Professional Documents
Culture Documents
Phone Number:
Fax Number:
Number of Heat Treat Employees at this Facility:
Internal (Captive) Heat Treater (Y/N):
Commercial Heat Treater (Y/N):
Date of Assessment:
Title:
Phone:
Email:
Auditors/Assessors:
Name:
Company:
Phone:
Email:
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
1.1
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.2
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.3
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.4
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.5
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.6
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.7
Question
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
1.8
1.9
Objective Evidence
N/A
Satisfactory
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.10
Question
Objective Evidence
N/A
Satisfactory
10
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.11
Question
Objective Evidence
N/A
Satisfactory
11
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
1.12
1.13
1.14
Objective Evidence
N/A
Satisfactory
12
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
1.15
1.16
Is management providing
employee training for heat
treating?
Objective Evidence
N/A
Satisfactory
13
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.17
Question
Objective Evidence
N/A
Satisfactory
14
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
1.18
Question
Objective Evidence
N/A
Satisfactory
15
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
1.19
1.20
Objective Evidence
N/A
Satisfactory
Is material from different steel Different steel mill heats or metals which require
mill heats or metals which may different heat treat parameters, such as but not
preclude achieving the
limited to, austentizing, quenching, or tempering
specified metallurgical
times and/or temperatures shall be processed
properties prevented from separately in order to achieve specified
being processed together? metallurgical properties.
16
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
2.1
17
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.2
2.3
Question
Objective Evidence
N/A
Satisfactory
18
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
2.4
2.5
Objective Evidence
N/A
Satisfactory
19
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.6
2.7
Question
Objective Evidence
N/A
Satisfactory
20
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
2.8
2.9
Objective Evidence
N/A
Satisfactory
21
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.10
Question
Objective Evidence
N/A
Satisfactory
22
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.11
Question
Objective Evidence
N/A
Satisfactory
23
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.12
Question
Objective Evidence
N/A
Satisfactory
2.13
24
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
2.14
Question
2.15
2.16
Objective Evidence
N/A
Satisfactory
25
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
Section 3 - Equipment
3.1
3.2
3.3
26
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
3.4
3.5
Objective Evidence
N/A
Satisfactory
27
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
3.6
Question
Objective Evidence
N/A
Satisfactory
28
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
and Guidance
Generator Requirements
and furnace atmosphere
carbon
potential/dew point shall be continuously
monitored, automatically controlled, and
documented. Recorded carbon potential shall be
controlled within +/- 0.05 of the set point. Recorded
dew point shall be controlled within acceptable
limits specified in the control plan or internal
procedures.
Objective Evidence
N/A
Satisfactory
controlled.
NOTE: This requirement The automatic and continuous atmosphere control
is specific to Process Tables A, system shall consist of sensors such as oxygen
B, E, F, and G; Sections 1.0 probes or on-line Infrared (IR) gas analysis. The
and 3.0.
heat treater shall also have a back-up method of
checking the carbon potential/dew point.
Examples are dew point, electrical wire resistance,
gas analysis, shim stock, carbon bar, etc. See
Process Tables, Sect. 3.0 for verification
frequencies of primary and back up method.
29
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
3.8
Question
Objective Evidence
N/A
Satisfactory
30
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
3.9
Question
Objective Evidence
N/A
Satisfactory
31
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
3.10
3.11
32
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
33
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
3.13
3.14
34
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
Objective Evidence
N/A
Satisfactory
3.16
3.17
35
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assess
Question
Number
Question
3.18
3.19
3.20
3.21
Objective Evidence
N/A
Satisfactory
36
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
37
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
38
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
39
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
40
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
41
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
42
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
43
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
44
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
45
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
46
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
47
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
48
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
49
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
50
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
51
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
52
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
53
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
54
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
55
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
56
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
57
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
58
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
59
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
60
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
n 3 - Equipment
61
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
62
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
63
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
64
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
65
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
66
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
67
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
68
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
69
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
70
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Satisfactory
Needs Immediate
Action
71
CQI-9
Question #
4.1
1.2
1.3
1.4
1.17
4.2
1.5
4.3
4.4
4.5
4.6
Customer or Internal
Requirement
Actual Condition
(Objective Evidence)
Pass /
Fail / N/A
1.6
2.1
2.2
2.3
2.4
2.1
1.6
2.7
2.9
72
CQI-9
Question #
4.7
Related
HTSA Question #
Customer or Internal
Requirement
Actual Condition
(Objective Evidence)
Pass /
Fail / N/A
1.5
1.6
2.1
2.14
2.15
73
CQI-9
Question #
4.8
4.8.1
4.8.2
4.8.3
4.8.4
Related
HTSA Question #
Customer or Internal
Requirement
Actual Condition
(Objective Evidence)
Pass /
Fail / N/A
2.15
74
CQI-9
Question #
Related
HTSA Question #
1.2
1.4
4.11
1.2
1.4
1.6
4.13
4.14
4.15
4.16
Actual Condition
(Objective Evidence)
Pass /
Fail / N/A
1.4
2.2
2.3
2.14
4.10
4.12
Customer or Internal
Requirement
1.2
1.4
1.6
1.11
1.17
1.11
2.14
2.15
1.17
2.6
2.11
75
CQI-9
Question #
4.19
Packaging Requirements
Are packaging requirements
identified?
