You are on page 1of 12

BOXES IN YELLOW TO BE FILLED BY SUBCONTRACTOR (SC)

Rev.

SC HYDRAULIC INSTALLATION
RFQ N

All

Mobilisation

All

Mobilisation

LS

All

Project management & Indirect labour (Subcontractor to provide a manpower Bar Chart over the erection works
duration).

LS

All

General Items

All

Crane (capacity inforamtion to be provided, ?? Ton)

LS

All

Lorry truck, trailer, manlift, forklift.

LS

All

Scaffolding supply and installation

LS

All

Final Documentation according to Worklot System and As-Built

LS

All

Supply & Prefabrication

All

Pipe Supports for piping: Shoe (Primary) and Secondary support (related to package)

802

Supply & Fabrication of CS ( S235/275 JR) Primary pipe supports (including painting & Teflon/SS sheet if needed,
excluding anchoring, bolts, nuts, washers)

LS

Supply & Fabrication of SS (316L) Primary pipe supports (including painting & Teflon/SS sheet if needed,
excluding anchoring, bolts, nuts, washers)

LS

Supply of PLASTIC (PEHD) Primary pipe supports ( excluding anchoring, bolts, nuts, washers)

LS

802

Supply & Fabrication of CS ( S235/275 JR) Secondary pipe supports (including painting & Teflon/SS sheet if
needed, excluding anchoring, bolts, nuts, washers)

LS

802

Supply & Fabrication of SS (316L)Secondary pipe supports (including painting & Teflon/SS sheet if needed,
excluding anchoring, bolts, nuts, washers)

LS

802

Supply of frames & related supports assembly steel bolts (Contengency 3%), including U-bolts (CS & SS)

LS

802

Supply of supports anchoring bolts (Contengency 3%)

All

Supply & Fabrication & surface protection for Process Steel Structure (Pipe racks) and Miscelaneous steel
works

2.1

Area

Build

802

Description

PRICE
BASIS

Items

WP1

WP2
0.00

WP3
0.00

WP4
0.00

WP5
0.00

WP1 to WP5
0.00

0.00
-

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

802

2.2

0.00

0.00

0.00

0.00

802

Instrumentation supports (Stainless Steel), including fixation bolts

LS

802

Instrumentation sunshades

LS

804

Instrumantation accessories (tubing, reducers, valves, flanges, etc) as per Hook-up

LS

802
802
802
802
802
802
802

2.3

0.00

802

802

COUNTER PLATE SIZING-000 - GENERALSTRUCTURE & ACCESS PLATFORMS-CLARIFIED WATER PUMPINGSTRUCTURE-CLARIFIED WATER PUMPINGSTRUCTURE-CLARIFIED WATER PUMPING TO DMPFSTRUCTURE-BACKWASH PUMPINGSTRUCTURE DRAWING-DUAL MEDIA PRESSURE FILTER -EAST SIDE GA
STRUCTURE DRAWING-DUAL MEDIA PRESSURE FILTER -WEST SIDE GA
STRUCTURE DRAWING-DUAL MEDIA PRESSURE FILTER -MIDDLE GALLE
STRUCTURE-PERMEATE TANK INLET PIPESTRUCTURE-PERMEATE TANK OVERFLOW PIPE-

0.00

PIPE
PIPE
PIPE
PIPE
PIPE
PIPE
PIPE
PIPE
PIPE
PIPE

802

SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT
SUPPORT

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

All

Bolts and Gaskets (related to package)

801

Supply of Bolts for GRP Piping assembly (flanges)

LS

801

Supply of Gaskets for GRP Piping assembly (flanges)

LS

805

Supply of Bolts for Other Piping assembly (flanges)

LS

805

Supply of Gaskets for Other Piping assembly (flanges)

LS

802

Supply of Bolts for pipes supports

LS

804

Supply of Bolts and Gasket for instrumentation

LS

All

Installation Work

0.00

0.00

0.00

0.00

0.00

0.00

4.1

All

SEA WATER -OFFSHORE TOWERS & AIR WALL PRODUCTION

0.00

0.00

0.00

0.00

0.00

0.00

4.2

4.3

4.4

4.5

4.6

4.7

4.8

4.9

4.10

4.11

4,12

101

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

102

SEA WATER -SCREENING, PUMPING & INLET MONITORING

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

127

SEADAF

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

3 to 6

131

DMGF- FILTERED WATER TANK - BACKWASH TANK, PUMPING & BLOWERS

XXX

Plastic floor installation - By floor supplier (out of scope)

