NTPC -11x660 MW Bulk Tender

Adoptions & Assumption:


A

Exchange Rate considered as on 27 Feb 2012


US $
Yen
Euro
SEK

49.44
0.612
66.74
7.6

Manufacturing Allowance 5% for Pressure and Non Pressure Parts

No design variation consideed

Mega project status available for all units


No input CD, ED
No Terminal ED
VAT / Sales Tax to be included separately

Freight to Job site -NOT INCLUDED

BOM furnished by HPE vetted & revised by Engg and BOI Vendor recommended by

recommended by Engg

NTPC -11x660 MW Bulk Tender


Services
Sl No
Product/Description
Erection supervision services
1
Air pre Heater
2
Circulating Pump

No of eqpts

Man days

4
1

60
10
70

140

=70 mandays x 2000 $/dayx 1.1 Tax x 50


Stay & Incidentals 40%
To&Fro 14 Er x 2Times x 1Lakh
Total site E&C supervision cost
Fans,HTM,SB Supervision
External Quality control assistance
Total
External engineering assistance
IBR and Misc Payments
Standards 2 sets
Instruction Manual
Total
Total per boiler
Man days info collected from Mr Venkat Rao

Table 5

Rs lakhs

77
31
28
136
56
50
242
50
20
30
20
120

No services

NTPC -11x660 MW Bulk Tender


Sl No DOW No

BGR supply Item description

Table 4
Quantit
y per
Contrac
t

Aux Boiler 50 TPH


19.10
19.10
19.10
19.11
19.14
19.15
19.17

GP Maintenance tool
SP Maintenance tool
Intrascope
QES( red 280 Lakhs)
Tube thickness measurements
YGP Machine (5.41)
Sky climber
Total with Aux Boiler

Rate

Currency Ex Rate

Rs
Lakhs

Freight
to site
in Rs
Lakhs

1
1
1
1
1
1
1
1

Set
Set
Set
Set
Set
Set
Set

Total Cost
on site in
Rs Lakhs
1495.32

15.00
12.00
1900000
932000

RS Lakhs
RS Lakhs
Yen
Euro

6.00 RS Lakhs
203080 Euro

0.10
0.10

0.612
66.74

15.00
12.00
11.63
622.02

66.74

6.00
135.54

0.10
1.00

6.00

15.10
12.10
11.63
628.02
6.10
136.54
2304.80
979.54

Vendor Name
Thermax offer+2%

Date of
offer
27/12/2011

Estd
Estd
J Mitra
27/11/2009
Instant upright
5/1/2010
To be estimated by MrSatish
Ducom Instruments
3/102/2009
Sky climber
21.07.2011

BGR supply Item description

Circulating Pump (1)


Safety Valves& ERV for SH/RH/Separator
Safety Valve &ERVSilencers
General Valves Imported+ control valves
General Valves Domestic
Condensate tank
Sootblowers / Wallblowers
Supports + silenser supports
Primary Steam Coil Air Pre-Heater
Secondary Steam Coil Air Pre-Heater
Pry APH
Scy APH
Primary Air (PA) Fans, including:
- Electric Motor Drives
- Inlet Silencers
Secondary Air Fans (SA), including: FD Fan
- Electric Motor Drives
- Inlet Silencers
Induced Draft Fans (ID), including:
- Electric Motor Drives
Seal Air Fans, including:HTM etc
Expansion Joints
Dampers and Gates
Fuel Feeders system from BB to Mill top
Mill electric motor drives (8)
Coal Conduits -Hangers
gate valve Electric (64 Nos)
CoalConduits-Expansion Joints
Coal Conduits -Ceramic Bends
Platform Steel - Floor GrillSheeting Work of
Fasteners ,Hangers & Castable
HSFG Bolt
Al sheet
Lagging + Fan Insulation
Maintenance hoists
Total

NTPC -11x660 MW Bulk Tender


Bought out Items
Change
0.85
Weight Mt Domestic Importe
Total
per boiler
Bought
d
Cost in
outs in Rs Boutout Rs lakhs
lakhs
Cost In
Rs Lakhs
10
192
192
20
266
267
84
141
141
150
409
409
100
333
333
60
60
100
442
442
17
17
20
8
18
18
12
82
82
718
511
662
1173
1166
882
779
1661
21
381
381
20
71
71
6
20
20
21
441
441
20
76
76
6
20
20
104
721
721
20
160
160
5
20
20
308
197
197
567
702
702
56
540
540
80
170
170
18
51
51
22
109
109
8
47
47
150
303
303
1080
550
550
53
53
119
119
200
51
51
274
373
373
1679
371
371
201
201
7053
8231
2309
10541

Mega power ICB tender- Hence NO input ED and CD considered


No terminal ED is applicable
No terminal Sales Tax added

Table 3
Vendor Name

Offer
Date

Torishima 8% discout
on
Sempell
CCI
Presta/BW/HPValves
L&T
Estd
Clyde
Estd
Patel Air temp india Ltd
Patel Air temp india Ltd
Alstom
Alstom
TLT Babcock
TNEIC
Estd
TLT Babcock
TNEIC
Estd
TLT Babcock
Weg
ACCEL
Meshwell
DEMECH- ???
Stock
Siemens/Estd
Estd
Estd
Flexatherm
DEMECH
Kanade Anand
Alfa steel
Estd
Estd
HINDALCO
Minwool rock fibre
Consolidated Hoist

24/1/201
1
2/11/201
3/1/2012
1
23/1/201
23/1/201
2
21/2/201
2
27/2/201
27/2/201
20/12/20
9/1/2012
11
20/12/20
9/1/2012
11
20/12/20
11/1/201
11
21/12/20
27/12/20
11
4/2/2012
11
22/4/201
2
03/08/20
26/12/20
11
20/12/20
11
11

HPE
Mail
No

732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732

DOW No BGR supply Item


description

1.1.1
1.1.1
1.1.1
1.1.1
1.1.1
1.1.1
1.1.2
1.1.2
1.1.2
1.1.2
1.6.2.2
1.6.2.2
1.6.2.2
1.6.2.2
1.8
1.8
1.8
1.8
1.10
1.10
1.10
1.10
1.10

Hopper
coiled Fins 17 x 6
Forgings/spl
components
Buck stay
Plates
Rods
Spiral wall
Fins16/17.8x6
Wall box
Pendulam+TB
Headers- pipe
Headers- tube
Headers- forgings
Headers- plates
SH Coil- tube
SH Coil- tube
SH Coil- tube
Plates
RH Coil -tubes
RH Coil -tubes
RH Coil -tubes
Armour Plate
Tube
Total

Material
Specification

T12
SA 387 Gr 12
SA 182 F12
CS Plate
CS Plate
CS rods
T12
SA 387 Gr 12
SA 387 Gr 12
SA 387 Gr 12
P91
T22
CS
CS
T91
TP 304 H Super
T22
SA240 Gr 309S
TP 304 H Super
T91
T22
SA 240 Gr 310
SA 240 Gr 309 S

NTPC -11x660 MW Bulk Tender


PRESSURE PARTS
DV
0.85
0.85
Table 2 A
MA
1.03
1.03
Finished Domestic Imported
Cost of
Cost of
Total Cost in
weight in
Raw
Raw
MaterialMaterialRs lakhs
MT
Material
Material
Domestic Imported In
Rate
Rate Rs/MT Rs lakhs
Rs Lakhs
Rs/MT
a
b
c
d=axbxMA d=axbxMA
F=d+e
97.67
12.84
0.66
48.60
4.90
0.44
335.34
43.61
107.08
6.79
146.21
21.10
7.20
10.10
332.00
96.00
50.60
26.80
119.83
77.06
17.38
3.00
1.80
1567.00

Mega power ICB tender- Hence NO input ED and CD considered


No terminal ED is applicable
No terminal Sales Tax added
Conversion cost based on the offers from Vendors
S/C rate adopted from the offer from Cethar vessel 12 April 2010
Offered Rate + 15% for period escalation on labour

60000
60000
90000

60000

130000

120000
130000

120000
210000
450000

120000
210000
120000
100000
450000
160000
250000
310000
700000
160000
700000
310000
160000

25.53
2.57
0.35

5.31

30.50

3.15
2.05
69.46

102.61
23.61
2.60
0.00
0.00
0.00
352.31
80.18
112.50
5.94
576.03
29.56
15.76
0.00
901.06
588.34
70.88
0.00
734.37
209.14
24.35
0.00
0.00
3829.23

102.61
23.61
2.60
25.53
2.57
0.35
352.31
80.18
112.50
5.94
576.03
29.56
15.76
5.31
901.06
588.34
70.88
30.50
734.37
209.14
24.35
3.15
2.05
3898.69

