pin connection.
Calculation Of Allowable Tension

Tension Capacity due to Bolt Shear, TI

Tension Capacity due to Bearing on I'late, 1'2

T2 = F p x d b x t / ( l / n + e y / Z b )
= [(Fu*lv*db*tw) / ( 2 * db)J / [ I/n +{dl2 ( I< + Iv + Ll2)} 1 {n ( n i l ) * d2/6}]
= 1(4.07*30*16*5)/ ( 2 * 16*100)]! [ 112 + ( 7512 (7.5 1 30 I 0)}1{2*(2+1)*75~/6)]
= 6.1 I ton
Gross Tension Capacity of Gusset Plate and Beam Web. T3
-

T3w= 0.6Fy / ( 1 / Ag + ey 1 Zgross )


= [0.6 Fy] / [ I/(d*tw) +{dl2 - ( k + Iv + LI2)) 1 {tw * d2/6)]
= [0.6 * 2.4/100] / [ 1/(75*5) 4- { 7 5 / 2 ( 7 . 5 + 30 + 0))/{5*75~/6)]
= 5.4 ton
T3g = 0.6Fy / ( 1 1 Ag + ey / Zgross )
= 10.6 Fy] / [ l/(d*tg) +{dl2 ( k + Iv + LI2)) / {tg * d216}]
= 10.6 * 2.4/100] / [ 1/(75*9) + { 7512 - (7.5 + 30 + 0))/{9*75~/6)]
= 9.72 ton
-

AIlowablc Tensile Capacity TaII,,,is T minimum among '1'1,T2,T3w, T3g So T,II,w= 5.4 ton
For completed other shape can be seen on the table of beam pin connection

9468-SK-CL-130-C

Page 23 of 25

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT


CALCULATION

Table 2. BEAM PIN CONNECTION


Fy = 2400 kglcm2
Fu = 4070 kglcm2
Fvb = 1470 kglcm2
Fb = 1440 kglcmz
sp = 15 mm

ma&

type

C-75
C-100
C-125
C -150
C-180
C -200
C -250
C -300

11
11
11
11
1
1

H-150
H -200
H -250
H -300
H -350
H -400
H -450
H -500
H -600

11
1
1
1
1
1
1

H -148
H-194
H -244
H-294
H-340
H -390
H -440
H-488
H-588
H-700
H -800
H-900

G PL
tg
(mm)
9
9
9
9
C
9
12
12

9
3
3
9

9
."

:2

11
1
1
1
1
1

1
1
1
1
1
1

9
9

Leg
a
(mm)
7
7
7
7
7

9
'

7
7
7

n
2
2
2
2
2
Z

3 3
2
2
3
3
4

7
7

2
2

12
16
16

7
5

3 3

I12

-2

.'io

12

1
5

16
16
19
19
19

22

12
42
72
<2

9468-SK-CL-130-C

6
7
9
10
12

H.S.B.
db
dh
(mm)
(mrn)
23.5
M 22
24
M 22
24
M 22
24
M 22
24
M 22
M 22
24
M 22
24
M 22
24

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22

24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24

k
(rnm)
7.5
10
22.5
22.5
20
30
25
50

?:2
25
50
45
40
35
60
50
24
32
32
47
40
65
60
54
74
70
90
80

I
I

DIMENSION
Iv
Ih
s
(mm) (mm) (mm)
40
60
30
40
40
60
40
40
60
40
40
60
40
60
40
40
40
60
40
40
60
40
60
40
40
40
40
40
40
40
40
40
40

50
35
3 5
40
1 4 0
40
40
40
40
40
40
40

I
I

40
40
40
40
40
40
40
40
40
40
40

1 4400
40
40
40
40
40
40
40
40

L
(mrn)

60
60
60
60
60
60
60
60
60

60
60
120
120

535
5.35
986
9.86

60
120
120
180
240
300
300
420

5.35
9.86
9.86
1504
20.60
26.36
26.36
38.14

60
110
120
180
180
240
300
360
480
540
660

5.35
9.30
9.86
15.041
15.04
20.60
26.36
32.23
44.07
49.98
61.76

1
1

'

4.68
6.33
11.34
11.34
17.09
23.41
53.85
40.21
59.42

4.68
6.33
9.67
1 15 11
3 0 3 9
30.39
41 6 2
53.61
66.18
11001
126.31
159.76

V3b
(ton)

