APTRANSCO SSR 2010-11

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

STANDARD SCHEDULE OF RATES

FOR EHT TRANSMISSION LINES AND


SUBSTATIONS
FOR THE YEAR 2010 - 11
(With effect from the date of issue of T.O.O. Ms.No 449, dated. 21.01.2011.)

APTRANSCO SSR 2010-11

INDEX

SI.
No.

Description

Page
No

Preamble:

ANNEXURE-I:
400kV Transmission Lines

15

ANNEXURE-II:
220kV & 132kV Transmission Lines

17

ANNEXURE-III
400kV, 220kV & 132kV Substations

22

ANNEXURE-IV
Illumination, Lighting, Fire Fighting, Airconditioning, D.G Set & 33kV Station Supply
System in 400kV Substations.

32

ANNEXURE-V:
Power Transformers

40

ANNEXURE-VI:
Transportation, Handling charges Involved
during erection of 400KV Transmission Lines

48

ANNEXURE-VII:
Handling charges of Equipments & Line
Materials

49

ANNEXURE-VIII:
Transport of Protection and Control of
Equipment and Line Materials.

55

APTRANSCO SSR 2010-11

PREAMBLE:
1.

The Rates for the item of works (Line & Substations) involved under
special conditions in the existing SSR 2010-11 are as follows:
(I)

TRANSMISSION LINE WORKS:

Sl.
No.
1.

River Crossing with JC type towers

2.

2nd Circuit Stringing with 1st Circuit lives. 75% extra

3.

Works under shutdown:

Description of work

% Over the basic labour rates


100% extra

50% extra

This is applicable under the following


conditions only.
i. Pre-programmed for interruption of
line.
ii.Pre-arranged replacement /
rectification of line materials.
4.

Dismantling works

5.

Emergency Works such as break down 100% extra


works.
This will not be applicable for prearranged shutdown works.

6.

Stringing of railway crossings

100% extra

7.

National and State High way crossings

25% extra

8.

Tree cutting & Jungle Clearance

100% extra

Sl.
No.
1.

SUBSTATIONS AND OTHER WORKS:


Description of work
Works under shutdown:

75% of Normal Rate.

% Over the Basic labour rates


50% extra

This is applicable under the following


conditions only.
i. Pre-programmed for interruption of
equipment.
ii. Pre-Programmed replacement of bus
in Substation.
iii. Pre-arranged replacement /
rectification of equipment
2.

Dismantling works

75% of Normal Rate.

APTRANSCO SSR 2010-11

Sl.
No.
3.

4.

Description of work

% Over the Basic labour rates

Emergency Works such as break down


works.
This will not be applicable for prearranged shutdown works.
Idle trip (No load) rate of the lowbedded trailer for movement of Power
Transformers.

100% extra

50% of basic labour rate of loaded


trip. Shortest distance from / to the
place of availability of low bedded
trailer shall be considered.

Note:- However if more than one special condition such as emergency,


shutdown, 2nd circuit stringing with First circuit live and breakdown etc are
applicable for a particular work item / situation, only one condition with maximum
extra rate out of applicable special conditions can be allowed. Applying more
than one special condition for any item is to be dispensed.
2

For EHT Transmission line works, Keeping scattered in nature, some


extra provisions

a.

b.

are provide and are as follows

5% extra provision on the basic rates of APTRANSCO towards scattered area


mobilization efforts in general areas
Or
10% extra provision on the basic rates of APTRANSCO towards scattered
area mobilization efforts in difficult areas. The concerned SE/TLC has to
certify that entire line passes through difficult terrain / areas duly furnishing the
justification.
Note:- If 10% extra toward mobilization efforts in difficult areas is applicable
for a work, then the 5% extra towards mobilization effort in general
areas is not applicable.

Transmission line erection works, Uniform area allowance minimum of 25%


on basic labour charges for the entire state as recommended by Board of
Chief Engineers will be allowed against weighted average of area allowance
mentioned in Schedule of rates except in Greater Municipal corporation limits.
If the entire line is with in the Greater Municipal Corporation limits, area
allowance shall be considered as mentioned in Common SSR 2010-11. This
uniform area allowance is applicable only for the Transmission line erection
works. However area allowance shall be considered as adopted from
Common SSR 2010-11, for the works other than transmission line works.

10
3(a)

APTRANSCO SSR 2010-11

10% extra to the rate of earth flat (material) is allowed towards wastage,
cleats and overlap etc., while preparing the estimate as the billing for this item
is on Running Meters basis and after laying of earth mat.

3(b)

For stringing of conductor for small modification works, if the length of the line
is less than 0.5 KM, 0.5KM is considered and if the length of the line is greater
than 0.5 KM and less than 1 KM, 1KM is considered, in the preparation of
estimate.

3(c)

For survey of small length of lines, if the length of line is less than 1KM, then
1KM is considered for survey of small length of lines in the preparation of
estimate.

3(d)

The rates for tree cutting and jungle clearance may be followed as per
Common SSR of Govt of Andhra Pradesh.

4.

AREA ALLOWANCES:

A)

CORPORATIONS & MUNICIPALITIES:


a)

(i)

(ii)

25% extra over the rates on labour component of works is allowed


in all Municipal Corporation Limits of Andhra Pradesh except
Greater Hyderabad, Greater Visakhapatnam and Vijayawada
municipal Corporations ( up to a belt of 12 Kms. from Municipal
Corporation limits ) and other corporations as notified by the
Government from time to time.
40% extra over the rates on labour component of works for
Greater Hyderabad, Greater Visakhapatnam and Vijayawada
Municipal Corporation (up to a belt of 12 Kms. from Municipal
Corporation limits).

b)

Allow 20% extra over basic rates on labour component of works in all
District Headquarters and the remaining Municipal limits (up to a belt of
12 Kms. from Municipal limits).

c)

For works at Tirumala Hills in Chittoor District, 40% extra over the basic
rates of labour component is allowed.

d)

For works at Horsely hills in Chittoor District, 30% extra over the basic
rates of labour component is allowed.

e)

20% extra over the basic rates of labour component for Tirupathi
Municipal Corporation is allowed.

11
B)

APTRANSCO SSR 2010-11

JAIL COMPOUNDS:
15% extra is allowed over basic labour rates for the work in the Jail
compounds. Only equivalent number of Man Mazdoor shall be provided in the
Jail premises and no women Mazdoor are allowed inside.

C)

INDUSTRIAL AREA:
20% over basic rates on labour component works allowed for works situated
within 10 Kms belt of Industrial area of, Jeedimetla, Lingampally,
Ibrahimpatnam,Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru,
Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur
District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District,
Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda
District, Ramagundam and Godavarikhani in Karimnagar District, Renigunta in
Chittoor District and Yerraguntla & Mangampet in Kadapa District, Manchiryal,
Mandamarri, Bellampalli in Adilabad District, Sarpaka, Kothagudem,
Paloncha, Manguguru, Singareni Collieries in Khammam District, Kamalapur,
Bhoopalpally of Warangal District, Wadepally of Nalgonda District, Nagapally
(Centenary Colony, Begumpet X roads),Takkelapally of Karimnagar District,
Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur
District and Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur &
Bethamcherla of Kurnool District ,Anakapally of Vishakhapatnam District.

D)

E)

AGENCY / TRIBAL AREAS:


a)

25% extra is allowed for the works located with in the interior Agency /
Tribal limits, i.e. for the works located with in & upto16 KMs from any all
weather route inside Agency / Tribal.

b)

40% extra is allowed for the works located with in the interior Agency /
Tribal limits, i.e. for the works located beyond 16 KMs from any all
weather routes inside Agency / Tribal. The extra percentage under
Agency / Tribal areas allowance may be allowed on the labour
component and on the labour charges in the rates for conveyance of
materials.

GHAT ROADS:
For Ghat Roads steeper than 1 in 20, the length of the road may be taken as
1.5 times the existing length of the road for the purpose of leads only for
conveyance of materials based on the certificate for the Ghat Road given by
the Superintending Engineer concerned. Under compelling circumstances, the
concerned Chief Engineer can adopt the equivalent length of road as 2
times of actual length.

12

APTRANSCO SSR 2010-11

Note: If more than one area allowance ( such as those ) for (1) Municipalities
(2) Agency / Tribal areas (3) Industrial areas are applicable for a
particular situation, only the maximum out of the allowable percentages
is to be allowed.

5.

14% on basic labour rates towards for contractors overheads and profit
including labour importation is applicable only for Turnkey projects (New
substations, Lines, 33kV features & Bay extension works) of more than 1
Crore and not applicable to O&M works and other than turnkey works.
Contractors over heads and profit including Labour importation 14% is
allowed on basic labour rates.

The overhead charges include the following:

Site accommodation, setting up plant, access road, water supply,


electricity and general site arrangements.
Office furniture, equipment and communications.
Expenditure on:
Corporate office of contractor.
Site supervision.
Documentation and as built drawings.
Mobilization / de-mobilization of resources.
Labour camps with minimum amenities and transportation to work
sites.
Light vehicles for site supervision including administrative and
managerial requirements.
Laboratory equipment and quality control including field and laboratory
testing.
Minor T&P and survey instruments and setting outworks, including
verification of line, dimensions, trial pits and bore holes, where require.
Watch and ward.
Traffic management during construction
Expenditure on safe guarding environment.
Sundries
Financing Expenditure.
Sales / Turn over tax.
Work Insurance / compensation.
AutoCAD Tower /Structure drawings of required sets.
AutoCAD shop drawings of Towers /Structures of required sets.
AutoCAD Substation layout.
Testing and commissioning of the equipment.

13

6.

APTRANSCO SSR 2010-11

The area allowances, COPs and Mobilization charges are not applicable for
O&M works and also on Fabrication charges and Galvanization Charges.