Out
sourcing
Rate
Rs/Kg
g

30.00
12.00
45.00

15.00

15.00
15.00

0.85
Total Cost
in Rs
lakhs
h=a x g

12.39
0.50
0.17

3.42

0.38
0.23
17.09

Mail No DOW No BGR supply Item


description

732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732

1.2.1
1.2.1
1.2.1
1.2.1
1.2.2
1.2.2
1.2.2
1.2.2
1.6.1.1
1.6.1.1
1.6.1.1
1.6.1.2
1.6.1.2
1.6.1.2
1.6.1.2
1.6.1.3
1.6.1.3
1.6.1.3
1.6.1.3
1.7
1.7
1.7
1.7
1.9
1.9
1.9
1.9
1.9
1.9
1.11
1.11
1.11
1.11
1.11
1.14
1,16,1
1,16,1
1,16,1
1,16,2
1,16,2

Material
Specification

Vertical wall
T12
Fins22x6
SA 387 Gr 12
Spl components-HPE
SA 182 F12
Pendulam+TB (4x148)
SA 387 Gr 12
Vertical wall
T12
Fins 79x8
SA 387 Gr 12
Spl components- HPE
SA 182 F12
Pendulam+TB(111+3x1
SA
387 Gr 12
48)
IB Piping- >219
SA 106 GR C
IB Piping <219
SA 106 GR C
Reducers,Tee,fittings
AS Forgings
Headers- pipe >219
SA 106 GR C
Headers- tube
T22
Headers- forgings
CS
Headers- plates
CS
Connectors
T91
Connectors
T22
Connectors
T12
Connectors
210 Gr C
SH Coil- tube
T91
Forgings/spl
SA 182 F91
Plates
F22
components
Plates
SS 310 plate
RH Coil -tubes
T12
RH Coil -tubes
T 91
RH Coil -tubes
T 22
RH Coil -tubes
304 H
Armour Plate
SA 240 Gr 304
Plates
SA 240 Gr 321
Economiser-tube
210 Gr C
Economiser-tube
304 H
Economiser-plate
SA 387 Gr
Economiser-tube
TP
91
12/22
Economiser-plate SS
SS 304 plate
Access Doors
SA 105
Uncooled roof
210 Gr C
Uncooled roof fins 79x6
387 Cl 12
Pendulam+TB
Forging
Uncooled wall
210 Gr C
Uncooled wall -fins etc
387 Cl 12

NTPC -11x660 MW Bulk Tender


PRESSURE PARTS
Change
0.85
0.85
Table 2
MA
1.03
1.03
Finished DomesticR Imported
Cost of
Cost of
Total Cost in
weight in aw Material
Raw
MaterialMaterialRs lakhs
MT
Rate Rs/MT Material
Domestic Imported In
Rate Rs/MT Rs lakhs
Rs Lakhs
a
b
c
d=axbxMA d=axbxMA
F=d+e
142.80
22.59
2.00
9.76
75.64
49.06
3.16
9.15
223.31
18.40
12.00
80.00
7.00
5.00
6.00
21.49
86.40
89.63
126.60
88.03
1.20
12.03
1.00
545.60
1.29
154.44
1.07
50.85
8.63
1201.00
100.00
58.00
2.00
0.00
16.83
16.04
1.20
50.50
35.50

80000

80000

170000
80000
80000

120000
210000
450000
100000
120000
210000
450000
100000
90000
80000
280000
90000
160000
250000
50000
310000
160000
120000
310000
800000
320000
160000
120000
310000
160000
360000
160000
140000
250000
170000
310000
90000
210000
280000
210000

88.67

841.18

2.98
11.79
35.37

150.02
41.53
7.88
8.54
79.47
90.19
12.43
8.01
175.96
12.89
29.42
63.04
9.81
10.94
2.63
58.32
121.03
94.17
0.00
238.92
8.40
33.70
1.40
573.21
3.51
216.33
3.37
71.23
10.57
0.00
0.00
148.84
157.41
0.00
0.00
0.00
29.48
2.94
0.00
65.27

150.02
41.53
7.88
8.54
79.47
90.19
12.43
8.01
175.96
12.89
29.42
63.04
9.81
10.94
2.63
58.32
121.03
94.17
88.67
238.92
8.40
33.70
1.40
573.21
3.51
216.33
3.37
71.23
10.57
841.18
0.00
148.84
157.41
2.98
0.00
11.79
29.48
2.94
35.37
65.27

Change
Out
sourcing
Rate
Rs/MT
g

120.00
120.00
300.00

12.00
12.00

15.00
15.00

15.00
45.00

Mail No DOW No BGR supply Item


description

732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
732
413,bgr
413,bgr
Change

1,16,3
1,16,2
1,16,3
1,16,3
1.18
1.21
15.5,6
15.5,6
15.5,6
15.5,6
15.10,11
15.10,11
15.10,11
15.10,11
15.20
15.20
15.20
15.20
3.3
3.3
3.3
7.9,10
7.9
15.5,6

Pendulam + TB (370)
Uncooled wall -frame
Boiler suspensions
Boiler suspensions
Boiler Accessories
Conservation System
Start up system Piping
Start up system Piping
Hangers,anchors
Plates
Drain & Vent piping
Drain & Vent piping
Drain & Vent piping
Hangers,anchors
Spray water piping
Spray water piping
Spray water piping
Hangers,anchors
SB piping
SB piping
Hangers,anchors
Inst.. air/oil piping'
Inst.. air/oil piping' str
Start up system Piping
Total

Material
Specification

Forgings
SA 387 Gr 12
CS Plate
SA 105 Rod
CS Plate
AS Plate
106 Gr C
P91
AS
SA 387 Gr 12
P22
P91
Gr C
AS
P11
P91
GrC
AS
Gr C
P1
AS
106 Gr C/P11
CS Plate
P91

NTPC -11x660 MW Bulk Tender


PRESSURE PARTS
Change
0.85
0.85
Table 2
MA
1.03
1.03
Finished DomesticR Imported
Cost of
Cost of
Total Cost in
weight in aw Material
Raw
MaterialMaterialRs lakhs
MT
Rate Rs/MT Material
Domestic Imported In
Rate Rs/MT Rs lakhs
Rs Lakhs
a
b
c
d=axbxMA d=axbxMA
F=d+e
7.32
280000
17.94
17.94
4.68
170000
6.97
6.97
112.17
42000
41.24
0.00
41.24
80.00
90000
63.04
63.04
182.82
42000
67.22
0.00
67.22
0.15
170000
0.22
0.22
126.46
80000
88.57
88.57
1.00
470000
4.11
4.11
9.00
160000
12.61
12.61
5.00
170000
7.44
7.44
9.55
160000
13.38
13.38
18.00
450000
70.92
70.92
23.00
100000
20.14
20.14
4.73
160000
6.63
6.63
14.35
210000
26.38
26.38
2.00
470000
8.23
8.23
1.00
80000
0.70
0.70
1.00
160000
1.40
1.40
44.71
130000
50.89
50.89
3.00
190000
4.99
4.99
5.00
160000
7.00
7.00
196.00
80000
137.28
137.28
43.00
42000
15.81
0.00
15.81
237.00
470000
866.23
866.23
4466.11
1104.27
3955.93
5060.20

Mega power ICB tender- Hence NO input ED and CD considered


No terminal ED is applicable
No terminal Sales Tax added
Conversion cost based on the offers from Vendors
S/C rate adopted from the offer from Cethar vessel 12 April 2010
Offered Rate + 15% for period escalation on labour

Change
Out
sourcing
Rate
Rs/MT
g
12.00
45.00
12.00
12.00
80.00
150.00
12.00
12.00
80.00
90.00
60.00
80.00
80.00
90.00
60.00
80.00
60.00
50.00
80.00
30.00
12.00
150.00

0.9
Total Cost
in Rs
lakhs
h=a x g

241.17
19.87
32.40

1.30
0.11

6.86
1.16

0.27
0.00

0.9
Total Cost
in Rs
lakhs
h=a x g
12.11
32.40
19.74
0.02
91.05
1.35
0.97
0.54
6.88
14.58
12.42
3.41
10.33
1.62
0.54
0.72
24.14
1.35
3.60
52.92
4.64
319.95
918.44

NTPC -11x660 MW Bulk Tender


NON-PRESSURE PARTS
Change
1
Change
MA
1.03
Raw
Finished
Raw
Conversion
Material
Remarks
weight in
Material
Rate in
Rate in
MT
cost
Rs/ MT
Rs/ MT
a
b
c=axbx MA
e

Mail No BGR supply Item description

635
635
635
635
635
635

635
656
656
656
656
656
656
656
656
656
656
656
656

Flues and Ducts


Air Ducts
Hangers
Door
Gas Flues
- boiler to airheater
Hangers
Door
- airheater to dust collector-BGR
- dust collector to stack-BGR
Seal Air Ducts / Piping
Coal Feed System
Coal Conduits (PF-pipe760 IDx12.7)
Mill Steam Inerting System
Structural Steel
Boiler Structural and Support Steel
Boiler Structural and Support Steel
E250
Boiler Structural and Support Steel
E350
Boiler
E250 Structural and Support Steel
E350
Bunker Structural E250
Bunker Structural E350
Tippler floor E250
Tippler floor E350
Roof structure E 250
Roof sytructure E 350
Boiler House Str E 250
Boiler House Str E 350