XXX

Media loading

LS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

182

CARTRIGE FILTERS-FILTERED WATER PUMPS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

185

R.O 1ST PASS - HP PUMP, BOOSTER PUMP & ERD

806

R0 modules field assembly as per related RFQ

LS

803

Rotating equipment installation (including labelling installation). Excluding RO modules

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works. Excluding RO modules

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation). Excluding RO modules

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

186

R.O 2ND PASS-BOOSTER PUMP

806

R0 modules field assembly as per related RFQ

LS

803

Rotating equipment installation (including labelling installation). Excluding RO modules

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works. Excluding RO modules

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation). Excluding RO modules

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

187

R.O UTILITIES-CIP, NEUTRALIZATION TANK, CITRIC ACID

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

10

289

PERMEATE WATER, TANKS & LIMESTONE FILTERS BW PUMPS

0.00

0.00

0.00

0.00

0.00

0.00

XXX

Permeat tank field installation

LS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

11.12

291

POTABILIZATION-LIMESTONE FILTER COMMON HEADERS & CO2 INJECTION

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

16

301

SLUDGE TREATMENT-EFFLUENT MIXING TANK

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

16

321

SLUDGE TREATMENT-DENSADEGS & EFFLUENT TANK

0.00

0.00

0.00

0.00

0.00

0.00

XXX

Metallic Dendadeg tanks & internal eqps installation

LS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

Items

4.13

RFQ N

Area

Build

Description

PRICE
BASIS

WP1

WP2

WP3

WP4

WP5

WP1 to WP5

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All
803

16

328

SLUDGE TREATMENT-THICKENED SLUDGE TANK & PUMPS


Rotating equipment installation (including labelling installation)

0.00

LS

0.00

0.00

0.00

0.00

0.00
-

Items

4.14

4.15

4.16

4.17

4,18

4.19

RFQ N

Area

Build

4.21

4.22

4,23

4.24

4.25

4.26

4.27

4.28

PRICE
BASIS

WP1

WP2

WP3

WP4

WP5

WP1 to WP5

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

16

342

SLUDGE TREATMENT-CENTRIFUGES

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

811

CHEMICALS-POLYMER

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

819

CHEMICALS-COAGULANT AID

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

821

CHEMICALS-FERRIC CHLORIDE

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

836

CHEMICALS-CAUSTIC SODA

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

805

Other Piping INSULATION

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

841

CHEMICALS-SULFURIC ACID TANK & DOSING PUMP

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All
4.2

Description

All

18

851

CHEMICALS-SODIUM HYPOCHLORITE STORAGE TANKS & DOSING PUMPS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18.00

871

CHEMICALS-SODIUM BISULPHITE STORAGE TANKS & DOSING PUMPS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

12.00

895

CHEMICALS-CO2 STORAGE TANKS, DOSING & VAPORIZERS

0.00

0.00

0.00

0.00

0.00

0.00

XXX

CO2 system installation; separate RFQ

LS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

898

CHEMICALS-ANTISCALANT STORAGE TANKS & DOSING PUMPS

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

18

899

CHEMICALS-FLUOR STORAGE TANKS & DOSING PUMPS

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

15

921

UTILITIES-DRAINAGE & OVERFLOW TANK AND OUTFALL

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

ALL

922

UTILITIES-SERVICE WATER SYSTEM

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

All

923

UTILITIES-INSTRUMENT AIR SYSTEM

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

All

1000

INTERCONNECTING PIPING

0.00

0.00

0.00

0.00

0.00

0.00

803

Rotating equipment installation (including labelling installation)

LS

804

Other Mechanical equipment installation (including labelling installation)

LS

804

Installation of Process Steel Structure and Miscelaneous steel works

LS

801

GRP piping installation (including NDT, pressure test, paint touch up, marking & identifiaction)

LS

805

Other Piping (SS, CS, PE, PP, PVC, etc) prefabrication and installation (including NDT, pressure test, paint touch
up, marking & identifiaction)

LS

804

Instrumentation installation (including labelling installation)

LS

All

Assistance to Precommissioning & Commissioning activities (Motor solo run, rotation check)

LS

All

5.1

All

OUT OF THIS SCHEDULE OF PRICE


All

926

XXX

0.00

0.00

0.00

0.00

0.00

0.00

FIREFIGHTING FACILITIES / NA
Separate RFQ

5.2

All

935

GENSET Installation / NA

XXX

Generator installation included daily tank, Sand trap, Sound trap, Exhaust duct.