The area allowances & COPs are applicable where both electrical & civil
works (labour) are involved and its value is more than Rs.20.00 lakhs.
7.

Erection of Power Transformers and Oil filtration through Private


Agency:
The rates were communicated by Chief Engineer / Transmission, vide
Letter No.CTO-121/F.PTRs erection works / D.No.104/08, dated.05.07.2008
and subsequent Amendment No. I, dt.15.07.2009 on rate contract basis for
erection, dismantling, transportation and oil filtration of Power Transformers
through private agency.
Area Allowances, Special provisions and any others allowances are not
applicable on the rates of rate contract.
The rates mentioned under the rate contract include all taxes & duties,
allowances and all extra provisions including Transport etc. excluding service
tax.

In the case of the works of Handling, Erection and filtration of Power


Transformers will be carried out by the department, in such cases, area
allowances, special provisions and taxes and duties are not applicable
8.

Civil Engineering Works in Transmission lines & Substations :


For Civil items works of Transmission Lines and Substations the
common SSR 2010-11 for engineering departments shall be followed in Toto.
Some provisions made in T.O.O.CE (Civil) Ms No.148, dated.21.10.2009 are
also applicable for civil works.

9.

In respect of Cement and Steel rods the procedure indicated in Common SSR
for all Engineering Departments shall be adopted for updating of estimates at
the time of finalization of tenders.

APTRANSCO SSR 2010-11

14

10.

All statutory levies such as VAT (Works Contract Tax) @4% on 70%, Service
Tax with Educational Cess @ 10.3%etc., cess for labour welfare @1% if any,
shall have to be added in the estimate based on the prevailing notified rate.

11.

The S.S.R will come into force with immediate effect until further orders.

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

15

APTRANSCO SSR 2010-11

ANNEXURE I
SSR RATES FOR ERECTION OF 400KV TRANSMISSION LINES
Sl.
No.
(1)
1

Description of Item

(2)
Preliminary Survey with GPS survey, theodilite &
total station, marking route on topo sheets
represents actual field conditions.
2(a) Detailed Survey with GPS, total stations, Digital
theodolite etc., along the approved alignments
preparation of profiles, tower spotting, tower
schedules and soil resistivity
2(b) Excavation of trail pit (1mt x 1 mt x 4mt)
3
Check Survey, peg marking the tower positions
on ground, conforming to the approved Profile
and tower schedules using GPS, Total stations,
Digital theodolites etc.
4
Setting with stub for all types of towers with stub
setting template which includes erection of stubs,
fixing of jacks for supporting template, alignment
and leveling excluding cost of excavation and
concrete (excluding transportation charges).
5
Super structure erection of all type of towers
including extensions except RC towers including
fitting of step bolts, danger plates, number plates,
phase plates, circuit plates, bird guards, anticlimbing devices etc., and tack welding of all
bolts & nuts (upto bottom cross arm level)
(excluding transportation charges).
6
Mounting of Insulators and stringing of double
circuit with twin bundled ACSR Moose Power
Conductor including laying, jointing, tensioning,
sagging clamping and fixing spacers (excluding
transportation charges).
6(a) Double Circuit Stringing
6(b) Single circuit Stringing
7
Mounting of Insulators and stringing of double
circuit with Quadruple ACSR Moose Power
Conductor including laying, jointing, tensioning,
sagging clamping and fixing spacers (excluding
transportation charges).
7(a) Double Circuit Stringing
7(b) Single circuit Stringing
8(a) Stringing of two (2) nos. 7/3.66 mm galvanized
steel earthwire, including laying jointing,
tensioning etc., with necessary accessories upto
the pinnacle (excluding transportation charges).

(3)
kM

SS Rate for
2010-11
(Rs.)
(4)
2513.00

kM

13056.00

No.
kM

1979.00
4500.00

Set

10594.00

MT

5686.00

kM
kM

226302.00
150868.00

kM
kM
kM

339454.00
226302.00
10633.00

Unit

APTRANSCO SSR 2010-11

16
Sl.
No.

Description of Item

Unit

(1)
8(b)

(2)
(3)
Stringing of one (1) no. 7/3.66 mm galvanized
KM
steel earthwire, including laying jointing,
tensioning etc., with necessary accessories
(excluding transportation charges).
9 (a) Stringing of two (2) nos. OPG Wire, including
KM
laying jointing, tensioning etc., with necessary
(excluding transportation charges).
9(b) Stringing of one (1) no. OPG Wire, including
KM
laying jointing, tensioning etc., with necessary
(excluding transportation charges).
10
Earthing of transmission towers:
10(i) Providing of Pipe type earthing including of cost
Each
of BH coke & salt but excluding cost of earthing
set
10(ii) Counter poise earthing sets excluding cost of all
Each
materials (4sides of tower)
location
10(iii) Counter poise earthing sets using Bentoinite and
Each
salt (4 sides of tower)
location

SS Rate for
2010-11
(Rs.)
(4)
7089.00

52348.00

34899.00

2913.00

2442.00
3664.00

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

17

APTRANSCO SSR 2010-11

ANNEXURE II
ERECTION OF 220kV & 132 kV TRANSMISSION LINES
Sl.
No.
(1)
1

Description of Item

(2)
Check Survey, peg marking the tower positions
on ground, conforming to the approved Profile
and tower schedules using GPS, Total stations,
Digital theodolites etc.
2
Conducting reconnoitery and preliminary survey
along bee line with three alternative routes and
furnishing report for selecting the best proposal
for approval, including cost & conveyance of all
materials, hire charges of equipment, tools and
plant, preparation of drawings and reports,
labour charges, complete for finished item of
work as per the directions of Engineer-in-charge
at site.
(a) With Theodolite
(b) With GPS equipment ( As per Clause 4.9 of
survey)
(c)
With total station equipment
3 Conducting detailed survey by taking the levels
along the route to a corridor of 15 mtrs. width on
either side of alignment, at every 20 mtrs. interval
and wherever there is a steep increase/decrease
in ground profile duly indicating the chainage
between angle points, river crossings, railway
crossing and major highway crossings and
plotting the profiles and preparation of vicinity
maps to the standard scales. The survey
includes clearing of bushes, branches of tree,
crops and shrubs wherever encountered for
detailed survey for viewing, for fixing anchor
towers and also taking levels etc. required for
conducting detailed surveys.
This work can be done with Theodolite or
with GPS equipment (As per clause no.4.9 of
survey) or with total station equipment. This
work involves the following items.
i) Tower schedules as per tower spotting
requirements plotted on reproducible tracing of
profile original with one extra copy shall be given.
And
ii) Identification of wind zones, collection of
Hydraulic data of rivers / drains from competent
authority.

Unit
(3)
kM

SS Rate for
2010-11
(Rs.)
(4)
2737.00

RKM
RKM

2486.00
2486.00

RKM

2486.00

RKM

8536.00

18

Sl.
No.

Description of Item

APTRANSCO SSR 2010-11

Unit

(1)
(2)
(3)
iii) Taking earth resistivity at an interval of 1 Km by
Loc
electrical resisitivity method (4 point method) or
by ERM method.
iv) Preparing of PTCC questionnaire, topo sheets
RKM
extracts with marking of the proposed line. Soil
resistivity report, tower sketch, station single line
diagram etc. (30 copies/sets)
v) Enumeration and numbering of trees, & marking
Each
on tree with white letters on yellow paint
measuring girth and height of the trees and
plotting in the profile. The trees enumerated shall
be shown in profile on either side of centre line
clearly, indicating name of tree, girth & height.
Separate tree schedule should be submitted
along with the profile for arriving tree
compensation amount.
vi Preparation of ground profiles for Railway
Each
crossing, River crossing and EHV power line crossing
crossing separately wherever required.
The above rates shall include cost and
conveyance of all materials hire charges of
equipment tools & plant, preparation of profile
drawing, painting of trees, labour charges,
preparation of report etc., complete for finished
item of work as per instructions of Engineer-incharge.
4
Excavation of trial pits of standard dimensions of
Each
1 mtr X 1 mtr. width upto 3 mtrs. depth at 1 KM
interval or wherever there is abnormal change in
topography and taking observation of soil strata
for classification of foundation and position of
existing ground water table/depth of water in the
existing open wells if any and back filling the trial
pits after vetting by Departmental officials.

SS Rate for
2010-11
(Rs.)
(4)
621.00

621.00

12.50

1243.00

1024.00

19

Sl.
No.
(1)
5

(a)
(b)
(c)
(d)
7(a)

7(b)

7(c)

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
Preparation of contour plan of special tower
location / switch yard sites by taking levels at
10m X 10m grid interval (where ever the ground
level variation are in substation or hilly areas 5 m
x 5m grid may be adopted). Plotting the
contours at each 1 Mtr. Intervals duly showing
the
boundaries
of
the
site,
existing
structures/features, roads, natural drain and
ponds. There alternative formation levels along
with cutting and filling quantities of earth in a
most economical way are to be prepared and
submitted. The rates are inclusive of cost and
conveyance of materials, labour charges, hire
charges of equipment and tools & plants.
Setting of stubs with stub-setting template :
Erection of stubs, stub template, fixing of jacks
for supporting template, allignment and levelling
for exact location of stubs of stubsetting
template, dismantling of
template after
completion of initial curing of C.C., movement of
template from one location to other location (A
minimum lead of 1 KM is adopted).
132 KV P, R & S-Type Towers
220 KV A, B, C & D-Type Towers
132 KV Multi circuit Towers
220 KV Multi circuit Towers
Erection of tower structures, including all types of
extensions except JC type towers (stub template
erection and dismantling are not to be included)
(including 3 mtr., 6 mtr. , 9 mtr., & 12 mtr.
extensions)
Erection of all types of multi circuit tower
structures, including all types of extensions
except JC type towers (stub template erection
and dismantling are not to be included)
(including 3 mtr., 6 mtr. , 9 mtr., & 12 mtr.
extensions)
Erection of
all types of
'JC' Type tower
structures, including all types of extensions (stub
template erection and dismantling are not to be
included)
(including '0' based, Extended and
Truncated)