BGR
BGR
BGR
BGR

1554
73
16

40800
120000
40800

653.05
90.23
6.72

15000
60000
24000

561
123
2
1250
600
7

40800
120000
40800
40800
40800
90000

235.75
152.03
0.84
525.30
252.14
6.49

15000
60000
24000
15000
15000
24000

359

50000

184.89

24000

400
2800
1000
300

42800
44800
42800
44800

176.34
1292.03
440.84
138.43

30000
32000
30000
32000

1300
200
2440
250

42800
44800
42800
44800

573.09
92.29
1075.65
115.36

18000
20000
18000
20000

NTPC -11x660 MW Bulk Tender


NON-PRESSURE PARTS
Change
1
Change
MA
1.03
Raw
Finished
Raw
Conversion
Material
Remarks
weight in
Material
Rate in
Rate in
MT
cost
Rs/ MT
Rs/ MT
a
b
c=axbx MA
e

Mail No BGR supply Item description

656
656
656
656
656
656
656
656

Lift structure E 250


Railing and ladder E 250
Cheq Plate E 250
Stairs
Monorails
Buckstays E 250
Buckstays 10 Cr Mo 910
Anchorages
Structurals+handling
Drainage

support+

Fixing Components & Inner Casing


Garbage Chutes 500x10-125 mtr

BGR
BGR

Total
Reduced after disc with HPE on 27/2/2012- 5.30 PM
Structurals
Ducts
PF lines

390
210
60
25
60
1120
105
30
1040

42800
42800
42800
42800
42800
42800
50000
80000
42800

171.93
92.58
26.45
11.02
26.45
493.74
54.08
24.72
458.47

18000
18000
18000
18000
18000
18000
24000
60000
18000

130
40

42800
42800

57.31
17.63

15000
24000

16445

7445.85

11900
4186
359

5338
1923
185

Raw Material rate is an average rate furnished by Mr Venkataraman CSPG on Feb 2012
Conversion rate basedon the offer from Vasan engg and derived rate of Simplex

0.9

Table 1

Conversion
Total Cost
Cost in Rs
Rs lakhs
lakhs
f=axe

g=c+f

209.79
39.42
3.46

862.84
129.65
10.18

75.74
66.42
0.43
168.75
81.00
1.51

311.49
218.45
1.27
694.05
333.14
8.00

77.54

262.43

108.00
806.40
270.00
86.40

284.34
2098.43
710.84
224.83

210.60
36.00
395.28
45.00

783.69
128.29
1470.93
160.36

0.9

Table 1

Conversion
Total Cost
Cost in Rs
Rs lakhs
lakhs
f=axe

g=c+f

63.18
34.02
9.72
4.05
9.72
181.44
22.68
16.20
168.48

235.11
126.60
36.17
15.07
36.17
675.18
76.76
40.92
626.95

17.55
8.64

74.86
26.27

3217.42

10663.27

2493
647
78

7832
2569
262

Insulation - Consolidated Values of Weight Estimation For TANDA 2 x 660 MW


Total Weight

Sl.
No
1
2
3
4
5
6

Component
Description

Total
Surface
Area by
HPE
(m2)
11093
4034
4521
7563
6266
5853

weight of
wool
(including
wire
netting)
(kg)
267746
53250
59679
120190
171058
202820

20309

268079

2350

73024

Boiler
Duct From FD fan to Air Heater
Duct From PA fan to Air Heater
Secondary hot air duct
to wind box
Primary
air duct
afterduct
air heater
Gas
from
boiler to AH
Gas duct from AH to chimney
Assumed (Same as 800 MW)
Feed water pipe

Main steam pipe

2084

66980

10
11
12
13
14
15
16
17

Cold Reheat pipe

1909

26761

3475
13809
280
513
267
2000
500

160885
116277
3696
6772
3524
52800
5600

86827

1659141

Hot reheat pipe


Drain Vent and intermitttant flow
FD Fan
PA Fan
ID Fan
Air Pre Heater
Vessels & Tank
Net Total
Weight in Tons

1659

For TANDA 2 x 660 MW


Total Weight
Weight of
Weight
Fixing
of
Componen
Aluminium
ts
(kg)
(kg)
48811
16640
10005
6051
11212
6782
18756
11345
15539
9399
14516
8780
50366

30464

10016

3525

6825

3126

7095

2864

13615
37654
694
1272
662
4960
2200

5212
20713
420
770
401
3000
750

254200

130240

254

130

660 MW Shop Labour Hours


Phase 1

Wall panel
Wall Panel
Roof
Walls

MT/Blr
169
134
34
96

Headers

HPE
Indication in Shop Production
Hours
Hours
16842
33684
11742
23484
3205
6410
8426
16852

Sub total

DL Cost
@160
Rs/Hr

80430

128.69

97

6801

13602

13602

21.76

Connectors
SH
RH
Economizer

293
104
750
1374

11856
11765
17966
32927

23712
23530
35932
65854

149028

238.44

Boiler suspension
Boiler accessories
Piping
Start up piping
Drains
Vents
Spray water piping
SB piping

192
183
254
135
50
6
10
53
3934

9093
14658
7686
4430
3150
286
661
1830
163324

243060

243060

388.90

160
496
185
535
212
1588

19144
49977
15885
29045
6405
120456

38288
99954
31770
58090
12810
240912

138242
31770

221.19
50.83

70900
240912

113.44
385.46

Phase 2
Hopper wall
Spiral wall
Headers
SH
RH

NO
Sr Artisan
Artisan
Jr Artisan

Cr/Year
61
183
367

3.36720
7.49202
10.97330

611

21.83252
357324
160

Per Hour rate

Hours per Year


No of days
Sundays
Holidays
Leave
No of effective days
Hours/year/Artisan
@8hrs/day

365
52
10
24
279
2232

Cost of welding consumables with 10% wastage

Kg
14781
6445
2194
4689

Cost Rate of
WM Rs/Kg
180
180
180
180

Cost in Rs
lakhs/Blr
29.27
12.76
4.34
9.28

Headers

2312

180

4.58

4.58

Connectors
SH
RH
Economizer

308
168
2830
4659

180
240
240
180

0.61
0.44
7.47
9.22

17.75

Phase 1
Wall panel
Wall Panel
Roof
Walls

Boiler suspension
Boiler accessories
Piping
Start up piping
Drains
Vents
Spray water piping
SB piping
Phase 2
Hopper wall
Spiral wall
Headers
SH
RH
Total

1586
674
255
30
59
269
41259
4088
36549
6668
3497
436
51238

Sub total

55.66

77.98
180
180
200
300
300

8.09
72.37
14.67
11.54
1.44

80.46
14.67
12.98
108.11

Indirect labour Cost


Total work force /CTC Table
Category
President
HOD
GM
SM
SE
Supervisor
Sr Artisan
Artisan
Jr Artisan
Total per Year

Total

Production
1
7
28
112
134
211
61
183
367
1104

3
10
40
64
161
61
183
367
889
81%

Others

Rs Cr/Year
1.15
5.796
15.456
33.488
21.574
24.265

248
552
1196
1030
1852

115
331
994
2153
1127
575

215
19%

101.729

4878

5295

976

1059

Cost of packing

169
134
34
96

Rs lakhs
12.31
9.76
2.48
6.99

97

7.06

7.06

Connectors
SH
RH
Economizer

293
104
750
1308

21.34
7.57
54.63
95.27

178.81

Boiler suspension
Boiler accessories
Piping
Start up piping
Drains
Vents
Spray water piping
SB piping

192
183
254
135
50
6
10
53
3868

217.41

217.41

160
496
185
535
212
1588

11.65
36.13
13.47
38.97
15.44
115.66

Headers

Phase 2
Hopper wall
Spiral wall
Headers
SH
RH

MT

333.07

Crate weight
2 MT
Crate construction c
12000 Rs/MT
Material cost
45000 Rs/MT
Cost of one crate
1.140 Rs lakhs
Other packing mater
15%
Cost of one crate
1.311 Rs lakhs
Weight of finished
18 MT
Cost of packing per MT
of goods
0.073 Rs Lakhs/MT

Rs lakhs
Others

1
4
18
72
70
50

Total per Boiler

Phase 1
Wall panel
Wall Panel
Roof
Walls

Prodn

Sub total

31.54

47.78
13.47
54.41
115.66

Cost of Power , water and Gas Consumption cost working for one boiler
Cost of Power working
Base Cost