XXX

Fuel tank(s) installation

XXX

Indoor and Outdoor piping

XXX

Daily tank installation

5.3

XXX
All
XXX

940

Fuel wall mounted pump


HVAC / NA
Separate RFQ

5.4

All

950

WASTEWATER TREATMENT / NA

XXX

Separate RFQ

5.5

All
XXX

960

STORM LAGOON / NA
Separate RFQ

Items

RFQ N

Area

Build

Description

PRICE
BASIS

WP1

WP2

WP3

WP4

WP5

WP1 to WP5
-

TOTAL
TOTAL STEEL STRUCTURE (2.3)
TOTAL GENSET (5)
ASSISSTANCE TO COMMISSIONING (4each3)
TOTAL - (2.3) - (5)- (4each1)- (4each2)- (4each3)
TOTAL - (5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

0.00

0.00

0.00

0.00

0.00

0.00

PIPE SUPPORTS

FABRICATION AND SUPPLY OF PIPE SUPPORTS INCLUDING SURFACE PROTECTION

Rev.

Description of the Support


Weights in Kilogrammes

SC HYDRAULIC INSTALLATION

Unit rate per Kilo (US$)

WP1 Weight

WP1 Price

WP2 Weight

WP2 Price

WP3 Weight

WP3 Price

WP4 Weight

WP4 Price

WP5 Weight

WP4 Price

TOTAL Weight

TOTAL Price

Comments

Standard pipe support according to Booklet .Weight of primary pipe


support to be calculated and provided by the Subcontrator

Standard pipe support according to Booklet .Weight of primary pipe


support to be calculated and provided by the Subcontrator

Weight of Secondary pipe support to be calculated and provided by the


Subcontrator

Weight of Secondary pipe support to be calculated and provided by the


Subcontrator

Standard pipe support according to Booklet .Weight of primary pipe


support to be calculated and provided by the Subcontrator

Supply of frames & related supports assembly steel bolts (Contengency 3%), including U-bolts (CS & SS)

Standard pipe support according to Booklet .Weight of primary pipe


support to be calculated and provided by the Subcontrator

Supply of supports anchoring bolts (Contengency 3%)

Chemical resin for anchors - As option (type to notify)

Supply & Fabrication of CS ( S235/275 JR) Primary pipe supports (including painting & Teflon/SS sheet if needed, excluding
anchoring, bolts, nuts, washers)
Supply & Fabrication of SS (316L) Primary pipe supports (including painting & Teflon/SS sheet if needed, excluding anchoring,
bolts, nuts, washers)

Supply of PLASTIC (PEHD) Primary pipe supports ( excluding anchoring, bolts, nuts, washers)

Supply & Fabrication of CS ( S235/275 JR) Secondary pipe supports (including painting & Teflon/SS sheet if needed, excluding
anchoring, bolts, nuts, washers)

Supply & Fabrication of SS (316L)Secondary pipe supports (including painting & Teflon/SS sheet if needed, excluding
anchoring, bolts, nuts, washers)

Surface protection of supports is included in supports pricing (see General Specification for Coating & Painting)

Bolts nuts washers to fix SUPPORT to Rack frame or anchor bolts to be


remeasured and paid for in accordance with actual quantities as per the
"for fabrication drawings"

MISC. STEEL WORKS

FABRICATION, SUPPLY AND INSTALLATION OF STEEL SUPPORTS, STEEL STRUCTURES,


INSULATION INCL SURFACE PROTECTION (WHEREVER REQUIRED)
DESCRIPTION

Rev.