(3)
One
Acre

SS Rate for
2010-11
(Rs.)
(4)
2275.00

Loc.
Loc.
Loc.
Loc.
MT

4886.00
7119.00
6107.00
8899.00
3235.00

MT

4530.00

MT

5824.00

20

Sl.
No.
(1)
8

(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
9

10

11

12

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
STRINGING OF POWER CONDUCTOR:
Hoisting of tension insulators and Suspension
insulators, paving out the conductor, rough
sagging,Jointing, tensioning, clipping and fixing
of preformed Armour rods and vibration
dampers.
measuring
ground
clearances
wherever necessary.Which includes the works
involved in the crossing of LT, 11kV & 33kV
power lines viz dismantling and restringing
of conductor
3 Nos. Zebra conductors
6 Nos. Zebra conductors
2 Nos. Panther conductors
3 Nos. Panther conductors
6 Nos. Panther conductors
2 Nos. Moose conductors
3 Nos. Moose conductors
6 Nos. Moose conductors
3 Nos. Bear conductors
6 Nos. Bear conductors
3 Nos. Dog conductors
6 Nos. Dog conductors
Stringing of Earthwire:
FIxing hardware,
paving out earth wire, jointing, tensioning,
stringing and clamping of 7/3.15 mm high
tensile galvanised steel wire.
Earthing of towers including cost of Excavation,
Back-filling, including cost of 25 mm dia 2.5 mm
thick, class 'C' G.I. pipe of 3 Mtrs length with
50X6 mm G.I. Flat 3 Mtrs long, Charcoal, Salt
etc., and measuring tower footing resistance.
Counterpoise earthing including clamping
devices and terminal lugs, but excluding cost of
steel wire.
Half round welding of G.I.bolts and nuts of
towers in the section between ground level &
upto bottom X-arm level including all bolts
connecting the bracings at the bottom X-arm
level and painting the welded portion with one
coat of zinc rich paint.

(3)

SS Rate for
2010-11
(Rs.)
(4)

RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM
RKM

27583.00
41372.00
14708.00
22063.00
34936.00
23290.00
34936.00
55161.00
27583.00
41372.00
16547.00
26202.00
4414.00

Nos.

2450.00

Rmts

24.90

Each

11.70

APTRANSCO SSR 2010-11

21
Sl.
No.
(1)
13

14

15

Note: -

Description of Item

Unit

(2)
Replacement of Insulator disc at Cut points
excluding transportation of material (220kV &
132kV)
Replacement of Insulator disc at Suspension
points excluding transportation of material
(220kV & 132kV)
Providing of Vibaration dampers (for 220kV &
132kV )

(3)
String

SS Rate for
2010-11
(Rs.)
(4)
1398.00

String

827.00

Each

82.00

While preparing the estimate, the transport component for the


Transmission lines works shall be added depending on the respective
lead and lifts and based on the rates communicated in prevailing
Common SSR of all Engineering Departments for Initial Transport I.e.,
from TLC stores to Site Stores and Second transport i.e., from Site
Stores to locations along the line (not for turnkey works).

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

22

APTRANSCO SSR 2010-11

ANNEXURE III
ERECTION OF 400kV, 220kV & 132 kV SUBSTATIONS
Sl.
No.
(1)

Description of Item
(2)
1 Hoisting of insulators & hardware, paving
conductor and stringing of 400kV main bus for
three phases with quadruple moose conductor to
a tension of 1000kgs for single moose conductor,
bus section length is 54mtrs.
2 Hoisting of insulators & hardware, paving
conductor and stringing of 400kV Jack bus for
three phases with twin moose conductor to a
tension of 1000kgs for single moose conductor,
bus section length is 60mtrs.
3 Hoisting of Insulators and hardware, stretching
the conductor and stringing of 220 kV bus
comprising of three phases with Quadraple
Moose conductor to a tension of 900kgs for
single moose conductor.( The maximum
length or up to a length of bus section of
40m)
4 Hoisting of Insulators and hardware, stretching
the conductor and stringing of 220 kV bus
comprising of three phases
with single
Zebra/Moose conductor to a tension of 900kgs.(
The maximum length or up to a length of bus
section of 40m)
5 Hoisting of Insulators and hardware, stretching
the conductor and stringing of 220 kV bus
comprising of three phases with Twin
Zebra/Moose conductor to a tension of
1800kgs, including fixing of spacer clamps( The
maximum length or up to a length of bus section
of 40m).
6 Hoisting of Insulators and hardware, stretching
the conductor and stringing of 132 kV bus
comprising of three phases with Single
Zebra/Moose conductor to a tension of 900kgs.(
The maximum length or up to a length of bus
section of 45m).
7 Hoisting of Insulators and hardware, stretching
the conductor and stringing of 132 kV bus
comprising of three phases with Twin
Zebra/Moose conductor to a tension of 1800kgs
including fixing of spacer clamps.( The maximum
length or up to a length of bus section of 45m).

Unit
(3)
Bus
Section

SS Rate for
2010-11
(Rs.)
(4)
25312.00

Bus
Section

12838.00

Bus
Section

14705.00

Bus
Section

3677.00

Bus
Section

7356.00

Bus
Section

3677.00

Bus
Section

7356.00

23

Sl.
No.

Description of Item

(1)
8

10

11

12
13
14

15

16

17

APTRANSCO SSR 2010-11

Unit

(2)
(3)
Hoisting of Insulators and hardware, stretching
Bus
the conductor and stringing of 33 kV bus Section
comprising of three phases with Single
Zebra/Moose conductor to a tension of 450kgs.(
The maximum length or up to a length of bus
section of 20m).
Hoisting of Insulators and hardware, stretching
Bus
the conductor and stringing of 33 kV bus Section
comprising of three phases with Twin
Zebra/Moose conductor to a tension of 900kgs
including fixing of spacer clamps.( The maximum
length or up to a length of bus section of 20m).
Hoisting of Insulators and hardware, stretching
Bus
the conductor and stringing of 132 kV bus Section
comprising of two phases with Single
Zebra/Moose conductor to a tension of 900kgs.(
The maximum length or up to a length of bus
section of 45m).
Erection of 7/3.66 G.S. Earth wire from top of
RM
Peak tower and LMs to ground and connecting to
untreated earth pits including cutting,clamping
and fixing of all hardware like Pad type
compression clamp, cleat type clamp and T
clamp etc (for 400kV).
Fixing of spacers for Twin Moose conductor
Each
Fixing of spacers for Quadruple Moose
Each
conductor
Fixing of Hardware,stretching the ground wire
Each
and stringing of earth wire to a tension of 450kgs
from pinacle to pinnacle.
Fixing of Hardware,stretching the ground wire
RM
and stringing of earth wire to a tension of 450kgs
from pinacle to ground.
Connecting equipment to equipment through 4"
Meter
IPS Al tube including cutting, bending, welding,
testing, clamping etc., for each meter including
both side connections.
Connection of equipment to bus and or another
Each
equipment with single zebra/Moose/Panther
conductor including measuring, cutting,clamping
and hoisting of suspension insulator assembly to
support the conductor wherever necessary.

SS Rate for
2010-11
(Rs.)
(4)
2758.00

4599.00

2451.00

37.50

72.80
109.20
550.00

37.50

163.00

193.00

24
Sl.
No.

Description of Item

(1)
(2)
18 Connection of equipment to bus and or another
equipment with Twin zebra/Moose/Panther
conductor including measuring, cutting,clamping
and hoisting of suspension insulator assembly to
support the conductor wherever necessary.
19 (i) Laying of earth mat including excavation &
backfilling, welding, connecting to all equipment,
structures, Junction boxes, and connecting
lightning shield to earth mat and earthing of
fence posts, drilling and connecting earth rods
including connecting to cast iron pipes as per
approved drawings with the following sizes:(for
400kV)
M.S. Rod 40 mm dia.
19(ii) Fabrication and connecting to risers from earth
mat to structures, equipment, marshalling boxes,
electrical panels, PLCC panels, fencing posts
etc.,.(for 400kV)
(a) M.S./ G.S. Flat 75 x 12 mm
(b) M.S./ G.S. Flat 50 x 8 mm ( Above ground)
(c) Un-Treated Earth pits including installation of 40
mm dia rod electrode, disconnecting links, and all
required materials and RCC collar/ chambers
with bricks, cement mortar 1:4 and completion
of related civil works as specified for LMs, LAs,
Carrier couplings and CVTs. (Cost of RCC Collar
included)
20 Laying of earth mat including excavation of
trenches, welding, connecting to equipment and
connecting lightning shield to earth mat and
earthing of fence posts, drilling and connecting
earth rods including connecting cast iron pipes
as per Drg. No.SET(P)/149/82 with the following
sizes of MS Flats /GI Flats.(for 220kV & 132kV)
including fabrication.
(a) 100x16mm MS Flat / GI Flat.
(b) 50x 8mm MS Flat / GI Flat.
(c ) 75x 8mm MS Flat / GI Flat.
(d ) For laying of earth flat in hard rock in substation /
bays extension, an additonal amount of Rs.45/per RM to the basic labour rate of SSR will be
allowed as there is no provision in the rate of
laying of earth flat for remvoal of hard rocks.

APTRANSCO SSR 2010-11

Unit
(3)
Each

RM

RM
RM
Each

RM
RM
RM

SS Rate for
2010-11
(Rs.)
(4)
299.00

97.80

85.30
36.40
1369.00

56.90
44.80
51.00

25

Sl.
No.

