Introduction
This is a short report on the UMTS RAN Product factory Planning, Design and
Configuration course which was attended by Technical Support, RNP and CNP members.
Course Title:

UMTS RAN (V4) Product Factory Planning, Design and

Venue:
Dates:
Instructor :
Teaching Assistant:
Number of Attendees:

Configuration
ZTE University, Shenzhen, China
12 October 2015 to 23 October 2015
Zhang Dong
Zhang Xiaolin
5

Attendees
David Kanhukamwe
Mutsawashe Gahadza
David Gate
Shelton Siziba
Godknows Mombeshora

RNP
RNP
RNP
CANS
CNP

Training Structure
Topic
WCDMA Key Technologies
UMTS radio Channels

From
To
13-Oct-15
14-Oct-15
15-Oct-15
15-Oct-15

UMTS RAN (V4) PRODUCT FACTORY PLANNING, DESIGNING AND CONFIGURATION COURSE
REPORT
DATE:

27 OCTOBER 2015

PREPARED BY:

GODKNOWS MOMBESHORA

UMTS Neighbour Cell, Scrambling Code and LAC Planning


UMTS Capacity Estimation
ZXUR 900 Introduction
ZXSDR BTS Introduction
ZXUR 9000 UMTS Configuration
ZXSDR BTS Node B Data Configuration
GU_ZXDR (V4.12) configuration

16-Oct-15
19-Oct-15
21-Oct-15
21-Oct-15
22-Oct-15
22-Oct-15
23-Oct-15

16-Oct-15
20-Oct-15
22-Oct-15
22-Oct-15
22-Oct-15
22-Oct-15
23-Oct-15

Generally the training proceeded quite well, the trainer had a good command of the
knowledge areas under study and could give practical examples. The trainees also asked quite
engaging questions which were adequately responded to.
However for the questions that the trainer could not address before the class came to an end,
the Instructor promised to continue researching and provide feedback via email.
The trainer and the trainees agreed that the duration allocated to the training was not
sufficient to adequately cover the content, so there was a bit of crushing done.
Travel and Hospitality
Ethiopian Airline was used for the entire trip, all check in and transfer processes were carried
out timeously with no incidences. ZTE provided the travel guides, transport for airport
transfers and allowances on time.
All attendees were checked in and out of the ZTE hotel successfully. The two week stay was
pleasant, with all necessary requirements being satisfactorily met by the fully complimented
and pleasant ZTE staff
Conclusion and Recommendations
The training was fruitful and informative. Having team members from different sections as
part of the team was quite good as we always had someone to ask practical questions from
our network as we worked through radio, radio controllers and configuration sections of the
training.
We highly recommend the extension of this type of training by at least a week.