12.16
12.16
21.49
21 49

15.11

2.92

V3a
(ton)
11.19
14.80
14.80
14.80

V2
(ton)
2.87
4.68
4.68
4.68

2.92

60
60
55
60

60
60
60
60
60
60

Vlb
(ton)
2.92
2.92
2.92
2.92

Vla
(ton)

'

14.80

15.90
11.61
14.47
21.49
35.69
35.69
42.72
49.75
56.78
84 14
92.49
109.19

V4a
(ton)
3.60
4.80
7.20
9.36
12.10
14.40
21.60
28.80

SHARE CAPACITY
V4c
V5a
V4d
V4b
(ton)
(ton) , (ton)
(ton)
3.14
4.01
5.18
4.64
6.91
6 15
7.40
6 15
6.91
10.00
8.90
9.07
11.28
12.10
1011
7.70
13.92 1 12.10
1011
7.70
23.04
19.56
18.75
20.95
27.84
18.75
23.04
20.95

7.20
10.56
1440
1872
23.52
30.72
38.88
48.00
63.36

7.69
10.21
13.04
18.10
21.71
27.35
33.63
43.47
54.80

9.07
12.10
17.28
17.28
22.46
27.65
32.83
43.78
57.60

8.52
1117
16.40
22.58
29.38
37.44
46.46
51.53
67.74
87.36
107 52
138.24

9.08
10.70
14.70
2168
26.81
35.90
42.98
46.20
61.54
76.83
95.73
119.56

8.64
11 23
15.55
2304
39 94
39 94
4915
58 37
67.58
102.14
113.09
134.98

Page 24 of 25

8.90
10.11
14.07
14.07
18.02
21.98
25.93
34.58
45.13
8 35
901
11.87
18.75
32.04
32.04
39.07
46.10
53.14
79.80
88.16
104.86

7.70
15.71
15.71
26.55

:75.61
664
12 72
20 95
47 20
47 20
7149
100.82
135.17
260.00
318.70
454.01

V5b
(ton)
0.91
1 63
1 63
2.80

V6
(ton)
1.59
2.60
3.12
3.38
6.68

V7
(ton)
4.79
4.79
4.79
4.79
5.76

Vallow
(ton)
0.91
1.63
1.63
2.80
5.35

2.80

2.60
5.25
10 56
11.44
18.78
29.40
5385
47.04
74.87

4.79
7.50
12.53
18.24
24.39
30.78
48.34
56.39
73.28

2.60
5.25
9.86
9.86
15.04
20.60
2593
26.36
38.14

2.54

3.12
5.73
10.43
1408
24.15
26.83
40.43
51.75
69.02
102.23
124.86
176.32

4.79
6.96
11.88
22.54
39.66
50.55
61.68
72.48
95.01
120.08
113.39
140.02

2.54
5.35
9.30
9.86
15.04
15.04
20.60
26.36
32.23
44.07
49.98
61.76

JAMB1 MERANG GAS PRODUCTION FACILITIES DEVELOPMENT

Leg.

H.S.B.

DIMENSION

SAFE
LOAD

TENSILE CAPACITY

mark
C -75
C -100
C -125
C-150
C -180
C -200
C -250
C -300

40
40
40

40
40
40

Tallow
(ton)
5.40
7.20
9.77
7.05
11.18
11.18
16.76
16.76

H -150
H -200
H -250
H -300
H -350
H -400
H -450
H -500
H -600

40
40
40
40
40
40
40
40
40

40
40
40
40
40
40
40
40
40

5.75
8.95
14.65
15.87
22.35
27.94
33.53
33.53
44.70

0.45
0 59
0.67
0.62
0.67
0.74
0.77
0.79
0.85

H -148
H -194
H -244
H -294
H -340
H -390
H -440
H -488
H -588
H -700
H -800
H -900

50
35
35
40
40
40
40
40
40
40
40
40

40
40
40
40
40
40
40
40
40
40
40
40

11.18
8.55
14.96
16.76
22.35
22.35
27.94
33.53
39.12
50.29
55.88
67.06

0.23
0.63
0.62
0.59
0.67
0.67
0.74
0.79
0.82
088
0 89
0 92

9468-SK-CL-130-C

40
40

Page 25 of 25

a
0.17
0.23
0.17
0.40
0.48
0.48
0 59
0 59

You might also like