Are parts packaged to minimize
mixed parts (for example, parts
packed over height of container)?
Shipping Requirements
Were the parts properly identified?
4.20
4.17
4.18
Related
HTSA Question #
Customer or Internal
Requirement
Actual Condition
(Objective Evidence)
Pass /
Fail / N/A
2.9
2.9
2.3
2.9
2.3
2.9
76
CQI-9
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performi
treater is conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #'
NA - Requirement not applicable
1.0
A1.1
A1.2
Category/Process Steps
3.1
3.7
3.1
3.7
All furnaces, generators and quench systems shall have temperature indicating instruments.
Continuous strip charts and/or data loggers are required for temperature and carbon monitoring
probe, IR gas analyzer, etc.
A1.3
1.18
A program for furnace and generator burnout is required (applies to carbon bearing atmospheres
A1.4
3.2
Furnace weigh scales shall be verified quarterly and calibrated annually at a minimum.
A1.5
3.2
Dew pointers, 3-gas analyzers, spectrometers, and carbon IR combustion analyzers (shim stock
carbon potential in furnaces, shall be calibrated annually at a minimum.
A1.6
3.2
A1.7
3.2
Verification of calibration of 3-gas analyzers with zero gas and span gas shall be performed week
A1.8
3.2
A1.9
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and veri
the applicable ASTM standard, ISO standard, JIS standard, or approved standard.
A1.10
2.16
Files for testing hardness shall be verified per the Customer requirement.
A1.11
3.2
Refractometers (typically used to check polymer quenchants and washer solutions) shall be verifi
water) and calibrated annually (per manufacturer's requirements) at a minimum.
2.0
A2.1
A2.3
3.2
3.3
3.2
3.3
3.2
3.3
A2.4
3.4
A2.2
PYROMETRY
Thermocouples and calibration of thermocouples shall conform to Section 3.1
Pyrometry Instrumentation and Calibration of instrumentation shall conform to Section 3.2
CQI-9 requires a System Accuracy Test (SAT) check of the control thermocouple in the Qualified
TUS shall be performed annually and after major rebuild per Section 3.4
Temperature uniformity tolerance for hardening furnaces shall be +/- 15 oC (or +/- 25oF). Tempera
tempering furnaces shall be +/- 10 oC (or +/- 20oF).
CQI-9
A2.5
3.5
Recorded temperature(s) for austentizing processes shall be controlled within +/- 10 oC (or +/- 15o
evidenced by continuous recording pyrometers. Furnace temperature shall be controlled with so
tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone.
A2.6
3.5
Recorded temperature(s) for tempering and precipitation hardening processes shall be controlled
the set point as evidenced by continuous recording pyrometers. Furnace temperature shall be co
starting at the lower tolerance limit (as defined above).
A2.7
3.2
For
Continuous
Furnaces,
requirement
to thecalibration
Qualified methods
Work Zone.
Infrared
pyrometers
shall be this
calibrated
annuallyapplies
using proper
or an approved
CQI-9
Batch
Furnace
Monitor primary temperature control instrument(s). Continuous recording with
sign-off every 2 hours or
each batch for processes
under 2 hours. Alarm
systems (if set per limits in
A2.5 and A2.6) satisfy the
sign-off requirement.
PROCESS MONITOR FREQUENCIES
A3.1
1.4
2.14
A3.2
1.4
2.14
3.7
A3.3
1.4
2.14
3.7
A3.4
1.4
2.14
3.7
3.8
A3.5
1.4
2.14
3.13
A3.6
1.4
2.12
Quench Level
Agitation
CQI-9
1.4
2.14
Each batch
A3.8
1.4
2.7
Each batch
A3.9
1.4
2.12
A3.10
1.4
2.12
4.0
Batch
Furnace
Each batch
A4.1
1.4
2.15
A4.2
1.4
2.15
1.4
2.15
1.4
2.15
Surface hardness
Each batch
Each batch
Each batch
A4.3
A4.4
5.0
A5.1
A5.2
A5.3
A5.4
A5.5
2.12
3.14
2.12
3.14
2.12
3.14
2.12
3.14
2.12
3.14
A5.6
2.13
A5.7
2.11
Batch
Furnace
Daily
Semi-annually
Semi-annually
Semi-annually
Daily
Semi-annually
Semi-Annually
2x / week
Daily
Each shift
CQI-9
fic requirements.
n testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat
Category/Process Steps
OK / NOK / NA
are required for temperature and carbon monitoring unit, e.g., dew point, oxygen
ers, and carbon IR combustion analyzers (shim stock analysis), used to verify
ated annually at a minimum.
used) shall be calibrated annually minimum, and verified daily or prior to use, per
d, JIS standard, or approved standard.
ymer quenchants and washer solutions) shall be verified prior to use (with distilled
cturer's requirements) at a minimum.
