Introduction
DesignTopics
Thefourmajordesigntopicsarethecranedesign,theplacementofthe
system,thecranefoundationandtheliftingmechanism.
CraneDesign
Duetotheconstraintsoftheroom,onlytwomaindesignideaswere
sufficient.Thesedesignsincludedaceilingmountedtrolleysystemanda
cantileverrotatingsystem.Apreviousproposalforaceilingmounted
trolleysystemfromtheNavywasquotedat$40,000.Thisshowedthata
ceilingmountedtrolleydesignwouldgreatlyexceedtheprojectbudget.
Therefore,thecantileverrotatingsystemwaschosenforfurther
investigation.Theteamwasabletofindastateoftheartproductinthe
researchprocess.ThecranetypeisajibcraneproducedbyGorbel[6],
whichisabletorotate360degrees.Gorbelprovidesalargerangeofspan
lengthsandheightclearances.Apictureofthecraneisshowninfiguresix
below.
Figure6
VisitGorbelathttp://www.gorbel.com/FSJib.html
PlacementoftheCrane
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
1/10
1/12/2016
Introduction
Thereweretwomainvariablesinvolvedindecidingwheretoplacethe
crane.Thesystemhadtobeabletoreachallsixcansandmovethemtothe
workingarea.Thesystemalsohadtobemountedfarenoughawayfrom
thesideoftheisolatedslabtoprovideenoughcounterbalancetoovercome
theloadingmoments.Calculationsconcerningcounterbalanceareincluded
intheCalculationssectionbelow.Figuresevenbelowshowsthefinal
placementofthecrane,whichfulfillsalltherequirements.Thespanofthe
jibcraneforthisparticularplacementwassetat16feet.
Figure7
CraneFoundationProblem
Gorbelspecifiedafourbysevenbysevenfootconcretefoundationto
mountthecraneon.Aonefootthickisolatedslabalreadyexistedinthe
roommakingitimpossibletomeetthefoundationrequirementsofGorbel.
Twomaindesignideaswerediscussedduringthedesignstagetosolvethis
foundationproblem.Athreebysevenbysevenfootslabofconcretecould
bebuiltontopoftheoldfoundationmeetingthespecificationsofGorbel.
Or,ametalplatefoundationcouldbedesignedtoaccommodatetheloads
inducedbythecrane.Therewasnotenoughroomtobuildaslabwith
neededdimensions,therefore,itwasdecidedtodesignametalplate
foundation.
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
2/10
1/12/2016
Introduction
Thismetalplatewouldbefastenedtotheexistingslabusingananchor
system.Thecranewouldbefastenedontopofthemetalplateusingbolts
orpossiblybywelding.Decisionsonfasteningsystems,metalplate
dimensions,andhowtofastenthecranetotheplateareshowninthe
analysissectionofthisreport.
Analysis
PlateThickness
An"ASTMA36"carbonsteeldistributedbyEarleM.JorgensenCo
[10]waschosenforthemetalplatefoundation.Thismaterialprovidesan
ultimatetensilestrengthof58,000psi.Thetotalloadingmomentatthe
baseofthecrane,includingtheperiscopecan,theliftingdeviceandthe
massoftheIbeam,wasdeterminedtobe48,850ft.lbs.Failureofthe
platecausedbyshearandbendingwasexamined[SeeAnalysisforthe
PlateThicknessbelow].Thethicknessoftheplatewascalculatedwitha
safetyfactoroftwo.Withbendingasthecontrollingmodeoffailure,the
minimumplatethicknesswascalculatedtobe1.1inches.
PlateWidths
APowersRawlepoxyanchorsystemwaschosentofastenthemetalplate
totheexistingfoundation.Thissystemhashighbondstrengths,iseasyto
installandisofferedatareasonableprice[2].Everyanchorhasanultimate
loadcapacityof8,915lbs.ina2000psi.concretefoundation.Theanchor
diameterwillbe7/8"andtheholestobedrilledintheconcretewillbe1"in
diameter.Usingthestrengthsofthisanchorsystemitwasthenpossibleto
calculatetheplatewidths.Bycalculatingthetotalmomentatthecranebase
andinsertingthisintoastaticmodelitwasfoundthattheminimumwidths
oftheplateneedtobe4.63x4.63usingeightepoxyanchors.[See
Analysisfortheplatewidthsbelow]
Welding
AnA.W.S.E60xxweldwasspecifiedduringthedesignprocess.Theheight
ofthefilletweldmustcomplywiththefailureanalysiscalculationsaswell
asA.W.S.standards[5].Therefore,thefinalheightoftheweldwas
determinedtobe3/8".[SeeWeldAnalysisbelow]
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
3/10
1/12/2016
Introduction
Calculations
WeightofIBeam
AnalysisforthePlateWidths
AnalysisforthePlateThickness
ConcreteCounterBalance
WeldAnalysis
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
4/10
1/12/2016
Introduction
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
5/10
1/12/2016
Introduction
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
6/10
1/12/2016
Introduction
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
7/10
1/12/2016
Introduction
SpecialOffers.
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
AdsByDealTotal
8/10
1/12/2016
Introduction
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
9/10
1/12/2016
Introduction
http://cefns.nau.edu/capstone/projects/ME/1998/crane/designanal.html
10/10