CommunityofPracticeProjectManagementCOP

ScopingDocument

Heading

A Standardized, or Best Practice Generic Deliverables List for


Engineering

ScopingDocument
Author

ProposedRPAuthor

GordonLawrence

Volunteerlistsofar:

SeeAppendix

GeneralOverview

Whendevelopingadesignpackageforanewproject(todevelopan
estimateand/ortodevelopthefullyengineereddesign)itisnecessaryto
issuealistofrequireddeliverables.

Thisstudywillattempttodevelopagenericlist.

Theperceivedadvantageisthatowners,contractorsandvendorswillbegin
toconvergeonastandard,commonunderstandingofwhatisrequiredat
eachstage.

SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC

PAGE 1 OF 4

CommunityofPracticeProjectManagementCOP

ScopingDocument

TopicstobeIncluded
inthescopeofthe
list

TopicsExcluded

Thelistshouldprovidefor,anddifferentiatebetween:
A30%ConceptualDesignestimate
A10%BasicDesignandfundsapprovalestimate
Issuedforconstructionpackage
Thelistshouldtakeaccountof:
BulkAPIchemicalfacilities
Bulkbiofacilities
Secondary/Pharma/formulation&finishingfacilities
Laboratories(QA/ChemicalResearch,BioResearch,development,
Vivarium)
Kilolabs
Thelistshouldinclude(anddifferentiatebetween)deliverablesprepared
by:
OwnerManagementTeam
OwnerEndUserTeam
Design/engineeringcontractor
Equipmentvendors
ConstructionContractors
Commissioning&Validationteam

TBA

References

AACEInternationalRecommendedPracticeNo18R97Cost
EstimateClassificationSystemAsappliedinEngineering,
ProcurementandConstructionfortheProcessIndustries

CIIPDRI,IPAFELandAPNetworksProjectPyramid/ReadinessIndex
allrequirepurchaseandsomaynotbeavailable

OthersTBA

1.
2.
3.
4.

Agreescopingdocumentdone26April2010
Agreedefinitions(ProposedDefinitionsAppended)
Assigntasks
Reviewnextsteps

Pathforward

SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC

PAGE 2 OF 4

CommunityofPracticeProjectManagementCOP

ScopingDocument

APPENDIX
Definitions

DeliverableListIssuePoints
The deliverable lists should relate to key points in the project definition cycle when a design package is
issued. The points chosen are:

A 30% Conceptual Design estimate


A 10% Basic Design and funds approval estimate
Issued for construction package

The 30% Conceptual Design Estimate, point should be in alignment with:

The requirements of a Class 3 estimate, as defined by AACE International Recommended


Practice No 18R-97 Cost Estimate Classification System As applied in Engineering,
Procurement and Construction for the Process Industries

The requirements of a Best Practical design package at the end of Conceptual Design, as defined
by Construction Industry Institutes Project Definition Rating Index

The requirements of a Best Practical design package at the end of Conceptual Design, as defined
by Asset Performance Networks Project Pyramid

The requirements of a Best Practical design package at the end of FEL2, as defined by
Independent Project Analysis Front End Loading Index.

The 10% Basic Design and funds approval estimate, point should be in alignment with:

The requirements of a Class 2 estimate, as defined by AACE International Recommended


Practice No 18R-97 Cost Estimate Classification System As applied in Engineering,
Procurement and Construction for the Process Industries

The requirements of a Best Practical design package at the end of Basic Design, as defined by
Construction Industry Institutes Project Definition Rating Index

The requirements of a Best Practical design package at the end of Basic Design, as defined by
Asset Performance Networks Project Pyramid

The requirements of a Best Practical design package at the end of FEL3, as defined by
Independent Project Analysis Front End Loading Index.

SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC

PAGE 3 OF 4

CommunityofPracticeProjectManagementCOP

ScopingDocument

Volunteers
Family
Name
J.Patrick
Brady
KishorD.
Datar
ThierryC.
Fiems
JeffreyS.
Fluharty
Etienne
Fockedey
DouglasJ.
Gackstetter
NormanA.
Goldschmidt
AndrewV.
Haines
NiallS.
Johnson
GordonR.
Lawrence
MichaelA.
Machin
TodorDraganov Massev
Andre
Michel
Hector
Olson
PietroP.
Perrone
Mongi
Sakly
Fred
Schiller
JohnM.
Wichelt
Anders
Widov
DennisM.
Woolley
GivenName

emailaddress
patrick.brady@ch2m.com
datarkishor@yahoo.co.in
thierry.fiems@UCB.com
fluharty_jeffrey_s@lilly.com
efockedey@hotmail.com
Doug.Gackstetter@PerfVal.com
ngoldschmidt@geieng.com
ahaines@ipsdb.com
nsjohnson@rcn.com
gordon_R_lawrence@hotmail.com
mike.machin1@btinternet.com
tmassev@actavis.bg
amichel300@gmail.com
hector.olson.b@bayer.com
deltapcube@hotmail.com
msakly@aol.com
schillerf@ebsi.com
john.wichelt@propharmagroup.com
aw@frph.se
dwoolley@taiengineering.com

SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC

PAGE 4 OF 4