PYROMETRY
uples shall conform to Section 3.1
T) check of the control thermocouple in the Qualified Work Zone per Section 3.3
ning furnaces shall be +/- 15 oC (or +/- 25oF). Temperature uniformity tolerance for
20oF).
OK / NOK / NA
CQI-9
ocesses shall be controlled within +/- 10 oC (or +/- 15oF) of the set point as
ers. Furnace temperature shall be controlled with soak times starting at the lower
precipitation hardening processes shall be controlled within +/- 5 oC (or +/- 10oF) of
cording pyrometers. Furnace temperature shall be controlled with soak times
ed above).
ent applies
to thecalibration
Qualified methods
Work Zone.
ually
using proper
or an approved manufacturer's procedure.
CQI-9
OK / NOK / NA
CQI-9
Continuous
Furnace
Daily per furnace
OK / NOK / NA
Every 2 hours
Every 4 hours
Every 4 hours
Continuous
Furnace
Daily
Semi-annually
Semi-annually
Semi-annually
Daily
Semi-annually
Semi-Annually
2x / week
Daily
Each shift
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
Related HTSA
Question #
Category/Process Steps
1.0
B1.1
OK / NOK / NA
All furnaces, generators and quench systems shall have temperature indicating instruments.
B1.3
1.18
A program for furnace and generator burnout is required. Not required for retort gas nitriding.
B1.4
3.2
Furnace weigh scales shall be verified quarterly and calibrated annually at a minimum.
B1.5
3.2
Dew pointers and gas analyzers, used to verify proper atmosphere in furnaces, shall be calibrated annually at a minimum.
B1.6
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified daily or prior to use, per the applicable ASTM
standard, ISO standard, JIS standard, or approved standard.
B1.7
2.16
Files for testing hardness shall be verified per the Customer requirement.
B1.8
3.2
Refractometers (typically used to check polymer quenchants and washer solutions) shall be verified prior to use (with distilled water) and calibrated
annually (per manufacturer's requirements) at a minimum.
B1.2
Continuous strip charts and/or data loggers are required for temperature and carbon monitoring unit, e.g., dew point, oxygen probe, IR gas
analyzer, etc. For salt bath, only temperature is required to be recorded.
2.0
B2.1
OK / NOK / NA
PYROMETRY
3.2
3.3
3.2
3.3
B2.3
3.2
3.3
CQI-9 requires a System Accuracy Test (SAT) check of the control thermocouple in the Qualified Work Zone per Section 3.3
B2.4
3.4
TUS shall be performed annually and after major rebuild per Section 3.4.
B2.2
3.5
Recorded temperature(s) shall be controlled within +/- 10 oC (or +/- 15oF) of the set point as evidenced by continuous recording pyrometers. Furnace
temperature shall be controlled with soak times starting at the lower tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone.
B2.6
3.2
3.0
Infrared pyrometers shall be calibrated annually using proper calibration methods or an approved manufacturer's procedure.
PROCESS MONITOR FREQUENCIES
B3.1
1.4
2.14
B3.2
1.4
2.14
3.7
B3.3
1.4
2.14
3.7
3.8
Batch
Furnace
Continuous recording with
sign-off every 2 hours or
each batch for processes
under 2 hours. Alarm
systems (if set per limits in
B2.5) satisfy the sign-off
requirement.
Continuous
Generators
Salt Bath
OK / NOK / NA
Furnace
Continuous recording with Sign-off required for Every 2 hours
sign-off every 2 hours or
each shift for
& after any
each lot for processes
generators.
change
under 2 hours). Alarm
systems (if set per limits in
B2.5) satisfy the sign-off
requirement
Generators shall be
continuously
monitored and
alarmed. Other
systems, such as
nitrogen-methanol
systems, may either
be continuously
monitored and
alarmed, or sign-off
every 2 hours.
Daily
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat treater is
conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #'
NA - Requirement not applicable
Item #
Related HTSA
Question #
Category/Process Steps
B3.4
1.4
3.7
B3.5
1.4
3.7
B3.6
1.4
2.14
3.13
B3.7
1.4
2.12
B3.8
B3.9
B3.10
1.4
2.14
1.4
2.7
1.4
2.12
4.0
Every 4 hours
Daily
N/A
Temperature
Each batch or
continuous
recording with
sign-off every
2 hours. Alarm
systems
satisfy the
sign-off
requirement.
Quench Level
Agitation
Daily
Daily
Each batch
Batch
Furnace
Each batch
Continuous
Furnace
Daily per furnace
Each batch
Each batch
Each batch
Generators
Salt Bath
B4.1
1.4
2.15
B4.2
1.4
2.15
1.4
2.15
1.4
2.15
Surface hardness
Each batch
Each batch
Each batch
Every 4 hours
Each batch
Each batch
Every 4 hours
Each batch
B4.3
B4.4
5.0
B5.1
B5.2
B5.3
B5.4
B5.5
2.12
3.14
2.12
3.14
2.12
3.14
2.12
3.14
2.12
3.14
B5.6
2.13
B5.7
2.11
Batch
Furnace
Continuous
Furnace*
OK / NOK / NA
Daily per
furnace
Generators
Salt Bath
Daily
Semi-annually
Daily
Semi-annually
Semi-annually
Semi-annually
Semi-annually
Semi-annually
Daily
Daily
Semi-annually
Semi-annually
Semi-Annual
Semi-Annual
2x / week
2x / week
2x / week
Daily
Daily
Daily
Semi-annually
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
B5.7
Related HTSA
Question
2.11 #
Category/Process Steps
- Temperature of solution (required if temperature is
specified to be above ambient temperature).