QTY

UNIT

Typical Halfen Channel

PRICE (US$)

TOTAL ESTIMATED

To fill if necessary

HDG Halfen channel type UNISTRUT P1000 with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1001 with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1100 with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1101 with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1000T with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1001T with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

HDG Halfen channel type UNISTRUT P1100T with fixing accessories included such as fittings, channel nuts , closures,
caps .

LM

Supply & Fabrication of process steel structure


(Pipe Racks, Equipment supports, )

Kg

Supply & Fabrication of process access platform.

Kg

Supply & Fabrication of process GRP Sun Shade.

Kg

Supply , fabrication & Fixing perforated aluminium 1 mm thickness or mesh for personnel protection (all included,
supply, fabrication, fixing, elbow...)

m2

Supply , fabrication & Fixing rock wool (100 mm tick max) + 0,8 mm thick aluminium plate for thermal insulation (all
included, supply, fabrication, fixing, elbow...)

m2

Bidder to add any other sizes required on the project

Miscellaneous Steel Structure

Insulation

Linear Meter LM
Square Meter m2
Kilogramm Kg
Unit price US dollar or Euro

FASTNERS

UNIT PRICE FOR SUPPLY OF FASTNERS

Comments LFO rev 0. Exact type to be checked with Piping Class

Rev.

Unit Rate (US$) for SS316L fasteners


Size
Sl.No.

Description

1
2
3

STUD - Length 1 mtr


HEX NUT
WASHER type L

Sl. No.

Specification : STUD BOLTS + 2 HH NUTS + 2 WASHERS -ASTM


A193Gr.B8M Cl.2 / ASTM A194Gr.8M - 1: UNC - Class 2-A / 2B - 1: 8-UN - Class 2-A / 2-

Grade

12mm

16mm

20mm

24mm

27mm

Size

Length

Material

QTY

UNIT

Rate / Set
(US$)

