Professional Documents
Culture Documents
Prefabricated Girders
11.1
Bearing Points
15
Girder Construction
27
33
Diaphragms
41
44
Prefabricated Girders
Section 11.1
Prefabricated Girders
Section 11
Bulb-I
Box
January, 2013
Prefabricated Girders
Section 11.1
Steel Plate
Girder
Precast Concrete
January, 2013
Prefabricated Girders
Section 11.1
January, 2013
Prefabricated Girders
Section 11.1
January, 2013
Prefabricated Girders
Section 11.1
MOAB
January, 2013
Prefabricated Girders
Section 11.1
Bridge Girders
Common characteristics include:
Camber & Deflection
Bearing points
Diaphragms
January, 2013
Prefabricated Girders
Section 11.1
January, 2013
Prefabricated Girders
Section 11.1
Bearing Points
Bearing Points
Bearing Pad or
Plate Assembly
Between Top Of
Bent & Bottom Of
Beam
One End Usually
Fixed & The
Other Allows
Movement
January, 2013
Prefabricated Girders
Section 11.1
January, 2013
Prefabricated Girders
Section 11.1
January, 2013
10
Prefabricated Girders
Section 11.1
January, 2013
11
Prefabricated Girders
Section 11.1
Grout Layer
No Grout Layer
Under Elastomeric Pad
Depends On
Design Of
Endwall
January, 2013
12
Prefabricated Girders
Section 11.1
Setting Beam
After Placing Grout Layer
Cleaning Up Grout
After Setting Beam
January, 2013
13
Prefabricated Girders
Section 11.1
January, 2013
14
Prefabricated Girders
Section 11.1
January, 2013
15
Prefabricated Girders
Section 11.1
Bearing Detail
January, 2013
16
Prefabricated Girders
Section 11.1
Bearing Details
January, 2013
17
Prefabricated Girders
Section 11.1
January, 2013
18
Prefabricated Girders
Section 11.1
January, 2013
19
Prefabricated Girders
Section 11.1
January, 2013
20
Prefabricated Girders
Section 11.1
January, 2013
21
Prefabricated Girders
Section 11.1
January, 2013
22
Prefabricated Girders
Section 11.1
BR445:
Keyway
Grout Detail
Top mismatch:
6 to 1 Taper
January, 2013
23
Prefabricated Girders
Section 11.1
Keyway Grout
Keyway Grouting
(00550.50)
Keep keyways moist for 24 hours prior to
grouting
45 degrees minimum for grouting
Water cure grout per manufacturers
recommendations
January, 2013
24
Print Form
Contract No.
Highway
Contractor or Subcontractor
Placement Date:
Completed
Item
1
10
Yes
No
N/A
Remarks
Remarks
Inspected by
734-slab_checklist (12-2010)
Date
http://www.oregon.gov/ODOT/HWY/CONSTRUCTION/hwyConstForms1.shtml
1 of 1
Prefabricated Girders
Section 11.1
Proper Cleanup
Proper Cleanup
Remove excess grout from around the
elastomeric pads from grout layer.
Remove excess keyway grout.
Remove concrete spills from bearing
areas and tops of abutments.
January, 2013
25
Prefabricated Girders
Section 11.1
January, 2013
26
Prefabricated Girders
Section 11.1
Girder Construction
January, 2013
27
Prefabricated Girders
Section 11.1
January, 2013
28
Prefabricated Girders
Section 11.1
Dropped Beam
January, 2013
29
Prefabricated Girders
Section 11.1
Alignment:
1/8 / 10 max.
sweep allowed
Actual for 150
was 3
January, 2013
30
Prefabricated Girders
Section 11.1
Sweep Example
150 Girder
Sweep of 3 Is this acceptable?
Allowable is 1/8 / 10
150 / (10 / 1/8) = 15/8 = 1 7/8
3 > 1 7/8
Therefore, the girder is out of spec.
Sweep Exercise
180 Girder
Sweep of 2 1/2
January, 2013
Is this acceptable?
31
Prefabricated Girders
Section 11.1
Inserts
January, 2013
32
Prefabricated Girders
Section 11.1
January, 2013
33
Prefabricated Girders
Section 11.1
Temporary Diaphragm
January, 2013
34
Prefabricated Girders
January, 2013
Section 11.1
35
Prefabricated Girders
Section 11.1
Come-a-longs
Used to Plumb and Support
Bracing
January, 2013
36
Prefabricated Girders
Section 11.1
Bracing
Bracing
Note the cable
holding beams
together
January, 2013
37
Prefabricated Girders
Section 11.1
Falsedeck Construction?
Girder Collapse
I-10 Twin Span Bridge
Lake Pontchartrain, New Orleans, LA
Oct 30, 2008
Fatalities: 1
Injuries: 2
January, 2013
38
Prefabricated Girders
Section 11.1
Girder
Collapse
10 men
30 drop
to water
January, 2013
39
Prefabricated Girders
Section 11.1
Girder Collapse
January, 2013
40
Prefabricated Girders
Section 11.1
Diaphragms
Diaphragms
January, 2013
41
Prefabricated Girders
Section 11.1
Diaphragms
Diaphragms provide the beams or girders
with lateral support and tie them together.
They include:
Pier and abutment diaphragms, and
Intermediate diaphragms.
Constructing Diaphragms
Intermediate diaphragms are usually
constructed first.
Pier and abutment diaphragms constructed
later (sometimes with deck).
Outer girders have threaded inserts on
interior sides for threaded rods and the
interior girders have through-holes for rebar.
January, 2013
42
Prefabricated Girders
Section 11.1
January, 2013
43
Prefabricated Girders
Section 11.1
January, 2013
44
Prefabricated Girders
Section 11.1
Girder Seats
Construct girder seats to correct alignment
and grade.
Check bearing devices:
Fixed, expansion, sliding, or rocker types
per plans.
Dimensions, positions, etc., of embedded
anchor bolts.
Steel Girders
Grout is not required under the elastomeric
pads.
The steel plate is a flat surface.
Elastomeric pads are thicker and tend
to conform to the shape and distribute the
load more than the thinner pads.
More camber with steel girders results
in more rotation.
January, 2013
45
Prefabricated Girders
Section 11.1
Cross Frame
January, 2013
46
Prefabricated Girders
Section 11.1
January, 2013
47
Prefabricated Girders
Section 11.1
January, 2013
48
Prefabricated Girders
Section 11.1
January, 2013
49
Prefabricated Girders
Section 11.1
January, 2013
50
Prefabricated Girders
Section 11.1
January, 2013
51
Prefabricated Girders
Section 11.1
January, 2013
52
Prefabricated Girders
January, 2013
Section 11.1
53
Prefabricated Girders
Section 11.1
January, 2013
54
Prefabricated Girders
Section 11.1
Demolition
January, 2013
55