Professional Documents
Culture Documents
Date: 15.06.2016
Site ID: EA5250
Site Name: Namwezi
Co ordinates:
Vendor: Netis
Sub-Contractor:
Site Supervisor: Edwin
Eaton Engineer:
Emmanuel
Lat:
Long:
Observations
Tower
M16 bolts used instead of the required M20 bolts on the diagonal
members. This greatly effects the structural capacity of the tower
The tower columns height level is below the required concrete level
No signage installed
Visible Crack in the boundary wall
Wrong power cable terminations in the DCDB
Missing bottom cover plate in the ACDB and ATS, no lugs, no cable glands
used
Guard house - poor workmanship on the fascia boards, untreated rafters
and purlins
There is a structure / wall near the boundary wall that possess security risk
to the site
The steel plate on the bundwall needs to flush with the wall
Alarms
MPF - Tested and working, Rectifier Major tested and working, Door
tested and working, LVB tested and working. (All alarms tested
with NOC personnel - Musa Busingye at 14 20 Hrs.)
Page 1 of 9
Diagonal members installed using M16 bolts instead of required M20 bolts
Page 2 of 9
Gap
M16 installed where M20 bolts are required as indicated in the drawing
below
Page 3 of 9
Page 4 of 9
Page 5 of 9
Wrong power cable terminations in the DCDB: All CBs are supposed to pick
from the (-) bar
Page 7 of 9
The house near the boundary wall that possess security risk to the site easily
jump into the site
Page 9 of 9