350 Rs/KVA
6000 KVA
2100000 Rs/Month

Fixed Cost
Variable cost
Hour per day
90% of load
factor
Units per day
Days per Month
Power Tarriff
Power cost

16
5400
70%
60480
25
3.5
5292000 Rs/Month

Total power cost per month


7392000 Rs /Month
Power cost per boiler
177

Rs lakhs/Boiler

73.92 Lakhs x 12 months/5 Boilers

Cost of Water working


10% of Power cost

17.74 Rs lakhs/Boiler

Cost of Gas used for one boiler shop production

Oxygen
LP Gas (heating)
Argon
Total
Total PWG

CBM/MT
1250
1250
1250

514

Rs/CBM
20
52
43

Rs/CBM
25
65
53

Rs/MT
31250
81250
66250

MT/Month
20
40
16

RS/Month
625000
3250000
1060000

Rs Lakhs/Yr
125
1300
170

RsLakhs/Blr
25
260
34
319

Option 3 - ( BGR Shop Loading with projected Expenses )


FG&D
PFPipe
Struct
Weight in MT
4186
359
11900
Material Cost
1923
185
5338
Direct Labour Cost
Welding Consumables
Packing Cost
Power water & gas
Sub contracting-Others
647
78
2493
OH
7%
Total Cost
2569
262
7832
Margin
0%
0
0
0
Price
2569
262
7832

Coils
Headers
2475
98
2553
86
238
22
18
5
179
7
158
14
179
3325
0
3325

6
140
0
140

Walls
Others
446
1447
568
1853
129
56
32
85
918
40
130
909
2901
0
0
909
2901

Coils
Headers
693
185
2528
627
113
51
13
15
54
13
75
34
177
2961
0
2961

44
783
0
783

Walls
Others
604
86
680
64
221
80
48
147
17
48
4
1224
86
0
0
1224
86

BOI
Common
7053
10541
980

10541
0
10541

980
0
980

Total
29531
27925
774
186
333
514
4153
627
34513
0
34513

NTPC -11x660 MW Bulk Tender

Weight
in MT
Non Pressure Parts
Flues and Ducts
Coal feed system
Structural steel
Sub Total

Value
in Rs Lakhs

Cost of Material
Value
Rs/MT
in Mill Euro

Euro/MT

Conversion
Value
Value
Rs/MT
in Rs Lakhs in Mill Euro

Total
Euro/MT

Value
in Rs Lakhs

4186
359
11900
16445

1923
185
5338
7446

2.881
0.277
7.999
11.157

45928
51500
44861
45277

688
772
672
678

647
78
2493
3217

0.969
0.116
3.736
4.821

15445
21600
20953
19565

231
324
314
293

2569
262
7832
10663

Pressure Parts (Local)


Coils
Headers
Walls
Others
Sub total

2475
98
446
1447
4466

2553
86
568
1853
5060

3.826
0.129
0.851
2.776
7.582

103177
88175
127258
128016
113302

1546
1321
1907
1918
1698

772
54
341
1048
2215

1.157
0.081
0.511
1.570
3.319

31195
55001
76432
72427
49598

467
824
1145
1085
743

3325
140
909
2901
7275

Pressure Parts (HPE)


Coils
Headers
Walls
Others
Sub total

693
185
604
86
1567

2528
627
680
64
3899

3.788
0.939
1.018
0.096
5.842

364880
339447
112543
74998
248799

5467
5086
1686
1124
3728

433
157
544
22
1155

0.649
0.235
0.815
0.032
1.731

62507
84818
90040
25229
73713

937
1271
1349
378
1104

2961
783
1224
86
5054

Bought out Items


Circulating Pump
Valves
Soot Blowers
SCAPH
APH
Fans with Motors
Damper & Gates
Fuel Feeder system

10
354
120
20
1884
223
875
56

192
1210
459
99
2834
1910
899
540

Mill Motors
Coal conduits
Platform steel
Insulation etc
Maintenance hoist

80
198
1280
1953
0

170
509
772
744
201

Sub total

7053

10541

29531

33535

TOTAL
Services
Common items
Spares
G .TOTAL

980

29531

34515

EX Rate

66.74

Total Cost
Value
Rs/MT
in Mill Euro

Euro/MT

3.849
0.393
11.735
15.977

61373
73100
65813
64842

920
1095
986
972

4.983
0.210
1.362
4.346
10.901

134372
143176
203690
200442
162900

2013
2145
3052
3003
2441

4.437
1.174
1.833
0.128
7.572

427388
424265
202583
100227
322512

6404
6357
3035
1502
4832

0.288
1.813
0.688
0.149
4.247
2.862
1.347
0.809

0.255
0.763
1.157
1.115
0.301
15.793
40.374

1.468

41.842

PAC
Applicable for Unit 1 &2
Import Items
Circulating Pump
Safety Valve
HP valves
APH Primary
APH Secondary

Domestic Items ( INR )


Safety Valve &ERVSilencers
General Valves Domestic
Condensate tank
Sootblowers / Wallblowers
Supports + silenser supports
Primary Steam Coil Air Pre-Heater
Secondary Steam Coil Air Pre-Heater
Pry APH
Scy APH
Primary Air (PA) Fans, including:
- Electric Motor Drives
- Inlet Silencers
Secondary Air Fans (SA), including: FD Fan
- Electric Motor Drives
- Inlet Silencers
Induced Draft Fans (ID), including:
- Electric Motor Drives
Seal Air Fans, including:HTM etc
Expansion Joints
Dampers and Gates
Fuel Feeders system from BB to Mill top
Mill electric motor drives (8)
Coal Conduits -Hangers
gate valve Electric (64 Nos)
CoalConduits-Expansion Joints
Coal Conduits -Ceramic Bends
Platform Steel - Floor GrillSheeting Work of
Fasteners ,Hangers & Castable
HSFG Bolt

Al sheet
Lagging + Fan Insulation
Maintenance hoists

PAC
Applicable for Unit 1 &2
Import Items
Circulating Pump
Valves
APH
P Parts Tubes

Domestic Items ( INR )


Fans
E joints
Mill Motor
Feeders
SAFans
APH
Soot Blowers
C Bends etc
P Parts (tubes)

Common for 2
Aux Boiler

In Rs Lakhs/Blr
192
267
409
662
779

In Rs Lakhs/Blr
141
333
60
442
17
18
82
511
882
381
71
20
441
76
20
721
160
20
197
702
540
170
51
109
47
303
550
53
119
51

Cry Likely
UKP,Yen,Euro
US $,Euro
US $,Euro
US $,Euro
US $,Euro

373
371
201

M Spares
In Rs Lakhs/Blr
282
326
463
89

Cry Likely
UKP,Yen,Euro
US $,Euro
US $,Euro
$,Euro

In Rs Lakhs/Blr
1130
276
28
44
21
468
85
165
375
Common for 2 Boilers
122

PAC
Applicable for Unit 1 &2
Imported Raw Materials
T91
T22
T12
106
P91
P11/22
SA 105 Rods
Coiled flats
387 Gr 12 Plates
Forgings etc
Domestic Raw Materials
210 Gr C
SS 304 pl
CS Plate
Applicable for Unit 2
Imported Raw Materials
T91
T22
Super 304 H
P91
Others

Imports
SD
RM
Spares

MT/Blr

In Rs Lakhs/Blr

169
248
855
713
258
27
80
224
88
71

458
347
898
549
809
45
63
366
113
158

MT/Blr

In Rs Lakhs/Blr

1395
2
338

977
3
124

MT/Blr

In Rs Lakhs/Blr

407
89
216
146
49

1105
125
1323
563
57

2310
3806
1160

2310
6978

16564

66.93
24748351
Million Euro
25

Cry Likely
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US

$
$
$
$
$
$
$
$
$
$

Cry Likely

Cry Likely
Euro,US
Euro,US
Euro,US
Euro,US
Euro,US

$
$
$
$
$

4620
10784
1160

NTPC 6 x 660 MW

Contract 1

Contract 2

Contract 3

G total

CIF
CIF M Spares
CIF Type test'
Ex works
M spares
Type Test'