ASTM A193Gr.B8M Cl.2


ASTM A194Gr.8M

ISO 7089

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

80mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

150mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

200mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

230mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

100mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

90mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

90mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

160mm

SS A4

SET

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

12mm

70mm

SS A4

SET

10

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

80mm

SS A4

SET

11

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

70mm

SS A4

SET

12

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

140mm

SS A4

SET

13

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

75mm

SS A4

SET

14

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

12mm

75mm

SS A4

SET

15

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

160mm

SS A4

SET

16

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

70mm

SS A4

SET

17

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

70mm

SS A4

SET

18

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

140mm

SS A4

SET

19

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

120mm

SS A4

SET

20

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

120mm

SS A4

SET

21

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

100mm

SS A4

SET

22

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

12mm

65mm

SS A4

SET

23

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

140mm

SS A4

SET

24

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

110mm

SS A4

SET

25

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

130mm

SS A4

SET

26

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

120mm

SS A4

SET

27

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

140mm

SS A4

SET

28

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

140mm

SS A4

SET

29

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

39mm

180mm

SS A4

SET

30

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

39mm

190mm

SS A4

SET

31

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

160mm

SS A4

SET

32

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

110mm

SS A4

SET

33

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

160mm

SS A4

SET

34

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

100mm

SS A4

SET

35

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

39mm

130mm

SS A4

SET

36

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

390mm

SS A4

SET

37

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

120mm

SS A4

SET

38

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

90mm

SS A4

SET

39

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

310mm

SS A4

SET

40

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

150mm

SS A4

SET

41

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

110mm

SS A4

SET

42

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

240mm

SS A4

SET

43

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

160mm

SS A4

SET

44

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

150mm

SS A4

SET

45

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

39mm

170mm

SS A4

SET

46

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

12mm

80mm

SS A4

SET

47

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

130mm

SS A4

SET

48

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

130mm

SS A4

SET

49

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

100mm

SS A4

SET

50

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

180mm

SS A4

SET

51

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

130mm

SS A4

SET

52

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

150mm

SS A4

SET

53

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

180mm

SS A4

SET

54

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

200mm

SS A4

SET

55

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

160mm

SS A4

SET

56

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

350mm

SS A4

SET

57

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

130mm

SS A4

SET

58

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

110mm

SS A4

SET

59

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

160mm

SS A4

SET

60

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

190mm

SS A4

SET

61

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

220mm

SS A4

SET

62

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

190mm

SS A4

SET

63

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

20mm

170mm

SS A4

SET

64

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

170mm

SS A4

SET

65

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

30mm

110mm

SS A4

SET

66

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

240mm

SS A4

SET

67

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

45mm

240mm

SS A4

SET

30mm

33mm

36mm

39mm

45mm

68

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

170mm

SS A4

SET

69

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

36mm

360mm

SS A4

SET

70

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

39mm

150mm

SS A4

SET

71

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

33mm

120mm

SS A4

SET

72

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

230mm

SS A4

SET

73

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

270mm

SS A4

SET

74

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

27mm

260mm

SS A4

SET

75

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

24mm

210mm

SS A4

SET

76

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

65mm

SS A4

SET

77

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

35mm

SS A4

SET

78

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

60mm

SS A4

SET

79

ASTM A193Gr.B8M Cl.2 / ASTM A194Gr.8M -

16mm

70mm

SS A4

SET

GASKETS

UNIT PRICE FOR SUPPLY OF THE GASKET


To be updated according to PIPING CLASS
Rev.

Comments LFO rev 0

DESCRIPTION

FLAT GASKET WITH STEEL RING PN10 FF - EN


FLAT GASKET - EN 1092-1 PN16
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET - EN 1092-1 PN16
FLAT GASKET - EN 1092-1 PN16
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
NONMETALLIC FLAT GASKET ASBESTOS FREE
FLAT GASKET WITH STEEL RING PN10 FF - EN
NONMETALLIC FLAT GASKET ASBESTOS FREE
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
NONMETALLIC FLAT GASKET ASBESTOS FREE
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
NONMETALLIC FLAT GASKET ASBESTOS FREE
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET - EN 1092-1 PN16
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN
FLAT GASKET WITH STEEL RING PN10 FF - EN

MATERIAL

1514-1
1514-1
1514-1
1514-1

1514-1
1514-1
1514-1
1514-1
1514-1
1514-1
(3MM THICK
1514-1
(3MM THICK
1514-1
1514-1
1514-1
1514-1
(3MM THICK
1514-1
1514-1
(3MM THICK
1514-1
1514-1
1514-1
1514-1
1514-1
1514-1
1514-1
1514-1
1514-1

) PN16 FF - EN 1514-1
) CL.#150 FF - EN 12560-1

) CL.#150 FF - EN 12560-1

) PN16 FF - EN 1514-1

EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM
EPDM

DN1

QTY

UNIT

200
80
150
125
100
40
25
800
250
400
600
1000
450
25
200
25
500
500
350
250
25
1400
1100
32
250
125
1200
700
800
65
900
1400
1200
400

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

PRICE (US$)

To be checked with piping class

TAGS
UNIT PRICE FOR THE TAGS
DESCRIPTION

QTY

UNIT

Supply and Installation of Stainless Steel (SS) Tag : Size : 50x40mm with three
lines (two holes)

No.

Supply and Installation of PVC Tag : Size : 50 x 40mm with three lines (max.
two holes).

No.

Supply and Installation of Anodized Aluminium Tag : Size : 50 x 40mm with


three lines (max two holes)

No.

Bidder to list any other type of labels / tages applicable as per tender
documents

PRICE (US$)

MANPOWER

UNIT PRICE FOR SUPPLY OF MANPOWER

TRADE
Fitter
Welder
Millwright
Helper
Painter
Sand Blaster
Insulator
Rigger
Foreman
Elecrician
Engineer - Mechanical / Electrical
Safety Officer
Scaffolder
Crane Operator
Forklift Operator
Driver

Rates must include for Food, Shelter, Transportation, Welfare, Insurance etc.

PRICE (US$) PER


HOUR

PRICE (US$) PER


DAY

PRICE (US$) PER


MONTH

PLANT & MACHINERY


SUPPLY OF PLANT & MACHINERY

PLANT / MACHINE
Forklift
Mobile Crane
Pickup - 3 Ton
Pickup - 1 Ton
Trailor
Scissor Lift
Manlift
Fixed Scaffolding - 5m & above (per m2)
Mobile Scaffolding - 5m & above

PRICE (US$) PER


HOUR

PRICE (US$) PER


DAY

PRICE (US$) PER


MONTH