Description of Item

(1)
(2)
21 Excavation of earth pit, putting cast iron pipe with
flange on one end (as per ISS7181/86) of
nominal dia 125mm and 2.75 meters long in side
the pit including supply and fixing RCC collars
0.75 meter dia (OD), 50mm thick and 0.60meters
long in side the pit, backfill the pit in the 25mm
size granules of BHcoke for full depth of the pit
with alternate layers of BH coke and salt of
300mm thick around the earth pipe of 150mm on
all the sides of the pipe including cost and
conveyance of BH coke, salt, clamps, C.I.Pipes
and RCC collars, labour charges for all
operational and incidental items of work etc.,
complete.
22(I) Laying including termination and providing
suitable ferrules & lugs etc of armoured Control
cables of size 2 core, 2.5 Sq.mm to 27 core, 2.5
Sq. mm including cost of Cable Glands, lugs,
ferrules (for 400kV)
(a) 2 to 12 core
(b) 14 to 19 core
(c) 27 core
22(II) Laying including termination and providing
suitable ferrules & lugs, Jointing kits etc of
armoured Power cables of the following size
including cost of cable glands, lugs, ferrules etc
complete.(for 400kV)
(a) upto 50 sq.mm
(b) above 50 sq.mm to 300 sq.mm
(c) above 300 sq.mm to 700 sq.mm
23 Buried Cable Trench - Excavation for cable
trench providing 100mm thick sand layer before
and after laying the cable & Providing 4" thick
brick cover over sand, refilling, consolidation and
levelling of surplus earth including the cost and
conveyance of all materials, route markers,
labour charges etc. complete for finished item of
work (for 400kV).
(a) Size : 300 x 300 mm
(b) Size : 300 x 600 mm
(c) Size : 1500 x 800 mm
24 Erection of Galvanised Cable trays with 2mm
thick perforated CRCA Sheet. Size : 200 and
600 mm (for 400kV)

APTRANSCO SSR 2010-11

Unit
(3)
Each

SS Rate for
2010-11
(Rs.)
(4)
8892.00

RM
RM
RM

33.00
37.50
44.40

RM
RM
RM

57.00
73.00
92.00

RM
RM
RM
RM

159.00
159.00
423.00
37.50

26

Sl.
No.

Description of Item

(1)
(2)
25 Laying and termination of HF cables for PLCC
system (for 400kV)
26 Laying of Telephone cable of Different sizes in
cable trench/ PVC Conduit pipe in wall (for
400kV)
27 Laying of underground OFAC (Optical Fibre
Approach cable of 12 fibre capacity) through 40
mm dia PLPE HDPE pipe (Laying of pipe
included) (for 400kV)
28 Laying of control cables of all sizes (from 2 core.
2.5 / 4.0sqmm to 12 core, 2.5/4.0sqmm , both
copper and alluminium in cable trenches
including cost of suitable metalic cable glands
with rubber lining. Note: This includes running
of cables in control room where cables are run
on cable racks in cable duct (for 220kV &
132kV).
29 Laying of power cables (for 220kV & 132kV). :a upto 50 sqmm
b above 50 sqmm
30 Cable terminations to the switchgear, Marshalling
boxes / Panel terminal blocks/control & relay
panels, LTAC panel including providng suitable
ferrules and lugs as per specification (including
cost of ferrules and lugs) (for 220kV & 132kV).
(i) 2.5 sqmm Copper with copper lugs each core at
both ends.
(ii) 4.0 sqmm Aluminium with Aluminium lugs each
core at both ends.
(iii) Up to 50 sqmm Power Cable with lugs each core
at both ends.
(iv) Above 50 sqmm Power Cable with lugs each
core at both ends.
31 Instalation of lighting fixtures on switch yard
structures including cabling and connections,
labour charges etc., including 40mm dia G.I bent
pipe of 0.75m length with suitable clamps for
fixing to structures in complete shape (excluding
cost of lighting fixtures)

APTRANSCO SSR 2010-11

(3)
RM

SS Rate for
2010-11
(Rs.)
(4)
10.20

RM

4.50

RM

18.20

RM

7.40

RM
RM

8.40
11.60

Nos.

23.00

Nos.

24.50

Nos.

44.70

Nos.

83.20

Each

736.00

Unit

27
Sl.
No.

Description of Item

(1)
(2)
32 Erection of the following equipment with Crane /
Derrick at site including handling the material /
equipment carefully at site including labour
charges for all incidental and operational items of
work. (excluding cost of transport charges from
Dept. stores to the site). Note :- In 400kV
Substations only, 25% extra charges for Testing
and Commissioning of switchgear equipment
where ever applicable).
a(i) 420 KV SF6 Circuit breaker with support
structure & marshalling boxes
a(ii) 220 kV Circuit breakers with support structure &
marshalling boxes including Ploe to Pole cable
wiring and terminations.
a(iii) 132 kV Circuit breakers with support structure &
marshalling boxes including Ploe to Pole cable
wiring and terminations.
a(iv) 33 kV Circuit breakers including Ploe to Pole
cable wiring and terminations.
b(i) 420 KV Single phase current transformers with
secondary terminal box
b(ii) 220 kV Current Tranformers.
b(iii) 132 kV Current Tranformers.
b(iv) 33 kV Current Tranformers.
c(i) 220 kV Potential Transfomers.
c(ii) 132 kV Potential transformers.
c(iii) 33 kV Potential transformers.
d(i) 390 KV Lightning Arrestors
d(ii) 220 kV Lightning Arrestors.
d(iii) 132 kV Lightning Arrestors.
d(iv) 33 kV Lightning Arrestors.
e(i) 420kV Single phase Capacitive Voltage
transformers with secondary terminal box ( with /
without carrier coupling device)
e(ii) 220 kV Capacitve Voltage Transformers.
e(iii) 132 kV Capacitve Voltage Transformers.
f(i) 400 KV Isolators, 3 pole Horizontal centre break
With Single earth switch including solid core
insulators.
f(ii) 400 KV Isolators, 3 pole Horizontal centre break
With Double earth switches including solid core
insulators.
f(iii) 220 KV Isolators, 3 pole Horizontal Double break
With Double earth switches including solid core
insulators.

APTRANSCO SSR 2010-11

(3)

SS Rate for
2010-11
(Rs.)
(4)

Set

15378.00

Each

12871.00

Each

9195.00

Each

2850.00

Each

4383.00

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

3127.00
2023.00
736.00
3127.00
2023.00
736.00
4228.00
2023.00
955.00
406.00
4383.00

Each
Each
Set

2942.00
2023.00
8904.00

Set

10685.00

Set

5958.00

Unit

28

Sl.
No.

Description of Item

(1)
(2)
f(iv) 220 kV Isolators with earth swtich including solid
core insulators.
f(v) 132 kV Isolators with earth swtich including solid
core insulators.
f(vi) 220 kV Isolators without earth swtich including
solid core insulators.
f(vii) 132 kV Isolators without earth swtich including
solid core insulators.
f(viii) 33 kV Isolators including solid core insulators.
g(i) 400 KV Line Traps with pedestal stand
g(ii) 220 kV Wave traps
g(iii) 132 kV Wave traps
h(i) 400 KV Bus post insulators
h(ii) 220 kV Bus Post Type Insulators.
h(iii) 132 kV Bus Post Type Insulators.
h(iv) 33 kV Bus Post Type Insulators.
33 33 kV /400 V Station Transformer and HG fuse
set including all necessary connections on HV &
LV side including cost of lugs (But excluding
cost of transformer and HG fuse set)
34 Erection of Control / Relay panels, LTAC panels,
announciation panels etc.,in the control room
duly mounting them on channels and grouting
them with foundation bolts excluding cost of
channels & foundation bolts (for 220kV & 132kV
)
35 Erection of 220 V, 200 Ah/ 80 Ah battery in
complete shape fit for charging (for 220kV &
132kV ).
36 Erection of 220 V, 200 Ah / 80Ah battery charger
(for 220kV & 132kV ).
37 Erection of PLCC battery set (Lead acid Battery)
in complete shape fit for charging.
38 Erection of PLCC battery set (Maintenance free)
in complete shape fit for charging (for 220kV &
132kV ).
39 Erection of PLCC battery charger) in complete
shape fit for charging (for 220kV & 132kV ).
40 Erection of Line Matching Unit
41 Erection of Capacitor Bank including series
reactor of 7.5 MVA Capacity

APTRANSCO SSR 2010-11

(3)
Each

SS Rate for
2010-11
(Rs.)
(4)
4965.00

Each

3677.00

Each

4599.00

Each

3309.00

Each
Each
Each
Each
Set
Each
Each
Each
Each

1195.00
2841.00
1379.00
955.00
4228.00
261.00
196.00
132.00
4599.00

Each

1286.00

Set

6953.00

Set

2506.00

Set

3721.00

Set

2291.00

Set

1146.00

Each
Each

267.00
3298.00

Unit

29
Sl.
No.

Description of Item

(1)
(2)
42 Erection of PLCC Equipment, site handling,
providing base channel, supports in complete
shape (for 400kv sub stations)
(a) PLCC Panel
(b) EPAX-Decolam Table
(c) Battery charger cum DC DB( incl.Testing&comm)
(d) 48 V, 400 AH Battery ( incl.Testing&Comm.)
43 Erection of Marshalling kiosk
44 Erection of Marshalling boxes
45 Erection of Lighting pillar box in switchyard on
foundation laid (Excluding pillar box). (for 220kV
& 132kV )
46 Fabrication of Main and Auxiliary structures, stub
setting templates, foundation bolts, 'U' bolts
etc,.using raw steel such as M.S.Angles, Plates,
Channels, R.S.Joists, M.S.rounds, excluding
cost of Mild Steel and transport charges to
substation site.
47 Galvanization of Main and Auxiliary structures,
stub setting templates, foundation bolts, 'U' bolts
etc,.using raw steel such as M.S.Angles, Plates,
Channels, R.S.Joists, M.S.rounds, excluding
cost of zinc and transport charges to substation
site.(Cost of zinc should be followed as per
IEEMA rates.).The average quantity of Zinc
required for all angles of tower parts is 60 Kgs.
48 Setting of stubs with with stub setting template
for sub-station structure:Erection of stub
template, fixing of jacks for supporting the
template, alignment and leveling of exact location
of stubs of stubsetting template, dismantling of
template after completion of initial curing of CC
(a) 220kV Towers
(b) 132kV Towers
(c ) 33kV Towers & CPL's
49 Erection of the main and auxiliary structures etc.,
using bolts and nuts.
50 Fixing of 90lb rail poles over the transformer
plinths.
51 Fixing of 105lb rail poles over the transformer
plinths.
52 Erection of 33kV HG Fuse set