Local TPT
Local TPT for MS
Installation

53098500
5840000
91500
59030000
38760000

Euro
Euro
Euro
Euro
Euro

8292600000
611500000
7200000
38760000 Euro 8911300000

INR
INR
INR
INR

39509
108868
6115
72
115055

764362000
53138000
12000000 Euro
1483100000
12000000 Euro 2300600000

INR
INR
INR
INR

7644
531
22863
31038

15519

21%
59%
3%
0%
62%
0%
4%
0%
12%
17%

1.121E+010 INR
1
112119

185601

92801

100%

185601

92801

109790000 Euro
66.93
73482

19754

57528

Budget
NPP
Flues and Ducts
Air Ducts
Hangers
Door
Gas Flues
- boiler to airheater
Hangers
Door
- airheater to dust collector-BGR
- dust collector to stack-BGR
Seal Air Ducts / Piping
Coal Feed System
Coal Conduits (PF-pipe760 IDx12.7)
Mill Steam Inerting System
Structural Steel
Boiler Structural and Support Steel E250
Boiler Structural and Support Steel E350
Boiler Structural and Support Steel E250
Boiler Structural and Support Steel E350
Bunker Structural E250
Bunker Structural E350
Tippler floor E250
Tippler floor E350
Roof structure E 250
Roof sytructure E 350
Boiler House Str E 250
Boiler House Str E 350
Lift structure E 250
Railing and ladder E 250
Cheq Plate E 250
Stairs
Monorails
Buckstays E 250
Buckstays 10 Cr Mo 910
Anchorages
Structurals+handling support+ Drainage
Fixing Components & Inner Casing
Garbage Chutes 500x10-125 mtr
PP
Vertical wall
Fins22x6
Spl components-HPE
Pendulam+TB (4x148)
Vertical wall

MT

DMC

1554
73
16

653
90
7

561
123
2
1250
600
7

236
152
1
525
252
6

359

185

400
2800
1000
300

176
1292
441
138

1300
200
2440
250
390
210
60
25
60
1120
105
30
1040
130
40
16445

573
92
1076
115
172
93
26
11
26
494
54
25
458
57
18
7446

143
23
2
10
76

150
42
8
9
79

Fins 79x8
Spl components- HPE
Pendulam+TB(111+3x148)
IB Piping- >219
IB Piping <219
Reducers,Tee,fittings
Headers- pipe >219
Headers- tube
Headers- forgings
Headers- plates
Connectors
Connectors
Connectors
Connectors
SH Coil- tube
Forgings/spl components
Plates
Plates
RH Coil -tubes
RH Coil -tubes
RH Coil -tubes
RH Coil -tubes
Armour Plate
Plates
Economiser-tube
Economiser-tube
Economiser-plate
Economiser-tube
Economiser-plate SS
Access Doors
Uncooled roof
Uncooled roof fins 79x6
Pendulam+TB
Uncooled wall
Uncooled wall -fins etc
Pendulam + TB (370)
Uncooled wall -frame
Boiler suspensions
Boiler suspensions
Boiler Accessories
Conservation
System
Start up system Piping
Start up system Piping
Hangers,anchors
Plates
Drain & Vent piping
Drain & Vent piping
Drain & Vent piping

49
3
9
223
18
12
80
7
5
6
21
86
90
127
88
1
12
1
546
1
154
1
51
9
1201
0
100
58
2
0
17
16
1
51
36
7
5
112
80
183
0
126
1
9
5
10
18
23

90
12
8
176
13
29
63
10
11
3
58
121
94
89
239
8
34
1
573
4
216
3
71
11
841
0
149
157
3
0
12
29
3
35
65
18
7
41
63
67
0
89
4
13
7
13
71
20

Hangers,anchors
Spray water piping
Spray water piping
Spray water piping
Hangers,anchors
SB piping
SB piping
Hangers,anchors
Inst.. air/oil piping'
Inst.. air/oil piping' str
Start up system Piping
PP2
Hopper
coiled Fins 17 x 6
Forgings/spl components
Buck stay
Plates
Rods
Spiral wall
Fins16/17.8x6
Wall box
Pendulam+TB
Headers- pipe
Headers- tube
Headers- forgings
Headers- plates
SH Coil- tube
SH Coil- tube
SH Coil- tube
Plates
RH Coil -tubes
RH Coil -tubes
RH Coil -tubes
Armour Plate
Tube
BOI
Circulating Pump (1)
Safety Valves& ERV for SH/RH/Separator
Safety Valve &ERVSilencers
General Valves Imported+ control valves
General Valves Domestic
Condensate tank
Sootblowers / Wallblowers
Supports + silenser supports
Primary Steam Coil Air Pre-Heater
Secondary Steam Coil Air Pre-Heater

5
14
2
1
1
45
3
5
196
43
237
4466

7
26
8
1
1
51
5
7
137
16
866
5060

98
13
1
49
5
0
335
44
107
7
146
21
7
10
332
96
51
27
120
77
17
3
2
1567

103
24
3
26
3
0
352
80
112
6
576
30
16
5
901
588
71
31
734
209
24
3
2
3899

10
20
84
150
100
0
100
20
8
12

192
267
141
409
333
60
442
17
18
82

Pry APH
Scy APH
Primary Air (PA) Fans, including:
- Electric Motor Drives
- Inlet Silencers
Secondary Air Fans (SA), including: FD Fan
- Electric Motor Drives
- Inlet Silencers
Induced Draft Fans (ID), including:
- Electric Motor Drives
Seal Air Fans, including:HTM etc
Expansion Joints
Dampers and Gates
Fuel Feeders system from BB to Mill top
Mill electric motor drives (8)
Coal Conduits -Hangers
gate valve Electric (64 Nos)
CoalConduits-Expansion Joints
Coal Conduits -Ceramic Bends
Platform Steel - Floor GrillSheeting Work of
Fasteners ,Hangers & Castable
HSFG Bolt
Al sheet
Lagging + Fan Insulation
Maintenance hoists

718
1166
21
20
6
21
20
6
104
20
5
308
567
56
80
18
22
8
150
1080
0
200
0
274
1679
0
7053

1173
1661
381
71
20
441
76
20
721
160
20
197
702
540
170
51
109
47
303
550
53
119
51
373
371
201
10541
980

29531

26945

Common for contract


Total

Conv
210
39
3
76
66
0
169
81
2
78

108
806
270
86

211
36
395
45
63
34
10
4
10
181
23
16
168
18
9
3217
0
0
0
0
0

0
0
0
241
20
32
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
7
1
0
0
0
0
0
0
0
0
0
0
0
0
0
12
32
20
0
91
1
1
1
7
15
12

3
10
2
1
1
24
1
4
53
5
320
918
0
0
0
12
0
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
17

4153

Basis

L2 Network
L2 Network & Invoice value
L2 Network
L2 Network- qty x rate
L2 Network qty x rate

Master Budget ( Balance sheet)


Cash Budget
Cash Collection
Outstanding budget
Income Budget
Inventory Budget
Raw Material
Transit
Finished Goods
WIP
Sales Budget- Qty in Mt or No
Sales Budget- value
Production Budget-Qty
Material Budget
Out sourcing cost Budget
Power Budget

Direct Labour Budget

Over head budget

Admin S&D - Budget

Organize

Allocate

ReviewResponsibilit
y accounting

corrective
action /
Control

All Values are in Rs lakhs


Index #
1.0

WORK DESCRIPTION

Supply Unit 1

DMC

DMC

DMC

CC

Steam Generator

1,2,1

Convection Pass Wall Panels (Vertical Tube / T = 60


mm)

JV Boiler

208

1,2,2

Convection Pass Wall Panels (Vertical Tube / T =


120 mm)

JV Boiler

190

Start-Up System (Recirculation Pump)

JV Boiler

1,6,1,1

Internal Boiler Piping

JV Boiler

218

293

1,6.1,2

Headers

JV Boiler

86

1,6,1,3

Connectors

JV Boiler

362

1,6,2,1

Internal Boiler Piping

JV Boiler

866

320

1.7

Superheater Coils with supports / attachments


(ferritic/T91) without connectors

JV Boiler

282

1.9

Reheater Coils with supports / attachments


(ferritic/T91) without connectors

JV Boiler

878

1.11

Economizer Coils with supports / attachments

JV Boiler

1130

1.12

Hanger tubes

HPE/JV Boiler

Included above

Included above

1.14

Access/Observation Doors

JV Boiler

20

21

1.15

Wall Openings/Penetrations/Seals

HPE/JV Boiler

included above

included above

1.4

192

1,16,1

Uncooled roof

JV Boiler

44

1,16,2

Uncooled front wall, side walls, rear wall

JV Boiler

126

1,16,3

Boiler suspensions

JV Boiler

104

45

1.18

Boiler Accessories ( Buckstay


drumming Plates, dust brakes etc.)

JV Boiler

67

20

Corners,

anti-

1.21

Conservation System
(Headers, Pipework)

included in piping

JV Boiler

2.0

Boiler Mountings & Valves


(To check with PID's !!)