Each shift
Each shift
Each shift
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performin
treater is conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related
HTSA
Question #
1.0
Category/Process Steps
C1.1
3.1
All furnaces and quench systems shall have temperature indicating instruments.
C1.2
3.1
Continuous strip charts and/or data loggers are required for temperature sensors.
C1.3
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified
the applicable ASTM standard, ISO standard, JIS standard, or approved standard.
C1.4
3.2
Furnace weigh scales shall be verified quarterly and calibrated annually at a minimum.
C1.5
3.2
Refractometers (typically used to check polymer quenchants and washer solutions) shall be verified
water) and calibrated annually (per manufacturer's requirements) at a minimum.
2.0
C2.1
3.2
3.3
PYROMETRY
Thermocouples and calibration of thermocouples shall conform to Section 3.1.
C2.2
3.2
3.3
C2.3
3.2
3.3
CQI-9 requires a System Accuracy Test (SAT) check of the control thermocouple in the Qualified Wo
C2.4
3.4
Temperature Uniformity Survey (TUS) TUS frequency shall be quarterly and after major rebuild per
Temperature Uniformity tolerance for solution and aging furnaces shall be +/- 5 oC (+/- 10oF).
Temperature Uniformity tolerance for annealing furnaces shall be +/- 15 oC (+/- 25oF)
Minimum and maximum temperature ranges shall be defined. Exception: If the operating range of th
equal to or less than 85oC (155oF) then only one temperature is required to be tested. The test temp
operating range of the Qualified Work Zone.
For Continuous Furnaces, this requirement applies to the Qualified Work Zone.
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performin
treater is conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related
HTSA
Question #
C2.5
3.5
Category/Process Steps
For Solution Treating and Aging: Recorded temperature(s) shall be controlled within +/- 5C (or +/evidenced by continuous recording pyrometers. Furnace temperature shall be controlled with soak t
tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone
C2.6
3.5
For Annealing Furnaces: Recorded temperature(s) shall be controlled within +/- 10C (or +/- 15F) o
evidenced by continuous recording pyrometers. Furnace temperature shall be controlled with soak t
tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone
C2.7
3.0
C3.1
3.2
1.4
2.14
Infrared pyrometers shall be calibrated annually using proper calibration methods or an approved ma
PROCESS MONITOR FREQUENCIES
Monitor primary temperature control instrument(s).
Batch Furnace
Continuous recording with
sign-off every 2 hours or
each batch for processes
under 2 hours. Alarm
systems (if set per limits in
C2.5 and C2.6) satisfy the
sign-off requirement.
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performin
treater is conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related
HTSA
Question #
C3.2
1.4
2.12
Category/Process Steps
Quench Level
Daily Verification
Agitation
C3.3
1.4
2.14
Each batch
C3.4
1.4
2.7
Each batch
C3.5
1.4
2.12
4.0
C4.1
1.4
2.15
5.0
C5.1
Each batch
Daily
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performin
treater is conforming to the customer's requirements.
Continuous furnace frequencies are per lot (work order) or as specified, whichever is more frequent.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
C5.1
Related
HTSA
2.12
Question
3.14 #
C5.2
2.12
3.14
2.11
C5.3
Category/Process Steps
Semi-annually
Semi-annually
Daily
Each shift
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ic requirements.
testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat
Category/Process Steps
OK / NOK / NA
ed) shall be calibrated annually minimum, and verified daily or prior to use, per
JIS standard, or approved standard.
er quenchants and washer solutions) shall be verified prior to use (with distilled
er's requirements) at a minimum.
PYROMETRY
es shall conform to Section 3.1.
check of the control thermocouple in the Qualified Work Zone per Section 3.3.
quency shall be quarterly and after major rebuild per Section 3.4.
hall be defined. Exception: If the operating range of the Qualified Work Zone is
e temperature is required to be tested. The test temperature shall be within the
applies to the Qualified Work Zone.
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ic requirements.
testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat
Category/Process Steps
emperature(s) shall be controlled within +/- 5C (or +/- 10F) of the set point as
. Furnace temperature shall be controlled with soak times starting at the lower
applies to the Qualified Work Zone
ure(s) shall be controlled within +/- 10C (or +/- 15F) of the set point as
. Furnace temperature shall be controlled with soak times starting at the lower
applies to the Qualified Work Zone
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ic requirements.
testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat
Category/Process Steps
Continuous recording
with sign-off every 2
hours or each lot for
processes under 2 hours.