APTRANSCO SSR 2010-11

Unit
(3)

SS Rate for
2010-11
(Rs.)
(4)

Each
Each
Each
Each
Each
Each
Each

3412.00
832.00
5019.00
5019.00
550.00
267.00
736.00

MT

6526.00

MT

3822.00

Each
Each
Each
MT

2579.00
1851.00
463.00
1839.00

RM

366.00

RM

428.00

Each

444.00

30
Sl.
No.

Description of Item

(1)
(2)
53 Painting of towers with two coats of Aluminium
paint using Aluminium paint 1st grade containing
3.6 kg of Aluminium paste for 18 liters of thinner
1st coat is to be applied before erection of towers
and 2nd coat after stringing and half round
welding including cost of paint, cost of brushes,
labour charges etc., complete.
(a) First coat of 1st Grade Aluminium Paint duly
scratching and cleaning of towers including
labour charges, cost of paint, brushes etc.
(b) Labour charges for painting including scratching
and cleaning of towers of 1st coat of Aluminium
with out cost of paint & brushes.
(c ) (*) Second coat of 1st Grade Aluminium Paint
duly scratching and cleaning of towers including
labour charges, cost of paint, brushes, etc,.
(d) (*) Labour charges for painting including
scratching and cleaning of towers of 2nd coat of
Aluminium with out cost of paint & brushes.
(*) Note:-The requirement of 2nd coat is to be
justified by the concerned Divisional Engineer
/Executive Engineer before execution of thIS
work
54 Painting of towers single coat of red oxide paint
of 1st Grade, including scratching and cleaning of
towers.
(a) One coat of 1st Grade Red Oxide Paint including
labour charges for scratching and cleaning of
towers including cost of paint, brushes etc,.
(b) Labour charges for painting of towers including
scratching and cleaning of towers without cost of
paint & brushes.

APTRANSCO SSR 2010-11

(3)

SS Rate for
2010-11
(Rs.)
(4)

MT

2618.00

MT

734.00

MT

1532.00

MT

416.00

MT

1640.00

MT

910.00

Unit

APTRANSCO SSR 2010-11

31
Sl.
No.
(1)
55

Description of Item

Unit

(2)
Preparation of contour plan of special tower
location / switch yard sites by taking levels at
10m X 10m grid interval (where ever the ground
level variation are in substation or hilly areas 5 m
x 5m grid may be adopted). Plotting the
contours at each 1 Mtr. Intervals duly showing
the
boundaries
of
the
site,
existing
structures/features, roads, natural drain and
ponds. There alternative formation levels along
with cutting and filling quantities of earth in a
most economical way are to be prepared and
submitted. The rates are inclusive of cost and
conveyance of materials, labour charges, hire
charges of equipment and tools & plants.

(3)
One
Acre

SS Rate for
2010-11
(Rs.)
(4)
2275.00

Note:
1.

The rates for item No, 32 to 42 the transport charges are extra from
departmental stores to site as per Common standard schedule of Board of
Engineers.

2.

While preparing the estimates, the transport component for the Substation
works shall be added depending on the respective lead and lifts and based on
the rates communicated in ' Common SSR (Latest) ' i.e. from departmental
stores to substation site (not applicable for turnkey projects).

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

32

APTRANSCO SSR 2010-11

ANNEXURE IV
ERECTION OF ILLUMINATION, LIGHTING, FIRE FIGHTING,
AIRCONDITIONING, D.G Set & 33kV STATION SUPPLY SYSTESM
IN 400kV SUBSTATIONS
Sl.
No.
(1)
A

(i)
(ii)
(iii)
3

4(i)

4(ii)

Description of Item

Unit

(2)
Erection of indoor and out door illumination
for 400/220 KV Substation, Control House,
Auxiliary Buildings, 33 KV Switch yard, street
lighting, erection and commissioning of
following items as per the approved design
and drawings, including indoor/ out door
Junction Boxes, Conduits, Lighting wires,
lugs, ferules etc for complete finished item of
work.
Fixing Buzzer anchor make or equivalent
approved make with ISI mark with necessary bell
and switches etc.
Providing and fixing concealed in roof and walls
with PVC Conduit piping of ISI standards with
necessary GI wire of suitable wire of suitable
guage to draw wires at later date including cost
of junction Box etc. cost of conveyance of all
materials etc complete for fnished item of work
for Guest House, store building, pump house
building & security room as approved and
directed by the Engineer-in-charge at site.
32 mm dia - 2mm thick
25 mm dia - 2 mm thick
12 mm dia - 1.5mm thick
Modular for Main distribution board with 1 No.
63A, TPMCB for I/C and 2 Nos. 32A SPMCB & 6
Nos. SPMCB with neutral link for O/G complete
make Havells or MDS or equivalent.
Fixtures for 36W lamps BJLM-236 type, Fixtures
for 36W lamps BJSM-236 type , Fixtures for 36W
lmaps BJIV-236 type, Fixtures for energy saving
tube light 2x36W.
Fixtures for 9W CFL Lamp, Fixtures for GLS
DBD-10type, Fixtures for 2x18 W CFL Lamp,
Fixtures for 1x36W CFL Lamp

(3)

SS Rate for
2010-11
(Rs.)
(4)

Each

180.00

RM
RM
RM
Each

72.00
63.00
42.00
1312.00

Each

359.00

Each

180.00

33
Sl.
No.
(1)
B

1
(i)
(ii)
2
3
4
5
6
7
8
9
10
11
12
13
14

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
Erection, testing and commissioning of
outdoor and street Lighting Fixtures
including fixing of conduit, Junction boxes,
wiring
and
terminations
complete
etc.(excluding cost of concrete)
Lighting Masts / Poles as per drawing enclosed
in including concreting in full shape.
Type A1
Type E1
All types of Lighting Panels
Junction Box with MCB and Terminal Blocks
(Bolt Type)
415V 63A Power Recepticle outdoor
5/15 A, 240 V sockets with swtich board
Decorative type switch Boards
Telephone Junction Boxes
Telephone Jacks for Telephones
Ceiling Fans with Electronic regulators
Flood lighting fixtures for 400W sodium Vapour
lamp
Street lighting fixtures for 150 W sodium Vapour
lamp
Street lighting fixtures for 250 W sodium Vapour
lamp
Industrial high bay lighting fixures for 250 W
HVSP lamp
Lighting fixtures for 125 HP MV lamp post
lantherns

(3)

SS Rate for
2010-11
(Rs.)
(4)

Each
Each
Each
Each

3688.00
1970.00
1266.00
251.00

Each
Each
Each
Each
Each
Each
Each

502.00
33.00
72.00
63.00
23.00
127.00
235.00

Each

235.00

Each

283.00

Each

283.00

Each

176.00

34
Sl.
No.
(1)
C
1

4
5
6
7(a)

7(b)
7(c)
7(d)
8
(a)
(b)
(c)
(d)
(e)
(f)

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
Erection, testing and commissioing of Fire
Fighting, Detection and Alarm System :
Erection of Horizontal centrifugal Electric Driven
Hydrant/HVW Spray pump of capacity 410M3/hr,
total dynamic head of 88MWC with all
accessories & fittings and Electric Induction
Motor Squirrel cage type for the above with all
accessories & fittings.
Erection of Horizontal centrifugal Diesel Engine
Driven Hydrant/HVW spray pump of capacity
410M3/hr and total dynamic head of 88MWC
with all accessories and fittings. Diesel Engine,
multi cylinder type, four stroke cycle with
mechanical airless injection cold starting type for
the above with all accessories and fittings and a
set of Batteries and battery chargers and fuel
tank having capacity to hold fuel oil for six hours
of full load run.
Erection of Horizontal centrifugal Electric Driven
jockey pump of capacity 10.8 m3/hr and Total
dynamic head of 88MWC with all accessories
and fittings along with Electric Motor for the
above with all accessories and fittings.
Air vessels with vent valves etc. as per system
requirement.
Sump pumps 10 Cum/ Hr. MWC with motor
starter and all accessories
Basket strainer 300 NB
Control panel equipped with all accessories for
motor drives of Fire water pumps and 2 Nos.
jockey pumps for two sources of supply.
Panel for 2 nos. Battery chargers & Diesel
Engine driven fire water pumps.
Annunciation panel at fire water pump house.
Annunciation panel in Control Room.
Hydrant and HVWS system Accessories.
Single headed Hydrants
Landing valves
Hose cabinets.
Hoses of 15.0m length with coupling
Hoses of 7.5m length with coupling
Branch pipe with Nozzels.