2.1

Feed water Check Valves

JV Boiler

2.2

Feedwater Regulating (Start-up By-pass valves)

JV Boiler

2.3

Main Steam Stop / Non-Return Valve

JV Boiler

2.4

Reheat Isolation Devices

JV Boiler

JV Boiler

JV Boiler

2.5

2,6,1

Valves Boiler Start-Up System (Recirculation Lines,


Discharge Pipes, Pipes upstream / downstream
Boiler Drain Condensate Tank)
Drain and Vent Valves
(Economiser, Evaporator, Recirculation System,
SH, RH)

2.9

SH and RH Spray Attemperator Regulating and


Isolation Valves

JV Boiler

2.10

Safety Valves for SH/RH/Separator

JV Boiler

2.11

Safety Valve Silencers, Start-up Vent Silencers

JV Boiler

2.12

Electrometric Relief Valves with Controller for SH/RH

JV Boiler

2.13

Electrometric Relief Valves Silencer for SH/RH

JV Boiler

2.14

Steam & Water Sample Shutoff Valves

JV Boiler

2.17

Nitrogen Blanket Valves

JV Boiler

2.18

Instrument Shutoff Valves

JV Boiler

2.19

Valves Auxiliary Steam System


(F.O. heating, tracing, atomizing steam, SCAPH,
inerting system mills, etc.)

JV Boiler/ BGR E

2.20

Valves Piping Condensate

JV Boiler/ BGR E

2.21

Valves for Soot Blowing System

JV Boiler

2.22

Steam Coil Valving

JV Boiler

1210

2.23

Steam Coil Air Heater Condensate Tanks

JV Boiler

2.24

Valves Closed Cooling Water System

JV Boiler/ BGR E

2.25

Valves Service Water System

JV Boiler/ BGR E

2.26

Valves Boiler Fill Water System

JV Boiler/ BGR E

2.27

Valves Air-Pre-Heater Wash Water System

JV Boiler/ BGR E

2.28

Valves Fire Water Supply for Fire Protection System


of Air Pre-Heaters and Coal Mills

JV Boiler/ BGR E

2,29,1

Valves Service Air System

JV Boiler/ BGR E

2,29,2

Valves Instrument Air System

JV Boiler/ BGR E

JV Boiler

JV Boiler

3.0

Valves Conservation System


Any other Valves, not mentioned specially but
needed to complete the System, with Drives,
wherever required e.g. Valves in the hot Standby
Pipework
Sootblower System
H

3.1

Sootblowers / Wallblowers

JV Boiler

3.2

Pressure Reducing Station

JV Boiler

Included in Valves above

3.3

Main and Branch Piping

JV Boiler

56

3.4

Valves, Steam Traps, Fittings

JV Boiler

Included in Valves above

3.5

Supports

JV Boiler

Included in Structurals

2.34
2.35

459

3.6

Control Logic

JV Boiler

NA

NA

NA

3.7

Control Hardware

JV Boiler

NA

NA

NA

3.8

Control Panel Insert

JV Boiler

NA

NA

NA

4.0

Airheater

4.1

Primary Steam Coil Air Pre-Heater

JV Boiler

4.2

Secondary Steam Coil Air Pre-Heater

JV Boiler

4.3

Primary Regenerative Air Pre-Heater

JV Boiler

4.4

Secondary Regenerative Air Pre-Heater

JV Boiler

5.0

Major Fans

5.1

Primary Air (PA) Fans, including:

JV Boiler

401

5.1.1

- Electric Motor Drives

JV Boiler

71

5.1.2

- Inlet Vanes/Damper & Actuator

JV Boiler

Refer damper list

5.1.3

- Outlet Dampers & Actuator

JV Boiler

Refer damper list

5.1.4

- Inlet Silencers

JV Boiler

Included above

5.1.5

- Shaft Couplings w/Guard

JV Boiler

Included above

5.1.6

- Sole Plates

JV Boiler

Included above

5.1.7

- Forced Lubrication Bearings

JV Boiler

Included above

5.1.8

- Water/Oil Heat Exchanger

JV Boiler

Included above

5.1.9

- Tests/Dynamic Balancing

JV Boiler

Included above

Forced Draft Fans (FD), including:

JV Boiler

461

- Electric Motor Drives

JV Boiler

76

5.2
5,2,1

2934

5,2,2

- Inlet Silencers

JV Boiler

Included above

5,2,3

- Shaft Couplings w/Guard

JV Boiler

Included above

5,2,4

- Sole Plates

JV Boiler

Included above

5,2,5

- Forced Lubrication Bearings

JV Boiler

Included above

5,2,6

- Water/Oil Heat Exchanger

JV Boiler

Included above

5,2,7

- Tests/Dynamic Balancing

JV Boiler

Included above

Induced Draft Fans (ID), including:

JV Boiler

721

5,3,1

- Electric Motor Drives

JV Boiler

160

5,3,2

- Shaft Couplings w/Guard

JV Boiler

Included above

5,3,3

- Sole Plates

JV Boiler

Included above

5,3,4

- Forced Lubrication Bearings

JV Boiler

Included above

5,3,5

- Water/Oil Heat Exchanger

JV Boiler

Included above

5,3,6

- Tests/Dynamic Balancing

JV Boiler

Included above

5.4

Seal Air Fans, including:

JV Boiler

20

5,4,1

- Electric Motor Drives

JV Boiler

Included above

5,4,2

- Inlet Vanes/Damper & Actuator

JV Boiler

Included above

5,4,3

- Outlet Dampers & Actuator

JV Boiler

Included above

5,4,4

- Shaft Couplings w/Guard

JV Boiler

Included above

5,4,5

- Sole Plates

JV Boiler

Included above

5,4,6

- Seal Air Piping

JV Boiler

6.0

Flues and Ducts

5.3

Included in 6.1

6.1

Air Ducts

JV Boiler

1923

6.2

Air Flow Elements

JV Boiler

Included above

6.3

Gas Flues

JV Boiler

Included above

6,3,1

- boiler to airheater

JV Boiler

Included above

6,3,2

- airheater to dust collector

JV Boiler

Included above

6,3,3

- dust collector to stack

JV Boiler

Included above

6.4

Access Doors

JV Boiler

Included above

6.5

Expansion Joints

JV Boiler

6.6

Airheater Fly Ash Hoppers

JV Boiler

6.7

Dampers and Gates

JV Boiler

6.8

Seal Air Ducts / Piping

JV Boiler

Included above

6.9

Support steel ducts

JV Boiler

Included above

7.0

Burner Systems

7,9,1

Instrument air, condensate, slop oil, steam trace


heating

JV Boiler/ BGR E

7,9,2

HFO. LDO

JV Boiler/ BGR E

7,9,3

Cooling air

JV Boiler

7,9,4

Atomizing steam, atomizing air

JV Boiler

647

197
Included above
702

8.0

Coal Feed System

8.4

Bunker Discharge Valves

JV Boiler

Included in 8.6 below

8.5

Flow Monitors / Belt weighter

JV Boiler

Included in 8.6 below

8.6

Fuel Feeders

JV Boiler

540

8.7

Transition Chute upstream/downstream Feeder

JV Boiler

Included above

8.8

Coal Bunker Evacuation Chutes


(Permanent Chutes Feeder Floor to Ground and
temporary Chutes (2) Bunker Downspout
Permanent Chutes)

JV Boiler

Included above

8.9

Remote operated Shut Off Gate

JV Boiler

Included above

- electric motor drives

JV Boiler

170

8.11

Coal Conduits (PF-pipes with Supports and Ceramic


Bends)

JV Boiler

8.12

Coal Conduits (Gate Valves, Dampers, 3-Way


Dampers, Expansion Joints and special Parts)

JV Boiler

8.14

Mill Steam Inerting System

JV Boiler

15.0

Piping Systems

15.5

Piping Boiler Start-up System (Recirculation Lines,


Discharge Pipes, Pipes upstream / downstream
Boiler Drain Condensate Tank)

JV Boiler

15,10,1

Drains Piping
(Economiser, Evaporator, Recirculation System,
SH, RH)

JV Boiler

Instrument Piping

JV Boiler

JV Boiler/ BGR E

JV Boiler/ BGR E

JV Boiler/ BGR E

JV Boiler

8,10,1

15.12

15,14,1

15,14,2

15.15

to

Piping Condensate
Piping after Condensate pumps to Water
treatment plant & Condenser
Piping Auxiliary Steam System
(Complete piping incl. F.O. heating, tracing,
atomizing steam, SCAPH, inerting system mills
etc.). Also steam piping from Auxiliary Boiler to Main
Boiler.

185

303
156

40

15.17

Seal Air Piping

15.18

Service Air Piping

JV Boiler/ BGR E

15.19

Instrument Air Piping

JV Boiler/ BGR E

51

78

15.20

Spray Water Piping for SH and RH

JV Boiler

15.24

Interconnecting Instrument Tubing

JV Boiler/ BGR E

15.25

Equipment Cooling Water System (ECW)


Piping Cooling Water System incl. Accessories,
incl. its Chemical Dosing System for Primary Circuit

JV Boiler/ BGR E

15.26

Piping Service Water System incl. Accessories

JV Boiler/ BGR E

15.27

Piping Boiler Fill Water System incl. Accessories

JV Boiler/ BGR E

15.28

Piping Air-Preheater Wash Water System incl.