Alarm systems (if set per
acceptable limits) satisfy
the sign-off requirement
Daily Verification
Daily visual check, or monitor the agitation during the
quenching operation with alarm systems set at
acceptable limits.
Twice/shift & after any
change in the indexing
or belt speed.
Twice/shift & after any
change in loading rate.
Each basket for pusher
type or roller hearth
continuous furnaces.
OK / NOK / NA
Every 4 hours
OK / NOK / NA
Daily
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ic requirements.
testing, greater frequencies, etc. When performing the job audit, the auditor shall verify heat
Category/Process Steps
Semi-annually
Semi-annually
Daily
Each shift
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When perform
job audit, the auditor shall verify heat treater is conforming to the customer's requirements.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related HTSA
Question #
1.0
Category/Process Steps
PROCESS AND TEST EQUIPMENT REQUIREMENTS
D1.1
2.16
All hardness test equipment (for each scale used) shall be calibrated annually
minimum, and verified daily or prior to use, per the applicable ASTM standard,
ISO standard, JIS standard, or approved standard.
D1.2
2.16
Files for testing hardness shall be verified per the Customer requirement.
D1.3
3.2
2.0
D2.1
3.2
PYROMETRY
Infrared pyrometers shall be calibrated annually using proper calibration
methods or an approved manufacturer's procedure.
3.0
All process parameters shall be checked the beginning of every shift, tool change, or any equipment
repair. In absence of process parameter alarms, also check process parameters at end of shift or lot
(whichever is the greater frequency).
D3.1
1.4
2.12
Quench Temperature
Quench Level
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When perform
job audit, the auditor shall verify heat treater is conforming to the customer's requirements.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related HTSA
Question #
D3.2
1.4
2.14
D3.3
1.4
2.14
3.16
D3.4
1.4
2.12
4.0
D4.1
1.4
2.15
D4.2
1.4
2.15
Category/Process Steps
IN-PROCESS/FINAL TEST
FREQUENCIES PER COIL
Induction pattern length
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When perform
job audit, the auditor shall verify heat treater is conforming to the customer's requirements.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related HTSA
Question #
Category/Process Steps
D4.3
1.4
2.15
Surface hardness
D4.4
1.4
2.15
D4.5
1.4
2.15
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When perform
job audit, the auditor shall verify heat treater is conforming to the customer's requirements.
OK - Complies to requirement
NOK - Does not comply to requirement (Explain noncompliance in 'Related HTSA Question #')
NA - Requirement not applicable
Item #
Related HTSA
Question #
5.0
D5.1
Category/Process Steps
QUENCHANT AND SOLUTION TEST FREQUENCIES
2.12
3.14
2.12
3.14
2.12
3.14
D5.4
2.13
D5.5
2.11
D5.2
D5.3
Daily
Every four months (complete
replacement of the quench media
and cleaning of the quench tank
within four months satisfies this
requirement).
Semi-annually (complete
replacement of the quench media
and cleaning of the quench tank
within six months satisfies this
requirement)
Daily
Semi-annually (complete
replacement of the quench media
and cleaning of the quench tank
within six months satisfies this
requirement)
2x / week
Daily
Each shift
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ents, e.g., inspection testing, greater frequencies, etc. When performing the
is conforming to the customer's requirements.
OK / NOK / NA
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
ents, e.g., inspection testing, greater frequencies, etc. When performing the
is conforming to the customer's requirements.
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
ents, e.g., inspection testing, greater frequencies, etc. When performing the
is conforming to the customer's requirements.
CQI-9
Special Process: Heat Treat System Assessment
ents, e.g., inspection testing, greater frequencies, etc. When performing the
is conforming to the customer's requirements.
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
All furnaces, generators and quench systems (where applicable) shall have temperature indicating instruments.
E1.3
3.2
Furnace weigh scales shall be verified quarterly and calibrated annually at a minimum.
E1.4
3.2
Dew pointers, 3-gas analyzers, spectrometers, and carbon IR combustion analyzers (shim stock analysis), used to
verify carbon potential in furnaces, shall be calibrated annually at a minimum. This is applicable when used in
controlling carbon-bearing atmospheres.
E1.5
3.2
Verification of calibration of spectrometers, and carbon IR combustion analyzers, shall be checked daily or prior to
use. This is applicable when used in controlling carbon-bearing atmospheres.
E1.6
3.2
Verification of calibration of 3-gas analyzers with zero gas and span gas shall be performed weekly at a minimum.
This is applicable when used in controlling carbon-bearing atmospheres.
E1.7
3.2
Oxygen probe controllers shall be calibrated quarterly (single-point or multi-point calibration) or semi-annual (multipoint calibration only; single-point calibration not allowed). This is applicable when used in controlling carbonbearing atmospheres.
E1.8
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified daily or prior
to use, per the applicable ASTM standard, ISO standard, JIS standard, or approved standard.
E1.9
3.2
Refractometers (typically used to check polymer quenchants and washer solutions) shall be verified prior to use
(with distilled water) and calibrated annually (per manufacturer's requirements) at a minimum.