(3)

SS Rate for
2010-11
(Rs.)
(4)

Each

45449.00

Each

48281.00

Each

4310.00

Each

3739.00

Each

3307.00

Each
Each

1436.00
2874.00

Each

2874.00

Each
Each

1095.00
1095.00

Each
Each
Each
Each
Each
Each

502.00
502.00
548.00
50.00
50.00
50.00

35
Sl.
No.
(1)
9

Description of Item

(2)
Mild steel black pipes and Galvanized Mild steel
pipes with wrapping & coating for below ground
and painting for above ground including cost of
wrapping & coating material and paint required &
excavation, back filling & all civil works etc.,
& testing complete.
a(i) 300 NB (below ground)
a(ii) 300 NB (above ground)
b(i) 250 NB (below ground)
b(ii) 250 NB (above ground)
c(i) 200 NB (below ground)
c(ii) 200 NB (above ground)
d(i) 150 NB (below ground)
d(ii) 150 NB (above ground)
e(i) 100 NB (below ground)
e(ii) 100 NB (above ground)
f(i)
80 NB (below ground)
f(ii) 80 NB (above ground)
g)
50 NB
h)
25 NB
i)
15 NB
10(a) Set of GI Piping beyond deluge valves for
transformer including detection piping and pipe
supports including all accessories.
10(b) Erection of Hume pipe as per specification
11
VALVES
(a) 300 NB Gate
(b) 250 NB Gate
(c)
250 NB Check
(d) 200 NB Gate
(e) 150 NB Gate
(f)
100 NB Gate
(g) 80 NB Gate
(h) 80 NB Check
(i)
25 NB Gate
(j)
50 NB Gate
(k)
50 NB Check
(l)
15 NB
(m) Float operated valve 100 NB
12
INSTRUMENTS
(a) Float operated level guage
(b) Level Switch
(c)
Pressure Guage
(d) Pressure Switch
(e) Differential Pressure Guage

APTRANSCO SSR 2010-11

Unit

(3)

RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
per Set

SS Rate for
2010-11
(Rs.)
(4)

1436.00
958.00
1175.00
741.00
912.00
696.00
719.00
587.00
456.00
371.00
348.00
240.00
232.00
139.00
99.00
163674.00

RM

456.00

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

1436.00
1220.00
1220.00
958.00
912.00
649.00
433.00
433.00
159.00
348.00
348.00
96.00
912.00

Each
Each
Each
Each
Each

787.00
787.00
456.00
958.00
696.00

36
Sl.
No.

Description of Item

(1)
(2)
13(a) Deluge valve with motor gounge, pr. switch,
pr.guage, solenoid valve to drain - size 150 NB
13(b) Local control panel for Deluge valve
13(c) Strainer Y type, 150 NB
13(d) Quartzoid bulb detectors
13(e) HVW spray nozzles
14
Detection & Alarm System
(a) Ionisation smoke detector
(b) Photoelectric smoke detector
(c)
Heat detector
(d) Response indicator
(e) Manual call point
(f)
Fire detection & Alarm panel
15
Portable Fire Extinguishers
(a) Dry chemical powder type Fire extinguishers with
all accessories.
(i)
10 kgs. Capacity
(ii)
25 kgs. Capacity (trolley mounted)
(iii) 50 kgs. Capacity (trolley mounted)
(iv) 150 kgs. Capacity (trolley mounted)
(b) CO2 type portable Fire extinguishers
(i)
45 kgs. Capacity (trolley mounted)
(ii)
22.5 kgs. Capacity (trolley mounted)
(iii) 9 kgs. Capacity (trolley mounted)
(iv) 2 kgs. Capacity (Portable )
(c)
9 iltres capacity Mechanical foam type fire
extinghuishers
(d) Sand / water Buckets 9 litres capacity
D
Air Conditioning System
1
Erection, testing and commissioing of Split AC 2
Ton with all suitable accessories
2
Erection of Air Conditioning AC distribution panel
3
Providing Under Deck Insulation for the Roof
exposed to sunlight with 50 mm thick TF quality
expanded poly styrene including GI washers and
wire for fixing.
4
Erection of Ventilation fans
i)
600 mm Sweep
ii)
450 mm Sweeep
iii)
300 mm Sweep

APTRANSCO SSR 2010-11

Unit

(3)
set

SS Rate for
2010-11
(Rs.)
(4)
4310.00

Each
Each
Each
Each

1220.00
958.00
77.00
77.00

Each
Each
Each
Each
Each
Each

348.00
348.00
348.00
348.00
348.00
348.00

Each
Each
Each
Each

35.00
69.00
93.00
199.00

Each
Each
Each
Each
Each

72.00
72.00
34.00
27.00
36.00

Each

47.00

Each

3412.00

Each
Sq. ft.

2874.00
31.00

Each
Each
Each

764.00
764.00
764.00

37
Sl.
No.
(1)
E

F
1
(a)
(b)
(c)
(d)
(e)
(f)
(g)

2
(a)

(b)

(c)

(d)

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
Erection, testing and commissioing of 250
KVA DG Set complete including AMF Panel,
auxilaries etc.
Erection, testing and commissioing of 33kV
Station Supply System
33kV/440 V Substation :
33kV/433 V, 630KVA Station supply transformer
33 kV Isolator with terminal connectors and
support insulators
33 kV HG Fuse set
33 kV Lightning Arrestor
150 x 75 mm M.S Channels & Struc. Steel
HT Trivector Meter Box
Hoisting of Insulators & Hardware, stringing /
formation of the 33 kV Bus comprising of 3
phases with DOG Conductor and all equipmnet
to equipment, euipment to bus interconnections,
jumpering, fixing of clamps & connectors etc.
required for the entire 33kV/440 V station supply
switchyard of 400/220 KV Substation complete
as directed by site engineer.
33 kV Line :
Erection of pole in position, aligning and setting
to work, fixing of cross arms and top clamps,
earthing of supports,fixing of danger boards,
back filling with earth and stones properly
ramming including transport of materials from
road side to location excluding concreting and
including excavation.
Assembly and erection of D.P.Structure as per
specification which includes fixing of top
channels and cross bracings, transport of all
materials from road side to the location, earthing,
back filling with earth ramming etc excluding
concreting and including excavation.
Mass concretingof supports erected with CC
(1:4:6) using 40 mm, HBG metal including the
cost of metal, sand, cement and curing etc.
Assembly and erection of stay set including fixing
of guy insulators, clamps etc., on the pole and
fixing stay wire and binding securely on either
side as per standards, transport of material from
road side to location and back filling with earth
ramming etc excluding concreting and including
excavation.

(3)
Set

SS Rate for
2010-11
(Rs.)
(4)
50905.00

Each
Set

4360.00
1551.00

Each
Each
MT
Each
LS

872.00
679.00
1839.00
548.00
10037.00

Set

1163.00

Set

1862.00

Cum

3506.00

Set

233.00

38

Sl.
No.

Description of Item

APTRANSCO SSR 2010-11

Unit

(1)
(2)
(3)
(e) Paving out conductor, providing temporary stays,
km
tensioning, sagging correctly, fixing strain points,
transferring to pin points binding, fixing of
Insulators, guys and jumpering etc., including
transport of material from road side to location. (
3 phases)
G Erection of Control and Relay Panels
Receipt from site stores, Transport to control
room, handling, Erection, Testing and
commissionig of all Control, Relay, Protection
and other Panels/ Equipment, with complete
accessories, equipment etc., as specified.
(i) 400 KV Feeders/ Tie/ 315 MVA Tranformer
Each
Control/ Relay/ Protection Panels.
(ii) 220 KV Feeders/ Bus coupler/ Transfer Bus / 315
Each
MVA Tranformer Control/ Relay/ Protection
Panels.
(iii) Common equipment Panels for 400/220kV.
Each
(iv) 400kV Bus bar Protection
Set
(v) 220KV Bus bar Protection
Set
(vi) All other equipment of SMS and Time
Each
synchronising equipment.
(vii) 400KV AC Bay Kiosk
Each
(viii) 220KV AC Bay Kiosk
Each
(ix) Complete Substation Automation system for
400/220KV Substation including hard ware and
software for remote control station along with
associated equipments and kiosks in full shape
as per specification.
(a) Installation, Testing and commissioning of
Set
Networking Panel, OWS1, OWS2, EWS Remote
work station. BCUs, LIUs, Ethernet Switches,
Splicing of OFC.
(b) Installation, Testing and commissioning of all
Set
necessary softwares compatible to IEC: 61850
for making the SAS operation in full shape
including remote SCADA complete as directed
by site engineer.
(c) Extension works of Installation, Testing and per Bay
commissioning of BCU, LIU, Ethernet Switch,
Splicing of OFC to the existing SAS System.

SS Rate for
2010-11
(Rs.)
(4)
8531.00

24005.00
22863.00

19729.00
30986.00
40004.00
91813.00
23243.00
17433.00

150000.00

50000.00

20000.00

APTRANSCO SSR 2010-11

39

Sl.
No.

Description of Item

Unit

(1)
(2)
(3)
(d) Extension works of Installation, Testing and per Bay
commissioning of all necessary softwares
compatible to IEC: 61850, adding new SLD for
the new bay in the existing substation and
configuring all necessary signals and data base
for making the SAS operation in full shape
including Remote SCADA as directed by site
engineer.
H
220 V DC Battery & Battery Chargers and AC,
DC Distribution Boards
1 Receipt from site stores, Transport to control
room, handling Erection, Testing and
commissionig of Battery & Battery chargers with
complete accessories, equipment etc., as
specified.
(a) 220V, 400AH Capacity Sealed Maintanace free
Set
VRLA Type 1 No Battery Banks along with all
other required accessories.
(b) 40/100A Folat - Cum- Boost Charger (1 No.)
Set
2 Receipt from site stores, Transport to control
room, handling, Erection, Testing and
commissionig of A.C.& D.C. Distribution Boards
with complete accessories, equipment etc., as
specified.
(a) 415V AC Main Board ( Sub- Boards- I & II ) as
Each
per the Specification & Drawing.
(b) 415V AC Distribution Board ( Sub- Boards- I & II)
Each
as per the Specification & Drawing.
(c) 415V AC Lighting Board ( Sub- Boards- I & II ) &
Each
Emergency Lighting Board as per the
Specification & Drawing.
(d) 220V DC Distribution Board ( Sub- Boards- I & II)
Each
as per the Specification & Drawing.

