S.B.P COMMERCIAL PVT.LTD.

FOR SLAB BETWEEN G-15/H-8 TO G-15/G-9 & X2- X4


DATE - 12/04/2016

LVL - 14850 & 11550

Breath
0.3
0.3
0.3
0.23
0.23
0.23
0.3

Height
0.6
0.6
0.6
0.6
0.6
0.6
0.6

Quantity
(CUM)
1.35
1.30
2.44
1.06
0.25
0.30
0.60

Suttering For
Beam (Sqm)
11.27
10.82
20.30
10.97
2.57
3.15
5.02

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25

6.92

4.02

0.140

3.89

27.78

M-25

0.6

4.015

0.140

0.17

1.20

M-25

6.92

4.24

0.140

4.10

29.31

M-25

6.92

2.815

0.120

2.34

19.48

M-25

24.37

0.3

0.13

0.95

7.31

M-25

DEDUCT FOR CUT OUTS


13

1.04

0.785

0.12

0.20

0.82

M-25

SUNSHADE LINTEL BEAM


14

55.601

0.5

0.3

8.34

27.80

M-25

Beam

Nos.

Length

Breath

Height

FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20
FB-07
SB

1
1
1
1
1
1
1
1
1
4

8.375
4.795
6.48
4.795
15.31
15.31
7.655
15.31
6.5
2.75

0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4

Quantity
(CUM)
2.26
0.44
1.75
0.44
2.76
2.76
1.38
2.76
1.17
1.0

Suttering For
Beam (Sqm)
11.81
3.79
9.14
3.79
19.29
19.29
9.65
19.29
8.19
2.2

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

S. No.
1
2
3
4
5
6
7

Particular

BEAMS

Beam
FB-02B
FB-09
FB 18
FB-08
B-10
B-20
FB-17

Nos.
1
1
1
1
1
1
1

Length
7.52
7.22
13.54
7.67
1.8
2.2
3.345

C
D

Slab
8
9

Slab

10
11

Projections
12

Slab at 11550 Lvl.


S. No.

Particular

15
16
17
Main
18
19 Building
Towrads
20
M.P
21 Bhawan
22
23
24

TO BE DONE
ON
16.04.2016

Slab
25

Main
Building
Section Slab B/W
26 Towards X2 to X4
M.P.Bhaw
an
27

3.375

3.445

0.12

5.58

11.63

M-25

7.09

1.585

0.12

2.70

11.24

4.6

3.49

0.12

1.34

14.01

15.31

0.3

0.13

1.19

4.59

M-25

0.955

1.01

0.12

0.23

0.96

M-25

M-25
M-25

Projections
28
DEDUCT FOR CUT OUTS
13

29
30
31

Columns
C1
C2A
C2

1
1
1

0.70
0.80
0.80

0.45
0.3
0.4

2.05
2.05
2.05

0.65
0.49
0.66

4.72
4.51
4.92

M-30
M-30
M-30

33
34
35
36
37

Shear Walls
W1
W1
W1
W1
W1

1
1
1
1
1

2.26
2.26
3.50
2.46
2.46

0.23
0.23
0.23
0.23
0.23

2.05
0.95
2.05
0.95
0.95

1.07
0.49
1.65
0.54
0.54

10.21
4.73
15.29
5.11
5.11

M-30
M-30
M-30
M-30
M-30

GRAND Total FOR THE SLAB &


Sunshade

53.61
6.08

GRAND Total FOR THE Columns


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30

0.43
59.27
6
20
-0.08

Quantity Balance/Excess M-25

-33.61

Rest Quantity To Be
Done on 16-04-2016
(Slab at 11550 &
Sunshade Lintel)

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN X4 & X6
DATE - 10/01/2016

S. No.

Particular

Suttering
Quantity
For Beam
(CUM)
(Sqm)

Beam

Nos.

Length

Breath

Height

FB-29
SB-02
FB-29
SB-02
FB-29
FB-32 A
FB-33
FB-20
FB-21
SB

1
1
1
1
1
1
1
1
1
4

8.375
4.795
8.375
4.795
8.375
14.859
14.858
14.859
14.859
1.585

0.45
0.23
0.45
0.23
0.45
0.3
0.3
0.3
0.23
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4

2.26
0.44
2.26
0.44
2.26
2.67
2.67
2.67
2.1
0.6

11.81
3.79
11.81
3.79
11.81
18.72
18.72
18.72
17.7
1.3

Main
Building
Section Slab B/W
11 Towards X4 to X6
M.P.Bhaw
an
12

3.375

3.445

0.12

5.58

11.63

7.09

1.585

0.12

2.70

11.24

7.09

1.578

0.12

2.69

11.19

0.8

0.4

0.6

0.58

0.32

1.8

0.3

0.12

0.19

0.54

0.955

1.01

0.12

0.23

0.96

0.52

1.01

0.12

0.06

0.53

1
2
3
Main
4
5 Building
Towrads
6
M.P
7 Bhawan
8
9

Slab

10

Columns
13

C1

Projections
14

DEDUCT FOR CUT OUTS


Main
Building
14 Section Slab B/W
Towards X4 to X6
M.P.Bhaw
an
15

GRAND Total FOR


THE SLAB

30.06

Deduct
Total

0.29
29.76

S.B.P COMMERCIAL PVT.LTD.


FOR Ramp SLAB BETWEEN
DATE - 10/01/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

3.5

2.3

0.15

3.5

1.1

0.15

3.4

3.5

0.15

0.325

0.83

2.3

0.325

0.83

Filler Wall

5.2

0.3

1.1

Column RC 3

0.4

0.4

Column CT 1

0.6

0.6

RAMP CARRIAGE
WAY

6.27

9.35

0.16

RB 11

7.2

0.45

0.5

RB 10

9.35

0.3

0.45

RB 12

6.4

0.3

0.6

CB10

1
1
1
1

7.2
5.1
0.6
5.1

0.3
0.3
0.6
0.4

0.6
0.6
0.9
0.7

1
1
1
1
1
1
1
1

6.6
6
1.6
5.5
5.5
1.6
5.45
0.6

0.5
1.6
0.5
1.6
0.6
0.325
0.325
0.6

0.6
0.15
0.6
0.15
0.5
0.6
3
2.7

Slab on 3.300
level

R.Wall

BEAM

CB10
Column CT1
Retaining Wall

LEFT OVER PART


BEAM
SLAB
BEAM
SLAB
BEAM
R.WALL
R.WALL
COLUMN

TOTAL

Suttering
Quantity
For Beam
(CUM)
(Sqm)
1.2075

8.05

0.28875

3.85

0.8925

11.9

1.88825

11.62

0.620425

3.818

1.716

11.44

0.16

0.928

0.36

1.632

9.37992

58.6245

1.62

10.44

1.26225

11.22

1.152

9.6

1.296
0.918
0.324
1.428

10.8
7.65
1.4688
7.14

1.98
1.44
0.48
1.32
1.65
0.312
5.31375
0.972

11.22
11.4
2.72
10.45
8.8
1.92
32.7
4.4064

38

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN X2 & X3
DATE - 17/01/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

1 BEAM

2BF 28

6.48

0.45

0.6

2 BEAM

2BF-20

7.879

0.3

0.6

6.979

6.13

0.18

4.6

3.49

0.2

2.75

4.43

0.225

3.76

0.3

0.375

SLAB (Lvl =
+1200

SLAB (Lvl =
+1200

SLAB (Lvl =
+1200

SLAB (Lvl =
+1200

7 BEAM

1 BF-11

6.48

0.3

0.6

8 BEAM

1 BF 20

6.278

0.3

0.6

6.048

6.13

0.18

0.3

2.7

SLAB (Lvl =
-3300)

10 Reataining Wall

17

11 Columns

2.3

0.6

0.6

12 Columns

2.3

0.4

0.4

TOTAL

Suttering
Quantity
For Beam
(CUM)
(Sqm)
1.75

8.75

1.42

7.09

7.70

42.78

1.86

14.01

4.06

18.03

0.423

1.41

1.166

5.83

1.130

5.65

6.673

37.07

14

91.8

1.66

5.52

0.37

3.68

42

.6-.3
15.3

0.526316
0.828

42.308

16.128

45

S.B.P COMMERCIAL PVT.LTD.


FOR Raft
DATE - 19/01/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

Raft

24.14

5.505

0.45

Raft

5.98

10.97

0.45

Footing F1

3.5

3.5

0.4

3.1

3.1

0.35

24.14

0.1

4
5

Footing F2
Retaining Wall
Raft

TOTAL

Suttering
Quantity
For Beam
(CUM)
(Sqm)
59.80

24.14

29.52

5.98

9.80

5.60

3.36

4.34

4.83

4.83

107

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB Main Building Towards Main Road
DATE - 22/01/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

BEAMS
1

FB 16

3.46

0.23

0.6

FB 16

11.92

0.3

0.6

FB 16

1
4.50

0.23

0.6

14.305

0.23

0.6

16.535

0.3

0.6

16.985

0.3

0.6

3
4
5

FB 8

FB 09

FB 02B

6
FB 03 B

9.21

0.3

0.75

FB 03C

8.67

0.3

0.6

FB 31

5.15

0.23

0.6

10

B1

2.5

0.23

0.6

11

B1

1.9

0.23

0.6

12

FB 18

13.535

0.3

0.6

13
14
15
16
17
18
19
20
21

FB 17

FB 17
FB 30
FB 31
FB-20
FB-32A
FB-32A
B10
B20

1
1
1
1
1
1
3
4

3.8
10.234
8.215
6.675
7
3.83
4.5
2.2
1.8

0.3
0.45
0.3
0.23
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

1
1
1

6.6
6.9
8.4

3.3
3.3
4.5

0.12
0.12
0.14

7
8

Beams

Slab
22
23
24

A
B
C

Slab

25
26
27
28
29
30
31

Slab

D
E
F
G
H
I
J
K

1
1
1
1
1
1
1
1

7.3
7.3
8.4
8.1
8.4
3.6
4.2
8.5

4.5
3.7
3.7
0.6
6.2
1.9
4.4
3.0
TOTAL

0.14
0.14
0.14
0.14
0.14
0.12
0.14
0.12

Suttering
Quantity
For Beam
(CUM)
(Sqm)

0.48

4.95

2.15

17.88

0.62

6.43

1.97

20.46

2.98

24.80

3.06

25.48

2.07

16.58

1.56

13.01

0.71

7.36

0.35

3.58

0.52

2.72

2.44

20.30

0.68
2.76
1.48
0.92
1.28
0.69
0.81
0.91
0.99

5.70
16.89
10.4
7.9
8.96

2.61
2.72
5.32

21.73
22.70
38.03

5.67
2.62

4.65
3.81
4.36
0.68
7.27
0.82
2.60
3.04
67.32

33.25
27.23
31.15
4.88
51.90
6.82
18.55
25.30

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB Main Building Towards Main Road
DATE - 22/01/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

BEAMS
1

FB 16

3.46

0.23

0.55

FB 16

11.92

0.3

0.55

FB 16

1
4.50

0.23

0.55

14.305

0.23

0.55

16.535

0.3

0.55

16.985

0.3

0.55

3
4
5

FB 8

FB 09

FB 02B

6
FB 03 B

9.21

0.3

0.745

FB 03C

8.67

0.3

0.6

FB 31

5.15

0.23

0.6

10

B1

2.5

0.23

0.6

11

B1

1.9

0.23

0.6

12

FB 18

13.535

0.3

0.6

13
14
15
16
17
18
19
20
21

FB 17

FB 17
FB 30
FB 31
FB-20
FB-32A
FB-32A
B10
B20

1
1
1
1
1
1
3
3

3.8
10.234
8.215
6.675
7
3.83
4.5
2.2
1.8

0.3
0.45
0.3
0.23
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

1
1
1

6.6
6.9
8.4

3.3
3.3
4.5

0.11
0.11
0.135

7
8
9

Beams

Slab
22 Slab
23
24

A
B
C

25
26
27
28
29
30
31

D
E
F
G
H
I
J
K

1
1
1
1
1
1
1
1

7.3
7.3
8.4
8.1
8.4
3.6
4.2
8.5

4.5
3.7
3.7
0.6
6.2
1.9
4.4
3.0

0.135
0.13
0.13
0.13
0.13
0.11
0.135
0.12

TOTAL
TOTAL Ordered
Balance/ Excess

Suttering
Quantity
For Beam
(CUM)
(Sqm)

0.44

4.60

1.97

16.69

0.57

5.98

1.81

19.03

2.73

23.15

2.80

23.78

2.06

16.49

1.56

13.01

0.71

7.36

0.35

3.58

0.52

2.72

2.44

20.30

0.68
2.76
1.48
0.92
1.28
0.69
0.81
0.91
0.75

5.70
16.89
10.4
7.9
8.96

2.39
2.50
5.13

21.73
22.70
38.03

5.67
2.62

4.49
3.54
4.05
0.63
6.75
0.75
2.50
3.04
64.00
65.00
1.00

33.25
27.23
31.15
4.88
51.90
6.82
18.55
25.30

S.B.P COMMERCIAL PVT.LTD.


For Slab Upper Basement Roof Level & Column Above G- Level Roof
DATE - 03/02/2016

S. No.

Particular

Beam

Nos.

Length

Breath

Height

2 BF-12

7.36

0.6

1.1

2 BF-11

7.36

0.6

1.1

2 BF-01

14.22

0.45

0.75

2 BF - 10

9.259

0.6

1.1

R-Wall

B/W A0-D

21.175

0.3

0.4

Slab

B/W D-C

1
6.36

5.497

0.225

3.309

7.07

0.16

7.745

1.847

0.175

0.8

0.3

2.85

Beams
3

6
Slab

B/W 16 13b

Slab

B/W A - C

Column

C2A

10

Shear Wall

W1

2.4

0.23

2.85

11

Shear Wall

W1

2.4

0.23

1.35

12

Column

C2

0.8

0.4

2.85

13
13

Shear Wall

W1

3.5
3.29

0.23
1.5

2.85
0.15

7
8
9

Stair Case

TOTAL
TOTAL Ordered
Balance/ Excess
Short Quantity

Suttering
Quantity
For Beam
(CUM)
(Sqm)

Grade

4.86

20.61

M- 25

4.86

20.61

M- 25

4.80

27.73

M- 25

6.11

25.93

M- 25

2.54

16.94

M- 25

7.87

M- 25
34.96
M- 25

3.74

23.39

2.50

14.31

2.74

25.08

1.57

14.99

M-30

0.75

7.10

M-30

0.91

6.84

M-30

2.29
2.5

21.26
1.44

M-30

48.04
48.00
-0.04
0.8832

M- 25
M-30

M-30

1
M30

S.B.P COMMERCIAL PVT.LTD.


For Raft Between A0-8/B-8 to A0-5a/B-4
DATE - 11/02/2016

S. No.

Particular

Raft

Retaining Wall
2 Raft
Footings

Beam/
Column/
Footing

Nos.

Length

Breath

Height

Suttering
Quantity
For Beam
(CUM)
(Sqm)

12

13.375

0.45

69.22

153.81

M-25

15

0.1

3.00

3.00

M-25

(F1)

3.50

3.5

0.4

19.60

22.40

M-25

92
90
-2
-

M25

TOTAL (As per Drawings)


TOTAL Ordered
Balance/ Excess
Short Quantity

Grade

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN X4 & X6
DATE - 13/02/2016

S. No.

Particular

LVL- 8100
Suttering
Quantity
For Beam
(CUM)
(Sqm)

Beam

Nos.

Length

Breath

Height

FB-29
SB-02
FB-29
SB-02
FB-29
FB-32 A
FB-33
FB-20
FB-21
SB
FB-30

1
1
1
1
1
1
1
1
1
5
1

8.38
4.80
8.38
4.80
8.38
18.58
18.58
18.58
19.18
1.59
8.38

0.45
0.23
0.45
0.23
0.45
0.3
0.3
0.3
0.3
0.23
0.3

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4
0.6

2.26
0.44
2.26
0.44
2.26
3.34
3.34
3.34
3.5
0.7
1.51

11.81
3.79
11.81
3.79
11.81
23.41
23.41
23.41
24.2
1.3
10.55

3.375

3.445

0.12

5.58

11.63

7.09

1.585

0.12

2.70

11.24

7.09

1.578

0.12

2.69

11.19

3.048

3.445

0.12

1.26

10.50

3.048

1.585

0.12

1.16

4.83

C1

0.8

0.4

0.6

0.77

0.32

C1

1.2

0.7

0.45

0.38

0.84

W-1Y

1.345

0.23

0.6

0.19

0.31

1.8

0.3

0.12

0.39

0.54

0.55

1.01

0.12

0.13

0.56

0.45

1.01

0.12

0.05

0.45

7.3

0.3

0.6

1.31

0.7

0.45

0.6

0.19

1
2
3
4
Main
5 Building
6 Towrads
M.P
7
8 Bhawan
9
10
11

Slab

12
Main
13 Building
Section Slab B/W
14 Towards X4 to X7
M.P.Bhaw
an
15
16

Columns
17
18
19

Projections
20

DEDUCT FOR CUT OUTS


Main
Building
21 Section Slab B/W
Towards X4 to X6
M.P.Bhaw
an
22

Retaining Wall

23

Between X1-X2

GRAND Total FOR THE SLAB

40.18

Deduct
Total
Quantity Ordered
Quantity Balance/Excess

0.13
40.05
40
-0.05

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN X4 & X6
DATE - 14/02/2016

S. No.

Particular

LVL- 4650
Suttering
Quantity
For Beam
(CUM)
(Sqm)

Beam

Nos.