E1.2
Continuous strip charts and/or data loggers are required for temperature and carbon monitoring unit, e.g., dew
point, oxygen probe, IR gas analyzer, etc.
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
PYROMETRY
E2.1
3.2
3.3
E2.2
3.2
3.3
E2.3
3.2
3.3
CQI-9 requires a System Accuracy Test (SAT) check of the control thermocouple in the Qualified Work Zone per
Section 3.3.
E2.4
3.4
TUS shall be performed annually and after major rebuild per Section 3.4.
Temperature uniformity tolerance for furnaces operating at austenitizing temperatures shall be +/- 15 oC
(or +/- 25oF). Temperature uniformity tolerance for tempering furnaces shall be +/- 10 oC (or +/- 20oF).
E2.5
3.5
Recorded temperature(s) for austentizing processes shall be controlled within +/- 10 oC (or +/- 15oF) of the set point
as evidenced by continuous recording pyrometers. Furnace temperature shall be controlled with soak times
starting at the lower tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone.
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
PROCESS MONITOR
Batch Furnace
FREQUENCIES
Monitor primary temperature Continuous recording
control instrument(s).
with sign-off every 2
hours or each batch
for processes under
2 hours. Alarm
systems (if set per
limits in E2.5) satisfy
the sign-off
requirement.
Continuous
Generators
Furnace
Continuous
Sign-off required for each shift for
recording with
generators.
sign-off every 2
hours or each lot
for processes
under 2 hours).
Alarm systems (if
set per limits in
E2.5) satisfy the
sign-off
requirement.
E3.1
1.4
2.14
E3.2
1.4
2.14
3.7
Monitor generator
atmospheres
E3.3
1.4
2.14
3.7
Continuous recording
with sign-off every 2
hours or each batch
for processes under
2 hours. Alarm
systems (if set per
acceptable limits)
satisfy the sign-off
requirement.
Continuous
recording with
sign-off every 2
hours or each lot
for processes
under 2 hours.
Alarm systems (if
set per acceptable
limits) satisfy the
sign-off
requirement.
E3.4
1.4
2.14
3.7
3.8
Daily
Daily
E3.5
1.4
2.14
3.13
Daily
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
E3.6
1.4
2.14
E3.7
1.4
2.7
IN-PROCESS/FINAL TEST
Batch Furnace
FREQUENCIES
Microstructure shall be
Each batch
checked at a minimum
magnification of 100x and,
400x or above 400x.
Microstructural visual
references shall be available.
Continuous
Furnace
Each production
run or each shift
at a minimum.
4.0
E4.1
1.4
2.15
E4.2
1.4
2.15
Each batch
Every 4 hours
E4.3
1.4
2.15
Each batch
Every 4 hours
Concentration
2x / week
2x / week
Concentration of cleaner
Daily
Daily
Temperature of solution
(required if temperature is
specified to be above
ambient temperature).
Each shift
Each shift
5.0
E5.1
2.13
E5.2
2.11
Batch Furnace
Continuous
Furnace
Washers
OK / NOK / NA
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
PROCESS AND TEST EQUIPMENT REQUIREMENTS
F1.1
3.1
3.7
All furnaces and liquid quench systems shall have temperature indicating instruments.
F1.2
3.1
All gaseous quench systems shall have pressure indicators and fan operation indicators.
F1.3
3.1
3.7
Recording instruments are required for temperature and, hydrocarbon flow and pressure.
F1.4
3.2
Furnace weigh scales shall be verified quarterly and calibrated annually at a minimum.
F1.5
3.2
Hydrogen sensors and carbon IR combustion analyzers used to verify carbon potential in furnaces, shall be calibrated annually at
a minimum.
F1.6
3.2
Verification of calibration of spectrometers and carbon IR combustion analyzers, shall be checked daily or prior to use.
F1.7
3.2
F1.8
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified daily or prior to use, per the
applicable ASTM standard, ISO standard, JIS standard, or approved standard.
F1.9
2.16
Files for testing hardness shall be verified per the Customer requirement.
F1.10
3.2
Refractometers (typically used to check polymer quenchants and washer solutions) shall be verified prior to use (with distilled
water) and certified annually per manufacturer's requirements at a minimum.
3.2
3.3
3.2
3.3
F2.3
3.2
3.3
CQI-9 requires a System Accuracy Test (SAT) check of the control thermocouple in the Qualified Work Zone per Section 3.3.
F2.4
3.4
TUS shall be performed annually and after major rebuild per Section 3.4.
F2.5
3.5
2.0
F2.1
F2.2
PYROMETRY
OK / NOK / NA
OK / NOK / NA
Temperature uniformity tolerance for hardening and tempering furnaces shall be +/- 10 C or +/- 20 F.
3.0
F3.1
F3.2
1.4
2.14
Recorded temperature(s) for austentizing and tempering processes shall be controlled within +/- 5 C or +/- 10 F of the set point as
evidenced by continuous recording pyrometers. Furnace temperature shall be controlled with soak times starting at the lower
tolerance limit (as defined above).