SS Rate for
2010-11
(Rs.)
(4)
50000.00

8437.00

5019.00

68242.00
113739.00
28572.00

17235.00

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

40

APTRANSCO SSR 2010-11

ANNEXURE V
RATES FOR HANDLING & ERECTION OF POWER TRANSFORMERS
Sl.
Description of Item
Unit
SS Rate for
No.
2010-11
(Rs.)
(1)
(2)
(3)
(4)
A)
HANDLING AS JOB WORK BY DEPARTMENT
1 Loading/Unloading of T&P such as wooden
sleepers, winch jacks, packing pieces etc.,
required for handling the power transformers.
a Up to 31.5 MVA transformers, one load of
Load
722.00
wooden sleepers and another load of T&P such
as chain pulley block and
rail poles etc
(Maximum two loads)
b For above 31.5 MVA and up to 100 MVA
Load
722.00
transformers, two loads of wooden sleepers and
another load of T&P such as chain pulley block,
winch and rail poles etc (Maximum three loads)
c For the above 100 MVA and up to 160 MVA
Load
722.00
transformers, three loads of wooden sleepers
and another load of T&P such as winch machine
and rail poles etc (Maximum Four loads)
2 Loading/Unloading of fragile material such as
a) LV bushing / Neutral bushing for 132 kV
Each
96.00
transformer
b) 132kV Bushings
Box
388.00
c) 220kV Bushings
Box
483.00
NOTE : If crane used ,Crane charges can be
claimed as per actuals and labour charges will be
reduced to 40%
3 Loading/Unloading of accessories of transformer
Load
1193.00
including raidator, pipe line, FCC & RTCC
panels, conservatory tank, turrets LA set frames
and oil barrels 'A' frame and header etc., (For
50MVA and above 50 MVA PTRs without oil
barrels)
4 Dragging of power transformer main tank
duly arranging wooden sleeper platform
providing packing pieces, jacking up the
transformer, insertion of wooden sleeper, rail
poles arrangement of pullies, steel ropes
positioning of winch and anchoring of
wrinch.
a Transformers upto 16 MVA capacity
Up to 10 Mtrs.
LS
1899.00
Over and above 10 Mtrs.
RM
190.00

41
Sl.
No.
(1)

Description of Item

(2)
b Transformers above 16MVA and upto 31.5 MVA
capacity
Up to 10 Mtrs.
Over and above 10 Mtrs.
c Transformers above 31.5MVA and upto 50 MVA
capacity
Up to 10 Mtrs.
Over and above 10 Mtrs.
d Transformers above 50MVA and upto 100 MVA
capacity
Up to 10 Mtrs.
Over and above 10 Mtrs.
e Transformers above 100MVA and upto 160 MVA
capacity
Up to 10 Mtrs.
Over and above 10 Mtrs.
5 Turning the transformer through 90 degrees
including making arrangements as above.
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
6 Turning the transformer through 180 degrees
including making arrangements as above.
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
7(a) Anchoring of transformer including excavation of
trench of 4 x 1x0. 5 mtrs for anchoring and
burying 2 Nos. sleepers in it and removing the
same after work is completed.
7(b) Movement of 10 MT winch for anchoring.

APTRANSCO SSR 2010-11

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

LS
RM

3469.00
347.00

LS
RM

4049.00
405.00

LS
RM

5004.00
500.00

LS
RM

6437.00
644.00

Each
Each

1701.00
2133.00

Each

2652.00

Each

3035.00

Each

3793.00

Each
Each

2948.00
3544.00

Each

4177.00

Each

4641.00

Each

5569.00

1 Job

722.00

1 Job

653.00

42
Sl.
No.
(1)

Description of Item

(2)
8 Lifting/Lowering the transformer main tank to
the required height of one sleeper using
jacks and wooden sleepers packing pieces
for loading onto /from the truck.
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
9 Pulling the transformer from platform to the
truck for loading/ from truck to the platform
for unloading
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
10 Fixing of transformer wheels to main tank
including alignment of transformer etc., vice
versa.
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
11 Arranging gas cutter equipment at site including
operator and helper to remove anchoring of
transformer main tank on truck for loading and
unloading (including cost of gas)

APTRANSCO SSR 2010-11

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

Each
Each

2063.00
3181.00

Each

3960.00

Each

5279.00

Each

6754.00

Each
Each

1735.00
3035.00

Each

3373.00

Each

4217.00

Each

5701.00

Job
Job

802.00
947.00

Job

1379.00

Job

1787.00

Job

2648.00

Job

1315.00

43
Sl.
No.

Description of Item

(1)
(2)
12 Removal of steel rope and turn buckles of
transformer main tank on truck.
(a) Up to 100MVA Capacity
(b) above 100MVA and up to 160MVA Capacity
13 Tieing the transformer main tank on to the truck
with steel rope and turn buckles
(a) Up to 100MVA Capacity
(b) above 100MVA and up to 160MVA Capacity
14 Assisting for lifting of overhead live lines, while
transporting of transformers by truck.
(a) Up to 100MVA Capacity
(b) above 100MVA and up to 160MVA Capacity
B)
ERECTION OF POWER TRANSFORMERS AS
JOB WORK BY DEPARTMENT
1 Opening of crates and keep ready for erection
of accessories of transformers
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
2 Shifting, loading dragging of accessories of
transformers like radiator, conservator tank,
pipe line, fans, headers, DM box, FCC and oil
barrels etc., from place of storage to work
spot and vice versa of transformers.(For
50MVA and above 50 MVA PTRs without oil
barrels)
a Transformers upto 31.5 MVA capacity
b Transformers above 31.5MVA and upto 100
MVA capacity
c Transformers above 100MVA and upto 160 MVA
capacity
d Transportation of oil barrels from unloading place
to the filter machine in the substation.

APTRANSCO SSR 2010-11

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

Job
Job

362.00
541.00

Job
Job

465.00
696.00

Job
Job

1018.00
2036.00

Job
Job

1134.00
1418.00

Job

1897.00

Job

2277.00

Job

3035.00

Job
Job

1701.00
2268.00

Job

3116.00

Job

1696.00

44
Sl.
No.
(1)

Description of Item

(2)
3 Erection of Radiators to the transformers
including headers
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
4 Erection of main conservator tank.
a Transformers upto 16 MVA capacity
b Transformers above 16MVA and upto 31.5 MVA
capacity
c Transformers above 31.5MVA and upto 50 MVA
capacity
d Transformers above 50MVA and upto 100 MVA
capacity
e Transformers above 100MVA and upto 160 MVA
capacity
f Pronal bag testing and commissioning
g Hiring of compressor
h Dry Nitrogen Cylinder (In case, Dry Nitrogen
Cylinder is used for commissioning of Air cell
instead of Air compressor), excluding
transportation cost.
5 Erection of transformer bushing
a 33 kV Neutral and teritary bushings
b(I) 132 kV bushings up to 100MVA.
b(ii) 132 kV bushings for above 100MVA and up to
160MVA
c(I) 220 kV bushings up to 100MVA
c(ii) 220 kV bushings for above 100MVA and up to
160MVA
d(I) 220kV 3 Nos. erection of turrets up to 100MVA
d(ii) 220kV 3 Nos. erection of turrets for above
100MVA and up to 160MVA
e(I) 132kV 3 Nos. erection of turrets up to 100MVA
e(ii) 132kV 3 Nos. erection of turrets for above
100MVA and up to 160MVA

APTRANSCO SSR 2010-11

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

Job
Job

1262.00
2022.00

Job

2513.00

Job

3080.00

Job

4199.00

Each
Each

1138.00
1266.00

Each

1856.00

Each

2891.00

Each

3722.00

Each
Each
Each

1252.00
876.00
1000.00

Each
Each
Each

248.00
462.00
578.00

Each
Each

693.00
860.00

Job
Job

993.00
1303.00

Job
Job

466.00
683.00

45
Sl.
No.
(1)

Description of Item

(2)
6 Erection of air blowers (cooling fans)
including frames and control cubical etc., (for
each transformer)
7 Erection of LA frames (HV & LV side)
8(a) I).Erection of driving mechanism box, bevel gear
of OLTC for below 100MVA..
ii).Erection of driving mechanism box, bevel gear
of OLTC 100MVA and above 100MVA.
8(b) ii).Erection of OLTC conservator tank with stand
for up to 100MVA.
ii).Erection of OLTC conservator tank with stand
for above 100MVA and upto 160MVA.
9 Erection of pipe line.
a Transformers upto 31.5 MVA capacity
b Transformers above 31.5MVA and upto 50 MVA
capacity
c Transformers above 50MVA and upto 100 MVA
capacity
d Transformers above 100MVA and upto 160
MVA capacity
10 I).Erection of Thermometer, pressure Relief valve
and vent pipe etc.,
ii)Erection of Thermometer, pressure Relief valve
and vent pipe etc.,100MVA and above PTRs.
11 Erection of detachable OLTC including
connecting internal jumper with OLTC tank.
a Transformers upto 31.5 MVA capacity
b Transformers above 31.5MVA and upto 100
MVA capacity
c Transformers above 100MVA and upto 160
MVA capacity
12 I).Erection of separate, cooler bay including 'A'
frame header pipes and bends of transformers
up to 100 PTRs MVA capacity.
ii).Erection of separate, cooler bay including 'A'
frame header pipes and bends of transformers
above 100 MVA and up to 160MVA PTRs
capacity.

