You are on page 1of 1

WORK SHEET

Project name:

Executing Country:

Pressure vessel inspection project

Bangladesh

Client: Holcim Cement (Bangladesh) Ltd

PO No.:
Ref / Order No.:

Place of Inspection:

Date of Inspection: 21 08 2016

Meghna Ghat, Sonargaon, Narayanganj,


Bangladesh

In time: 8.30 AM
Out time: 5.30 PM

Description of Job
1. Equipment Name: Compressed Air tank
2. Model: 611-PV1 or D31-PV1.
3. Serial No: 08
4. Capacity: 10 m3
5. Working Pressure 30 Kg/cm2, Test Pressure 8 kg/cm2 and Operating Pressure
6 kg/cm2
Finding: Gat Valve Leakage and Blind Leakage.
Inspection Team- TV Rheinland BD:

1. Md. Amit Hasan + Team .TUV


2. Md. Akterruzzaman HCL
Clients Representative:
Name: Md. Nazmul huda
Designation:
Sign:

You might also like