You are on page 1of 3

DAFTAR PUSTAKA

Adrianto, Wahyu dan Muhammad Kholil. 2015. Analisis Penerapan Lean


Production Process Untuk Mengurangi Lead Time Process Perawatan Engine.
JOSI. Vol. 14 (2) : 99-309.
Agustiningsih, Ars. 2011. Desain Perbaikan Proses Pelayanan Unit Rawat Jalan
dengan Konsep Lean Hospital di Rumah Sakit Karya Bhakti. Depok: Fakultas
Kesehatan Masyarakat Universitas Indonesia.
Apel, Wolfgang. Jia, Yong Li. Vanessa, Walton. 2007. Value Stream Mapping for
Lean Manufacturing Implementation. Worcester : Faculty of Polytechnic
Institute (WPI) And Central Industrial Supply (CIS) WPI.
Dave, Yash., Nagendra, Sohani. 2012. Single Minute Exchange of Dies: Literature
Review. International Journal of Lean Thinking. Volume 3, Issue 2.
Derya, Sevim K., Nevzat Cakicier, E. Seda Erdinler, Gksel Ulay and Ahmet
Muhlis Dogan. 2009. 5S activities and its application at a sample company.
African Journal of Biotechnology. Vol. 8 (8): 1720-1728.
Enaghani, Mohammad Reza. 2009. The Relationship between Lean and TPM.
Boras : School of engineering University of Boras.
Gaspersz, V. 2011. All In One Management Tool Book. Bogor: Tri-Al_Bros
Publishing.
Gaspersz, V. 2012. All in one Practical management Excellence. Jakarta : PT.
Niaga Swadaya.
Hamin, M. dan Nurnajamuddin, M,. 2012. Manajemen produksi modern, operasi
manufaktur dan jasa. Jakarta : PT. Bumi Aksara.

22

Hartika, N., Abinin, N. and Omar, M. W. 2011. Factor Influencing Empoyees


Motivation inImplementing 5S System. Journal of Human Resource
Management. Vol 39: 4836-4867.
Irani, S.A., dan Zhou, J. (2000). Value Stream Mapping of a Complete Product.
International Journal of Production Research. Vol 38 (8): 1855-1874.
Joshi, M. R., dan Naik, GR. 2012. Reduction in Setup Time By SMED, A
Literature Review. International Journal of Modern Engineering Research.
Vol. 2: 442-444.
Mazumder, B., S. Hattacharya., and A. Yadav. 2011. Total Quality Management in
Pharmaceuticals: A Review. International Journal of PharmTech Research.
Volume 3(1): 365-375.
Purwanggono, B., R. Ruminta., dan Irawati. 2014. Analisis Faktor-faktor yang
mempengaruhi Motivasi Karyawan dalam Menerapkan Budaya Kerja 5S
(Studi Kasus pada Karyawan PT. PLN (Persero) P3jb APP Semarang).
Prosiding SNATIF ke-1 th. 2014. Semarang: Universitas Diponegoro.
Rother, Mike. John, and Shook. 1999. Learn to see : Value Stream Mapping to
Eliminate Muda. Brooklyn: Lean Enterprise Institute.
Sorooshian, Salimi, Bavani, and Aminattaher. 2012. Experience of 5S
Implementation. Journal of Applied Sciences Research. Vol. 8 (7): 38553859.
Vipulkumar, Patel, and Thakkar. 2014. A Case Study: 5s Implementation in
Ceramics Manufacturing Company. Bonfring International Journal of
Industrial Engineering and Management Science. Vol. 4 (3).
Venkatesh, J. Plant Maintenance Resource Center, 2007. An Introduction to Total
Productive

Maintenance

(TPM)

[Online].

http://www.plant-

maintenance.com/articles/tpm_intro.pdf . Diakses pada tanggal 14- 09-2016.


Wijayanto, Bagas, Saleh, dan Zain. 2015. Rancangan Proses Produksi Untuk
Mengurangi Pemborosan Dengan Penggunaan Konsep Lean Manufacturing

23

Di Pt. Mizan Grafika Sarana. Jurnal Online Institut Teknologi Nasional. Vol.
03 (01) : 2338-5081.
Winintasari, F., Juliani, W., dan Suryadhini, P. 2014. Perencanaan Perbaikan
Strerch Forming Area di PT Dirgantara Indonesia untuk Mereduksi Lead
Time Menggunakan Metode 5S dengan Pendekatan Lean Manufacturing.
Tugas Akhir. Bandung: Universitas Telkom.
Womack, J. P., 1996, Lean Thinking : Banish Waste and Create Wealth in Your
Corporation. Simon & Schuster.

24

You might also like