PROCESS MONITOR FREQUENCIES
Monitor primary temperature control instrument(s). Continuous recording with sign-off every 2 hours or each batch for processes
under 2 hours. Alarm systems (if set per limits in F2.5) satisfy the sign-off requirement.
1.4
2.14
3.7
1.4
2.14
Monitor primary furnace atmosphere control(s) or hydrocarbon flows. Continuous recording with sign-off every 2 hours or each
batch for processes under 2 hours. Alarm systems (if set per acceptable limits) satisfy the sign-off requirement.
Monitor pressure in the carburizing and gas quenching process. Continuous recording with sign-off every 2 hours or each batch
for processes under 2 hours (carburizing process). Continuous recording with sign-off each batch (quenching process). Alarm
systems (if set per acceptable limits) satisfy the sign-off requirement.
F3.4
1.4
2.14
3.7
3.8
Verify primary atmosphere control method by back-up method by microstructural evaluation of parts or coupon, or carbon analysis
of shim stock or carbon bar. Verification shall be daily.
F3.5
1.2
2.7
Prior to production (APQP), the surface area of the parts shall be calculated and documented for each load configuration.
F3.3
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Category/Process Steps
FREQUENCY
Continuous recording with alarm system is required.
Quench Level
Agitation
F3.7
1.4
2.12
F3.8
F3.9
1.4
2.12
4.0
Weekly
Temper Delay Time The maximum delay time between quenching and tempering
shall be specified on the control plan and monitored.
Each batch
IN-PROCESS/FINAL TEST
FREQUENCY
F4.1
1.4
2.15
Microstructure shall be checked at a minimum magnification of Daily per furnace (may rotate cells) or any time one of the
100x and, 400x or above 400x. Microstructural visual
process parameters is out of specification.
references shall be available.
F4.2
1.4
2.15
1.4
2.15
Surface hardness
Each batch
Daily per furnace (may rotate cells) or any time one of the
process parameters is out of specification.
1.4
2.15
Daily per furnace (may rotate cells) or any time one of the
process parameters is out of specification.
F4.3
F4.4
5.0
F5.1
F5.2
F5.3
F5.4
2.12
3.14
Daily
Semi-annually
2.12
3.14
2.12
3.14
Water Quenching
Suspended solids
Semi-annually
Oil Quenching
Water content, suspended solids, viscosity, cooling curve, total Semi-annually
acid, and flash point.
2.13
F5.5
FREQUENCY
2.11
2x / week
Washers
Concentration of cleaner
Daily
Temperature of solution (required if temperature is specified to Each shift
be above ambient temperature).
OK / NOK / NA
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
Related HTSA
Question #
1.0
G1.1
Category/Process Steps
PROCESS AND TEST EQUIPMENT REQUIREMENTS
3.1
3.7
All furnaces, generators and quench systems shall have temperature indicating instruments.
3.1
3.7
Continuous strip charts and/or data loggers are required for temperature and carbon monitoring unit, e.g., dew point, oxygen probe, IR
gas analyzer, etc.
G1.3
3.1
G1.4
1.18
A program for furnace and generator burnout is required (applies to carbon bearing atmospheres).
G1.5
3.2
Dew pointers, 3-gas analyzers, spectrometers, and carbon IR combustion analyzers (shim stock analysis), used to verify carbon potential
in furnaces, shall be calibrated annually at a minimum (applies to carbon bearing atmospheres).
G1.6
3.2
Verification of calibration of spectrometers, and carbon IR combustion analyzers, shall be checked daily or prior to use (applies to carbon
bearing atmospheres).
G1.7
3.2
Verification of calibration of 3-gas analyzers with zero gas and span gas shall be performed weekly at a minimum (applies to carbon
bearing atmospheres).
G1.8
3.2
Oxygen probe controllers shall be calibrated quarterly (single-point or multi-point calibration) or semi-annual (multi-point calibration only;
single-point calibration not allowed). This applies to carbon bearing atmospheres.
G1.9
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified daily or prior to use, per the
applicable ASTM standard, ISO standard, JIS standard, or approved standard.
G1.2
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
Related HTSA
Question #
Category/Process Steps
2.0
G2.1
G2.2
G2.3
G2.4
PYROMETRY
3.2
3.3
3.2
3.3
3.2
3.3
3.4
TUS shall be performed annually and after major rebuild per Section 3.4.
OK / NOK / NA
Temperature uniformity tolerance for hardening furnaces shall be +/- 15C (or +/- 25F). Temperature uniformity tolerance for tempering
furnaces shall be +/- 10C (or +/- 20F).
G2.5
3.5
Recorded temperature(s) for sintering processes shall be controlled within +/- 10C (or +/- 15F) of the set point for processes operating
less than 1000C (1830F) and +/- 20C (+/- 35F) for processes operating greater than 1000C (1830F) as evidenced by continuous
recording pyrometers. Furnace temperature shall be controlled with soak times starting at the lower tolerance limit (as defined above).
For Continuous Furnaces, this requirement applies to the Qualified Work Zone.