Accessories

JV Boiler/ BGR E

15.29

Piping Fire Water Supply for Fire Protection System


of Air Pre-Heaters and Coal Mills incl. Accessories

JV Boiler/ BGR E

15.34

Weather Hoods for Pipes crossing Ceilings and


Walls

JV Boiler

15.35

Special Accessories like Floor Stands etc.

JV Boiler

15.37

Boiler Flash Tank incl. Vent Piping with Silencer,


Condensate Tank and Condensate Pump

JV Boiler

15.38

SCAPH Condensate Tank and Condensate Pump

JV Boiler

15.39

Tanks as described elsewere in the specification for


the above systems

JV Boiler

16.0

Instrumentation and Controls

16.1

Plant DCS / DAS (DDCMIS)

16.2

Combustion Controls

16.3

Burner Management
(BMS/FSS)

16.4

421

211

JV Boiler

NA

NA

JV Boiler

NA

NA

JV Boiler

NA

NA

Safety Interlocks

JV Boiler

NA

NA

16.5

Accoustic Steam Leak Detection System

JV Boiler

NA

NA

16.7

Airheater

JV Boiler

NA

NA

Fuel

Safety

System

16.9

Metal Thermocouples

JV Boiler

NA

NA

16.10

Ash Hopper Level Switches

JV Boiler

NA

NA

16.11

Process Thermocouples

JV Boiler

NA

NA

16.13

Metal Thermocouple Junction Boxes

JV Boiler

NA

NA

16.14

Retractable Furnace Temperature Probes

JV Boiler

NA

NA

16.18

Air Flow Elements

JV Boiler

NA

NA

16.19

Transmitters/Switches

JV Boiler

NA

NA

16.20

Interconnecting Wiring with DCS/Tubing/Hook-up


materials

JV Boiler

NA

NA

16.21

O2 Analyzers @ economizer outlet and AH gas


outlet

JV Boiler

NA

NA

16.22

CO Analyzers

JV Boiler

NA

NA

16.23

CEMs (SOx, NOx, CO, CO2, O2)

JV Boiler

NA

NA

16.24

Water/Steam Sampling Station

JV Boiler

NA

NA

16.25

Damper & Valves Actuators (electrical & pneumatic)

JV Boiler

NA

NA

16.28

Accoustic pyometer temperature device

JV Boiler

NA

NA

16.29

Flame Cameras

JV Boiler

NA

NA

16.30

PADO

JV Boiler

NA

NA

16.31

Provision of Creep Measurement on the Piping


Operating in Creep Region (viz. Main Steam, Hot
Reheat)

JV Boiler

NA

NA

16.32

Rota Probe Type Coal Sampling System

JV Boiler

NA

NA

16.33

Dirty Pitot Tube

JV Boiler

NA

NA

16.34

On Line Fuel Measurement Facility

JV Boiler

NA

NA

16.35

Adjustable Valve / Orifice

JV Boiler

NA

NA

16.36

Intrascope

JV Boiler

16.38

Furnace Draft Control

JV Boiler

NA

NA

16.39

Secondary Air Pressure FD Fan Control

JV Boiler

NA

NA

16.40

Primary Air Pressure - PA Fan

JV Boiler

NA

NA

16.41

Fuel Demand

JV Boiler

NA

NA

16.42

Coal Flow Control

JV Boiler

NA

NA

16.43

Mill Counter Pressure Control

JV Boiler

NA

NA

16.44

Mill Roller Pressure Control

JV Boiler

NA

NA

16.45

PA Flow Control

JV Boiler

NA

NA

16.46

PA Temperature Control

JV Boiler

NA

NA

16.47

Oil Pressure Control after Pump

JV Boiler

NA

NA

16.48

Atomising Steam Pressure and Temperature


Control

JV Boiler

NA

NA

16.49

Atomising Air Pressure Control

JV Boiler

NA

NA

16.50

Retractable Furnace Temperature Control

JV Boiler

NA

NA

16.51

Discharge Valve Control

JV Boiler

NA

NA

16.52

SH1, SH2, SH3 Drain Control

JV Boiler

NA

NA

16.53

RH1, RH2 Drain Control

JV Boiler

NA

NA

16.54

Super Heater 1 & 2 Temperature Control

JV Boiler

NA

NA

16.55

Reheater Temperature Control

JV Boiler

NA

NA

16.56

Feed Water Flow Control

JV Boiler

NA

NA

16.57

NPSH Injection Flow Control

JV Boiler

NA

NA

16.58

Auxiliary Boiler Control

JV Boiler

NA

NA

16.59

SG-DDCMIS

JV Boiler

NA

NA

16.60

Secondary Air Distrubution Control

JV Boiler

NA

NA

16.61

SCAPH Drain Level Control

JV Boiler

NA

NA

16.62

Fuel Oil Pumping and Heating Unit Control

JV Boiler

NA

NA

16.64

Mill Fire Control

JV Boiler

NA

NA

16.65

Mill Fire Detection System

JV Boiler

NA

NA

16.66

Mill Luboil System Control

JV Boiler

NA

NA

16.67

Flame Monitoring System & Flame Detection

JV Boiler

NA

NA

16.68

Coal Feeder Controls

JV Boiler

NA

NA

16.69

Electromatic Safety Valve Control

JV Boiler

NA

NA

16.70

Level Switching
(Conductivity)

JV Boiler

NA

NA

16.71

Air Heater Fire Detection System (temp. Elem.)

JV Boiler

NA

NA

16.72

Electrical Drives
Actuators

JV Boiler

NA

NA

17.0

Structural Steel

17.1

Foundations

JV Boiler

NA

NA

NA

NA

17.2

Concrete Floor Slabs

JV Boiler

NA

NA

NA

NA

17.3

Base Plates

JV Boiler

17.4

Anchor Bolts

JV Boiler

17.6

Boiler Structural and Support Steel

JV Boiler

17.7

Boiler Top Grid Steel

JV Boiler

System

HAT

for

Motors,

Drip

LT

Legs

Motors,

17.8

Boiler Area Platforms, handrails, etc.

JV Boiler

17.11

Conduit & Cable Trays Support Steel

JV Boiler

17.12

Monorails

JV Boiler

17.13

Elevator Framing, Machine Room incl. Structural


Steel Beams, Roof and Wall Beams etc.

JV Boiler

17.14

Buckstays

JV Boiler

17,15,1

a) Boiler Hangers

JV Boiler

17,15,2

b) Flue / Duct Hangers

JV Boiler

17.18

Platform Steel

JV Boiler

17.19

Checker Plate

JV Boiler

17.20

Handrail/Toeplate

JV Boiler

17.21

Stairtreads

JV Boiler

17.22

Caged Ladder

JV Boiler

17.23

Purlins & Girts

JV Boiler

17.24

Archetectural siding

JV Boiler

17.25

Doors, Windows & Ventilators,


glazing with polycarbonate Sheets

JV Boiler

17.26

Roof & Floor Drainage of SG supporting Structure,


Mill Bunker Building and TPs

JV Boiler/
BGR E

18.0

Electrical

18.1

Electric Motors

JV Boiler

NA

NA

18.2

Motor Control Centers

JV Boiler

NA

NA

Electric Motor Starters (non-integral)

JV Boiler

NA

NA

Wires / Cables

JV Boiler

NA

NA

18,2,1
18.3

5298

772

2493

18,3,1

Power

JV Boiler

NA

NA

18,3,2

Instrumentation and Controls

JV Boiler

NA

NA

18.4

Conduit & Cable Trays

JV Boiler

NA

NA

18.5

Lighting

JV Boiler

NA

NA

18.6

Grounding Systems

JV Boiler

NA

NA

18.7

Communications System

JV Boiler

NA

NA

18.8

LJB (Local Junction Box Including Cable)

JV Boiler

NA

NA

19.0

Miscellaneous

19.2

Insulation incl. metal sheeting

JV Boiler

19.3

Lagging

JV Boiler

19.4

Refractory

JV Boiler

19.9

Maintenance hoists

JV Boiler

19.11

One set of quick Erect Scaffolding erectable inside of


the Steam Generator

JV Boiler

19.13

Instrument for Tube Thickness Measurement

JV Boiler

19.14

Ultrasonic Thickness Gauges suitable for


Measurement of the Pressure Part Tube / Pipe
Thickness

JV Boiler

19.15

One Coal Abrasion Test Apparatus along with all


necessary Accessorries

JV Boiler

19.16

On Line Carbon in Ash Analyser with all Accessories

JV Boiler

19.17

Power Operated Sky Climber (Inspection Cradle)

JV Boiler

19.18

Garbage Chutes (from various levels to grade)

JV Boiler

19.20

Heat Tracing

JV Boiler/ BGR E

744

201

Included in Structurals above

JV Boiler

19.21

Pulverized Coal Sampling Device

19.22

Airheater Water Wash System

19.43

Performance Test Report

JV Boiler

19.44

Equipment / Systems for 3-D Model,


incl. Software and Hardware, incl. Licenses,
incl. Upgrades, incl. Server, Printer, Plotter etc.