Length

Breath

Height

FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20
FB-07
SB

1
1
1
1
1
1
1
1
1
4

8.375
4.795
6.48
4.795
15.31
15.31
7.655
15.31
6.5
2.75

0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4

2.26
0.44
1.75
0.44
2.76
2.76
1.38
2.76
1.17
1.0

11.81
3.79
9.14
3.79
19.29
19.29
9.65
19.29
8.19
2.2

3.375

3.445

0.12

5.58

11.63

7.09

1.585

0.12

2.70

11.24

4.6

3.49

0.12

1.34

14.01

C1

0.8

0.4

0.6

0.58

0.32

W-1X

1.734

0.23

0.6

0.24

0.40

1.8

0.3

0.12

0.19

0.54

0.955

1.01

0.12

0.23

0.96

1
2
3
Main
4
5 Building
Towrads
6
M.P
7 Bhawan
8
9

Slab
Main
Building
Section Slab B/W
11 Towards X2 to X4
M.P.Bhaw
an
12
10

Columns
15
16

Projections
17

DEDUCT FOR CUT OUTS

18

Main
Building
Section Slab B/W
Towards X2 to X4
M.P.Bhaw
an

GRAND Total FOR THE SLAB

27.35

Deduct
Total
Quantity Ordered
Quantity Balance/Excess

0.23
27.12
25
-2.12

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN E-15/E-8 TO G-15/G-9
DATE - 18/02/2016

S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13

Particular

LVL-8100

Suttering
Quantity For Beam
(CUM)
(Sqm)
0.48
4.95
2.15
17.88
0.62
6.43
1.97
20.46
2.98
24.80
3.06
25.48
2.07
16.58
0.68
5.70
2.76
16.89
1.28
4.86
1.56
13.01
0.61
2.62
0.25
2.14

Beam
FB 16
FB 16
FB 16
FB 8
FB 09
FB 02B
FB 03 B
FB 17
FB 17
FB-20
FB 03C
B10
B20

Nos.
1
1
1
1
1
1
1
1
1
1
1
2
1

Length
3.46
11.92
4.50
14.305
16.535
16.985
9.21
3.8
10.234
4
8.67
2.2
1.8

Breath
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.23
0.23

Height
0.6
0.6
0.6
0.6
0.6
0.6
0.75
0.6
0.6
0.6
0.6
0.6
0.6

12

6.525

3.3

0.12

2.57

21.45

M-25

13

8.985

4.2

0.14

5.33

38.06

M-25

8.985

3.7

0.14

4.67

33.38

M-25

15

6.2

8.985

0.14

4.84

55.62

M-25

16

3.4

3.0

0.12

0.88

10.18

M-25

17

4.2

4.4

0.14

2.60

18.55

M-25

5
1
1

0.7
0.7
0.8

0.45
0.45
0.3

2.85
2.85
2.85

4.49
0.90
0.68

32.78
6.56
6.27

M-30
M-30
M-30

2
3

5.512
0.8

0.3
0.3

0.12
0.12

0.40
0.09

1.65
0.24

M-25
M-25

1.7

0.885

0.12

0.18

1.50

M-25

BEAMS

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

Slab

14

17
18
19

Slab

Columns
C1
C2
C2A

Projections
20
21

DEDUCT FOR CUT OUTS


22

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

47.82
0.18
47.64

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR SLAB BETWEEN G-15/G-9 TO H-15/H-9 &
Columns & R.wall + Filler Wall
LVL- (+8100) ; (-7820) ;
(+150) ; (+4650)

DATE - 23/02/2016

Particular

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Suttering
For Beam
(Sqm)

GRADE

BEAMS

FB-02B
FB-09
FB 18
FB-08
FB 17
B-10
B-20

1
1
1
1
1
1
1

7.52
7.22
13.54
7.215
3.715
1.8
2.2

0.3
0.3
0.3
0.23
0.45
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6

1.35
1.30
2.44
1.00
1.00
0.25
0.30

11.27
10.82
20.30
10.32
6.13
2.57
3.15

M-25
M-25
M-25
M-25
M-25
M-25
M-25

4.015

7.9

0.14

4.29

31.84

M-25

7.100

4.2

0.14

4.21

30.08

M-25

10

7.100

3.6

0.12

3.05

25.40

M-25

11

2.200

0.9

0.14

0.28

1.98

M-25

1.5

0.3

0.12

0.11

0.45

M-25

0.75

0.12

0.18

0.75

M-25

1.5

0.15

1.58

10.54

M-25

0.23

0.23

0.34

0.18

M-25

13.99

0.6

0.23

1.93

46.45

M-25

20

2.25

0.325

14.63

206.00

M-25

S. No.
1
2
3
4
5
6
7

Slab
8
9
Slab

Projections
12
DEDUCT FOR CUT OUTS
13
STAIR CASE (-6600)
14
Sump Pit Walls
15
Filler Wall
16

Filler Wall (Between


A/D)

Retaining Wall
17

Between (A/7 to A3a)

Columns
18

C1

2.85

0.7

0.45

4.49

13.11

M-30

19
20
21
22

C2
RC2
C1
C2A

2
1
1
1

2.85
2.85
3.25
2.85

0.8
0.8
0.7
0.8

0.4
0.3
0.45
0.3

1.82
0.68
1.02
0.68

13.68
12.54
14.95
12.54

M-30
M-30
M-30
M-30

Shear Wall
23

Lift Shear Wall

3.25

2.4

0.23

1.79

34.19

M-30

24

CR1

3.2

0.9

0.3

0.86

15.36

M-30

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

49.59
0.18
49.41

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR SLAB BETWEEN X1-X2 & Columns & Shear Wall
DATE - 2/03/2016

LVL- (+8100) ; (+1200)


STEEL Quantity (KGS)

S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

GRADE

10

12

16

20

25

32

Spacer
Bars

1
2

BEAMS

2BF- 11
2BF-20

1
1

6.36
6.05

0.23
0.3

1.25
0.6

1.83
1.09

M-25
M-25

91.10
65.52

105.04
29.15

148.94
44.58

61.38
36.40

9.1
11.4

2BF- 11
2BF-20

1
1

6.36
6.05

0.23
0.3

1.25
0.6

16.22
7.98

6.05

5.81

0.18

6.32

6.05

5.81

0.18

35.14

3
1

2.85
2.85

0.8
0.8

0.3
0.4

2.05
0.91

3
1

2.85
2.85

0.8
0.8

0.3
0.4

18.81
6.84

1
1

5.2
3.6

1.5
1.5

0.16
0.16

1.24
0.86

1
1

5.2
3.6

1.5
1.5

0.16
0.16

8.59
5.98

Shuttering For Beams (Sqm)


1
2

BEAMS

Slab
8

b/w X1-X2

M-25

Shuttering For Slab (Sqm)


8

b/w X1-X2

Columns
22
23

C2A
C2

Shuttering For Column (Sqm)


22
C2A
23
C2

M-30
M-30

Stair Case
24

M-25
M-25

Shuttering For Stair Case (Sqm)


24

Shear Wall
25

Lift Shear Wall

2.26

2.85

0.23

2.96

M-30

26
27

Lift Shear Wall


Lift Shear Wall

2
1

2.46
3.5

2.85
2.85

0.23
0.23

3.23
2.29

M-30
M-30

2
2
1

2.26
2.46
3.5

2.85
2.85
2.85

0.23
0.23
0.23

27.84
30.31
21.56

Shuttering For Column (Sqm)


25
Lift Shear Wall
26
Lift Shear Wall
27
Lift Shear Wall

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

22.79
0.00
22.79
24.00
-1.21

227.0521 392.6222

16

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR SLAB BETWEEN X4 - X6

Revised

DATE Of CONCRETE- 8/03/2016

LVL- (+14850)

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Shuttering For
Beam (Sqm)

GRADE

1
2
3
4

FB-29
SB-02
FB-29
SB-02

1
1
1
1

8.38
4.80
8.38
4.80

0.45
0.23
0.45
0.23

0.6
0.4
0.6
0.4

2.26
0.44
2.26
0.44

11.81
3.79
11.81
3.79

M-25
M-25
M-25
M-25

FB-29

8.38

0.45

0.6

2.26

11.81

M-25

FB-32 A

18.58

0.3

0.6

3.34

23.41

M-25

FB-33

18.58

0.3

0.6

3.34

23.41

M-25

FB-20
FB-21
SB
FB-30

1
1
5
1

18.58
19.18
1.59
8.38

0.3
0.3
0.23
0.3

0.6
0.6
0.4
0.6

3.34
3.5
0.7
1.51

23.41
24.2
1.3
10.55

M-25
M-25
M-25
M-25

4
2

3.375
7.09

3.445
1.585

0.12
0.12

5.58
2.70

11.63
11.24

M-25
M-25

7.09

1.578

0.12

2.69

11.19

M-25

3.048

3.445

0.12

1.26

10.50

M-25

3.048

1.585

0.12

1.16

4.83

M-25

1
1

18.583
7.88

0.3
0.3

0.12
0.12

0.67
0.28

5.57
2.36

M-25
M-25

2
2

0.955
0.52

1.01
1.01

0.12
0.12

0.23
0.13

0.96
0.53

M-25
M-25

S. No.

Particular

Main
Building
6 Towrads
M.P
7 Bhawan
8
9
10
11

Slab
12
Main
13 Building
14 Section Slab B/W
15 Towards X4 to X7
M.P.Bhaw
an
16

Projections
14
14

DEDUCT FOR CUT OUTS


14
Slab B/W X4 to X6
15

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

38.08
0.36
37.72

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR Raft BETWEEN Y3 - X1
DATE -7/03/2016

S. No.
1

2
3

LVL- (-7820)

Particular

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Shuttering For
Beam (Sqm)

GRADE

Raft

8.14

10.472

0.45

38.37

8.38

M -25

Retaining
Wall Raft

8.14

0.1

1.63

1.83

M -25

Footing
CF 12

5.40

5.90

0.35

9.56

5.74

M -25

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

49.55
0.00
49.55

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR Ramp SLAB BETWEEN B2 ROOF TO B2
DATE Of CONCRETE- 13/03/2016

LVL- (-3300 TO -6600)

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Shuttering For
Beam (Sqm)

GRADE

CB - 10

8.82

0.3

0.6

1.16

11.82

M-25

CB - 10

3.92

0.3

0.6

0.52

5.25

M-25

RB - 10

6.37

0.3

0.45

0.55

5.61

M-25

CB - 10

5.21

0.3

0.6

0.69

6.98

M-25

5
6
7

CB - 10
RB - 10
CB - 10

1
1
1

5.21
5.21
17.33

0.3
0.3
0.3

0.6
0.45
0.6

0.69
0.45
2.29

6.98
4.58
23.22

M-25
M-25
M-25

8 Ramp (B2 Roof to


B2 Level)
9

CB - 10

7.90

0.3

0.6

1.04

10.59

M-25

RB - 10

12.61

0.3

0.45

1.10

11.10

M-25

10

CB - 10

2.04

0.3

0.6

0.27

2.73

M-25

11

CB - 10

2.04

0.3

0.6

0.27

2.73

M-25

11

RB - 10

2.04

0.3

0.45

0.18

1.80

M-25

12
13
14

RB-11
RB-12
RB-12

1
1
1

7.33
7.33
6.75

0.3
0.4
0.4

0.6
0.6
0.6

0.97
1.29
1.19

8.65
9.38
8.64

M-25
M-25
M-25

15

6.4

0.16

3.08

19.24

M-25

16

5.206

0.16

2.50

15.62

M-25

17

S. No.

Particular

Slab

Ramp (B2 Roof to


18
B2 Level)

14.9

0.16

7.16

44.74

M-25

6.273

0.16

3.01

18.82

M-25

19

5.206

0.16

2.50

15.62

M-25

20

6.273

0.16

3.01

18.82

M-25

21

2.04

0.16

0.98

6.12

M-25

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered
Quantity Balance/Excess

34.89
0.00
34.89

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN E-15/E-8 TO G-15/G-9
DATE - 15/03/2016

S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13

Particular

REVISED
LVL - 11550

Suttering
Quantity For Beam
(CUM)
(Sqm)
0.48
4.95
2.15
17.88
0.62
6.43
1.38
14.33
2.21
18.38
2.21
18.38
2.07
16.58
0.68
5.70
2.76
16.89
1.28
4.86
1.56
13.01
0.61
2.62
0.25
2.14
0.50
4.28
0.52
2.26
0.50
2.14

Beam
FB 16
FB 16
FB 16
FB 8
FB 09
FB 02B
FB 03 B
FB 17
FB 17
FB-20
FB 03C
B10
B20
B20
B1
B1

Nos.
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
2

Length
3.46
11.92
4.50
10.02
12.25
12.25
9.21
3.8
10.234
4
8.67
2.2
1.8
3.6
1.9
1.8

Breath
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.23
0.23
0.23
0.23
0.23

Height
0.6
0.6
0.6
0.6
0.6
0.6
0.75
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

12

6.525

3.3

0.12

2.57

13

8.985

4.2

0.14

5.33

14

8.985

3.7

0.14

4.67

6.2

8.985

0.14

4.84

BEAMS

14
15

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

Slab

15

Slab

16

17

38.06
33.38
55.62
10.18

M-25
M-25
M-25
M-25

3.4

3.0

0.12

0.88

4.2

4.4

0.14

2.60

3.3

2.4

0.14

1.10

7.85

5
1
1
1

0.7
0.7
0.8
1.906

0.45
0.45
0.3
0.23

2.7
2.7
2.7
2.7

4.25
0.85
0.65
1.18

31.05
6.21
5.94
11.53

M-30
M-30
M-30
M-30

1
1

20.48
17.125

0.3
0.3

0.12
0.12

0.74
0.62

6.14
5.14

M-25
M-25

22

1.7

0.885

0.12

0.54

1.50

M-25

STAIR CASE (11550)


14

1.5

0.15

1.77

11.79

M-25

18

Columns (done on
14/3/2016)
17
C1
18
C2
19
C2A
19
W1X

21.45

18.55

M-25
M-25
M-25

Projections
20
21

DEDUCT FOR CUT OUTS

GRAND Total FOR THE SLAB/


Staircase
GRAND Total FOR THE
Columns
Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

44.88
6.93
0.54
51.27
8
45
-1.07
-0.12

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN G-15/G-8 TO H-15/H-9
DATE - 19/03/2016

S. No.
1
2
3
4
6
7

LVL - 11550
Suttering
Quantity
For Beam
(CUM)
(Sqm)

Particular

Beam

Nos.

Length

Breath

Height

GRADE

BEAMS
(G/H TO
15/8)

FB-02B
FB-09
FB 18
FB-08
B-10
B-20

1
1
1
1
1
1

7.52
7.22
13.54
4.915
1.8
2.2

0.3
0.3
0.3
0.23
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6

1.35
1.30
2.44
0.68
0.25
0.30

11.27
10.82
20.30
7.03
2.57
3.15

M-25
M-25
M-25
M-25
M-25
M-25

4.015

5.8

0.14

3.11

23.41

M-25

7.100

4.2

0.14

4.21

30.08

M-25

7.100

3.6

0.12

3.05

25.40

M-25

18.260

0.3

0.14

0.77

5.48

M-25

2
3
1
2

2.7
2.7
2.7
2.7

0.7
0.8
0.8
0.8

0.45
0.4
0.3
0.3

1.70
2.59
0.65
1.30

24.84
38.88
11.88
23.76

M-30
M-30
M-30
M-31

0.785

1.04

0.12

0.10

0.82

M-25

10

12

66
62
94
68
16
16

21

Slab

8
9

SLABS
(G/H TO
15/8)

10

Projections
12
Columns
18
19
20
21

C1
C2
RC1
C2A
Deductions

GRAND Total FOR THE SLAB

17.45

GRAND Total FOR THE


Columns

6.24

Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

0.10
23.59

254

557

188

594

162

290

16

20

25

7
11
66
29
44
44

102
86

274
153
239
168

62
21
21

32

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN
DATE - 20/03/2016

S. No.
1
2
3
4
5
6
7
8
10

LVL - 8100
Suttering
Quantity
For Beam
(CUM)
(Sqm)

Particular

Beam

Nos.

Length

Breath

Height

GRADE

Main
Building
Towrads
M.P
Bhawan

FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20
SB

1
1
1
1
1
1
1
1
4

8.38
4.80
6.48
4.795
15.31
15.31
7.655
15.31
2.75

0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.4

2.26
0.44
1.75
0.44
2.76
2.76
1.38
2.76
1.01

11.81
3.79
9.14
3.79
19.29
19.29
9.65
19.29
2.17

M
M
M
M
M
M
M
M
M

Main
Building
Section Slab B/W
Towards X2 to X4
M.P.Bhaw
an

3.375

3.4

0.12

5.58

11.63

M 25

519

7.090

1.6

0.12

2.70

11.24

M 25

424

4.600

3.5

0.12

1.34

14.01

M 25

485

0.955

1.01

0.12

0.23

0.96

M 25

17.31

0.3

0.12

0.62

5.19

M 25

W1

2.7

2.26

0.23

2.81

12.42

M-30

W1

2.7

2.46

0.23

3.06

12.96

M-30

W1

2.7

3.5

0.23

2.17

11.88

M-30

25
25
25
25
25
25
25
25
25

10

12

16

20

25

32

100
12
157
12
150
125
96
97
26

40
36
50
36

51

80

477

122

198

162

130
85
104

281
47
256
173

SLABS
10
11
12

Main
DEDUCT Building
FOR CUT OUTS
Section Slab B/W
18
Towards X2 to X4
M.P.Bhaw
an
Projections

17

Columns

18
19
20

GRAND Total FOR THE SLAB

25.79

GRAND Total FOR THE


Columns

8.04

Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

0.23
33.60

90
26
121
58

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.

FOR SLAB BETWEEN X4 - X7

FOR SLAB BETWEEN X4 - X6 (Steel Quantity)

DATE Of CONCRETE- 16/03/2016

S. No.

Particular
1
2
3
4
5

Main
Building
6 Towrads
M.P
7 Bhawan
8
9
10
11

LVL- (+14850)

DATE Of CONCRETE- 16/03/2016

LVL- (+14850)

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Shuttering For
Beam (Sqm)

GRADE

10

12

16

20

25

32

FB-29
SB-02
FB-29
SB-02

1
1
1
1

8.38
4.80
8.38
4.80

0.45
0.23
0.45
0.23

0.6
0.4
0.6
0.4

2.26
0.44
2.26
0.44

11.81
3.79
11.81
3.79

M-25
M-25
M-25
M-25

18
18

100

40
60
40
60

51

80

477

51

80

477

40

477

100

FB-29

8.38

0.45

0.6

2.26

11.81

M-25

100

FB-32 A

18.58

0.3

0.6

3.34

23.41

M-25

238

FB-33

18.58

0.3

0.6

3.34

23.41

M-25

199

FB-20
FB-21
SB
FB-30

1
1
5
1

18.58
19.18
1.59
8.38

0.3
0.3
0.23
0.3

0.6
0.6
0.4
0.6

3.34
3.5
0.7
1.51

23.41
24.2
1.3
10.55

M-25
M-25
M-25
M-25

199
137
38
64

4
2

3.375
7.09

3.445
1.585

0.12
0.12

5.58
2.70

11.63
11.24

M-25
M-25

719
345

7.09

1.578

0.12

2.69

11.19

M-25

344

3.048

3.445

0.12

1.26

10.50

M-25

202

3.048

1.585

0.12

1.16

4.83

M-25

128

1
1

18.583
7.88

0.3
0.3

0.12
0.12

0.67
0.28

5.57
2.36

M-25
M-25

2
2

0.955
0.52

1.01
1.01

0.12
0.12

0.23
0.13

0.96
0.53

M-25
M-25

51

80

208

448

143

135

74

110
37
160

149

157
365

51

287

10
1243

12
0

Slab
12
Main
13 Building
14 Section Slab B/W
Towards X4 to X7
15
M.P.Bhaw
an
16

Projections
14
14

48
20

DEDUCT FOR CUT OUTS


14
Slab B/W X4 to X6
15

GRAND Total FOR THE SLAB

35.06

GRAND Total FOR THE SLAB

GRAND Total FOR THE


Columns

0.00

GrAND TOTAL Placed at Site

Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

0.36
34.70

8
1775

16
690

20
696

25
1571

32
1430

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR SLAB BETWEEN X4 - X6
DATE Of CONCRETE- 23/03/2016

LVL- (+14850)

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

1
2
3
4

FB-29
SB-02
FB-29
SB-02

1
1
1
1

8.24
4.48
8.24
4.48

0.45
0.23
0.45
0.23

0.6
0.4
0.6
0.4

2.22
0.41
2.22
0.41

FB-29

8.24

0.45

0.6

2.22

FB-32 A

15.31

0.3

0.6

2.76

FB-33

15.31

0.3

0.6

2.76

8
9
10

FB-20
FB-21
SB

1
1
4

15.31
15.31
1.59

0.3
0.3
0.23

0.6
0.6
0.4

2.76
2.8
0.6

3.375

3.445

0.12

5.58

7.09

1.585

0.12

2.70

7.09

1.578

0.12

2.69

1
1

15.31
7.88

0.3
0.3

0.12
0.12

0.55
0.28

2
2

0.955
0.52

1.01
1.01

0.12
0.12

0.23
0.13

7.0

1.5

0.15

1.56

S. No.

Particular

BEAMS

Slab

11

Main
Building
Section Slab B/W
12
Towards X4 to X6
M.P.Bhaw
an
13

Projections
14
15

DEDUCT FOR CUT OUTS


16
17

Slab B/W X4 to X6

Stair Case ( 11550 to


14850)
18
WAIST SLAB

19

BEAM

4.2

0.45

0.3

0.57

2
2

2.7
2.7

2.26
2.46

0.23
0.23

2.81
3.06

W1

2.7

3.5

0.23

2.17

C2A

2.7

0.8

0.3

1.94

C2

2.7

0.8

0.4

0.86

Columns
20
W1
21
W1
22
23
24

GRAND Total FOR THE SLAB


GRAND Total FOR THE
Columns
Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

33.03
10.84
0.36
43.52
13.5
32
2.66
-1.03

Shuttering For
Beam (Sqm)

GRADE

11.62
3.54
11.62
3.54

M-25
M-25
M-25
M-25

11.62

M-25

19.29

M-25

19.29

M-25

19.29
19.3
1.3

M-25
M-25
M-25

11.63

M-25

11.24

M-25

11.19

M-25

4.59
2.36

M-25
M-25

0.96
0.53

M-25
M-25

10.43

M-25

33.03
10.84
0.36
43.52
13.5
32
2.66
-1.03

4.41

M-26

26.89
29.05

M-30
M-30

DONE

20.14

M-30

DONE

17.82

M-30

DONE

6.48

M-30

DONE

S.B.P Commercial Pvt. Ltd.


Reconstruction Of Assam House New Delhi.
FOR Retaining Wall & Walls

REVISED

DATE Of CONCRETE- 23/03/2016

LVL- ( +8100, -6600)

Columns

Nos.

