Professional Documents
Culture Documents
DESCRIPTION
OF WORK
Sl
No.
QTY
UNIT
RATE
SUPPLY
AMOUNT
INSTALLTION
RATE
IN Rs.
IN Rs
IN Rs.
mtrs
1800.00
9000.00
800.00
No.
1800.00
7200.00
1000.00
Mtrs
1350.00
6750.00
500.00
No.
8000.00
8000.00
2000.00
500
Kgs
80.00
40000.00
30.00
No's
8000.00
RO
1500.00
No's
22000.00
RO
1500.00
20
Mtrs
600.00
RO
110.00
20
Mtrs
2200.00
RO
125.00
e 95sqmm CU cable
10
Mtrs
850.00
RO
100.00
25
20
20
1
Mtrs
No's
Mtrs
No.
1600.00
300.00
500.00
55000.00
40000.00
RO
RO
RO
500.00
75.00
90.00
3000.00
8
2
2
No.
No.
No.
850.00
300.00
200.00
6800.00
RO
RO
300.00
54.00
55.00
1
1
No.
No.
450000.00
750000.00
RO
RO
5500.00
10000.00
7.0 APPROVALS
a CEIG APPROVAL 500kVA
a CEIG APPROVAL 750kVA
1
1
Ls
Ls
35000.00
45000.00
8.0 MISCELLENOUS
a Initial charging of DG batteries for one DG Set
b Transportation, Unloading , shifting & positioning of DG Set - 500kVA
b Transportation, Unloading , shifting & positioning of DG Set - 750kVA
2
1
1
No.
Ls
Ls
1500.00
32000.00
45000.00
a Supply 3.5cx240sqmm Al. armoured power cable from generator to panel (3R)
b 2CX4Sqmm YRY Cu-Conductor armoured Cable
c 16CX2.5Sqmm YRY Cu-Conductor armoured Cable
TOTAL
GRAND TOTAL/set
117750.00
230150.00
TAXES
Service tax : included @12.36% on Approval & Miscellenous charges
VAT: Extra @ 14% shall be charged on the materials.
NOTE
Limits quoted are only estimations & the actual measurement will be as per site conditions.
Fuel and Consumables to be provided by the customer.
The above prices are based on present day price lists of Materials. Any revision in the above prices shall be to the customers account, even if the order is placed within the
validity period.
Changes
in Statutory Levies, if any, due to change in Govt. Notifications, shall be to your
account.
Following facilities to be provided at site, free of cost to complete our work:
Suitable electrical power with switchboard etc., inside DG room for welding machine and other equipments, Lighting arrangement, Necessary shutdown on Electrical system, if
required.
Lockable space to store our tools and material etc.
Prices quoted above are for Bangalore Jurisdiction only.
Pollution
Board approval
not included
our scope.
PCC Bed Control
is not included
in our is
scope.
We shallinprovide
the dimensions and details of the
foundation
Thanking you
INSTALLTION
AMOUNT
IN Rs
4000.00
4000.00
2500.00
2000.00
15000.00
RO
RO
RO
RO
RO
12500.00
RO
RO
RO
2400.00
RO
RO
RO
RO
35000.00
RO
3000.00
32000.00
RO
112400.00