WORK SHEET

Project name:

Executing Country:

Pressure vessel inspection project

Bangladesh

Client: Holcim Cement (Bangladesh) Ltd

PO No.:
Ref / Order No.:

Place of Inspection:

Date of Inspection: 24 08 2016

Meghna Ghat, Sonargaon, Narayanganj,


Bangladesh

In time: 8.00 AM
Out time: 6.00PM

Description of Job
1. Name: PFA Unloading Dispatch Vessel 2 for plant 2
2. Model: 5E1 PT2
3. Serial No: 12
4. Capacity: 5 m3
5. Working Pressure 8.1 Kg/cm2, Test Pressure 13.2 kg/cm2.
Finding: Solenoid valve Leakage, Solenoid Valve Connection Lunges Union
Connection Leakage.
Inspection Team- TV Rheinland BD:

1. Md. Amit Hasan + Team .TUV


2. Md. Akterruzzaman HCL
Clients Representative:
Name: Md. Nazmul huda
Designation:
Sign: