You are on page 1of 6

SITE INSPECTION AND TEST RECORD

Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

4400004548
PAGE:

1 of 6
FS TEST

1. GENERAL DATA AND INFORMATION:

Sl. No.

Description

1.

Panel Name

2.
3.
4.
5.
6.
7.
8.
9.
10.

Relay Manufacturer
Relay Type.
Rated Voltage Aux.
Rated Voltage I/O.
Order Code.
Serial No.
VT Sec inputs.
Power supply burden.
Frequency.

Remarks
13.8/4.16KV UAT-14 TRAFO RTCC PANEL

ZIV
6RTVP_N***4A6_N
48-250 Vac/Vdc (+ 20%)
125VDC
6RTV-4PN-22M4A61ML
123614
50-230V AC
7W, max.: <20W
16-81Hz

a. FIELD DATA:
Sl. No.

Description

1.
2.

CT Ratio.
VT Ratio.

Remarks
3900/5
4160/3:110 /3

2. MECHANICAL AND VISUAL INSPECTION CHECKLIST:


Sl. No.
1.
2.
3.

Description

Remarks

Inspect for physical damage / defects.


Inspect for equipment earth connection.
Check tightness of all connections.

OK
OK
OK

3. ELECTRICAL TESTS CHECKLIST:


Sl. No.
1.
2.
3.
4.
5.

Name
Signature

Description

Remarks

Verify the DC Source and Loop.


Test switch / plug checked for correct function.
Verify connections as per approved drawings.
Verify all back indication as per scheme.
Set the Clock as per the reference.

OK
OK
OK
OK
OK

Test performed by

Test witnessed by

AT&C

SEC-COA

Eng./ Hesham Elnggar

Eng./Taher Shoaib

Date of test:

OCT-27-2015

SITE INSPECTION AND TEST RECORD


Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

4400004548
PAGE:

2 of 6
FS TEST

4. RELAY BURDEN:
DC
Voltage(v)

DC Current in normal
mode mA

DC Current in
operating mode mA

125

80.4

143

Burden(w)
Normal
mode

Operating
mode

10.05

17.875

Voltage Magnitude Measured (V)

% Error

110.064

0.058

Current Magnitude Measured (A)

% Error

5.00

0.0

5. MEASUREMENT CHECK:
5.1 VOLTAGE MEASUREMENT:
Voltage Phase-Phase: R & B phases.
Current Phase: Y phase.
VNOMINAL: 110 V
Sl.No.

Voltage Magnitude set (V)

1
110
Accuracy: 0.1% or 50mV (the greater).
5.2 CURRENT MEASUREMENT:
INOMINAL: 5 A
Sl.No.

Current Magnitude set (A)

1
5
Accuracy: 0.1% or 2mA (the greater).
5.3 PHASE ANGLE MEASUREMENT:
VNOMINAL: 110V
Sl.No.

Injected Voltage

Injected Current

Expected
Phase Angle

Measured
Phase Angle

% Error

1.

110V AC

5A

270 Deg.

270.3

0.11

6. BANDWIDTH CHECK:

Name
Signature

Test performed by

Test witnessed by

AT&C

SEC-COA

Eng./ Hesham Elnggar

Eng./Taher Shoaib

Date of test:

OCT-27-2015

SITE INSPECTION AND TEST RECORD


Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

4400004548
PAGE:

3 of 6
FS TEST

Accuracy: 0.4% or 100mV (the greater).

% BW = 100 *(U2 U1)


(U2 + U1)
7. TIMER CHECK:
7.1 TIMER T1 (DEFINITE TIME):
Bandwidth setting: 1 %
VNOMINAL: 110 V

Accuracy: 4ms + Contact time of the physical output.


7.2 TIMER T2 (DEFINITE TIME):
Bandwidth setting: 1%
VNOMINAL: 110V

Sl.
No.

Voltage Deviation DV = 2%

Operating Values of T2(Sec)

(T2)Time
setting

1.

Error %

RAISE (U1)

LOWER (U2)

RAISE (U1)

LOWER (U2)

10.01

10.01

0.1

0.1

10

Accuracy: 4ms + Contact time of the physical output.


7.4 Run Back Voltage Test:
Runback Voltage
Setting

Injected Voltage

Measured time for T1 CMD

range

115%

126.5

1.53

0.5-1.5s

8. BLOCKING PROTECTION FUNCTIONS:

Name
Signature

Test performed by

Test witnessed by

AT&C

SEC-COA

Eng./ Hesham Elnggar

Eng./Taher Shoaib

Date of test:

OCT-27-2015

SITE INSPECTION AND TEST RECORD


Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

4400004548
PAGE:

4 of 6
FS TEST

8.1 UNDER VOLTAGE BLOCKING:


VNOMINAL: 110 V
Sl.
No.

Under Voltage
setting %Un

80

Voltage value
corresponding to
%Un (V)
88

Measured Pick up
Value (V)

Error %

88

Measured Pick up
Value (V)

Error %

131.9

0.075

Current value
corresponding to %In

Measured Pick up
Value (A)

Error %

4.75

4.747

0.057

Accuracy: 0.1% or 50mV (the greater).


8.2 OVER VOLTAGE ALARM:
VNOMINAL: 110 V
Sl.
No.

Over Voltage
setting %Un

2.
120
Accuracy: 0.1% or 50mV (the greater).

8.3 OVER CURRENT BLOCKING:


INOMINAL: 5 A.
Sl.
Over current
No.
setting % In

Voltage value
corresponding to
%Un (V)
132

1.
95
Accuracy: 0.1% or 2mA (the greater).

Name
Signature

Test performed by

Test witnessed by

AT&C

SEC-COA

Eng./ Hesham Elnggar

Eng./Taher Shoaib

Date of test:

OCT-27-2015

SITE INSPECTION AND TEST RECORD


Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

4400004548
PAGE:

5 of 6
FS TEST

9. INPUT VERIFICATION CHECKLIST:


Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

Input Description

Hardware Channel

Remarks

Input 1
Input 2
Input 3
Input 4
Input 5
Input 6
Input 7
Input 8
Input 9
Input 10
Input 11
Input 12
Input1 3
Input 14
Input 15
Input 16
Input 17
Input 18
Input 19
Input 20
Input 21
Input 22
Input 23
Input 24
Input 25

E8, E7
E10, E9
F1, E9
F2, E9
F4, F3
F5, F3
F7, F6
F8, F6
H4, H3
H5, H3
H6, H3
H8, H7
H9, H7
H10,H7
I2, I1
I3, I1
I4, I1
I6, I5
I7, I5
I9, I8
I10, I8
J2, J1
J3, J1
J5, J4
J6, J4

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

10. LED VERIFICATION CHECKLIST:


Test performed by

AT&C
Name
Signature

Eng./ Hesham Elnggar

Test witnessed by

Date of test:

SEC-COA
Eng./Taher Shoaib

OCT-27-2015

SITE INSPECTION AND TEST RECORD


Description:
AVR RELAY 6RTV ZIV

Contract No.:

Contractor

End Client:

SSEM
POWER PLANT NAME:
ALQURAYAT PP-EXT-3

SEC-COA
Panel / Designation / Location no.:
90/+RTCC.14/SWGR BLDG

Sl.
No.
1
2
3
4
5
6
7
8
9
10

4400004548
PAGE:

LED Description
LED1
LED2
LED3
LED4
P1
P2
P3
P4
P5
P6

6 of 6
FS TEST

Remarks

U/V BLOCK
O/V BLOCK
O/C BLOCK
GENERAL BLOCK
RAISE CMD
SPARE
LOWER CMD
SPARE
SPARE
SPARE

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

11. OUTPUT VERIFICATION CHECKLIST:


Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12

Name
Signature

Input Description
Watchdog
Output 1
Output 2
Output 3
Output 4
Output 5
Output 6
Output 7
Output 8
Output 9
Output 10
Output 11
Output 12

U/V BLOCK
SPARE
SPARE
U/V & O/V & O/C

SPARE
SPARE
AUTO MODE
MANUAL MODE

SPARE
SPARE
SPARE
SPARE

Hardware Channel
D2, D3 (NO)
D2, D4 (NC)
D5, D6 (NO)
D7, D8 (NO)
D9, D10 (NO)
E1, E2 (NO)
E3, E4 (NO)
E5, E6 (NO)
G1, G2 (NO)
G3, G4 (NO)
G5, G6 (NO)
G7, G8 (NO)
G9, G10 (NO)
H1, H2 (NO)

Test performed by

Test witnessed by

AT&C

SEC-COA

Eng./ Hesham Elnggar

Eng./Taher Shoaib

Remarks
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Date of test:

OCT-27-2015

You might also like