You are on page 1of 3

Page 1 of 3

From: Ruth DeLaMater Bundy or Ralph Charles Whitley, Sr.


Date: 6/1/2010 4:23:57 PM
To: CGRDCDeepwaterHorizon@uscg.mil; president@whitehouse.gov; askdoj@usdoj.gov;
bobby.jindal@la.gov; charlie.crist@myflorida.com; Babic.branko@virgin.net; Arlene Johnson;
backflow2@verizon.net; Senator Bill Nelson; storms.ronda.web@flsenate.gov; Adrian
Subject: Look at what happened Since JUNE 3, 1979 before I recommended to IXTOC 1 PEMEX
to use lead balls.

Rear Admiral Landry and others:

Here is a real eye opener.....are the same people still working for Trans Ocean and
BP ?

http://farmwars.info/?p=2986

Operation Sombrero II ? ....... Listen then decide JUNK SHOT, CEMENT TOP
KILL....nothing worked until PEMEX used LEAD BALLS on their runaway
CASING....repeat CASING....they had no BOP on the sea bed.

Why will not BP use JUNK SHOT WITH SPECIAL SIZE LEAD BALLS OR EVEN
STEEL BALLS as it would work folks on the riser until you could CUT IT ROUND
WITH THE CHOP SAW SPECIAL DIAMOND BLADE COING AROUND THE OUTSIDE
SUPPORTED !!

Remember:
HYDRAULIC SHEAR MUST CUT ON TOP OF PIPE WITH SHEAR BLADE
POSITIONED ON TOP OF PIPE AS THE 8 STORY PULL DOWN ON THE
PIPE WILL JAM THE SHEAR IF YOU TRY TO CUT FROM THE BOTTOM !!! 
ONCE CUT STARTS IT WILL PEAL AWAY AND COLLAPSE STRAIGHT
DOWN WITH PULL OF PIPE SO HAVE ONE CRANE HOLDING IT IN PLACE
THEN MOVE AWAY FROM RIG OR THERE COULD BE SUPER PROBLEMS.

YOU MUST ALSO SUPPORT WITH CRANE LINE TAUGHT THE AREA
GOING TOWARD BOP AND THE HYDRAULIC SHEAR UNIT OR THAT
COULD REALLY START A NIGHTMARE !  LEAVE THE CRANE HOLDING
THE BENT PIPE SECTION STEADY AND NOT ALLOWING IT TO FALL OR
MORE DAMAGE TO THE SHORT RISER COULD PREVENT USE OF
COUNTER PRESSURE PLUG OR ANYTHING SIMILAR LET ALONE ALLOW
SOMETHING TO BE PLACED OVER THE FLANGE LIKE THE CLEVER
SOMBRERO AS IT WILL BLOW OFF WITH PRESSURE UNLESS SUPER
BOLTS AND THREADED HOLES ARE ON THE UNIT LOWERED THEN ROV

6/1/2010
Page 2 of 3

TIGHTENING TO KEEP IT IN PLACE.   TO PREVENT SUPER PRESSURE


THE RISER FLEXIBLE SECTIONS FLOTATION DEVICE ADDED SHOULD
STAND STRAIGHT UP WITH SHUTOFF AVAILABLE ON THE SOMBRERO
TO ALL LOWERING FLOW WHILE ATTACHING MORE  FLOTATION
DEVICE GE RISER PIPE TO THE SURFACE.

NOW TELL ME IF I AM STUPID IN BELIEVING THE PROPER FLOTATION


GE PIPE SHOWN BEFORE ON DRILLING AHEAD PAGE WOULD STAND
STRAIGHT UP IN THE WATER WITHOUT ANY PROBLEM UNTIL READY
TO HOOK UP TO SHIP RIG.....THAT MEANS A SHUTOFF MUST BE UP ON
TOP OF THE MULTIPLE RISER STACKS TO ALLOW CUTTING BACK ON
THE FLOW UNTIL YOU CAN LOWER FLOTATION TYPE PIPE FROM THE
SURFACE RIG DOWN TO THE FLANGED PIPE THEN START
PRODUCTIONS BUT A MIRACLE WOULD HAPPEN........... NO MORE
LEAKS INTO THE SEA FOLKS !  SHOULD HAVE BEEN DONE IN 8 HOURS
TOPS HAD ANYONE MADE THE COUNTER PRESSURE PLUG WITH
BEVELED WASHER WELDED WITH SPECIAL 3 OR 3 FOOT SLEEVE TO
STOP SPLITTING THE RISER PIPE HAVING  SHUTOFF AND FEMALE GE
RISER FLANGE ABOVE THE 30,0O0 POUND STACK OF WEIGHTS WHICH
COULD HAVE BEEN LIKE A SUPER FUNNEL LOWERED OVER THE BOP
AND SECURED LATER WITH STEEL BENT SPECIAL AND HAVING THICK
BOLTS TO HOLD IT IN PLACE ON BOP AND FUNNEL AREA.

REMEMBER ALSO:

ANY ROV WITH CIRCULAR SAW EVEN 50 INCH MUST USE SAME
PROCEDURE CUTTING PIPE FROM TOP IF STRESSED WITHOUT BEING
ON THE STRESS SIDE OR IT TOO WILL STOP FUNCTIONING LIKE
CUTTING A LONG BAR WITH A HACKSAW BINDING BLADE !

CRITICAL THAT YOU KEEP THE BENT SECTION SUPPORTED AND NOT
CRIMP OR DEFORM THE 21 INCH RISER SO YOU COULD USE THE
BRANKO R. BABIC COUNTER PRESSURE PLUG WITH BEVELED
WASHER AND 2 FOOT OF HEAVY STEEL WALL 18 INCH PIPE PERHAPS
JUST BARELY FITTING INSIDE THE 21 INCH .813 INCH RISER PIPE
PLUS THE SHUTOFF AND FLANGE FOR TAKING EVERYTHING TO THE
SURFACE SHIP WHO ALSO MUST HAVE A LINE DOWN WITH SHUTOFF
DOWN BELOW AND UP AT TOP USING     F L O T A T I  O N    RISER PIPE
FROM GE NOT REGULAR RISER WHICH WOULD FALL TO THE BOTTOM 

6/1/2010
Page 3 of 3

LIKE WAS USED ON DEEPWATER HORIZON FOR REASONS


UNKNOWN......POSSIBLE THE SAME PIPE WAS USED WITHOUT A BOP
ON IXTOC 1 ?????

Ralph

060110 @ 4:23 PM Eastern

Ralph Charles Whitley, Sr.  CFC032631


Backflow Prevention, Inc.
4532 W. Kennedy Blvd. PMB-276
Tampa, Florida 33609-2042 USA
Phone: 813-286-2333

SKYPE:  ralphwhitleysr

URL:   http://www.scribd.com/ralphwhitleysr 

E-MAIL:  Backflow2@verizon.net 

T H A N K S

_ .... ._ _. _._ ...

Ralph

6/1/2010

You might also like