Q (cums)

C1
W1X
FR1
C2
CT1
CT1
CR1

3
1
1
1
1
1
3

2.7
2.7
1.39
0.60
1.16
1.39
1.20

0.7
1.829
0.4
0.8
0.6
0.6
0.3

0.45
0.23
0.4
0.45
0.6
0.6
3

2.55
1.14
0.22
0.22
0.42
0.50
3.24

Retaining Wall

Nos.

Q (cums)

8.4

0.325

8.22

Nos.

Q (cums)

1
1

8.7
3.6

1.8
0.23

0.15
0.3

2.35
0.25

20
21
22
23
24
25
26

27

INCLUDING SHEAR
WALLS

Stair Case
28
29

GRAND Total FOR THE


R.Wall/ Staircase
GRAND Total FOR THE
Columns
Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

10.81
8.29
0.00
19.10

Q (Sqm.)
(shuttering)
18.63
11.12
2.23
1.50
2.79
3.34
23.76

10.81
8.29
0.00
19.10

GRADE
M-30
M-30
M-30
M-30
M-30
M-30
M-30

Q (Sqm.)
(shuttering)

GRADE

50.56

M-25

Q (Sqm.)
(shuttering)

GRADE

15.66
2.988

M-25
M-25

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN E-15/E-8 TO G-15/G-9 & X6- X7
DATE - 15/03/2016

REVISED
LVL - 14850

Beam
FB 16
FB 16
FB 16
FB 8
FB 09
FB 02B
FB 03 B
FB 17
FB 17
FB-21
FB-20
FB- 30
FB-31
FB 03C
B10
B20
B20
B1
B1

Nos.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
1
4
2

Length
3.46
11.92
4.50
6.825
8.985
8.985
8.985
2.815
10.234
3.363
6.993
8.38
6.115
8.67
2.2
1.8
3.6
1.9
1.8

Breath
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.3
0.45
0.3
0.3
0.3
0.3
0.3
0.23
0.23
0.23
0.23
0.23

Height
0.6
0.6
0.6
0.6
0.6
0.6
0.75
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

Quantity
(CUM)
0.48
2.15
0.62
0.94
1.62
1.62
2.02
0.51
2.76
0.61
1.28
1.28
1.28
1.56
0.91
0.75
0.50
1.05
0.50

Suttering For
Beam (Sqm)
4.95
17.88
6.43
9.76
13.48
13.48
16.17
4.22
16.89
5.04
8.81
10.55
7.70
13.01
2.62
2.14
4.28
2.26
2.14

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

12

6.525

2.930

0.12

2.29

19.12

M-25

13

8.535

4.236

0.14

5.06

36.15

M-25

14

8.535

3.7

0.14

4.44

31.71

M-25

8.535

6.790

0.14

6.11

34.71

M-25

16

2.977

4.2

0.12

1.14

12.64

M-25

17

1.660

2.977

0.12

1.19

4.94

M-25

4.3

4.0

0.14

1.67

17.47

M-25

1
1

20.48
17.125

0.3
0.3

0.12
0.12

0.74
0.62

6.14
5.14

M-25
M-25

1.7

0.885

0.12

0.54

1.50

M-25

Nos.

Q (cums)

Q (Sqm.)
(shuttering)

GRADE

1
1

8.7
3.6

1.8
0.23

0.15
0.3

2.35
0.25

15.66
2.988

M-25
M-25

S. No.
1
2
3
4
5
6
7
8
9

Particular

BEAMS
10

11
12
13
14
15

Slab

Slab

15

18

Projections
20
21

DEDUCT FOR CUT OUTS


22

Stair Case
28
29

GRAND Total FOR THE SLAB/


Staircase
GRAND Total FOR THE
Columns
Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess
M25

48.27

0.54
47.73

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN G-15/H-8 TO G-15/G-9 & X2- X4
DATE - 12/04/2016

LVL - 14850 & 11550

Breath
0.3
0.3
0.3
0.23
0.23
0.23
0.3

Height
0.6
0.6
0.6
0.6
0.6
0.6
0.6

Quantity
(CUM)
1.35
1.30
2.44
1.06
0.25
0.30
0.60

Suttering For
Beam (Sqm)
11.27
10.82
20.30
10.97
2.57
3.15
5.02

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25

6.92

4.02

0.140

3.89

27.78

M-25

0.6

4.015

0.140

0.17

1.20

M-25

6.92

4.24

0.140

4.10

29.31

M-25

6.92

2.815

0.120

2.34

19.48

M-25

24.37

0.3

0.13

0.95

7.31

M-25

DEDUCT FOR CUT OUTS


13

1.04

0.785

0.12

0.20

0.82

M-25

SUNSHADE LINTEL BEAM


14

55.601

0.5

0.3

8.34

27.80

M-25

Beam

Nos.

Length

Breath

Height

FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20
FB-07
SB

1
1
1
1
1
1
1
1
1
4

8.375
4.795
6.48
4.795
15.31
15.31
7.655
15.31
6.5
2.75

0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4

Quantity
(CUM)
2.26
0.44
1.75
0.44
2.76
2.76
1.38
2.76
1.17
1.0

Suttering For
Beam (Sqm)
11.81
3.79
9.14
3.79
19.29
19.29
9.65
19.29
8.19
2.2

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

S. No.
1
2
3
4
5
6
7

Particular

BEAMS

Beam
FB-02B
FB-09
FB 18
FB-08
B-10
B-20
FB-17

Nos.
1
1
1
1
1
1
1

Length
7.52
7.22
13.54
7.67
1.8
2.2
3.345

C
D

Slab
8
9

Slab

10
11

Projections
12

Slab at 11550 Lvl.


S. No.

Particular

15
16
17
Main
18
19 Building
Towrads
20
M.P
21 Bhawan
22
23
24

TO BE DONE
ON
16.04.2016

Slab
25

Main
Building
Section Slab B/W
26 Towards X2 to X4
M.P.Bhaw
an
27

M-25

3.375

3.445

0.12

5.58

11.63

7.09

1.585

0.12

2.70

11.24

4.6

3.49

0.12

1.34

14.01

15.31

0.3

0.13

1.19

4.59

M-25

0.955

1.01

0.12

0.23

0.96

M-25

1
1
1
1
1

0.70
0.80
0.80
0.80
0.80

0.45
0.3
0.4
0.4
0.3

2.05
2.05
2.05
1
1

0.65
0.49
0.66
0.32
0.24

4.72
4.51
4.92
2.40
2.20

M-30
M-30
M-30
M-30
M-30

1
1
1
1
1

2.26
2.26
3.50
2.46
2.46

0.23
0.23
0.23
0.23
0.23

2.05
0.95
2.05
0.95
0.95

1.07
0.49
1.65
0.54
0.54

10.21
4.73
15.29
5.11
5.11

M-30
M-30
M-30
M-30
M-30

M-25
M-25

Projections
28
DEDUCT FOR CUT OUTS
13

29
30
31
32
33

33
34
35
36
37

Columns
C1
C2A
C2
C1
RC 1
Shear Walls
W1
W1
W1
W1
W1

GRAND Total FOR THE SLAB &


Sunshade

53.61
6.64

GRAND Total FOR THE Columns


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30

0.43
59.83
7
20
0.36

Quantity Balance/Excess M-25

-33.61

Rest Quantity To Be
Done on 16-04-2016
(Slab at 11550)

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN A8-B8 & A12- B12
DATE - 15/04/2016

LVL - (-3300)

Slab at 11550 Lvl.

S. No.
15
16
17
18
19
20
21
22

Particular

Suttering
Quantity
For Beam
(CUM)
(Sqm)
11.81
2.26
3.79
0.44
9.14
1.75
3.79
0.44
19.29
2.76
19.29
2.76
9.65
1.38
19.29
2.76

Beam
FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20

Nos.
1
1
1
1
1
1
1
1

Length
8.375
4.795
6.48
4.795
15.31
15.31
7.655
15.31

Breath
0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3

Height
0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6

23

FB-07

6.5

0.3

0.6

1.17

8.19

M-25

24

SB

2.75

0.23

0.4

1.0

2.2

M-25

4
2

3.375
7.09

3.445
1.585

0.12
0.12

5.58
2.70

11.63
11.24

M-25
M-25

4.6

3.49

0.12

1.34

14.01

15.31

0.3

0.13

1.19

4.59

M-25

0.955

1.01

0.12

0.23

0.96

M-25

Nos.
1
1
1
1
1

Length
5.2
5.23
3.4
4.2
2.23

Breath
0.3
0.23
0.23
0.23
0.23

Height
0.6
0.6
1.2
0.6
0.6

A
B
C
D
E
F
G

1
1
1
1
1
1
1

3.22
2.4
3.2
2.8
0.7
2.9
2.26

3.9
3.9
1.5
4.5
1.7
0.7
3.5

0.15
0.15
0.15
0.15
0.15
0.15
0.15

1.88
0.70
0.72
1.89
0.09
0.30
1.19

12.56
4.68
4.80
12.60
0.60
2.03
7.91

2.26

1.75

0.15

0.59

3.96

1.75

1.725

0.15

0.45

3.02

6.72

1.65

0.15

1.66

11.09

3.1

1.2

0.15

0.28

1.86

8.4

1.5

0.15

1.89

12.60

Main
Building
Towrads
M.P
Bhawan

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

Slab
Main
25 Building
26 Section Slab B/W
Towards X2 to X4
27 M.P.Bhaw
an

M-25

Projections
28
DEDUCT FOR CUT OUTS
13

Slab at X1-X2 & Staircase


S. No.
12
13
14
15
16

Particular
2
2
2
2
2

Main
Building
Towrads
M.P
Bhawan

Beam
BF - 25
BF - 11
BF - 11
BF - 22
BF - 12

Suttering
Quantity
For Beam
(CUM)
(Sqm)
6.55
0.94
6.22
0.72
8.13
0.94
5.00
0.58
2.65
0.31

GRADE
M-25
M-25
M-25
M-25
M-25

Slab
17
18
19
20
21
22
Main
23 Building
Section
Towards
24 M.P.Bhaw
an
25
26
27

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

STAIRCASE
A

17

S. No.
5

Particular

Beam
1BF - 02

Nos.
1

Length
5.76

Breath
0.3

Height
0.6

5.16

2.110

0.150

Suttering
Quantity For Beam
(CUM)
(Sqm)
1.04
6.91

M-25

GRADE
M-25

Slab
11

GRAND Total FOR THE SLAB


GRAND
Total FOR THE
& STAIRCASE
Columns
Deduct
Total
Quantity Ordered M-30
Quantity
Ordered M-25MQuantity
Balance/Excess
30
Quantity Balance/Excess M25

45.27
0.00
0.23
45.04
0
45
0.00
-0.04

1.63

10.89

M-25

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN Y1-X1 & A0-7 to A0-6
DATE - 26/04/2016

S. No.
1
2
3
4
5
6
7
8

Particular

BEAMS

LVL - (-3300)

Beam

Nos.

Length

Breath

Height

Quantity
(CUM)

Suttering For
Beam (Sqm)

GRADE

1 BF - 07

7.65

0.5

0.6

2.30

9.18

M-25

1 BF - 07
1 BF - 32
1 BF - 33
1 BF - 23
1BF - 23
1BF - 27
SB-03

1
1
1
1
1
1
1

5.01
8.84
6.3
10.2
5.1
10.95
11.065

0.3
0.35
0.3
0.3
0.3
0.23
0.3

0.6
0.6
0.6
0.6
0.6
0.6
0.6

0.90
1.86
1.13
1.84
0.92
1.51
1.99

3.01
6.63
3.78
6.12
3.06
4.27
6.64

M-25
M-25
M-25
M-25
M-25
M-25
M-25

2.54

6.00

0.150

2.28

15.20

M-25

2.25

5.800

0.150

1.96

13.05

M-25

2.54

4.70

0.150

1.79

11.94

M-25

2.25

5.120

0.150

1.73

11.52

M-25

3.5

0.150

0.53

3.50

M-25

3.5

8.84

0.150

4.64

30.94

M-25

2.5

4.4

0.150

0.83

5.50

M-25

8.7

4.4

0.150

4.17

27.82

M-25

7.45

4.4

0.150

3.67

24.47

M-25

7.4

4.4

0.150

3.38

22.54

M-25

1
1

10.65
7.71

0.325
0.325

0.5
0.5

1.73
1.25

10.65
7.71

M-25
M-25

2
1

0.60
0.80

0.6
0.45

2.5
2.5

1.80
0.90

6.00
6.25

M-30
M-30

SLAB
9
10
11
12
13
14
15
16
17

Retaining Wall
18

Columns
19
20

GRAND Total FOR THE SLAB

36.90

GRAND Total FOR THE Columns


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

2.70
0.00
39.60

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN A0-14 to A0-8
DATE - 28/04/2016

LVL - (-3300)

Retaining Wall
1
2

1
1

6.35
10.34

0.29
0.29

GRAND Total FOR THE Retaining


Wall
GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

2.85
2.85

5.20
8.54

13.74
0.00
0.00
13.74

36.19
58.91

M-25
M-25

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN C13-D13 &C7-D7 & A0-11 to A0-8

REVISED

DATE - 27/04/2016

LVL - (+1200 , -3300)

S. No.
1
2
3
4
5
6
7
8
9

Particular

BEAMS

Beam
2BF-02A

Nos.
1

Length
5.46

Breath
0.3

Height
0.6

Quantity
(CUM)
0.98

Suttering For
Beam (Sqm)
6.77

GRADE
M-25

2BF-03
2BF-04
2BF-05
2BF-12
2BF-11
2BF-01
2BF-10
2BF - 02

1
2
1
1
1
1
1
1

7.18
5.61
7.18
22.63
22.63
7.86
4.078
6.06

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

1.29
2.02
1.29
4.07
4.07
1.41
0.73
1.09

8.90
6.96
8.90
28.06
28.06
9.75
5.06
7.51

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

5.46

3.30

0.130

2.34

18.03

M-25

5.26

3.415

0.130

2.34

17.96

M-25

5.61

3.56

0.130

2.59

19.94

M-25

5.61

3.275

0.130

2.39

18.37

M-25

5.26

3.615

0.130

2.47

19.01

M-25

5.26

3.615

0.130

2.47

19.01

M-25

1.50

29.79

0.130

5.81

44.69

M-25

2.7

5.2

0.130

1.81

13.93

M-25

5.5

3.4

0.130

2.42

18.58

M-25

Nos.
1
1

Length
6.15
6.50

Breath
0.3
0.3

Height
0.7
0.7

Quantity
(CUM)
1.29
1.37

Suttering For
Beam (Sqm)
8.61
9.10

GRADE
M-25
M-26

2.80

5.40

0.150

1.13

15.12

M-25

SLAB
10
11
12
13
14
15
16
17
18

S. No.
1
2

Particular
Filler Wall
R- Wall
SLAB

10

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

45.40
0.00
0.00
45.40
0
46.00
0.00
0.60

S.B.P COMMERCIAL PVT.LTD.


FOR SLAB BETWEEN X2-X4, Columns (B13-B7 & C13-C7) &
R.wall On A0-13 to A0-10
DATE - 27/04/2016

LVL - (+1200 , -3300, +14700)

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

FB-29
SB-02
FB-28
SB-02
FB-32 A
FB-33
FB-21
FB-20
FB-07
SB

1
1
1
1
1
1
1
1
1
4

8.375
4.795
6.48
4.795
15.31
15.31
7.655
15.31
6.5
2.75

0.45
0.23
0.45
0.23
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4

2.26
0.44
1.75
0.44
2.76
2.76
1.38
2.76
1.17
1.0

11.81
3.79
9.14
3.79
19.29
19.29
9.65
19.29
8.19
2.2

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

3.375

3.445

0.12

5.58

11.63

M-25

7.09

1.585

0.12

2.70

11.24

4.6

3.49

0.12

1.34

14.01

14

15.31

0.3

0.13

1.19

4.59

M-25

DEDUCT FOR CUT OUTS


15

0.955

1.01

0.12

0.23

0.96

M-25

5
5
2
1

0.80
0.8
0.8
0.8

0.4
0.4
0.4
0.45

2.85
2.85
1.275
1.8

4.56
4.56
0.82
0.64

34.20
34.20
6.12
4.44

M-30
M-30
M-30
M-31

1
1

5.0
10.4

0.3
0.3

3.0
2.23

4.49
6.95

29.96
46.37

M-25
M-25

S. No.

Particular

1
2
3
4
Main Building
5
Towrads M.P
6
Bhawan
7
8
9
10

Slab
11

Main Building
Section
Slab B/W
12
Towards
X2 to X4
M.P.Bhawan
13

M-25
M-25

Projections

16
17
18
19

Columns
C2
SC2
SC2
C2

Retaing Wall
20
21

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30

38.98
10.58
0.23
49.33
9
29.00
1.58

4 Columns Not Casted

-1.46

Deducted Due to not


Pour 1.5 Cum from
Vendor

Quantity Balance/Excess M-25

S.B.P COMMERCIAL PVT.LTD.

FOR Raft Between A0-4 & A0-1


DATE - 05/05/2016

LVL = (-7110)

S. No.

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering (Sqm)

1
2

RAFT

1
1

9.975
12.2

8.8
9.975

0.45
0.45

39.50
2.99

8.45
4.99

M-25
M-25

RAFT (Retaining
Wall)

20.8

0.1

4.16

4.16

M-25

Footing F1

Footing CF11

1
1
1

3.5
5.95
3.715

3.5
3.5
2.3

0.4
0.35
0.35

4.90
7.29
2.99

5.60
6.25
3.90

M-25
M-26
M-27

1
1

5.8
10.4

0.3
0.3

3.0
2.23

5.21
6.95

34.73
46.37

GRADE

Retaing Wall
20
21

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

74.00
0.00
0.00
74.00
0
77.00
0.00
3.00

M-25
M-25

S.B.P COMMERCIAL PVT.LTD.

FOR SLAB BETWEEN X1 & Y6, X1 & X2


DATE - 15/05/2016
S. No.

LVL - (-3300, + 4650)


Suttering For
Beam (Sqm)

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

1
Between X1 to
2
Y6
3

1 BF 23

1 BF 20
SB 03

1
1

5.1
5.1
11.05

0.3
0.3
0.3

0.6
0.6
0.6

0.92
0.92
1.99

6.43
13.92

M-25
M-25
M-25

1
1
1
1

2.4
2.4
5.1
2.42

5.8
6.1
2.4
4.71

0.15
0.15
0.15
0.15

2.09
2.20
1.84
1.71

13.92
14.64
12.24
11.40

M-25
M-25
M-25
M-25

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

FB 28

FB 11
FB 11
FB 07
FB 12
FB 22
FB 33
FB 32A
FB 20
SB 02

1
1
1
1
1
1
1
1
1

5.1
8.76
5.73
13.4
4.2
4.2
5.98
5.83
5.528
3.83

0.3
0.3
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4

0.92
1.58
0.79
2.41
0.58
0.58
1.08
1.05
1.00
0.35

11.04
6.82
16.88
4.97
5.00
7.53
7.34
6.97
3.03

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-26
M-26
M-26

2
1
1
1

3.83
6.20
3.56
3.1

3.1
1.7
5.134
4.2

0.12
0.12
0.12
0.12

2.85
1.26
2.19
2.17

11.87
10.53
18.28
13.02

M-25
M-25
M-25
M-25

2
3
2
1

0.80
0.8
1.2
0.9

0.4
0.4
0.3
0.3

2.85
2.85
3
3

1.82
2.74
2.16
0.81

13.68
20.52
18.00
7.20

M-30
M-30
M-30
M-30

2
1

3.50
3

1.5
1.5

0.15
0.15

1.58
0.68

3.00
1.35

M-25
M-25

1.5

3.83

25.50

M-25
M-26

1.04

M-7.5

6.43

GRADE

Slab
11
12
13

Between X1 to Y6

14
S. No.

Particular

15
16
17
18
19 Between X1 To
X2
20
21
22
23
24

6.43

Slab
24
25
26
27

28
29
30
31

Between X1 toX2

Columns
C2
SC2
CR11
CR1
Stair Case

30

Retaing Wall
31
32

8.5
0.3
Remaining From Last Pour

2.5 CUMS

PCC For Ramp Slab


31

6.9

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

0.1

1.55
39.03
7.53
0.00
46.56
9
31.00
1.47
-8.03

Left Over M25 USED

B/W Y6-X1 Not Done


1 Cums Deducted

S.B.P COMMERCIAL PVT.LTD.

FOR RAMP SLAB


DATE -25/05/2016
S. No.

Particular

LVL - (+150 to - 3300)


Suttering For
Beam (Sqm)

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

RB 11

RB
RB
CB
CB

1
1
1
1

6.96
6.96
29.78
9.6
24.6

0.3
0.3
0.3
0.3
0.3

0.6
0.6
0.45
0.6
0.6

3.76
1.25
4.02
0.86
2.21

8.77
28.59
2.88
7.38

M-25
M-25
M-25
M-25
M-25

1
1
1
1
1
1
1

3.146
3.304
3.733
3.733
5.8
5.8
7.9

1.316
1.316
3.146
3.01
3.146
3.437
0.81

0.16
0.16
0.16
0.16
0.16
0.16
0.16

0.86
0.90
2.44
2.34
3.80
4.15
1.33

4.14
4.35
11.74
11.24
18.2
19.93
4.38

M-25
M-25
M-25
M-25
M-25
M-25
M-25

Slab Along Side Ramp


CB 10
12
1BF 07
12

1
1

9.3
6.36

0.3
0.5

0.6
0.6

0.84
0.95

2.79
3.18

M-25
M-25

Slab Along Side Ramp


13

6.71

8.8

0.15

4.43

59.05

M-25

3.2

0.3

0.15

0.07

0.96

M-25

1
1
1

5.01
5.655
6.13

0.3
0.3
0.3

0.6
0.6
0.6

0.45
0.51
0.55

1.50
1.70
1.84

M-25
M-25
M-26

5.3

6.1

0.17

4.42

32.53

M-25

23.7

0.3

3.0

21.33

142.19

M-25

1
2 Ramp From
3 U.B. Roof To
L.B. Roof
4

5
6
7
8
9
10
11

Ramp Slab

11
10
10
10

8.77

GRADE

Deduct
14
Slab Along Side Ramp
1 BF 07
12
1BF23
12
1BF 33
13
Slab
13
Retaing Wall
31

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

61.41
0.00
0.07

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

61.34
0
42.00
0.00
-19.41

S.B.P COMMERCIAL PVT.LTD.


LVL - (+4650, -3300, +150 to
-3300)

FOR RAMP SLAB


DATE -28/05/2016
Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

1 BF 23

5.1

0.3

0.6

0.92

6.43

M-25

2 Between X1 to 1 BF 20
Y6
3
1 BF 27
4
SB 03
5
R.Wall

1
1
1
1

5.1
11.05
11.05
5.1

0.3
0.3
0.3
0.3

0.6
0.6
0.6
1

0.92
1.99
1.99
1.5

6.43
13.92
13.92
10.5

M-25
M-25
M-25
M-25

1
1
1
1

2.4
2.4
5.1
2.42

5.8
6.1
2.4
4.71

0.15
0.15
0.15
0.15

2.09
2.20
1.84
1.71

13.92
14.64
12.24
11.40

M-25
M-25
M-25
M-25

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

3
1
1
1
1

6.96
6.96
29.78
9.6
24.6

0.3
0.3
0.3
0.3
0.3

0.6
0.6
0.45
0.6
0.6

3.76
1.25
4.02
0.86
2.21

8.77
8.77
28.59
2.88
7.38

M-25
M-25
M-25
M-25
M-25

1
1
1
1
1
1
1

3.146
3.304
3.733
3.733
5.8
5.8
7.9

1.316
1.316
3.146
3.01
3.146
3.437
0.81

0.16
0.16
0.16
0.16
0.16
0.16
0.16

0.86
0.90
2.44
2.34
3.80
4.15
1.33

4.14
4.35
11.74
11.24
18.2
19.93
4.38

M-25
M-25
M-25
M-25
M-25
M-25
M-25

1
4
1
1
2
2

0.75
0.8
2.46
2.46
0.9
1.2

0.45
0.4
0.23
0.23
0.3
0.3

2.85
2.85
2.85
1.5
3.0
3.0

0.96
3.65
1.61
0.85
1.62
2.16

6.84
27.36
15.33
8.07
14.40
18.00

M-30
M-30
M-30
M-30
M-30
M-30

1
1
1

4.80
1.5
6.3

1.5
1.5
1.5

0.15
0.15
0.15

1.08
0.34
1.42

1.89
0.90
2.34

M-25
M-25
M-25

S. No.

Particular
1

Slab
11
12
13

Between X1 to Y6

14
S. No.

Particular
1
2 Ramp From
3 U.B. Roof To
L.B. Roof
4

Beam
RB
RB
RB
CB
CB

11
11
10
10
10

NOT DONE
5
6
7
8
9
10
11

16
17
18
19
20
21

Ramp Slab

Columns
C1
C2
W1
W1
CR1
CR11

Stair Case
30

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

45.94
10.85
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

56.79

NOT DONE

S.B.P COMMERCIAL PVT.LTD.


LVL - (+4650, +3450 to
-3300)

FOR Main Building Between B14-B7 & D14-D7


DATE -06/06/2016
S. No.

Particular

Ground Floor
Roof Slab

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

FB 13

22.631

0.3

0.6

4.07

28.52

M 25

SB 10
FB 12
FB 11
FB 01
FB 03
FB 05
SB 02
SB

1
1
1
1
1
1
3
6

22.631
25.831
25.831
8.16
8.16
8.16
3.8
2.11

0.3
0.3
0.3
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4

4.07
4.65
4.65
1.47
1.47
1.47
1.05
1.16

28.52
32.55
32.55
10.28
10.28
10.28
3.00
1.67

M
M
M
M
M
M
M
M

25
25
25
25
25
25
25
25

3
3
6
3
3

3.473
3.415
2.115
2.115
3.74

4.25
4.25
2.159
4.318
2.17

0.12
0.12
0.14
0.12
0.12

5.31
5.22
3.84
3.29
2.92

14.76
14.51
4.57
9.13
8.12

M
M
M
M
M

25
25
25
25
26

1
1
1

4.80
1.5
6.3

1.5
1.5
1.5

0.15
0.15
0.15

1.08
0.34
1.42

1.89
0.90
2.34

M-25
M-25
M-25

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

3
1
1
1
1

6.96
6.96
24.655
15.684
17.326

0.3
0.3
0.3
0.3
0.3

0.6
0.6
0.45
0.6
0.6

3.76
1.25
3.33
1.41
1.56

8.77
8.77
23.67
4.71
5.20

M-25
M-25
M-25
M-25
M-25

32.1

0.16

40.06

192.60

M-25

SLAB

Ground Floor Roof Slab

Stair Case
30

S. No.

Particular
1
2 Ramp From
3 U.B. Roof To
L.B. Roof
4

Beam
RB
RB
RB
CB
CB

Ramp Slab

11
12
10
10
10

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

95.93
0.00
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

95.93
0
99.00
0.00
-5.90

NOT DONE

3.5Cums Extra
Ordered

S.B.P COMMERCIAL PVT.LTD.

FOR B2 Slab Towards Staff Quarter

LVL - (-3300)

DATE -03/06/2016
S. No.

Particular
B2 ROOF SLAB
TOWARDS
STAFF
QUARTER

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

B 28

4.52

0.23

0.6

0.62

5.38

M 25

B 29

5.00

0.23

0.6

0.69

5.94

M 25

B4

2.93

0.23

0.6

0.40

3.49

M 25

B4

3.4

0.23

0.6

0.47

4.05

M 25

1
1
1

3.4
4.52
5.00

1.25
1.35
2.74

0.125
0.125
0.125

0.51
0.55
0.86

4.25
6.10
13.69

M 25
M 25
M 25

15.475

0.3

4.64

30.95

M 25

SLAB
B2 ROOF SLAB TOWARDS
STAFF QUARTER

SLAB
Retaining Wall

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

8.75
0.00
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

8.75

S.B.P COMMERCIAL PVT.LTD.

FOR B2 Slab Towards Staff Quarter

LVL - (-3300)

DATE -03/06/2016
S. No.

Particular

MUMTY SLAB
& Machine
Room

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

MB 4

3.6

0.23

0.6

0.99

4.07

M 25

MB 4

1.90

0.23

0.6

0.52

2.15

M 25

MB 4b

6.36

0.23

0.6

0.88

7.19

M 25

MB 4b

4.33

0.23

0.6

0.60

4.89

M 25

1
2
1
1
2

3.6
1.9
2.03
0.75
0.8

6.36
1.8
1.5
0.45
0.3

0.15
0.15
0.23
1
1

3.43
1.03
0.70
0.34
0.48

22.90
3.42
6.78
1.58
1.08

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

MB 4

3.46

0.23

0.6

0.95

3.91

M 25

MB 4

2.46

0.23

0.6

0.34

2.78

M 25

1
1
2

2
0.75
2.46

1.8
0.45
0.23

0.15
0.6
0.6

0.54
0.20
0.68

3.60
1.22
1.41

M 25
M 26
M 27

SLAB
MUMTY SLAB & Machine
Room
SHEAR Wall
C1
C2A

S. No.

Particular
Machine Room

SLAB
Machine Room
C1
Shear Wall

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

11.69
0.00
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

11.69

M
M
M
M
M

25
25
26
27
28

S.B.P COMMERCIAL PVT.LTD.

FOR B2 Slab Towards Staff Quarter

LVL - (-3300)

DATE -03/06/2016
S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

1.50
0.31
0.28
1.50
0.43
1.50
1.08
0.36
0.36
0.33
0.76
1.76
0.50
0.23

Suttering For
Beam (Sqm)
12.50
2.55
2.30
12.54
3.58
12.54
8.97
2.99
2.99
2.76
6.33
11.96
4.13
1.96

GRADE
M25
M25
M25
M25
M25
M25
M25
M25
M25
M25
M25
M25
M25
M25

0.125
0.14
0.14
0.125
0.125
0.125
0.125
0.125
0.125
0.125

1.41
3.10
3.10
1.04
1.04
0.4
1.71
1.44
0.405
0.72

11.25
22.14
22.14
8.32
8.32
3.2
13.68
18.98
3.24
5.76

M25
M25
M25
M25
M25
M25
M25
M25
M25
M25

Breath

Height

Quantity (CUM)

0.3
0.3
0.3
0.3

0.6
0.6
0.6
0.6

1.134
0.27
1.08
0.324

Suttering For
Beam (Sqm)
10.08
2.52
9
2.88

GRADE
M25
M26
M27
M28

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Between Y6 Y1

B29
B4
B4
B30
B32
B33
B31
B2
B3
B4
B6
1BF 23
B28
B5

1
1
1
1
1
1
2
1
1
1
1
1
1
1

10.9
2.93
2.64
10.9
3.11
10.9
3.9
2.6
2.6
2.4
5.5
9.8
4.75
1.7

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.3
0.23
0.23

0.6
0.46
0.46
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.46
0.6

1
1
1
1
1
1
1
1
1
2

4.5
5.4
5.4
3.2
3.2
2
3.8
7.3
2.7
1.2

2.5
4.1
4.1
2.6
2.6
1.6
3.6
2.6
1.2
2.4

Particular

Nos.

Length

CR1
CR2
CR11
CRT

7
2
5
2

0.9
0.75
1.2
0.9

SLAB
15
16
17
18
19
Between Y6 - Y1
20
21
22
23
24

Columns
S. No.
25
26
27
28

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

28.08
0.00
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

28.08

S.B.P COMMERCIAL PVT.LTD.

FOR 1ST Floor Roof Slab

LVL - (-3300,8100)

DATE 11/06/2016,13/06/2016
Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

1
FB 28
2
FB 11
3
FB 11
4
FB 07
5
FB 12
Between X1 To
6
FB 22
X2
7
FB 33
8
FB 32A
9
FB 20
10
SB 02
11
SB

1
1
1
1
1
1
1
1
1
1
2

5.1
9
6
14
5.0
5
7.00
7.00
7
4
2

0.3
0.3
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4

0.92
1.62
0.83
2.52
0.69
0.69
1.26
1.26
1.26
0.37
0.4

6.43
11.34
7.14
17.64
5.95
5.95
8.82
8.82
8.82
3.16
2.7

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-26

12
13
14
15
16

2
1
1
1
2

3.83
6.20
4
4.5
2.26

3.1
1.7
5.134
4.5
0.3

0.12
0.12
0.15
0.15
0.6

2.85
1.26
3.08
3.45
0.81

11.87
10.53
20.54
20.25
6.14

M-25
M-25
M-25
M-25
M-26

9.30

1.5

0.15

2.09

3.24

M-25

3
1
1

0.90
0.75
0.6

0.30
0.30
0.6

3.00
3.00
2.70

2.43
0.68
0.97

21.60
6.30
6.48

M-30
M-30
M-30

1
1

20.5
0.3

0.3
0.3

3.0
3.0

18.45
0.27

123.00
1.80

M-25
M-26

0.8

28.00

0.00

M-25

S. No.

Particular

Beam

Slab

Between X1 toX2

Stair Case
17

18
19
20

Columns
CR1
CR2
CT1
Retaing Wall

21
22

CT1

23

Slab
Stitch Slab

35

GRAND Total FOR THE Columns


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

76.13
4.08
80.21
4
81.50
-0.08
5.37

S.B.P COMMERCIAL PVT.LTD.

FOR 1ST Floor Roof Slab

LVL - (-3300,8100)

DATE 11/06/2016,13/06/2016
S. No.

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

PCC Below Tank

19

4.42

83.98

GRAND Total FOR THE Columns


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

#REF!
#REF!
#REF!
4
81.50
#REF!
#REF!

Suttering For
Beam (Sqm)

GRADE

S.B.P COMMERCIAL PVT.LTD.

FOR Slab Grid 6-7 & Column

LVL - (-3300,8100 & +150)

DATE 11/06/2016,13/06/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

Between 6 to
7 & Y6 to X1

B3
B2
2BF 07
2BF 07
2 BF 23
2 BF 23
2 BF27
SB 03
B2
CB10
B29
B1
B1
B28

1
1
1
1
1
1
1
1
1
1
1
1
1
1

8.71
6.2
6.4
4.85
9.63
5.1
5.2
5.2
5.10
11.5
4.85
2.8
3.4
4.5

0.3
0.3
0.4
0.4
0.23
0.23
0.23
0.3
0.3
0.3
0.23
0.23
0.23
0.23

0.75
0.75
0.6
0.2
0.2
0.75
0.15
0.75
0.75
0.6
0.6
0.6
0.6
0.6

1.96
1.40
1.54
0.39
0.44
0.88
0.18
1.17
1.15
2.07
0.7
0.4
0.5
0.6

13.59
9.67
8.70
2.72
3.76
7.60
1.51
8.11
7.96
14.49
5.8
3.3
4.0
5.4

M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

Between 6 to 7 & Y6 to
X1

1
1
1
1
1
1
1

10.0
8.55
5
5.3
6.2
4.85
4.5

3.75
4.5
5.25
5.1
7.6
2.8
1.63

0.175
0.175
0.2
0.15
0.175
0.125
0.125

6.54
6.73
5.25
4.05
4.12
0.85
0.53

37.38
38.48
26.25
27.03
2.36
0.68
4.20

M-25
M-25
M-25
M-25
M-25
M-25
M-25

1
1

19.0
15.6

0.3
0.3

0.4
1.475

2.28
6.90

15.20
46.02

M-25
M-26

3
3
2
2
2

0.80
0.75
0.9
0.9
1.2

0.40
0.30
0.3
0.3
0.3

2.85
2.85
2.85
3.9
2.85

2.74
1.92
1.54
2.11
2.05

20.52
17.96
13.68
18.72
17.10

M-30
M-30
M-30
M-30
M-30

Slab

Retaining Wall

Columns
C2
C2A
CR1
CR2
CR11

GRAND Total FOR THE Slab


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

50.57
10.36
0.00
60.93
12
50.00
1.64
-0.57

S.B.P COMMERCIAL PVT.LTD.

FOR Slab Grid 6-7 & Column

LVL - (-3300,8100 & +150)

DATE 11/06/2016,13/06/2016
Columns
C1
C2
W1
CT
CR1
CR2

1
7
2
1
1
2

0.75
0.80
2.26
0.7
1.2
0.9

0.45
0.40
0.3
0.7
0.3
0.3

2.85
2.85
2.85
2.5
2.85
1.5

0.96
6.38
3.86
1.23
1.03
0.81

6.84
47.88
29.18
7.00
8.55
7.20

M-30
M-30
M-30
M-30
M-30
M-30

12.30

1.5

0.15

2.77

4.14

M-25

Stair Case
17

GRAND Total FOR THE Slab


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

2.77
14.27
0.00
17.04
16
0.00
2.00
-2.77

S.B.P COMMERCIAL PVT.LTD.

FOR Slab Y1 to Y7 & Column

LVL - (+1200, +8100)

DATE - 14/07/2016
BEAMS
S. No.
1
2
3
4
5
6
7
8

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

SLAB FOR
STAFF
QUARTER

GB11
GB2
B6
B29
B11
B1
B6
B2

1
1
2
1
2
2
1
1

10.3
7.3
7.3
6.135
10.5
3
3.2
3.2

0.3
0.3
0.23
0.23
0.4
0.23
0.23
0.23

1.05
1.05
0.6
0.6
0.6
0.45
0.6
0.6

3.24
2.30
2.01
0.85
5.04
0.62
0.44
0.44

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

SLAB FOR STAFF


QUARTER

1
1
1
1
1
1

2.4
4.7
3.2
2.7
1.25
1.25

4.5
4.1
5.6
3.2
2
9.25

0.225
0.14
0.125
0.14
0.125
0.125

2.43
2.70
2.24
1.21
0.31
1.45

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

C2
SC2
SC2

5
5
2

0.8
0.8
0.8

0.4
0.4
0.4

2.8
2.8
1.43

4.48
4.48
0.91

Suttering For
Beam (Sqm)
21.84
15.48
8.40
7.06
13.86
3.39
3.68
3.68

GRADE
M 25
M 25
M 25
M 25
M 25
M 25
M 25
M 25

Suttering For
Beam (Sqm)
10.80
19.27
17.92
8.64
2.50
11.56

GRADE
M 25
M 25
M 25
M 25
M 25
M 25

Suttering For
Beam (Sqm)
33.60
33.60
6.84

GRADE
M 30
M 30
M 30

Suttering For
Beam (Sqm)
79.12

GRADE
M 25

SLAB
S. No.
9
10
11
12
13
14

Columns
S. No.
15
16
17

Not Taken

Wall
S. No.

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

18

WALL

18.9

0.15

2.1

5.93

P.C.C For Lowe Basement Slab


S. No.

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

19

Lower basement Ramp


Slab

6.8

6.6

0.05

2.24

----

M7.5

GRAND Total FOR THE Slab


GRAND Total FOR THE Columns
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

31.22
9.87
0.00
41.09
10
32.00
0.13
0.78

(.91 Not Done)

S.B.P COMMERCIAL PVT.LTD.

FOR 2nd Floor Roof Slab X1-X2/1-6

LVL - (+14850)

DATE - 15/07/2016
Beams
S. No.

Particular
2
3
4
5
6
7
8
9
10
11

BEAMS

Beam
FB 11
FB 11
FB 07
FB 12
FB 22
FB 33
FB 32A
FB 20
SB 02
SB

1.10
0.78
2.39
0.58
0.83
1.08
1.08
1.08
0.41
0.4

Suttering For
Beam (Sqm)
7.69
6.76
16.73
4.98
7.14
7.56
7.56
7.56
3.56
3.1

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

0.12
0.12
0.15
0.15
0.12

2.76
1.26
3.08
4.20
0.16

11.49
10.53
20.54
20.25
1.23

M-25
M-25
M-25
M-25
M-25

0.15
0.45

2.09
0.41

3.24
2.9

M-25
M-25

Nos.

Length

Breath

Height

Quantity (CUM)

1
1
1
1
1
1
1
1
1
2

6.1
5.68
13.279
4
6
6
6
6
4
2

0.3
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.45
0.45

2
1
1
1
2

3.83
6.20
4
4.5
2.26

3
1.7
5.134
4.5
0.3

1
1

9.30
3.00

1.5
0.3

Slab
12
13
14
15
16

Between X1 toX2

Stair Case
17
18

GRAND Total FOR THE SLAB


Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

23.71
0.00
23.71
0
28.00
0
4.29

S.B.P COMMERCIAL PVT.LTD.

FOR Main Building Between B14-B7 & D14-D7

LVL - (11550)

DATE -26/07/2016
S. No.

Particular

First Floor Roof


Slab

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

FB 13

22.331

0.3

0.6

4.02

28.14

M 25

SB 10
FB 12
FB 11
FB 01
FB 03
FB 05
SB 02
SB

1
1
1
1
1
1
3
6

22.331
22.331
22.331
8.09
8.09
8.09
3.35
2.11

0.3
0.3
0.3
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4

4.02
4.02
4.02
1.46
1.46
1.46
0.92
1.16

28.14
28.14
28.14
10.19
10.19
10.19
2.65
1.67

M
M
M
M
M
M
M
M

25
25
25
25
25
25
25
25

3
3
6
3
3
1

3.473
3.415
2.11
2.11
1.5
28.876

3.35
3.35
1.8
3.10
7.35
0.3

0.12
0.12
0.12
0.14
0.12
0.12

4.19
4.12
2.70
2.75
3.97
1.04

11.63
11.44
3.76
6.54
11.03
8.66

M
M
M
M
M
M

25
25
25
25
25
25

1
4
2

0.75
0.8
2.26

0.45
0.4
0.23

2.7
2.7
2.7

0.91
3.46
2.81

6.48
25.92
26.89

M 30
M 30
M 30

SLAB

First Floor Roof Slab

COLUMN
C1
C2
SHEAR WALLS

GRAND Total FOR THE SLAB


GRAND Total FOR THE Columns
Deduct

41.30
7.17
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

48.48
7
45.00
-0.17
3.70

S.B.P COMMERCIAL PVT.LTD.

FOR Main Building Between A12/A7 & B12/B7

LVL - (1200)

DATE -03/08/2016
S. No.

Particular

Suttering For
Beam (Sqm)

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

2 BF 03

2 BF 05
GB 11
FB 34
SB
SB 02
SB 10

1
1
1
4
2
1

6.06
4.35
6.06
14.52
2.11
1.74
14.52

0.3
0.3
0.4
0.4
0.23
0.23
0.3

0.6
0.6
1.02
0.6
0.4
0.4
0.6

1.09
0.78
2.47
3.48
0.78
0.32
2.61

6.53
14.79
19.75
6.67
1.37
18.30

M
M
M
M
M
M
M

25
25
25
25
25
25
25

Second Floor Roof Slab

1
2
2
4
1

14.46
1.844
2.11
2.11
12

1.506
7.13
3.1
1.80
0.15

0.21
0.215
0.14
0.12
0.9

4.63
5.65
1.83
1.82
1.62

21.77
13.14
6.54
3.80
21.60

M
M
M
M
M

25
25
25
25
25

4
5

0.8
0.8

0.4
0.4

2.7
2.7

3.46
4.32

25.92
32.40

M 30
M 30

Ground Floor
Beams

COLUMN
C2
SC2

GRAND Total FOR THE SLAB

27.09

GRAND Total FOR THE Columns


Deduct

7.78
0.00

Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

34.87
8
29.00
0.22
1.91

7.64

GRADE

CANTINEVER
Before Canti
DOWN
Passage
Wall

Qty as per site measurement


Given 25 cum

S.B.P COMMERCIAL PVT.LTD.

FOR 2nd Floor Roof Slab X1-X2/1-6

LVL - (+14850, +1200)

DATE - 11/08/2016
Beams
S. No.

Particular
2
3
4
5
6
7
8
9
10
11

Beam
FB 11
FB 11
FB 07
FB 12
FB 22
FB 33
FB 32A
FB 20
SB 02
SB

1.10
0.78
2.39
0.58
0.83
1.08
1.08
1.08
0.41
0.4

Suttering For
Beam (Sqm)
7.69
6.76
16.73
4.98
7.14
7.56
7.56
7.56
3.56
3.1

GRADE
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25
M-25

0.12
0.12
0.15
0.15
0.12
0.12
0.12

2.76
1.26
3.08
4.20
0.16
0.23
0.20

11.49
10.53
20.54
20.25
1.23
1.61
1.39

M-25
M-25
M-25
M-25
M-25
M-25
M-25

1.5
0.3

0.15
0.45

2.09
0.41

3.24
2.9

M-25
M-25

0.23
0.23

2.5
2.5

2.59
2.07

28.25
21.45

M 30
M 30

Nos.

Length

Breath

Height

Quantity (CUM)

1
1
1
1
1
1
1
1
1
2

6.1
5.68
13.279
4
6
6
6
6
4
2

0.3
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.23
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.45
0.45

2
1
1
1
2
1
1

3.83
6.20
4
4.5
2.26
6.4
5.5

3
1.7
5.134
4.5
0.3
0.3
0.3

1
1

9.30
3.00

5
3

0.9
1.2

Slab
12
13
14
15
16
17
18

Between X1 toX2

PROJECTION
PROJECTION
Stair Case

19
20

21
22

COLUMN
CR1
CR11

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

24.14
4.66
0.00
28.79

S.B.P COMMERCIAL PVT.LTD.

FOR Main Building Between B14-B7 & D14-D7

LVL - (14850)

DATE -17/08/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

First Floor Roof


Slab

FB 13
SB 10
FB 12
FB 11
FB 01
FB 03
FB 05
SB 02

1
1
1
1
1
1
1
3

22.331
22.331
22.331
22.331
8.09
8.09
8.09
3.35

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4

4.02
4.02
4.02
4.02
1.46
1.46
1.46
0.92

Suttering For
Beam (Sqm)
28.14
28.14
28.14
28.14
10.19
10.19
10.19
2.65

3
3
3
1
1

3.473
3.415
2.11
28.576
22.031

3.35
3.35
7.1
0.30
1.50

0.12
0.12
0.12
0.12
0.12

4.19
4.12
5.41
1.03
3.97

11.63
11.44
15.02
8.57
33.05

M
M
M
M
M

COLUMN
SC2

0.8

0.4

2.8

2.69

20.16

M 30

CORNICE
BEAM
SLAB

1
1

20
20

0.5
0.6

0.3
0.3

3.00
1.80

6.00
12.00

M 25
M 26

GRADE
M 25
M 25
M 25
M 25
M 25
M 25
M 25
M 25

SLAB

First Floor Roof Slab

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

44.88
2.69
0.00
47.57

25
25
25
25
25

S.B.P COMMERCIAL PVT.LTD.

FOR Under Ground Tank Raft

LVL - (-3300)

DATE -24/08/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

1
2

RAFT
HAUNGE

1
1

19.227
18.727

4.4
3.85

0.26
0.05

22.00
0.56

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

22.56
0.00
0.00
22.56

Suttering For
Beam (Sqm)
12.3
-

GRADE
M-25
M-25

FOR Main Building Between A14-A7 & B14-B7

LVL - (8100)

DATE -27/08/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

First Floor Roof


Slab

B38
SB 10
FB 01
FB 03
FB 05
FB 07
SB 02
SB

1
1
1
1
1
1
3
6

22.631
22.631
5.56
5.56
5.56
5.56
3.35
2.11

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.45
0.6

4.07
4.07
1.00
1.00
1.00
1.00
1.36
1.75

Suttering For
Beam (Sqm)
28.52
28.52
7.01
7.01
7.01
7.01
3.22
2.51

3
3
3
6

3.473
3.415
2.11
1.9

3.35
3.35
1.4
2.11

0.12
0.12
0.14
0.12

4.19
4.12
1.24
2.85

11.63
11.44
2.95
3.96

GRADE
M 25
M 25
M 25
M 25
M 25
M 25
M 25
M 25

SLAB

First Floor Roof Slab

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

27.66
0.00
27.66

M
M
M
M

25
25
25
25

FOR UNDER GROUND TANK (Outer Side Wall)

LVL - (-3050 to -250)

DATE -29/08/2016
S. No.
1

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

TANK WALL

TW1

20.727

0.3

2.8

17.41

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

17.41
0.00
17.41

Suttering For
Beam (Sqm)
116.07

GRADE
M 25

u
LVL - (-3050 to -250 ,4650 ,
14850 )

FOR UNDER GROUND TANK/Column/Ramp/Ramp Parapet


DATE -1/09/2016
S. No.
1

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

TANK WALL

TW1

14.727

0.3

2.8

12.37

Suttering For
Beam (Sqm)
82.47

5
1
6
4
1
1
1

0.8
0.8
0.8
0.8
2.26
2.26
3.5

0.4
0.4
0.4
0.4
0.23
0.23
0.23

2.8
2.8
1.2
1.2
1.8
0.8
1.5

4.48
0.90
2.30
1.54
0.94
0.42
1.21

33.60
6.72
17.28
11.52
8.96
3.98
11.19

6.3

5.2

0.15

4.91

3.45

M 25

14

0.15

4.20

56.00

M 25

COLUMN
SC2
C2
C2
SC2
SHEAR WALL
SHEAR WALL
SHEAR WALL
RAMP
RAMP

GRADE
M 25

M
M
M
M
M
M
M

30
30
30
30
30
30
30

RAMP Parapet

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

21.48
11.77
0.00
33.26

TERRACE

S.B.P COMMERCIAL PVT.LTD.


FOR UNDER GROUND TANK/Column/Ramp Parapet/Staff
Quarter

LVL - (-3050 to -250 ,4650 ,


14850 )

DATE -8/09/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
Beam (Sqm)

GRADE

TANK WALL
(INSIDE)

TW1

23

0.3

2.8

19.32

128.80

M 25

STAFF Quarter GF Roof Slab


B6D
B1E
B1
BT2
STAFF Quarter
GF Roof Slab
B6
B11
B1E
B10

1
2
2
2
1
2
1
2

7.7
4.9
4.4
2.8
7.7
10.3
3.8
1.25

0.6
0.6
0.6
0.23
0.6
0.6
0.6
0.6

0.3
0.23
0.23
0.3
0.23
0.4
0.23
0.23

1.39
1.35
1.21
0.39
1.06
4.94
0.52
0.35

11.70
6.76
6.07
2.18
10.63
17.72
5.24
1.73

M
M
M
M
M
M
M
M

25
25
25
25
25
25
25
25

2
1
2
3

4.9
3.8
2.3
3.6

2.8
2
1.3
0.45

0.14
0.14
0.125
0.14

3.84
1.06
0.75
0.68

27.44
15.20
5.91
3.24

M
M
M
M

25
25
25
26

27.829

0.225

0.8

5.01

44.53

M 25

1
1

16
16

0.25
0.9

0.6
0.315

2.40
4.54

19.20
4.54

M 25
M 26

11.2

1.8

0.15

3.02

3.36

M 25

STAFF Quarter GF Roof Slab


STAFF Quarter GF Roof
Slab

PARAPET ON R.WALL
PARAPET ON R.WALL
ROOF Cornice

RAMP Parapet Cantilever

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

51.84
0.00
0.00
51.84

S.B.P COMMERCIAL PVT.LTD.

FOR Main Building Between A14-A7 & B14-B7

LVL - (8100)

DATE -11/09/2016
S. No.

Particular

Beam

Nos.

Length

Breath

Height

Quantity (CUM)

First Floor Roof


Slab

B38
SB 10
FB 01
FB 03
FB 05
FB 07
SB 02
SB

1
1
1
1
1
1
3
6

22.631
22.631
5.56
5.56
5.56
5.56
3.35
2.11

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.23

0.6
0.6
0.6
0.6
0.6
0.6
0.45
0.6

4.07
4.07
1.00
1.00
1.00
1.00
1.36
1.75

Suttering For
Beam (Sqm)
28.52
28.52
7.01
7.01
7.01
7.01
3.22
2.51

3
3
3
6

3.473
3.415
2.11
1.9

3.35
3.35
1.4
2.11

0.12
0.12
0.14
0.12

4.19
4.12
1.24
2.85

11.63
11.44
2.95
3.96

M
M
M
M

25
25
25
25

1
1
1
1
1
1
1

9.3
2.7
2.7
8.1
2.7
2.65
2.65

1.5
0.3
0.3
0.3
0.23
1.5
1.5

0.15
0.6
0.6
0.6
0.45
0.15
0.12

2.09
0.48
0.48
1.46
0.27
0.60
0.48

13.95
3.34
3.34
10.21
2.36
4.13
3.98

M
M
M
M
M
M
M

25
25
25
25
25
25
25

GRADE
M 25
M 25
M 25
M 25
M 25
M 25
M 25
M 25

SLAB

First Floor Roof Slab

Staircase
Staircase
Staircase BEAM 1
Staircase BEAM 2
Staircase BEAM 3
Staircase BEAM 4
Staircase Landing
Corridor

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

33.51
0.00
33.51
0
36.00
2.49

S.B.P COMMERCIAL PVT.LTD.


FOR Main Building Between A14-A7 & B14-B7, STAFF
QUARTER, SERVICE LIFT

LVL - (8100, +14850)

DATE -20/09/2016
S. No.

Particular

Nos.

Length

Breath

Height

Quantity (CUM)

Suttering For
(Sqm)

GRADE

RETAINING WALL TANK

17

0.3

1.8

9.18

61.20

M 25

COLUMNS
SC2
C2
CR1
CR11

5
1
5
3

0.8
0.8
0.9
1.2

0.4
0.4
0.2
0.23

2.85
2.85
2.55
2.55

4.56
0.91
2.64
2.11

6.84
6.84
5.76
7.29

M
M
M
M

1
1

10
10

0.5
0.6

0.3
0.1825

1.50
0.55

3.00
6.00

M 25
M 25

LIFT SLAB
Beam MB4
SLAB

2
1

2.36
1.9

0.23
1.8

0.6
0.185

0.65
0.63

3.92
3.42

M 25
M 25

MUMTY SLAB
Beam MB1
Beam MBC
Beam FB4
SLAB
LIFT WALL

1
1
1
1
1

7.078
2.5
3.325
6.64
2.26

0.23
0.23
0.3
3.3
0.23

0.6
0.6
0.3
0.185
1.25

0.98
0.35
0.30
4.05
0.65

5.87
2.08
2.00
21.91
6.22

30
30
30
30

CORNICE

GRAND Total FOR THE SLAB


GRAND Total FOR THE Column
Deduct
Total
Quantity Ordered M-30
Quantity Ordered M-25
Quantity Balance/Excess M-30
Quantity Balance/Excess M-25

18.84
10.22
0.00
29.06

M
M
M
M
M

25
25
25
25
26

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
Ground Floor

S. No.

Particular

GRID

1
Grid E,F/15
2
Less Window W1
3
Less D1'
4
Grid F,G/15
5
Less Window W1
6
Less Window W2
7
Grid 15,13a/G
8
Less Window W4
9
Grid 13a,12/G
10
Less D
11
Grid 12,2/X10
12
Less Window W1
13
Grid X10,X9/1
14
Grid X9,X8/1
15
Grid X8,X7/1
16
Less Window W5
17
Grid X7,X6/1
18
Less Window V
19
Grid X5,X6/1
20
Less Window W1
21
Grid X5,X4/1
22
Less Window W1
23
Grid X4,X3/1
24
Less Window W1
25
Grid X3,X2/1
26
Less Window W1
27
Grid X1,X2/1
28
Less Window W1
29 BLOCK Less Window W2
30 WORK Grid X3,X4/4
31 200 MM Less Window W1A
32
Grid X4,X5/4
33
Less Window W1A
34
Less D'
35
Grid 8,9/E
36
Grid 9,11/E
37
Less Window W1
38
Grid 11,13a/E
39
Less Window W1
40
Grid 13A,15/E
41
Grid E,F/15,13a
42
Grid E,F/13a

Nos.

Length

Breath

1
-1
-1
1
-1
-1
1
-1
1
-1
1
-1
1
1
1
-1
1
-1
1
-2
1
-2
1
-2
1
-2
1
-1
-1
1
-2
1
-1
-1
1
1
-1
1
-2
1
1
1

6.39
1.80
1.50
7.11
1.80
1.50
1.95
1.35
4.00
1.80
5.58
1.80
1.90
1.90
3.60
1.80
2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
5.69
1.80
1.50
6.82
1.80
6.60
1.80
1.80
2.70
2.38
1.80
8.00
1.80
2.30
2.85
8.40

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.30
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

43
44
45
46
47
48
49
50
51
52
53
54
55
56

X7,X5/4
Less D2
X10,X9/2
Less Lift Opening
X9,X8/2
Less Lift Opening
X8/2,3
Grid 3a,1/X7
Grid 3a,3/X7
X1,X2/3a Kitcen Wall
Less D4
Grid X1,X2/5
Grid X1,X2/5,6
Less Lift Shaft Opening

1
-1
1
-1
1
-1
1
1
1
1
-2
1
1
-1

8.36
1.50
1.90
0.90
1.90
0.90
1.62
4.65
1.70
5.59
0.90
2.77
1.90
0.90

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

57

Grid F,E/11,9

0.98

0.20
TOTAL
(-) Mortar 10%
TOTAL

58
59
60
61
62
63
64
65
66
67
68
150mm
69
Block
70 Work
71
72
73
74
75
76
77
78
79

Grid X6,X7/3a,2

3.79

0.15

Less D5
Grid X6/3a,2
Grid 13a/F,G
Grid 7,8/A,B
Less D5
Grid 11,8/A,B
Less D5
Grid 11,12a/A,B
Less D5
Grid 7,8/C,D
Less D5
Grid 11,8/C,D
Less D5
Grid 11,12a/C,D
Less D5
X7,X6/2 WC Wall
X7,X6/3,3a Handiaped Wall
Near X6/1,3 WC Wall

-1
1
1
1
-1
1
-1
1
-1
1
-1
1
-1
1
-1
2
1
1

0.75
1.31
3.35
8.47
0.75
8.47
0.75
8.47
0.75
8.47
0.75
8.47
0.75
5.86
0.75
1.31
4.37
5.11

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

X5,X4/1,3a Toilet Wall

17.33

0.15

Less D5

-2

0.75

0.15

Less Opening

-1

1.00

0.15
TOTAL
(-) Mortar 10%
TOTAL

80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95 100mm
Block
Work

Grid F/15,13a
Grid 13a,15/G,F
Grid F,E/12,13a
Grid F,E/11,13a
Grid F,E/11,9
Grid F,E/11,9
Grid F,E/11,9
X7,X6/2 He Toilet Wall
Less D4
X7,X6/2,3a She & Handiaped Wall
Less D4
X7,X6/3a Handiaped Wall
Less D6
X5,X6/1,3 near Shaft
X5,X6/1,3 Shaft 750X985 Wall
X5,X6/1,3 Staff Room Toilet Wall

1
1
1
1
1
1
1
1
-1
1
-2
1
-1
1
1
1

2.07
1.8
2.98
6.76
3.20
1.65
1.93
1.80
0.90
3.75
0.90
3.05
0.60
1.07
1.84
6.06

0.10
0.1
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

100mm
96 Block
97 Work
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117 Outer
118 100 mm
Wall
119
120

Less D3a
X5,X6/1,3 Wall b/w Staff Room & R.
X5/1,3a Wall of R.C.spa
Less D3a
X5,X6/1,3 Wall of R.C.spa
Less D3a
X5/3,3a Wall of R.C.spa
X3,X2/2,3a Dining Hall Wall
Less D2a
X1,X2/2,3a Store Room Wall
Less D4
X1,X2/3,3a Kitcen Wall
Grid X2,X6/3a
Less D2b
Less D6
Less Opening
Grid X2,X1/6,7

-2
1
1
-1
1
-1
1
1
-1
-1
-2
1
1
1
-1
-1
1

1.00
3.66
4.48
1.00
3.00
1.00
3.08
4.18
1.20
5.00
0.90
1.80
28.09
1.50
0.60
1.00
4.14

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

Grid
Grid
Grid
Grid

Grid G,F/15

1
1
1
1
1
1

8.16
6.74
11.06
13.83
10.50
5.71

0.10
0.10
0.10
0.10
0.10
0.10

Traingular Wall b/w grid 8,9

3.70

0.10

E,F/15
15,1/G
X3,X5/4
8,15/E

TOTAL
(-) Mortar
TOTAL

Height

Quantity
(CUM)

2.85
1.90
2.40
2.85
1.90
1.90
2.85
1.90
2.85
2.40
2.85
1.90
2.85
2.85
2.85
1.95
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
1.90
2.85
1.60
2.85
1.60
2.10
2.85
2.85
1.90
2.85
1.90
2.85
2.85
2.85

3.64
-0.68
-0.72
4.05
-0.68
-0.57
1.11
-0.51
2.28
-0.86
3.18
-0.68
1.08
1.08
2.05
-0.70
1.18
-0.86
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.24
-0.68
-0.57
3.89
-1.15
3.76
-0.58
-0.76
1.54
1.35
-0.68
4.56
-1.37
1.31
1.62
4.79

2.85
2.10
2.85
2.10
2.85
2.10
2.85
2.85
2.85
2.85
2.10
2.85
2.85
2.10
3.33
TOTAL

Mortar 10%
TOTAL

4.76
-0.63
1.08
-0.38
1.08
-0.38
0.92
2.65
0.97
3.19
-0.76
1.58
1.08
-0.38
0.66
59
5.90
53

CEMENT USED
(Bags)

Sand USED (CUMS

58

13

Blocks Used
(Nos.)
1887
189
1699

3.33

1.89

3.31
2.85
3.33
3.31
2.10
3.31
3.31
3.31
2.10
3.31
2.10
3.31
2.10
3.31
2.10
3.33
3.33
3.33

-0.37
0.56
1.67
4.20
-0.24
4.20
-0.37
4.20
-0.24
4.20
-0.24
4.20
-0.24
2.91
-0.24
1.31
2.18
2.55

3.33

8.66

2.10

-0.47

2.10

-0.32

CEMENT USED
(Bags)

Sand USED (CUMS

Blocks Used
(Nos.)

40

40

1708

TOTAL

Mortar 10%
TOTAL
2.85
3.3
2.85
2.85
2.85
3.33
3.33
3.33
2.10
3.33
2.10
3.33
2.10
3.33
3.33
3.33

129

4.00

171

36

1537

0.59
0.6
0.85
1.93
0.91
0.55
0.64
0.60
-0.19
1.25
-0.38
1.02
-0.13
0.35
0.61
2.02

2.10
3.05
2.85
2.10
3.33
2.10
3.33
3.33
2.10
3.33
2.10
3.33
2.85
2.10
2.10
2.10
3.32

-0.42
1.12
1.28
-0.21
1.00
-0.21
1.03
1.39
-0.25
-1.67
-0.38
0.60
8.00
0.32
-0.13
-0.21
1.37

3.45
3.45
3.45
3.45
3.45
3.45

2.81
2.32
3.82
4.77
3.62
1.97

3.31

1.22

CEMENT USED
(Bags)

Sand USED (CUMS

Blocks Used
(Nos.)

TOTAL

44

75

18

2841

-) Mortar
TOTAL

4.44
40

284
2557

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
1st Floor

S. No.

Particular

GRID

Grid E,F/15
Less Window W1
Grid F,G/15
Less Window W1
Less Window W2
Grid 15,13a/G
Less Window W4
Grid 13a,12/G
Less Window W1
Grid 12,2/X10
Less Window W1
Grid X10,X9/1
Grid X9,X8/1
Grid X8,X7/1
Less Window W1
Grid X7,X6/1
Less Window
Grid X5,X6/1
Less Window
Grid X5,X4/1
Less Window
Grid X4,X3/1
Less Window
Grid X3,X2/1
Less Window
200mm Grid X3,X4/4
Block
Less Window
Work
Grid X4,X5/4

W2
W1
W1
W1
W1
W1A

Nos.

1
-2
1
-1
-1
1
-1
1
-1
1
-1
1
1
1
-1
1
-1
1
-2
1
-2
1
-2
1
-2
1
-2
1

Less Window W1A


Grid 8,9/E
Grid 9,11/E

-2
1
1

Less Window W1
Grid 11,13a/E
Less Window W1
Grid 13A,15/E
Grid 13a/E,F
Less D3a

-1
1
-2
1
1
-1

Grid 13a,15/E,F
Less Lift Shaft Opening
Grid 2/X8,X10
Less Lift Shaft Opening
Grid 2,3/X8
Grid 3a,1/X7
Grid 4,1/X7,X5
Less D3
Grid X1,X2/3a
Grid X1,X2/5
Grid X1,X2/5,6
Less Lift Shaft Opening
Grid 13/A,C
Less D7

1
-1
1
-2
1
1
1
-1
1
1
1
-1
1
-1

Tot

(-) Mo

TOT

Grid F/13a,15
Grid 13a/F,G
Less D4a
Grid 13a/F,G
Grid 13a/F,G
Grid 12/F,G Toilet Wall
Grid 12/F,G Shaft Wall
150 mm Grid 11/F,E
block Grid 11/F,E
Grid X5/3
Less D5
Grid X5/3
Less D5
Grid X5,X4/3
Less D5

1
1
-1
1
1
1
1
1
1
1
-1
1
-1
1
-1

Tot

(-) Mo
TOT

Grid 13a,15/E,F
Grid 13a,15/G,F
Grid 13a/E,G
Grid 13a/E,G
Grid 13a/E,G
Grid F/13,12
Less D4a
Grid E,F/13,12
Grid E,F/13,12 Corridor Wall Near D4a
Grid E,F/12 Wall b/W Dwg R. & Bed R.
Grid G,F/12a,12 B.R & VIP Suit Wall
Grid G,F/11,12 Toilet Wall
Less D5
Grid G,F/11,12 Toilet to C1 Column
Grid G,F/11,9 Wall b/W Dwg R. & Bed R.
Less D3
Grid G,F/11,9 b/w B.R to Vip Suit
Less D3
Grid F,E/11,9 Traingular Shaft Wall
Grid E,F/11,13 Corridor Side Wall
Less D3a
Grid E,F/11,13 Toilet Wall
Less D5

1
1
1
1
1
1
-2
1
1
1
1
1
-1
1
1
1
-1
1
-1
1
1
-1
1
-1

Grid E,F/11,13 Toilet Wall


Grid E,F/11,13 Toilet Wall
Grid E,F/11 Wall b/w B.R & Vip Suit
100mm Less D3
Block Grid E,F/11,13 Shaft Of Toilet
Work Grid E,F/11,9 Traingular Shaft Wall
Grid E,F/11,9 Traingular Shaft Wall
Shaft Wall Near W1X Column
Near Grid 8,9/E
Near Grid X7,X2/3a
Less D3
Less D6
Grid X6/3a Shaft wall
Grid X5/3a Shaft wall
Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X6/3a,1 Wall B/W B.R & Vip Suit
Less D3
Grid X6,X5/3a,1 Vip Suit & Suit
Grid X5/3a,1 B.R & Suit
Less D3
Grid X5/3a,1 Toilet Wall
Grid X5,X4/3a,1 B/w Bed Room
Grid X4/3a,1
Grid X4,X3/3a,1
Grid X3/3a,1

Grid G,F/15

1
1
1
-1
1
1
1
1
1
1
-7
-5
1
1
1
1
1
-1
1
1
-1
1
1
1
1
1
1
1
1
1
1
1

Tot

(-) Mo
TOT

Ltd.
ONSUMPTION

Length

Breath

Height

Quantity
(CUM)

6.39
1.80
7.11
1.80
1.50
1.95
1.35
4.00
1.80
5.58
1.80
1.90
1.90
3.60
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
2.85
2.85
1.90

3.64
-1.37
4.05
-0.68
-0.57
1.11
-0.51
2.28
-0.68
3.18
-0.68
1.08
1.08
2.05
-0.68

2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
6.82
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.60

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.89
-1.15

6.60

0.20

2.85

3.76

1.80
2.70
2.38

0.20
0.20
0.20

1.60
2.85
2.85

-1.15
1.54
1.35

1.80
8.00
1.80
2.30
4.41
1.00

0.20
0.20
0.20
0.20
0.20
0.20

1.90
2.85
1.90
2.85
2.85
2.10

-0.68
4.56
-1.37
1.31
2.51
-0.42

2.80
0.90
3.80
0.90
1.62
4.65
7.74
1.00
4.48
2.77
1.90
0.90
6.26
1.00

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Total
(-) Mortar
TOTAL

2.10
2.10
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.10

1.18
-0.38
2.17
-0.76
0.92
2.65
4.41
-0.42
2.55
1.58
1.08
-0.38
3.57
-0.42

55.68
5.57
50

11.57407
9.679012
1.580247

390.84
16676
22200
5524
129.47

CEMENT USED
(Bags)

Sand USED (CUMS

92

21

1.96
2.60
0.90
3.35
2.60
5.15
1.98
1.15
1.80
4.47
0.75
4.18
0.75
4.18

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.33
2.85
2.10
3.33
2.85
2.85
3.33
3.31
3.31
3.31
2.10
3.31
2.10
3.31

0.98
1.11
-0.28
1.67
1.11
2.20
0.99
0.57
0.89
2.22
-0.24
2.08
-0.24
2.08

0.75

0.15

2.10

Total

-0.24
14.91

(-) Mortar
TOTAL

1.49
13

3.3
1.8
2.5
3.3
2.7
2.7
0.9
1.8
1.8
7.0
5.4
4.9
0.8
0.9
8.4
0.55
1.0
4.7
1.0
1.95
5.0
1.0
2.29
0.8

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10
0.1
0.1
0.1
0.1

3.3
3.3
3.3
3.3
3.3
3.3
2.1
3.3
3.3
2.9
3.3
3.3
2.1
3.3
3.3
3.3
2.1
3.3
2.1
3.33
3.3
2.1
3.3
2.1

1.1
0.6
0.8
1.1
0.9
0.9
-0.4
0.6
0.6
2.0
1.8
1.6
-0.2
0.3
2.8
0.2
-0.2
1.6
-0.2
0.65
1.6
-0.2
0.8
-0.2

CEMENT USED
(Bags)
28

Sand USED (CUMS


6

2.75
2.29
4.5
1.0
0.6
1.8
1.95
2.96
0.6
30.7
1.0
0.6
3.12
3.15
3.12
3.12
5.0
1.0
6.06
3.80
1.00
0.55
1.00
4.95
0.53
7.82
1.10
5.1
7.82
1.10
10.5

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

3.3
3.3
2.9
2.1
3.3
3.3
3.3
3.3
3.3
2.9
2.1
2.1
3.3
3.3
3.3
3.3
2.9
2.1
3.3
2.9
2.1
3.3
3.3
3.3
3.3
2.9
3.3
3.3
2.9
3.3
3.5

0.9
0.8
1.3
-0.2
0.2
0.6
0.6
1.0
0.2
8.7
-1.5
-0.6
1.0
1.0
1.0
1.0
1.4
-0.2
2.0
1.1
-0.2
0.2
0.3
1.6
0.2
2.2
0.4
1.7
2.2
0.4
3.6

5.71

0.10

3.45

Total

1.97
53.55

(-) Mortar
TOTAL

5.36
48

CEMENT USED
(Bags)
90

Sand USED (CUMS


19

1471.875
615.44
2.3915816327

Blocks Used
(Nos.)
1782
178
1604

Blocks Used
(Nos.)
636
64
572

Blocks Used
(Nos.)
3427
171
1542

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
2nd Floor

S. No.

Particular

GRID

Grid E,F/15
Less Window W1
Grid F,G/15
Less Window W1
Less Window W2
Grid 15,13a/G
Less Window W4
Grid 13a,12/G
Less Window W1
Grid 12,2/X10
Less Window W1
Grid X10,X9/1
Grid X9,X8/1
Grid X8,X7/1
Less Window W1
Grid X7,X6/1
Less Window
Grid X5,X6/1
Less Window
Grid X5,X4/1
Less Window
Grid X4,X3/1
Less Window
Grid X3,X2/1
Less Window
Grid X3,X4/4
200mm
Less Window
Block
Work Grid X4,X5/4

W2
W1
W1
W1
W1
W1A

Nos.

1
-2
1
-1
-1
1
-1
1
-1
1
-1
1
1
1
-1
1
-1
1
-2
1
-2
1
-2
1
-2
1
-2
1

Less Window W1A


Grid 8,9/E
Grid 9,11/E

-2
1
1

Less Window W1
Grid 11,13a/E
Less Window W1
Grid 13A,15/E
Grid 13a/E,F
Less D3a

-1
1
-2
1
1
-1

Grid 13a,15/E,F
Less Lift Shaft Opening
Grid 2/X8,X10
Less Lift Shaft Opening
Grid 2,3/X8
Grid 3a,1/X7
Grid 4,1/X7,X5
Less D3
Grid X1,X2/3a
Grid X1,X2/5
Grid X1,X2/5,6
Less Lift Shaft Opening
Grid 13/A,C

1
-1
1
-2
1
1
1
-1
1
1
1
-1
1

Less D7

-1

TOT

(-) Mo

TOT

Grid F/13a,15
Grid 13a/F,G
Less D4a
Grid 13a/F,G
Grid 13a/F,G
150mm Grid 12/F,G
Block Grid 11/F,E
Work Grid X5/3
Less D5
Grid X5,X4/3
Less D5

1
1
-1
1
1
1
1
1
-1
1
-1

Tot
(-) Mo
TOT

Grid 13a,15/E,F
Grid 13a,15/G,F
Grid 13a/E,G
Grid 13a/E,G
Grid 13a/E,G
Grid F/13,12
Less D4a
Grid E,F/13,12
Grid G,F/13,12
Grid G,F/11,12
Less D5
Grid G,F/11,12
Grid G,F/11,9
Less D3
Grid G,F/11,9
Less D3
Grid F,E/11,9
Grid E,F/11,13
Less D3a
Grid E,F/11
100mm
Block Less D3
Work Grid E,F/11,13
Grid E,F/11,9
Grid 11/F,E
Grid E,F/11,9
Near Grid 8,9/E
Near Grid X7,X2/3a
Less D3

1
1
1
1
1
1
-2
1
1
1
-1
1
1
-1
1
-1
1
1
-1
1
-1
1
1
1
1
1
1
-7

Less D6
Grid X6/3a Shaft wall
Grid X5/3a Shaft wall
Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X2,X3/3a Shaft wall
Grid X6/3a,1
Less D3
Grid X6,X5/3a,1
Grid 8,15/E
Grid G,F/15

-5
1
1
1
1
1
1
-1
1
1
1
1

Grid 4/X6X7

Tot
(-) Mo
TOT

Ltd.
ONSUMPTION

Length

Breath

Height

Quantity
(CUM)

6.39
1.80
7.11
1.80
1.50
1.95
1.35
4.00
1.80
5.58
1.80
1.90
1.90
3.60
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
2.85
2.85
1.90

3.64
-1.37
4.05
-0.68
-0.57
1.11
-0.51
2.28
-0.68
3.18
-0.68
1.08
1.08
2.05
-0.68

2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
6.82
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.60

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.89
-1.15

6.60

0.20

2.85

3.76

1.80
2.70
2.38

0.20
0.20
0.20

1.60
2.85
2.85

-1.15
1.54
1.35

1.80
8.00
1.80
2.30
4.41
1.00

0.20
0.20
0.20
0.20
0.20
0.20

1.90
2.85
1.90
2.85
2.85
2.10

-0.68
4.56
-1.37
1.31
2.51
-0.42

594

2.80
0.90
3.80
0.90
1.62
4.65
7.74
1.00
4.48
2.77
1.90
0.90
6.26

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.00

0.20

TOTAL
(-) Mortar
TOTAL

2.10
2.10
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.10

1.18
-0.38
2.17
-0.76
0.92
2.65
4.41
-0.42
2.55
1.58
1.08
-0.38
3.57
-0.42

CEMENT USED
(Bags)

Sand USED (CUMS

55.68

90

20

5.57
50

1.96
2.60
0.90
3.35
2.60
7.13
1.80
4.18
0.75
4.18
0.75

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.33
2.85
2.10
3.33
2.85
2.85
3.31
3.31
2.10
3.31
2.10

Total
(-) Mortar
TOTAL

6.1
1.8
2.5
3.3
2.7
2.7
0.9
1.8
5.4
4.9
0.8
0.9
9.0
1.0
4.7
1.0
1.93
5.0
1.0
7.0
1.0
0.6
1.9
1.2
1.8
0.6
30.7
1.0

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.98
1.11
-0.28
1.67
1.11
3.05
0.89
2.08
-0.24
2.08
-0.24
7.63
0.76
7

3.3
3.3
3.3
3.3
3.3
3.3
2.1
3.3
3.3
3.3
2.1
3.3
3.3
2.1
3.3
2.1
3.33
3.3
2.1
2.9
2.1
3.3
3.3
3.3
3.3
3.3
2.9
2.1

2.0
0.6
0.8
1.1
0.9
0.9
-0.4
0.6
1.8
1.6
-0.2
0.3
3.0
-0.2
1.6
-0.2
0.64
1.6
-0.2
2.0
-0.2
0.2
0.6
0.4
0.6
0.2
8.7
-1.5

CEMENT USED
(Bags)
15

Sand USED (CUMS


3.5

0.6
2.2
2.2
2.2
2.2
2.2
5.0
1.0
6.1
13.8
10.5
5.71
2.0

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10
0.1

Total
(-) Mortar
TOTAL

2.1
3.3
3.3
3.3
3.3
3.3
2.9
2.1
3.3
3.5
3.5
3.45
3.3

-0.6
0.7
0.7
0.7
0.7
0.7
1.4
-0.2
2.0
4.8
3.6
1.97
0.7
21.95
2.19
20

CEMENT USED
(Bags)
38

Sand USED (CUMS


9

Blocks Used
(Nos.)
1782
178
1604

Blocks Used
(Nos.)
313
33
293

Blocks Used
(Nos.)
1405
140
1264

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
3rd Floor

S. No.

Particular

GRID

Grid E,F/15
Less Window W1
Grid F,G/15
Less Window W1
Less Window W2
Grid 15,13a/G
Less Window W4
Grid 13a,12/G
Less Window W1
Grid 12,2/X10
Less Window W1
Grid X10,X9/1
Grid X9,X8/1
Grid X8,X7/1
Less Window W1
Grid X7,X6/1
Less Window
Grid X5,X6/1
Less Window
Grid X5,X4/1
Less Window
Grid X4,X3/1
Less Window
Grid X3,X2/1
Less Window
Grid X3,X4/4
200mm
Less Window
Block
Work Grid X4,X5/4

W2
W1
W1
W1
W1
W1A

Nos.

1
-2
1
-1
-1
1
-1
1
-1
1
-1
1
1
1
-1
1
-1
1
-2
1
-2
1
-2
1
-2
1
-2
1

Less Window W1A


Grid 8,9/E
Grid 9,11/E

-2
1
1

Less Window W1
Grid 11,13a/E
Less Window W1
Grid 13A,15/E
Grid 13a/E,F
Less D3a

-1
1
-2
1
1
-1

Grid 13a,15/E,F
Less Lift Shaft Opening
Grid 2/X8,X10
Less Lift Shaft Opening
Grid 2,3/X8
Grid 3a,1/X7
Grid 4,1/X7,X5
Less D3
Grid X1,X2/3a
Grid X1,X2/5
Grid X1,X2/5,6
Less Lift Shaft Opening
Grid 13/A,C

1
-1
1
-2
1
1
1
-1
1
1
1
-1
1

Less D7

-1

TOT

(-) Mo
TOT
Grid F/13a,15

150mm
Block
Work

Grid 13a/F,G
Less D4a
Grid 13a/F,G
Grid 13a/F,G
150mm Grid 12/F,G
Block Grid 11/F,E
Work Grid X5/3
Less D5
Grid X5,X4/3
Less D5

1
1
-1
1
1
1
1
1
-1
1
-1

Tot
(-) Mo
TOT
Grid 13a,15/E,F
Grid 13a,15/G,F
Grid 13a/E,G
Grid 13a/E,G
Grid 13a/E,G
Grid F/13,12
Less D4a
Grid E,F/13,12
Grid G,F/13,12
Grid G,F/11,12
Less D5
Grid G,F/11,12
Grid G,F/11,9
Less D3
Grid G,F/11,9
Less D3
Grid F,E/11,9
Grid E,F/11,13
Less D3a
100mm Grid E,F/11
Block Less D3
Work Grid E,F/11,13
Grid E,F/11,9
Grid 11/F,E
Grid E,F/11,9
Near Grid 8,9/E
Near Grid X7,X2/3a
Less D3
Less D6
Grid X6/3a Shaft wall

1
1
1
1
1
1
-2
1
1
1
-1
1
1
-1
1
-1
1
1
-1
1
-1
1
1
1
1
1
1
-7

Grid X5/3a Shaft wall


Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X2,X3/3a Shaft wall
Grid X6/3a,1
Less D3
Grid X6,X5/3a,1
Grid 8,15/E
Grid G,F/15
Grid 4/X6X7

-5
1
1
1
1
1
1
-1
1
1
1
1
1

Tot
(-) Mo
TOT

Ltd.
ONSUMPTION

Length

Breath

Height

Quantity
(CUM)

6.39
1.80
7.11
1.80
1.50
1.95
1.35
4.00
1.80
5.58
1.80
1.90
1.90
3.60
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
2.85
2.85
1.90

3.64
-1.37
4.05
-0.68
-0.57
1.11
-0.51
2.28
-0.68
3.18
-0.68
1.08
1.08
2.05
-0.68

2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
6.82
1.80

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.60

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.89
-1.15

6.60

0.20

2.85

3.76

1.80
2.70
2.38

0.20
0.20
0.20

1.60
2.85
2.85

-1.15
1.54
1.35

1.80
8.00
1.80
2.30
4.41
1.00

0.20
0.20
0.20
0.20
0.20
0.20

1.90
2.85
1.90
2.85
2.85
2.10

-0.68
4.56
-1.37
1.31
2.51
-0.42

2.80
0.90
3.80
0.90
1.62
4.65
7.74
1.00
4.48
2.77
1.90
0.90
6.26
1.00

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

TOTAL
(-) Mortar
TOTAL

2.10
2.10
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.85
2.85
2.10
2.85
2.10

1.18
-0.38
2.17
-0.76
0.92
2.65
4.41
-0.42
2.55
1.58
1.08
-0.38
3.57
-0.42

CEMENT USED
(Bags)

Sand USED (CUMS

22.27

38

8.5

2.23
20

1.96
2.60
0.90
3.35
2.60
7.13
1.80
4.18
0.75

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.33
2.85
2.10
3.33
2.85
2.85
3.31
3.31
2.10

0.98
1.11
-0.28
1.67
1.11
3.05
0.89
2.08
-0.24

4.18
0.75

0.15
0.15

3.31
2.10

2.08
-0.24

Total
(-) Mortar
TOTAL

6.1
1.8
2.5
3.3
2.7
2.7
0.9
1.8
5.4
4.9
0.8
0.9
9.0
1.0
4.7
1.0
1.93
5.0
1.0
7.0
1.0
0.6
1.9
1.2
1.8
0.6
30.7
1.0

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

5.55
0.55
5

3.3
3.3
3.3
3.3
3.3
3.3
2.1
3.3
3.3
3.3
2.1
3.3
3.3
2.1
3.3
2.1
3.33
3.3
2.1
2.9
2.1
3.3
3.3
3.3
3.3
3.3
2.9
2.1

2.0
0.6
0.8
1.1
0.9
0.9
-0.4
0.6
1.8
1.6
-0.2
0.3
3.0
-0.2
1.6
-0.2
0.64
1.6
-0.2
2.0
-0.2
0.2
0.6
0.4
0.6
0.2
8.7
-1.5

CEMENT USED
(Bags)
10

Sand USED (CUMS


2.6

676

2.3
196
0.8889
174.22

3242
2770
37.84
59.7115
41.04
101.333
18.4667
80
132.8
52.456
5
100

0.6
2.2
2.2
2.2
2.2
2.2
5.0
1.0
6.1
13.8
10.5
5.71
2.0

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10
0.1

Total
(-) Mortar
TOTAL

2.1
3.3
3.3
3.3
3.3
3.3
2.9
2.1
3.3
3.5
3.5
3.45
3.3

-0.6
0.7
0.7
0.7
0.7
0.7
1.4
-0.2
2.0
4.8
3.6
1.97
0.7
19.95
2.00
18

CEMENT USED
(Bags)
34

Sand USED (CUMS


8

Blocks Used
(Nos.)
713
71
641

Blocks Used
(Nos.)
228
24
213

0.6172839506
120.987654321
150
292.4
115.498

Blocks Used
(Nos.)
1277
128
1149

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
GF BOXING

S. No.

Particular
1
2
3
4
5
6
7
8
9

GRID
ON G/16

Between
On F /16
Between
Between
Between
Between
Between
Between

F & G/16
E&F /16
13/16, E
E, 12
E, 11
E, 9 & 8
X4 , 6

Between X3/ X4 , 6

10

Nos.

Length

Breath

Height

Quantity
(CUM)

1
1
1
1
1
1
1
1
1

5.07
2.20
2.30
2.13
8.32
2.80
2.45
4.88
4.93

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

4.35
4.35
4.35
4.35
4.35
4.35
4.35
3.6
3.6

2.21
0.95
1.00
0.93
3.62
1.22
1.07
1.76
1.77

2.02

0.1

3.6

0.73

TOTAL
(-) Mortar
TOTAL

S.B.P.
Commer
cial Pvt.
Ltd.

15.25
1.52
14

884

CEMENT USED
(Bags)
27

Sand USED (CUMS


7

Blocks Used
(Nos.)
976
98
878

CEMENT AND BLOCK CONSUMPTION


1st Floor & Above Boxing
S. No.

Particular

GRID

11
12
13
14
15
16
17
18
19

ON G/16

20

Between X3/ X4 , 6

Between
On F /16
Between
Between
Between
Between
Between
Between

F & G/16
E&F /16
13/16, E
E, 12
E, 11
E, 9 & 8
X4 , 6

Nos.

Length

Breath

Height

Quantity
(CUM)

2
2
2
2
2
2
2
2
2

5.07
2.20
2.30
2.13
8.32
2.80
2.45
4.88
4.93

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

4.35
4.35
4.35
4.35
4.35
4.35
4.35
3.6
3.6

4.41
1.91
2.00
1.85
7.24
2.44
2.13
3.51
3.55

2.02

0.1

3.6

1.45

CEMENT
USED
(Bags)

Sand
USED
(CUMS

30.50

52

12

TOTAL
(-) Mortar
TOTAL

Blocks Used
(Nos.)
1952

3.05

195

27

1757

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
3rd Floor Boxing
S. No.

Particular

21
22
23
24

GRID
For Total Boxing Outside
Less W1a
Less W1
Less W2
Less W4

Quantity
(CUM)

Nos.

Length

Breath

Height

51

0.1

3.3

-2
-6
-1

1.8
1.8
1.5

0.1
0.1
0.1

1.6
1.9
1.9

16.83
-0.58
-2.05
-0.29

-1

1.35

0.1

1.9

-0.26

CEMENT
USED
(Bags)

Sand
USED
(CUMS

13.66

25

6.2

25
TOTAL
(-) Mortar
TOTAL

S.B.P.
Commer
cial Pvt.
Ltd.

Blocks Used
(Nos.)
874

1.37

87

12

787

CEMENT AND BLOCK CONSUMPTION


Brick Work Cement Bricks ( ALL Floors)
S. No.

Particular

GRID

Nos.

Length

26

On G 16

27

On G 16

Breath

17
17.5
TOTAL

Height

Quantity
(CUM)

0.2

3.45

35.19

0.2

3.3

11.55

CEMENT USED
(Bags)

Sand USED (CUMS

46.74

91

33

Blocks Used
(Nos.)
6232

S.B.P.
Commer
cial Pvt.
Ltd.
CEMENT AND BLOCK CONSUMPTION
Brick Work Cement Bricks ( ALL Floors)
S. No.
26

Particular

GRID
ON Stairs

Nos.
57.5
141

Length
1.5
1.5

Breath
0.3
TOTAL
0.3

Height
0.15

Quantity
(CUM)

3.88
3.88

0.15

9.52

CEMENT USED
(Bags)
13

Sand USED (CUMS


3

Blocks Used
(Nos.)
518

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
Drain

S. No.

Particular

GRID

TOTAL LENGTH OF THE DRAIN

Nos.

Length

Breath

Height

Quantity
(CUM)

227.201

0.23

0.45

23.52

Total

CEMENT USED
(Bags)

23.515

Sand USED (CUMS


13

Brick Used
(Nos.)
13632

LIFT & STAIR CASE


S. No.

S. No.

Particular

Particular

GRID

Nos.

Length

Breath

Height

Quantity
(CUM)

STAIR CASE ON B2 LEVEL

1
1
1

3.05
6.6
6.84

0.2
0.2
0.2

3.3
3.3
3.3

2.01
4.36
4.51

4.1

0.2

3.3

2.71

CEMENT USED
(Bags)

Sand USED (CUMS

Brick Used
(Nos.)

Total

13.589

14

435

(-) Mortar 10%


Total

1.36

Sand USED (CUMS

Brick Used
(Nos.)
339

12.230

GRID

Nos.

Length

Breath

Height

Quantity
(CUM)

STAIR CASE ON B1 LEVEL

1
1
1

3
4.5
3

0.2
0.2
0.2

3.3
3.3
3.3

1.98
2.97
1.98

4.6

0.2

3.3

Total
(-) Mortar 10%
Total
S. No.

Particular

GRID

STAIR CASE ON B2 LEVEL

Particular

Particular

Nos.

Length

Breath

Height

Quantity
(CUM)

1
1

5.99
3.84

0.2
0.2

3.8
4

4.55
3.07

3.9

0.2

3.8

2.96
10.588

CEMENT USED
(Bags)
11

Sand USED (CUMS


2.2

Brick Used
(Nos.)
112

1.06
9.530

GRID

Nos.

Length

Breath

Height

Quantity
(CUM)

STAIR CASE ON B1 LEVEL

1
1
1

3
4.5
3

0.2
0.2
0.2

3.8
3.8
3.8

2.28
3.42
2.28

4.6

0.2

3.8

3.50
11.476

CEMENT USED
(Bags)
12

Sand USED (CUMS


2.5

Brick Used
(Nos.)
367

1.15
10.328

GRID

Nos.

Length

Breath

Height

Quantity
(CUM)

MUMTY

1
1
1

3
4.5
3

0.2
0.2
0.2

2.4
2.4
2.4

1.44
2.16
1.44

4.6

0.2

2.4

Total
(-) Mortar 10%
Total

2.2

1.00

Total
(-) Mortar 10%
Total
S. No.

CEMENT USED
(Bags)
10

8.969

Total
(-) Mortar 10%
Total
S. No.

3.04
9.966

2.21
7.248

0.72
6.523

CEMENT USED
(Bags)
7.5

Sand USED (CUMS


2

Brick Used
(Nos.)
232

7.054591
11.28735
1.612478
46.0708

S.B.P. Commercial Pvt. Ltd.


CEMENT AND BLOCK CONSUMPTION
Deductions/Additions In Quantity last Submitted

DEDUCTIONS
In Ground Floor
S. No.

GRID

Nos.

Length

1
-2
1
1
1
1
1
-1
-1
1

5.59
0.90
2.77
1.90
1.80
28.09
1.50
0.60
1.00
4.14

Nos.

Length

Grid X8,X7/1
Less Window W1

1
-1

3.60
1.80

Grid X7,X6/1
Less Window W2
Grid X5,X6/1
Less Window W1
Grid X5,X4/1
Less Window W1
Grid X4,X3/1

1
-1
1
-2
1
-2
1

2.07
1.50
6.73
1.80
6.73
1.80
6.73

Nos.

Length

52 X1,X2/3a Kitcen Wall


53 Less D4
54 Grid X1,X2/5
55 Grid X1,X2/5,6
107 X1,X2/3,3a Kitcen Wall
108 Grid X2,X6/3a
109 Less D2b
110 Less D6
111 Less Opening
112 Grid X2,X1/6,7

In First Floor
S. No.

GRID

In Second Floor
S. No.

GRID

Grid X7,X6/1
Less Window
Grid X5,X6/1
Less Window
Grid X5,X4/1
Less Window
Grid X4,X3/1
Less Window
Grid X3,X2/1
Less Window
Grid X3,X4/4
Less Window

1
-1
1
-2
1
-2
1
-2
1
-2
1
-2

2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
6.82
1.80

Grid X4,X5/4

6.60

Less Window W1A

-2

1.80

Nos.

Length

W2
W1
W1
W1
W1
W1A

In Thrird Floor
S. No.

GRID

Grid X7,X6/1
Less Window
Grid X5,X6/1
Less Window
Grid X5,X4/1
Less Window
Grid X4,X3/1
Less Window
Grid X3,X2/1
Less Window

---

1
-1
1
-2
1
-2
1
-2
1
-2

W2
W1
W1
W1
W1

---

---

2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80
TOTAL (Deduc

---

ADDITIONS
In Ground Floor
S. No.

GRID

94 X5,X6/1,3 Shaft 750X985 Wall


95 X5,X6/1,3 Staff Room Toilet Wall
96 Less D3a

Nos.

Length

1
1
-2

1.84
6.06
1.00

Nos.

Length

1
1
1
1
1
1
-1
1
1
-1

3.12
3.15
3.12
3.12
1.00
4.9
0.8
0.9
0.55
1.0

Nos.

Length

1
1
1
1
-1
1
1
-1

3.12
3.15
1.00
4.9
0.8
0.9
0.55
1.0

In First Floor
S. No.

GRID

Grid X6/3a Shaft wall


Grid X5/3a Shaft wall
Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X5/3a,1 Toilet Wall
Grid G,F/11,12 Toilet Wall
Less D5
Grid G,F/11,12 Toilet to C1 Column
Less D3

In Second Floor
S. No.

GRID

Grid X6/3a Shaft wall


Grid X5/3a Shaft wall
Grid X5/3a,1 Toilet Wall
Grid G,F/11,12 Toilet Wall
Less D5
Grid G,F/11,12 Toilet to C1 Column
Less D3

In Third Floor

S. No.

GRID

Grid X6/3a Shaft wall


Grid G,F/11,12 Toilet Wall
Less D5
Grid G,F/11,12 Toilet to C1 Column
Less D3

Nos.

1
1
-1
1
1
-1

Length

3.12
4.9
0.8
0.9
0.55
1.0
TOTAL (Addit

ON
ubmitted

UCTIONS

Breath

Height

Quantity
(CUM)

0.20
0.20
0.20
0.20
0.10
0.10
0.10
0.10
0.10
0.10

2.85
2.10
2.85
2.85
3.33
2.85
2.10
2.10
2.10
3.32

3.19
-0.76
1.58
1.08
0.60
8.00
0.32
-0.13
-0.21
1.37

Breath

Height

Quantity
(CUM)

0.20
0.20

2.85
1.90

2.05
-0.68

0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
2.85
1.90
2.85

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84

Breath

Height

Quantity
(CUM)

Quantity
Deducted/
Added (CUM)
200 mm
Blocks

-5.09

100 mm
Blocks

-9.96

Quantity
Deducted/
Added (CUM)

200 mm
Blocks

-10.75

Quantity
Deducted/
Added (CUM)

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.60

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.89
-1.15

0.20

2.85

3.76

0.20

1.60

-1.15

Breath

Height

Quantity
(CUM)

0.20
2.85
0.20
1.90
0.20
2.85
0.20
1.90
0.20
2.85
0.20
1.90
0.20
2.85
0.20
1.90
0.20
2.85
0.20
1.90
TOTAL (Deductions)

---

---

1.18
-0.57
3.84
-1.37
3.84
-1.37
3.84
-1.37
3.84
-1.37

---

200 mm
Blocks

-15.83

Quantity
Deducted/
Added (CUM)

200 mm
Blocks

-10.48

200 mm
100 mm

-42.16
-9.96

---

---

---

DITIONS

Breath

Height

Quantity
(CUM)

0.15
0.15
0.15

3.33
3.33
2.10

0.92
3.03
-0.63

Breath

Height

Quantity
(CUM)

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.3
3.3
3.3
3.3
3.3
3.3
2.1
3.3
3.3
2.1

1.6
1.6
1.6
1.6
0.5
2.4
-0.2
0.4
0.3
-0.3

Breath

Height

Quantity
(CUM)

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.3
3.3
3.3
3.3
2.1
3.3
3.3
2.1

1.6
1.6
0.5
2.4
-0.2
0.4
0.3
-0.3

Quantity
Deducted/
Added (CUM)
150 mm
Block

3.31

Quantity
Deducted/
Added (CUM)

150 mm
Block

9.31

Quantity
Deducted/
Added (CUM)

150 mm
Block

6.20

Breath

Height

0.15
3.3
0.15
3.3
0.15
2.1
0.15
3.3
0.15
3.3
0.15
2.1
TOTAL (Additions)

Quantity
Deducted/
Added (CUM)

Quantity
(CUM)

1.6
2.4
-0.2
0.4
0.3
-0.3

150 mm
Block

4.13

150 mm

22.95

Work Area Details


B2

S. No.

PARTICULAR

GRID
FROM
X7/1 To
X11/1

TO
F/16 To
G16

Nos.

Length

Breath

20.101

11.844

RAFT (PCC)

Kota Work

X7/1 To
X11/2

F/16 To
G17

20.101

11.844

RAFT (RCC)

X7/1 To
X11/1

F/16 To
G16

20.101

11.844

RAFT (PCC)

X7/1 to
X1/1

F/16 To B
16

36.615

34.416

Kota Work

X7/1 to
X1/1

F/16 To B
16

36.615

34.416

RAFT (RCC)

X7/1 to
X1/1

F/16 To B
16

36.615

34.416

RAFT (PCC)

X1/1 to
Y1/1

B 16 To
A0/16

47.02

13.04

Kota Work

X1/1 to
Y1/1

B 16 To
A0/16

47.02

13.04

RAFT (RCC)

X1/1 to
Y1/1

B 16 To
A0/16

47.02

13.04

10

ADD AREA
UNDER RAFT Of
Retaining Wall
(PCC)

200.1

0.5

11

ADD AREA
UNDER RAFT Of
Retaining Wall
(KOTA)

200.1

0.5

12

ADD AREA
UNDER RAFT Of
Retaining Wall
(RCC)

200.1

0.4

ADD AREA
UNDER
X8/1 to X8
FOOTINGS OUT
3
OF RAFT LINE
(PCC)

X10/1 to
X8 3

6.63

0.335

ADD AREA
UNDER
X8/1 to X8
FOOTINGS OUT
3
OF RAFT LINE
(KOTA)

X10/1 to
X8 3

6.63

0.335

ADD AREA
UNDER
X8/1 to X8
FOOTINGS OUT
3
OF RAFT LINE
(RCC)

X10/1 to
X8 3

6.63

0.335

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

X6/1 to 3

X7/1 to 3

6.24

0.825

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

X6/1 to 3

X7/1 to 3

6.24

0.825

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

X6/1 to 3

X7/1 to 3

6.24

0.825

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

X5/1 to X5/ 3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

X5/1 to X5/ 3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

X5/1 to X5/ 3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

X2/1 to X2/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

X2/1 to X2/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

X2/1 to X2/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

X1/1 to X1/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

X1/1 to X1/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

X1/1 to X1/3

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

Y1/1 to Y1 3

2.3

0.55

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

Y1/1 to Y1 3

2.3

0.55

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

Y1/1 to Y1 3

2.3

0.55

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

A0/7

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

A0/7

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

A0/7

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

A0/8

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

A0/8

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

A0/8

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

A/16

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

A/16

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

A/16

3.5

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

B/16 to C 16

5.75

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

B/16 to C 17

5.75

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

B/16 to C 18

5.75

0.975

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(PCC)

H/16

5.515

0.975

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(KOTA)

H/17

5.515

0.975

ADD AREA
UNDER
FOOTINGS OUT
OF RAFT LINE
(RCC)

H/18

5.515

0.975

ADD AREA
UNDER
Retaining Wall
Raft (RCC)

TOTAL AREA

Height

Quantity
(CUM /
SQM)

0.1

22.0

220.2

0.45

99.1

0.1

122.99

1229.9

0.45

1229.9

0.1
0.45

67.591
675.91
304.1595

0.1

10.005

100.05

0.55

80.04

0.1

0.22

2.22

0.6

1.33

0.1

0.51

5.15

0.6

3.09

0.1

0.35

3.50
1.75

0.85

2.98

0.1

0.35

3.50

0.85

2.98

0.1

0.35

3.50

0.45

1.58
4850

0.1

0.13

1.27

0.8

1.01

0.1

0.35

3.50

0.85

2.98

0.1

0.35

3.50

0.45

1.58

0.1

0.35

3.50

0.85

2.98

0.1

0.58

5.75

OTAL AREA

0.8

4.49

0.1

0.27

2.69

0.8

2.15

2263.53

5.515

2.688563

0.975

Bill Of Quantity & Works in July '16


Work Area Details
ALL Floors Concrete

S. No.

PARTICULAR

LOCATION

Nos.

