Pre-feasibility Report
said that an investment worth US$ 176.49 billion is likely to go into the steel sector by
2020.
In the first 10 months of 2008-09, India's steel production went up to 46.8 MT up by
1.1 per cent from last year.
Consumption
India is the fifth-largest consumer of steel in the world. It consumes about 1.5 MT of
stainless steel a year with around 70 per cent accounting for kitchenware. However,
its use in railway coaches, wagons, airports, hotels and retail stores is growing
immensely. Demand for steel in India is likely to grow at around 12 per cent against
the global average of 56 per cent. Steel consumption grew at 3.8 per cent in the
January-March quarter of 2008-09 over the same period last year.
A Credit Suisse Group study states that India's steel consumption will continue to grow
by 16 per cent annually till 2012, fuelled by demand for construction projects worth
US$ 1 trillion. The scope for raising the total consumption of steel is huge, given that
per capita steel consumption is only 35 kg compared to 150 kg across the world and
250 kg in China
Future demand
While the demand for steel will continue to grow in traditional sectors such as
infrastructure, construction, housing automotive, steel tubes and pipes, consumer
durables, packaging, and ground transportation, specialized steel will be increasingly
used in hi-tech engineering industries such as power generation, petrochemicals,
fertilizers, etc. The new airports and railway metro projects will require a large
amount of stainless steel.
According to an estimate, with the growing need for oil and gas transportation
infrastructure, a US$ 118 billion opportunity is waiting to be tapped by steel
22
Pre-feasibility Report
manufacturers in the next five years. Indian steelmakers are set to make the most of
booming global demand for steel pipes and tubes with the government withdrawing
the 10 per cent duty on the exports of these products. According to a study by ICICI
Direct, Indian steel companies are likely to get 19 per cent of the total global demand
in the years to come.
23
2.4.
Pre-feasibility Report
Tunnel Kiln
Name
The length of the
kiln
Inner width
3.3M
Loading height
1.8M
24
Pre-feasibility Report
Name
Raw materials
processing
Device configuration(includes)
Iron ore powder dryer, reducing agent drier, Conveying
equipment and so on
tunnel kiln steel structure parts, kiln trolley transport
Tunnel kiln
equipment
Loading system
Unloading system
Broken cold
pressing system
Gas generating
station
25
Pre-feasibility Report
2.4.4. Main cost structure of 1ton sponge iron (TFe65%Iron ore powder as an example)
NO.
tons of consumption
ore fine
1.4T
producer gas
900Nm
power consumption
60kw
limestonereducing agent
Si C tank
0.12T
12kg according to the cycle number
allocation
Name
TFe(Total iron)
TFe65%
86.44%
10.2%
TFe67%
89.93%
7.46%
TFe70%
95.47%
3.32%
26
Pre-feasibility Report
27
Pre-feasibility Report
Reducing agent
Desulfurizingag
Fracture
Dry
Fracture
Sieve
Mixed
ingredient
Sieve
Dry
Dry
Automatic
Gas furnace
Tunnel
Automatic
Ash
The tail
Fracture
Tail slag
Magnetic
Pressing
Storage
On the top of preheating section of kiln flue heat exchanger is arranged and in the
middle of cooling section rapid cooling /heating exchanger is arranged, hot air which
temperature is 300~350 degrees out from cooling /heating exchanger can be
used for combustion-supporting directly, it can save fuel 20%~25%, at the same time
it reduces both waste gas temperature and the temperature of cooling section.
28
2.4.8.2.
Pre-feasibility Report
Gas burner with multi points by small flow arrangement in the roasting section are
"goods" type distribution which are in upper and lower dislocation, so, combustion
gas injected into the kiln can also stir air, let reduction temperature in a kiln reaches
unanimity, the maximum temperature difference is no more than plus or minus 10
degrees.
2.4.8.3.
In the rear of cooling section circulating water cooling system is arranged. For further
reduce the temperature in the kiln, meanwhile the output of the hot water can meet
the various needs of the factories such as heating or bath hot water and so on.
2.4.8.4.
Trolley foot made by radiation type big wheel with high temperature resistant
bearing coupled with kiln trolley frame body connected with a bearing seat, run safely
and steadily.
2.4.8.5.
It has such characteristics as simple operation, low amount of repair, a high degree of
mechanization. It improves the labor intensity of workers and operating environment
and increase the economic benefit of enterprises.
2.4.8.6. Automatic control
The electrical appliance control equipment and switch are centralized installed in the control
cabinet. In the both ends of the tunnel kiln, including the back trolley line, video surveillance
system is equipped.
Following the social economic development, it always accompanied by peoples new
technology and new process innovation. A mature innovation process should be from simple
to complex, from complexity to simplicity, the company's innovative series tunnel kilns have
29
Pre-feasibility Report
such characteristics. Welcome friends to choose the coal based tunnel kiln equipment
suitable for your own development. It will bring investors great economic benefit and social
benefit to construct DRI tunnel kiln production line which is low investment and quick
returns.