3.0
G3.1
Batch
Furnace
Continuous recording with
sign-off every 2 hours or
each batch for processes
under 2 hours. Alarm
systems (if set per limits in
G2.5) satisfy the sign-off
requirement.
Continuous
Furnace
Continuous recording with
sign-off every 2 hours or
each lot for processes
under 2 hours). Alarm
systems (if set per limits
in G2.5) satisfy the signoff requirement
Atmosphere Generation
One of the three options is
required.
(1) Record temperature 2x
per shift or after any
change.
(2) Continuously record
temperature and sign-off 2x
per shift or after any
change.
(3) Alarm system on
temperature controller.
G3.2
OK / NOK / NA
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
G3.3
Related HTSA
Question #
1.4
Monitor primary furnace atmosphere control(s)
2.14
Flow rates.
3.7
Category/Process Steps
Batch processes are in
vacuum furnaces:
G3.4
1.4
2.14
3.7
3.8
G3.6
1.4
2.12
Daily
G3.7
1.4
2.12
G3.8
1.4
2.14
Each batch
G3.9
1.4
2.7
Each batch
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
G3.10
Related HTSA
Category/Process Steps
Question #
1.4
Quench Delay Time Each batch
Not applicable for belt
2.12
Quench delay time shall be based on the time that the
furnaces.
furnace door starts to open to the time the load is at
the bottom of the quench tank (oil) or the start of the
gas pressure quenching (gas quench).
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Item #
Related HTSA
Question #
4.0
G4.1
G4.2
G4.3
G4.4
Category/Process Steps
1.4
2.15
1.4
2.15
OK / NOK / NA
Each Lot
Each Lot
Apparent hardness
Each batch
Every 4 hours
Each batch
Every 4 hours
CQI-9
PROCESS TABLE H - Ion Nitriding
Category/Process Steps
PROCESS AND TEST EQUIPMENT REQUIREMENTS
OK / NOK / NA
H1.1
3.1
3.7
All vessels shall have temperature, flow meters, vacuum gages, and gas flow indicating instruments.
H1.2
3.1
3.7
Data loggers and/or Recording instruments are required for temperature, pressure, amps and volts. Amps and volts are referance only. Frequency is per
customer and control plan
H1.3
1.18
H1.4
3.2
H1.5
3.2
Gas ratios controller / meters shall be calibrated / verified as recommended by the manufacturer. As an option gas composition may be analyzed using gas
mixture analyzer semi- annually and calibrated as recommended by the manufacturer.
H1.6
2.16
All hardness test equipment (for each scale used) shall be calibrated annually minimum, and verified daily or prior to use, per the applicable ASTM standard,
ISO standard, JIS standard, or approved standard.
H1.7
2.16
Files for testing hardness, if used, shall be verified per the Customer requirement.
2.0
H2.1
H2.2
3.2
3.3
3.2
3.3
PYROMETRY
Thermocouples and calibration of thermocouples shall conform to Section 3.1.
OK / NOK / NA
H2.3
3.2
3.3
Protection Tubes for thermocouples in the vessels, if used, shall be visually checked for each batch.
H2.4
3.4
Temperature Uniformity Survey (TUS) and Systems Accuracy Test (SAT) are not required.
In lieu of TUS & SAT, Temperature ranges shall established during preproduction testing usining multiple thermocouples representing the work zone and
confirmed in the capability study and documented in the Control Plan for each part.
H2.5
3.5
Temperature shall be controlled with thermocouples in the load for each batch placed as practical to represent the extremes of the load (max and min
temperatures) as evidenced by recording.
H2.6
3.2
Infrared pyrometers shall be calibrated annually using proper calibration methods or an approved manufacturer's procedure.
H3.1
1.4
2.14
Each batch or recording per see H1.2 above with sign-off every 2
hours. Alarm systems satisfy the sign-off requirement. Control
plan to include the lose of a thermocouple during the run and alarm
settings. Alarms are to be checked quarterly and alarms during the
cycle are to be documented.
H3.2
1.4
2.14
3.7
Each batch or recording per see H1.2 above with sign-off every 2
hours. Alarm systems satisfy the sign-off requirement. Control
plan to include the alarm setting. Alarms are to be checked quarterly
and alarms during the cycle are to be documented.
3.0
H3.3
H3.5
1.4
2.11
Pump down of 75 microns per hour or less and leak up of 90 microns per hour or less
2.12 are required prior to initiating the cycle
FREQUENCY
Each Batch
1.4
2.14
1.4
2.7
Each batch
Each batch
H4.1
1.4
2.15
H4.2
1.4
2.15
1.4
2.15
1.4
2.15
Surface hardness
Each Batch
Each Batch
Each Batch
2.13
H3.6
4.0
H4.3
H4.4
IN-PROCESS/FINAL TESTS
5.0
H5.1
H5.2
SOLUTION TESTS
2.11
Washers
Concentration of cleaner
Temperature of solution (required if temperature is specified to be above ambient
temperature).
69
OK / NOK / NA
FREQUENCY
OK / NOK / NA
FREQUENCY
OK / NOK / NA