Length

Breath

Height

Quantity (CUM /
SQM)

Area

1
2

CONCRETE
CONCRETE

PLUMP CONCRETE
RCC (Cornice Beam)

1
1

15.000
15.210

0.850
0.500

1.8
0.4

23.0
3.0

12.8
7.6

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

CONCRETE
CONCRETE
CONCRETE

1
1
2
1
1
1
1
1
1
1
3
6
3
3
6
3
3

15.210
1.200
0.900
22.331
22.331
22.331
22.331
8.09
8.09
8.09
3.35
2.11
3.473
3.415
2.11
2.11
1.5

0.900
0.300
0.300
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.23
0.23
3.35
3.35
1.8
3.10
7.35

0.23
2.5
3.9
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4
0.12
0.12
0.12
0.14
0.12

3.1
0.9
2.1
4.02
4.02
4.02
4.02
1.46
1.46
1.46
0.92
1.16
4.19
4.12
2.70
2.75
3.97

13.7
6.7
7.6
28.14
28.14
28.14
28.14
10.19
10.19
10.19
2.65
1.67
11.63
11.44
3.76
6.54
11.03

1
1
1
2
1
2
2
1
1

28.876

0.3

0.12

1.04

8.66

10.3
7.3
7.3
6.135
10.5
3
3.2
3.2

0.3
0.3
0.23
0.23
0.4
0.23
0.23
0.23

1.05
1.05
0.6
0.6
0.6
0.45
0.6
0.6

3.24
2.30
2.01
0.85
5.04
0.62
0.44
0.44

21.84
15.48
8.40
7.06
13.86
3.39
3.68
3.68

1
1
1
1
1
1

2.4
4.7
3.2
2.7
1.25
1.25

4.5
4.1
5.6
3.2
2
9.25

0.225
0.14
0.125
0.14
0.125
0.125

2.43
2.70
2.24
1.21
0.31
1.45

10.80
19.27
17.92
8.64
2.50
11.56

5
5

0.8
0.8

0.4
0.4

2.8
2.8

4.48
4.48

33.60
33.60

18.9

0.15

2.1

5.93

79.12

1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
2

5.1
9
6
18
5
6
7
7
10
4
2
3.83
6.20
4
4.5
2.26

0.3
0.3
0.23
0.3
0.23
0.23
0.3
0.3
0.3
0.23
0.23
3.1
1.7
5.134
4.5
0.3

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4
0.12
0.12
0.15
0.15
0.12

0.92
1.62
0.83
3.24
0.69
0.83
1.26
1.26
1.80
0.37
0.4
2.85
1.26
3.08
4.20
0.16

6.43
11.34
7.14
22.68
5.95
7.14
8.82
8.82
12.60
3.16
2.7
11.87
10.53
20.54
20.25
1.23

1
1
1
1
1
1
1
1
1
1
1
3
6

9.30
3.00
8.500
8.500
22.331
22.331
22.331
22.331
8.09
8.09
8.09
3.35
2.11

1.5
0.3
0.500
0.900
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.23
0.23

0.15
0.45
0.4
0.23
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.4
0.4

2.09
0.41
1.7
1.8
4.02
4.02
4.02
4.02
1.46
1.46
1.46
0.92
1.16

3.24
2.9
4.3
7.7
28.14
28.14
28.14
28.14
10.19
10.19
10.19
2.65
1.67

CONCRETE

RCC (Cornice )
RCC (Column )
RCC (Column )
FB 13
SB 10
FB 12
FB 11
First Floor
FB 01
Roof Slab
FB 03
FB 05
SB 02
SB

First Floor Roof Slab

20
22
23
24
25
26
27
28
29
30
32
33
34
35
36
37
38
40
41
42
43
45
46
47
48
49
50
51
52
53
54
55
56
57
60
61
62
63
64
65
66
67
68
69
71
72
73
74
75
76
77
78
79

CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE

SLAB FOR
STAFF
QUARTER

GB11
GB2
B6
B29
B11
B1
B6
B2

SLAB
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE

SLAB FOR STAFF


QUARTER

Columns
C2
SC2

CONCRETE
CONCRETE

Wall
WALL

CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE

FB 28
FB 11
FB 11
FB 07
FB 12
Between
FB 22
X1 To X2
FB 33
FB 32A
FB 20
SB 02
SB

Between X1 toX2

Stair Case
CONCRETE
CONCRETE
CONCRETE
CONCRETE

Stair Case
Stair Case
RCC (Cornice Beam)
RCC (Cornice )
FB 13
SB 10
FB 12
FB 11
Second
Floor Roof
FB 01
Slab
FB 03
FB 05
SB 02
SB

81
82
83
84
85
86
88
89
90
91

Second Floor Roof Slab

C1
C2
SHEAR WALLS
STITCH SLAB IN THE
B2

92

3
3
6
3
3
1
1
4
2

3.473
3.415
2.11
2.11
1.5
28.876
0.75
0.8
2.26

3.35
3.35
1.8
3.10
7.35
0.3
0.45
0.4
0.23

0.12
0.12
0.12
0.14
0.12
0.12
2.7
2.7
2.7

0.09

TOTAL

4.19
4.12
2.70
2.75
3.97
1.04
0.91
3.46
2.81

11.63
11.44
3.76
6.54
11.03
8.66
6.48
25.92
26.89

3.15

2.16

195.9

Bill Of Quantity & Works in July '16


Work Area Details
ALL Floors PLASTER
S. No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

PARTICULAR

LOCATION

Nos.

Length

Breath

Height

Quantity (CUM /
SQM)

Plaster Work Shaft

Terrace to 3rd Floor

0.99

4.35

8.613

Plaster Work Shaft

Terrace to 3rd Floor

0.93

4.35

8.091

Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft
Plaster Work Shaft

LIFT wall
LIFT wall
LIFT Ceiling
LIFT wall
LIFT wall
LIFT Ceiling
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
LIFT wall
Terrace
Terrace
Terrace
Terrace
Terrace
Terrace
Terrace
Terrace
3rd to 2nd
3rd to 2nd
2nd to 1st
2nd to 1st
2nd to 1st
2nd to 1st
Terrace
2nd to 1st
2nd to 1st
2nd to 1st
2nd to 1st
2nd to 1st
2nd to 1st
Terrace
Terrace
Terrace
Terrace
Terrace
Terrace
Terrace
2nd to GF
2nd to GF
2nd to GF
2nd to GF
2nd to GF
2nd to GF
2nd to GF
3rd to GF

2
1
1
2
1
1
2
1
2
1
2
1
2
1
2
1
2
2
2
2
1
1
1
1
2
2
2
2
2
2
2
2
2
2
1
2
2
1
1
1
4
4
2
2
2
2
1
1
1
2
2
1

1.79
1.87
1.79
1.78
1.84
2
2
1.8
2
1.76
2
1.77
2
1.77
2
1.77
0.765
1.04
1.7
0.59
3.1
3.1
3.1
3.1
1.665
0.6
1
0.75
1.67
0.61
0.99
0.93
1
0.79
1.67
0.6
1.67
1.65
1.9
0.94
0.93
0.985
0.93
0.985
0.98
0.93
1.75
1.55
1.05
0.93
0.98
1.75

1.87
1.8
-

5.5
5.5
3.4
3.4

19.69
10.285
3.3473
12.104
6.256
3.6
18
8.1
20.6
9.064
24.8
10.974
15.2
6.726
14.6
6.4605
1.7901
2.4336
3.978
1.3806
2.914
2.604
3.1
1.271
16.983
6.12
7
5.25
12.024
4.392
8.613
8.091
8.2
6.478
5.511
3.96
6.68
4.5375
5.225
2.585
11.904
12.608
9.672
10.244
9.212
8.742
10.5
9.3
6.3
12.462
13.132
6.7375

4.5
4.5
5.15
5.15
6.2
6.2
3.8
3.8
3.65
3.65
1.17
1.17
1.17
1.17
0.94
0.84
1
0.41
5.1
5.1
3.5
3.5
3.6
3.6
4.35
4.35
4.1
4.1
3.3
3.3
2
2.75
2.75
2.75
3.2
3.2
5.2
5.2
4.7
4.7
6
6
6
6.7
6.7
3.85

Area

less (1.26)
less (1.26)
less (1.26)
less (1.26)
less (1.292)
less (1.292)

less (2.562)
less (1.281)
less (1.281)

less (2.562)

less (3.843)

56
57
58
59
60
61

Plaster
Plaster
Plaster
Plaster
Plaster
Plaster

Work
Work
Work
Work
Work
Work

Shaft
Shaft
Shaft
Shaft
Shaft
Shaft

4th
5th
6th
7th
8th
9th

to
to
to
to
to
to

GF
GF
GF
GF
GF
GF

1
1
1
1
1
1

1.55
1.05
0.98
0.93
0.93
0.93

TOTAL

6.4
3.85
5.1
5.1
4.3
4.3

9.92
4.0425
4.998
4.743
3.999
3.999
490.15

Bill Of Quantity & Works in July '16


Work Area Details
ALL Floors Block work
GROUND FLOOR
Grid X3,X2/1
Less Window W1
Grid X1,X2/1
Less Window W1
Less Window W2
Grid 1,3a/X1
Less Window W3
Grid 3a,5/X1
Less D7
Grid 5,6/X1
Grid 6,7/X1
Grid C,D/13
Grid 13,11/D
Less Window W1
Grid 8,11/D
Less Window W1
Grid 7,8/D
Less Window W1
Grid 7,8/C,D
Less D5
Grid 11,8/C,D
Less D5
Grid 11,12a/C,D
Less D5
Grid C,D/7,8
Grid C,D/9
Grid C,D/12
Grid C/13,7
Less D3
Less D6
Grid C,D/7
Grid C,D/7,8

TOTAL Quantity
1
-2
1
-1
-1
1
-1
1
-1
1
1
1
1
-2
1
-2
1
-2
1
-1
1
-1
1
-1
1
1
1
-6
-3
1
1

6.73
1.80
5.69
1.80
1.50
5.26
1.20
3.00
1.00
1.90
3.39
4.76
6.98
1.80
7.01
1.80
7.00
1.80
8.47
0.75
8.47
0.75
5.86
0.75
3.12
3.12
3.12
21.04
1.00
0.60
1.10
4.76

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

2.85
1.90
2.85
1.90
1.90
2.85
1.50
2.85
2.10
2.85
2.85
2.85
2.85
1.90
2.85
1.90
2.85
1.90
3.31
2.10
3.31
2.10
3.31
2.10
3.33
3.33
3.33
2.85
2.10
2.10
3.32
2.85

3.84
-1.37
3.24
-0.68
-0.57
3.00
-0.36
1.71
-0.42
1.08
1.93
2.71
3.98
-1.37
3.99
-1.37
3.99
-1.37
4.20
-0.24
4.20
-0.24
2.91
-0.24
1.04
1.04
1.04
5.99
-1.26
-0.38
0.37
1.36

1
-2
1
-2
1
-1
1
-1
1
1
1
1
1
-2
1
-2
1
-2
1
-1
1
-1
1
-1
1
1
1
-6
-3
1

6.73
1.80
5.69
1.80
5.26
1.20
3.00
1.80
1.90
3.39
2.66
4.76
6.98
1.80
7.01
1.80
7.00
1.80
8.47
0.75
8.47
0.75
8.47
0.75
4.8
1.1
21.0
1.0
0.6
3.1

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.15
0.15
0.15
0.15
0.15
0.1
0.1
0.1
0.1
0.1
0.1

2.85
1.90
2.85
1.90
2.85
1.50
2.85
1.90
2.85
2.85
2.85
2.85
2.85
1.90
2.85
1.90
2.85
1.90
3.31
2.10
3.31
2.10
3.31
2.10
2.9
3.3
2.9
2.1
2.1
3.3

3.84
-1.37
3.24
-1.37
3.00
-0.36
1.71
-0.68
1.08
1.93
1.51
2.71
3.98
-1.37
3.99
-1.37
3.99
-1.37
4.20
-0.24
4.20
-0.24
4.20
-0.24
1.4
0.4
6.0
-1.3
-0.4
1.0

23.34

10.60

9.20

First FLOOR

Grid X3,X2/1
Less Window W1
Grid X1,X2/1
Less Window W1
Grid 1,3a/X1
Less Window W3
Grid 3a,5/X1
Less Window W1
Grid 5,6/X1
Grid 6,7/X1
Grid 13,14/C
Grid C,D/13
Grid 13,11/D
Less Window W1
Grid 8,11/D
Less Window W1
Grid 7,8/D
Less Window W1
Grid 7,8/C,D
Less D5
Grid 11,8/C,D
Less D5
Grid 11,12a/C,D
Less D5
Grid C,D/7
Grid C,D/7
Grid C/13,7
Less D3
Less D6
Grid C,D/7,8

23.10

11.90

11.4

less (3.843)

11.4

Grid C,D/9
Grid C,D/12
Grid A,D/13
Grid C,D/11,12
Less D5

1
1
1
1
-1

3.1
3.1
1.1
5.9
0.8

0.1
0.1
0.1
0.1
0.1

3.3
3.3
3.3
3.3
2.1

1.0
1.0
0.4
2.0
-0.2

Second FLOOR
Grid X5,X4/1
Less Window W1
Grid X4,X3/1
Less Window W1
Grid X3,X2/1
Less Window W1
Grid X1,X2/1
Less Window W1
Grid 1,3a/X1
Less Window W3
Grid 3a,5/X1
Less Window W1
Grid 5,6/X1
Grid 6,7/X1
Grid X3,X4/4
Less Window W1A
Grid X4,X5/4
Less Window W1A
Grid X5/3
Less D5
Grid X5,X4/3
Less D5
Grid X3,X4/3
Less D5
Grid X3,X4/3
Less D5
Grid X3,X2/3
Less D5
Grid X3,X2/3
Less D5
Grid X5/3a Shaft wall
Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X2,X3/3a Shaft wall
Grid X6/3a,1
Less D3
Grid X6,X5/3a,1
Grid X5/3a,1
Less D3
Grid X5,X4/3a,1
Grid X4/3a,1
Grid X4,X3/3a,1
Grid X3/3a,1
Grid X2,X3/3a,1
Grid X3,X5/4
Grid 4/X6X7

1
-2
1
-2
1
-2
1
-2
1
-1
1
-1
1
1
1
-2
1
-2
1
-1
1
-1
1
-1
1
-1
1
-1
1
-1
1
1
1
1
1
-1
1
1
-1
1
1
1
1
1
1
1

6.73
1.80
6.73
1.80
6.73
1.80
5.69
1.80
5.26
1.20
3.00
1.80
1.90
3.39
6.82
1.80
6.60
1.80
4.18
0.75
4.18
0.75
4.18
0.75
4.18
0.75
4.18
0.75
4.18
0.75
2.2
2.2
2.2
2.2
5.0
1.0
6.1
5.0
1.0
5.1
7.9
5.1
7.9
5.1
11.1
2.0

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.90
2.85
1.50
2.85
1.90
2.85
2.85
2.85
1.60
2.85
1.60
3.31
2.10
3.31
2.10
3.31
2.10
3.31
2.10
3.31
2.10
3.31
2.10
3.3
3.3
3.3
3.3
2.9
2.1
3.3
2.9
2.1
3.3
2.9
3.3
2.9
3.3
3.5
3.3

3.84
-1.37
3.84
-1.37
3.84
-1.37
3.24
-1.37
3.00
-0.36
1.71
-0.68
1.08
1.93
3.89
-1.15
3.76
-1.15
2.08
-0.24
2.08
-0.24
2.08
-0.24
2.08
-0.24
2.08
-0.24
2.08
-0.24
0.7
0.7
0.7
0.7
1.4
-0.2
2.0
1.4
-0.2
1.7
2.2
1.7
2.2
1.7
3.8
0.7

Second FLOOR
Grid X6/3a Shaft wall
Grid X5/3a Shaft wall
Grid X4,X5/3a Shaft wall
Grid X4,X3/3a Shaft wall
Grid X6,X5/3a,1
Grid X5/3a,1
Less D3
Grid X5,X4/3a,1
Grid X4/3a,1
Grid X4,X3/3a,1
Grid X3/3a,1
Grid X3,X5/4
Grid 4/X6X7
Grid X5/3
Less D5
Grid X5,X4/3
Less D5
Grid X3,X4/3
Less D5
Grid X3,X4/3
Less D5
Grid X3,X2/3

1
1
1
1
1
1
-1
1
1
1
1
1
1
1
-1
1
-1
1
-1
1
-1
1

2.2
2.2
2.2
2.2
6.1
5.0
1.0
5.1
7.9
5.1
7.9
11.1
2.0
4.18
0.75
4.18
0.75
4.18
0.75
4.18
0.75
4.18

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.2
3.2
3.2
3.2
3.2
2.7
2.1
3.2
2.7
3.2
2.7
3.3
3.2
3.16
2.10
3.16
2.10
3.16
2.10
3.16
2.10
3.16

0.7
0.7
0.7
0.7
1.9
1.3
-0.2
1.6
2.1
1.6
2.1
3.6
0.6
1.98
-0.24
1.98
-0.24
1.98
-0.24
1.98
-0.24
1.98

21.30

11.03

21.3

17.5

10.47

10.47

Less D5
Grid X3,X2/3
Less D5
Grid X7,X6/1
Less Window W2
Grid X5,X6/1
Less Window W1
Grid X5,X4/1
Less Window W1
Grid X4,X3/1
Less Window W1
Grid X3,X2/1
Less Window W1

-1
1
-1
1
-1
1
-2
1
-2
1
-2
1
-2

0.75
4.18
0.75
2.07
1.50
6.73
1.80
6.73
1.80
6.73
1.80
6.73
1.80

0.15
0.15
0.15
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.10
3.16
2.10
2.70
1.90
2.70
1.90
2.70
1.90
2.70
1.90
2.70
1.90

TOTAL QTY
100 mm
150
200 mm

-0.24
1.98
-0.24
1.12
-0.57
3.63
-1.37
3.63
-1.37
3.63
-1.37
3.63
-1.37

59.41
44.01
77.36

9.61

FIRST AID ROOM

Cube Identification
No.

Age Of Cube
(Days)

Wt. Of Cube (Kgs)

Dimension Of Cube
(MM*MM*MM)

Dt. 14/8/2016
Dt. 14/8/2016

28
28

8.552
8.226

150*150*150
150*150*150

Cube Identification
No.

Age Of Cube
(Days)

Wt. Of Cube (Kgs)

Dimension Of Cube
(MM*MM*MM)

Dt. 28/8/2016
Dt. 28/8/2016

7
7

8.310
8.010

150*150*150
150*150*150

Cube Identification
No.

Age Of Cube
(Days)

Wt. Of Cube (Kgs)

Dimension Of Cube
(MM*MM*MM)

8.410
8.511

150*150*150
150*150*150

Dt.
Dt.

Cube Identification
No.

Age Of Cube
(Days)

Wt. Of Cube (Kgs)

Dimension Of Cube
(MM*MM*MM)

Dt. 13/8/2016
Dt. 13/8/2016
Dt. 13/8/2016

28
28
28

8.290
8.407
8.423

150*150*150
150*150*150
150*150*150

Density of Cube
(Kg/m^3)

Area Of Cube
Face (MM^2)

Failure Load (KN)

Compressive
Strength (N/MM^2)

2534
2437

22500
22500

760
675

33.7778
30.0000

Density of Cube
(Kg/m^3)

Area Of Cube
Face (MM^2)

Failure Load (KN)

Compressive
Strength (N/MM^2)

2462
2373

22500
22500

350
425

15.5556
18.8889

Density of Cube
(Kg/m^3)

Area Of Cube
Face (MM^2)

Failure Load (KN)

Compressive
Strength (N/MM^2)

2492
2522

22500
22500

525
610

23.3333
27.1111

Density of Cube
(Kg/m^3)

Area Of Cube
Face (MM^2)

Failure Load (KN)

Compressive
Strength (N/MM^2)

2456
2491
2496

22500
22500
22500

700
650
650

31.1111
28.8889
28.8889

Average
Compressive
Strength
31.89

Average
Compressive
Strength
17.22
eternaldenitecryst
Average
Compressive
Strength
25.22

Average
Compressive
Strength
29.63

You might also like