JV Boiler

19.45

Pneumatic Emergency Retract Drives

JV Boiler

19.48

Economiser replacement / handling system

JV Boiler

22.0

Auxilliary Boiler

JV Boiler

JV Boiler/ BGR E

TOTAL

5060

7446

10541

4136

5060

7446

10541

4136

Shop conversion cost


Total of the above
Common items per Boiler
Total excluding M Spares

1297
27183
980
29460

Common items for contract of 2 Boilers value in Rs lakhs


16.36

Intrascope

JV Boiler

10

19.11

One set of quick Erect Scaffolding erectable inside of


the Steam Generator

JV Boiler

523

19.13

Instrument for Tube Thickness Measurement

JV Boiler

Included in C&I Package

19.14

Ultrasonic Thickness Gauges suitable for


Measurement of the Pressure Part Tube / Pipe
Thickness

JV Boiler

Included in C&I Package

19.15

One Coal Abrasion Test Apparatus along with all


necessary Accessorries

JV Boiler

Included in C&I Package

19.16

On Line Carbon in Ash Analyser with all Accessories

JV Boiler

19.17

Power Operated Sky Climber (Inspection Cradle)

JV Boiler

114

22.0

Auxilliary Boiler

JV Boiler

1308

REMARK

JV Boiler to provide the workshop and erection drawings for piping and supports, including supports for spring hangers and including the
support steel (secondary structural steel). HPE to provide technical specification of spring and constant hangers for purchase purpose.

JV Boiler to provide the workshop and erection drawings for piping and supports, including supports for spring hangers and including the
support steel (secondary structural steel). HPE to provide technical specification of spring and constant hangers for purchase purpose.

SH1

RH1

For respective scope

For respective scope.


Included in index 1,1 and 1,2.

Scope includes common manifold and piping between the manifold and the stub on header.

Start-up flow and pressure to be defined by HPE


Not applicable for NTPC
NRV not applicable.

Distribution net by JV Boiler.


Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Valves by BGR E / JV Boilers for the respective piping system.
Valves by BGR E / JV Boilers for the respective piping system.
See also index 3.2 & 3.4.

See interface drawing. Distribution net by JV Boiler.


Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Within boiler by JV Boiler and from boiler front by BGR E.
See interface drawing. Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Within boiler by JV Boiler and from boiler front by BGR E.
Valves by BGR E / JV Boilers for the respective piping system - Connection for DM water with an isolation valve near C row at about 4m
above GL (Ground Level) by BGR E - within boiler by JV Boiler.

Valves by BGR E / JV Boilers for the respective piping system - Connection for DM water with an isolation valve near C row at about 4m
above GL (Ground Level) by BGR E - within boiler by JV Boiler.

See interface drawing. Distribution net by JV Boiler.


Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Valves by BGR E / JV Boilers for the respective piping system - near D row column by BGR E - within boiler by JV Boiler.
See interface drawing. Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Valves by BGR E / JV Boilers for the respective piping system.
See interface drawing. Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Valves by BGR E / JV Boilers for the respective piping system.
See interface drawing.
See interface drawing.

See also index 2.21 Valves for Sootblowing System

See also index 2.21 Valves for Sootblowing System

Logics diagrams from similar plant as per MoM "I&C Clarification Meeting" between HPE and BGR dated 09.03.2010 (Doc. No.:
P2010-76-99-U003-00001)
HPE for logics only, controls in DCS by JV Boiler.
HPE for logics only, controls in DCS by JV Boiler.

Review for arrangement by HPE.


Review for arrangement by HPE.
Review for arrangement by HPE.
Review for arrangement by HPE.

Review for arrangement by HPE.


Special requirements (if any) will be provided by HPE.

Review for arrangement by HPE.


Special requirements (if any) will be provided by HPE.

Review for arrangement by HPE.


Special requirements (if any) will be provided by HPE.

See also index 16,18

ESP info by JV Boiler

Between boiler axis 0 (1OUHA) and chimney.

Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS). Within
boiler by JV Boilers - upto boiler front by BGR E as applicable.
From first column inside boiler house to burner racks - within boiler by JV Boilers - upto boiler front by BGR E.
TP: Cooling air fan (Cooling air fan arranged inside boiler house)
From steam/air control station to burners

Between RC Feeder and Coal Mill


included with pulverizer
Specification by HPE.

HPE interface: Nozzle at Mill

HPE to provide the workshop and erection drawings for piping and supports upstream of the terminal point (condensate pumps), including
supports for spring hangers and including the support steel for all systems (secondary structural steel). HPE to provide technical
specification of spring and constant hangers for purchase purpose. JV Boiler to provide all drawings for piping and supports downstream
of the terminal point.

HPE to provide connections on headers / pipe in HPE scope for instruments. Within boiler by JV Boilers and upto the boiler front
by BGR E.
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
PRDS completely in BGR E responsibility
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
PRDS completely in BGR E responsibility
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
See also index 5.4.6 "Seal Air Piping".
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS).

HPE is responsible for the engineering downstream of the terminal points:


For SH: From nozzle of feed water piping downstream non return valve, appr. +65m, inside boiler house
For RH: 1m from axis D-D, direction of C-C (inside boiler house)
For start-up pump: 1m from axis D-D, direction of C-C (inside boiler house)

Distribution net by JV Boiler.


Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS). Piping
within boiler by JV Boilers and from boiler front by BGR E.
Distribution net by JV Boiler.
Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and Interface Data Sheets (IDS). Piping
within boiler by JV Boilers and from boiler front by BGR E.
Piping within boiler by JV Boilers and from boiler front by BGR E - Connection for DM water with an isolation valve near C row at about 4m
above GL (Ground Level) by BGR E - within boiler by JV Boilers.
Piping within boiler by JV Boilers and from boiler front by BGR E - Connection for DM water with an isolation valve near C row at about 4m
above GL (Ground Level) by BGR E - within boiler by JV Boilers.

Piping within boiler by JV Boilerrs and from boiler front by BGR E near D row column by BGR E - within boiler by JV Boilers.

HPE to support with boiler/mill related info as outlined in this section. HPE to provide narratives, I/O count and instrument lists for its
scope.
HPE shall include: I/O list, Control Diagrams and HMI graphic definition
Logics by HPE
Logics by HPE

With airheater package

By ash handling system vendor

Piezometers for PAF, SAF; venturi for pulv.

BGR confirmed supply of analysers


At economizer outlet
At ESP outlet / stack.
HPE responsibility is only boiler specific criteria (if any).

for obtaining samples from PF outlets of the mills


for checking on line pulverized coal / primary air flow balance
for accurate measurement of coal mass floe rate / air fuel ratio
for adjustment of coal flow in PF pipelines

for inspection of all steam generator pressure parts

HPE for Design Criteriia of Boiler area only


HPE for Design Criteriia of Boiler area only
HPE for Design Criteriia of Boiler area only
Anchor bolt length / diameters and arrangement details by HPE only

HPE to define major cable tray routing in boiler areas in PDMS model.
To this see 19,9 "Maintenance hoists"

Boiler to APH by HPE; APH to stack by JV Boiler.

Boiler to have roof and burner deck weather enclosures.


Boiler to have roof and burner deck weather enclosures.

For Mill & TP by BGR E, for SG by JV Boilers

With driven equipment supplier.


HPE will give as Design Criteria the necessary data of the driven equipment.

Complete for HPE / JV Boiler scope

Specialty cables with equipment


With its supports

as required for equipment

HPE to provide specifications and attachment details for boiler


HPE to provide specifications and attachment details for boiler
HPE to spec refractory and requirements for boiler
More than 50 kg manual hoists / trolleys with runway beams etc.
Weighing 500 kg or more motorized hoistes and trolleys with runway beams etc.
common for all the units
common for all the units

common for all the units

one per steam generator


common for all the units

Electric / steam as required


HPE responsible for design criteria. Requirements of HPE consumers are defined in the Auxiliary Medium List (AML) and
Interface Data Sheets (IDS).

Extractor system for coal dust measurement


(Included in weight of item 8,11)
External to AH by BGR E.

for each type of soot blowers

Auxiliary steam is required for boiler start up. HPE will specify the required design data within HPE scope (auxiliary steam
demand within HPE scope for start up) to enable JV Boiler to specify the auxiliary steam boiler - including the requirements for
the start up period.

in Rs lakhs
for inspection of all steam generator pressure parts
common for all the units
common for all the units

common for all the units

one per steam generator


common for all the units

Auxiliary steam is required for boiler start up. HPE will specify the required design data within HPE scope (auxiliary steam
demand within HPE scope for start up) to enable JV Boiler to specify the auxiliary steam boiler - including the requirements for
the start up period.