APTRANSCO SSR 2010-11

Unit

(3)
Job

SS Rate for
2010-11
(Rs.)
(4)
1876.00

Each
Each

589.00
589.00

Each

1178.00

Each

760.00

Each

1138.00

Each
Each

398.00
595.00

Each

1008.00

Each

1261.00

Each

398.00

Each

595.00

Each
Each

1956.00
2948.00

Each

3287.00

Bay

4217.00

Bay

4641.00

46
Sl.
No.

Description of Item

(1)
(2)
13 Removal of old worn out gaskets and
replacement with new gaskets including
cutting, pasting of gasket with all accessories
including cost of adhesives.
a Transformers upto 16 MVA capacity
b Transformers 31.5MVA and 50 MVA capacity
c Transformers 100 MVA and upto 160 MVA
capacity
14 Erection of supporting insulators and earth flat for
HV & LV Neutrals / Tertiary.
C OIL FILTERATION OF TRANSFORMERS AS
JOB WORK BY DEPARTMENT
1 Loading / Unloading of 2KL Oil filter.
2 Laying of L.T.Cable from AC Supply point to filter
connecting Pipes etc, from filter to transformer
and back to filter and Vice-versa.
3 Loading / unloading of full transformer oil barrels.
4 Loading / unloading of oil drums.
5 Oil topping for transformer through oil filter:
5.1 Transformer already filled with oil
a Transformers upto 31.5 MVA capacity
b Transformers above 31.5MVA and upto 50 MVA
capacity when the transformer is received with
transformer oil
5.2 Transformers above 50MVA upto 160 MVA
capacity When the transformer is received empty
with Nitrozen
6 Assisting labour for filtering of oil during the
period of filteration for
a Transformers upto 31.5 MVA capacity
b Transformers above 31.5 MVA and upto 100
MVA capacity
c Transformers above 100 MVA and upto 160
MVA capacity
7(I) Dismantling of control cables of power
transformer for arranging, pulling of transformer
maintank out of plinth for failed transformer or
improvement of transformercapacity.
(ii) Laying of control cables for the transformers
which are received with non completion of wiring
on the transformer and complete wiring of the
transformer on the tank.F.C.C,D.M box etc., (for
old repaired transformers).

APTRANSCO SSR 2010-11

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

Job
Job
Job

1631.00
2535.00
3262.00

Job

398.00

Job
Job

1393.00
673.00

Barrel
Barrel

31.00
5.20

Each
Each

535.00
1178.00

Barrel

16.30

Each
Each

2543.00
3561.00

Each

5087.00

Job

470.00

Job

1252.00

APTRANSCO SSR 2010-11

47
Sl.
No.

Description of Item

Unit

(1)

(2)
8 Shifting of filter machine in switch yard from
existing place to near transformer or to the
convient place manually (where movement of
tractor trailer is not possible).
9 Labour charges for arrangement for vaccum
filling for the power transformer for
prescribed time duration for 50MVA and
above PTRs which are received at site with
nitrogen gas filled.
(a) Below 100MVA PTRs
(b) Above 100MVA PTRs.
10 Loading / Unloading of 5 KL Storage tanker.
11 Hire charges for a private tractor for transport of
6 KL of oil filter is
(a) Up to 50KM ( to and fro)
(b) Beyond 50KM (to and fro)
12 Complete wiring up of the transformer
indicating systems cooler control fans and
motor driving mechanism of OLTC panel
providing suitable ferrules and lugs.
a) 16/31.5 MVA Transformer
b) 50 MVA Transformer
c) 100 MVA Transformer
d) 160 MVA Transformer
D)
ERECTION OF POWER TRANSFORMERS
AND OIL FILTERATION THROUGH PRIVATE
AGENCY
Please refer Lr.No.CTO-121/F-PTRs erection
works /D.No.104/08, dt.05.07.2008 of Chief
Engineer / Transmission and subsequent
amendments.

(3)
RM

SS Rate for
2010-11
(Rs.)
(4)
58.50

Job
Job
Job

1876.00
3755.00
621.00

LS
KM

1725.00
26.00

LS
LS
LS
LS

11031.00
14341.00
15905.00
15905.00

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

APTRANSCO SSR 2010-11

48

ANNEXURE VI
TRANSPORTATION, HANDLING CHARGES INVOLVED DURING
ERECTION OF 400KV TRANSMISSION LINES
Sl.
No.
(1)
1

2
3

Description of Item

Unit

(2)
Total cost for transportaion and handling
Charges for Setting of Stub with Stub setting
template
Erection of Tower : Total cost for transportation
and handling Charges
Double Circuit Stringing with Twin Moose :
Transportation and and handling charges for line
materials
Single Circuit Stringing with Twin Moose : :
Transportation and handling charges for line
materials.
Double Circuit Stringing with Quadruple Moose :
Transportation and and handling charges for line
materials
Single Circuit Stringing with Quadruple Moose : :
Transportation and handling charges for line
materials.
OPG wire & earthwire: Transportation and
handling charges for OPGW/earthing materials
for 1 kM for D/C stringing.
OPG wire & earthwire: Transportation and
handling charges for OPGW/earthing materials
for 1 kM for S/C stringing.

(3)

SS Rate for
2010-11
(Rs.)
(4)

Each
Set

546.00

Per MT

431.00

Per KM

11797.00

Per KM

6297.00

Per KM

23595.00

Per KM

12595.00

Per KM

359.00

Per KM

367.00

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

APTRANSCO SSR 2010-11

49

ANNEXURE VII
(I). Loading / Unloading of materials from departmental / Private vehicles
in to the stores yard and stacking and vice-versa
Sl.
No.

Description of Item

Unit

(1)

(2)

(3)
MT

I
2
(I)
(ii)
(iii)

Cement
All othe materials
Steel
Tower parts
RS Joists and rail poles and MS Sheets pf
various sizes.
3 Cable / Conductor drums (for loading / un
loading )
a Panther ACSR
b Zebra ACSR
c Moose ACSR
d Moose ACSR (Huge Drums of 1.75KM and
above)
e Earth wire
f Control cables up to 6 Core
g Control cables above 6 Core

h 3 1/2 Core LTAC cable drum (up to 500


meters).
i 3 1/2 Core LTAC cable drum (above 500
meters).
4 Other materials received in cases.
(i) Case weighing not more than 100kgs.
(ii) Case weighing from101kgs to 500kgs.
(iii) Case containg fragile items and weighing
more than 501kgs and up to 1MT
(iv) for LTAC panel
v(a) 70KN Normal disc insulator
v(b) 120KN Normal disc insulator
v(c) 160KN Normal disc insulator

SS Rate for 2010-11


(Rs.)
Loading Un loading
(4)
(5)
66.00
77.00

MT
MT
MT

131.00
150.00
131.00

131.00
150.00
131.00

Each
Drum
Each
Drum
Each
Drum
Each
Drum
Each
Drum
Each
Drum
Each
Drum
Each
Drum
Each
Drum

164.00

164.00

230.00

230.00

230.00

230.00

26200

262.00

98.00

98.00

98.00

98.00

131.00

131.00

132.00

132.00

165.00

165.00

Each
case
Each
case
Each
case
Each
Each
Each
Each

87.00

87.00

164.00

164.00

328.00

262.00

219.00
1.00
1.25
1.50

219.00
1.00
1.25
1.50

APTRANSCO SSR 2010-11

50

Sl.
No.

Description of Item

(1)
vi(a)
vi(b)
vi(c)
(vii)

(2)
70KN Anti-fog disc insulator
120KN Anti-fog disc insulator
160KN Anti-fog disc insulator
Loading / Un loading and stacking charges
for 70KN /120KN SRC insulators.
(a) 132kV
(b) 220kV

(viii) Loading / Un loading and stacking charges


for 120KN /160KN SRC insulators for
400kV .
5 Cases containing Control & Relay Panels
(a) 33kV
(b) 132kV and 220kV
6 Cases containing CTs, PTs, CVTs
(i) 11kV to 33kV Rating
(ii) Above 33kV and up to 132kV
(iii) 220kV Rating
7 Cases containing LAs
(i) 33kV
(ii) 132kV
(iii) 220kV
8 Loading / Un-Loading of
1 33kV Breaker
2 132kV CB
3 220kV SF6 CB
4 Station Transformer (100KVA)
5 Station Transformer (250KVA)
6 132kV Wave Trap
7 220kV Wave Trap
8 220V 80AH Battery (Conventional)

Unit
(3)
Each
Each
Each

SS Rate for 2010-11


(Rs.)
Loading Un loading
(4)
(5)
1.25
1.25
1.50
1.50
2.00
2.00

Each
string
Each
string
Each
string

2.00

2.00

2.00

2.00

3.00

3.00

Each
Each

219.00
273.00

219.00
273.00

Each
case
Each
case
Each
case

66.00

66.00

328.00

328.00

492.00

492.00

15.00

15.00

164.00

164.00

219.00

219.00

656.00

656.00

1311.00

1311.00

1639.00

1639.00

273.00

273.00

328.00

328.00

87.00
328.00
546.00

87.00
328.00
546.00

Each
case
Each
case
Each
case
Each
set
Each
set
Each
set
Each
set
Each
set
Each
Each
Set

APTRANSCO SSR 2010-11

51

Sl.
No.
(1)
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

30
a
b
31
32
33
34
35
36
37

Description of Item

Unit

(2)
220V 80AH Battery (VRLA)
220V 200AH Battery
220V 400AH Battery
48V PLCC battery 150 AH
48V PLCC battery 250 AH
48V Battery Charger 10A
48V Battery Charger 35/50A
48V Battery Charger 100A
220V Battert Charger with DC distribution
Board
DCDB for battery Charger.
132kV Hardware single
132 KV Hardware double
220 kV Hardware single
220 KV Hardware double
220 KV Isolators, without insulators
including machanism box
220kV Solid core insulators
132 KV Isolators (without soild core
insulators)
132kV Solid core insulators
33 KV Isolators (without soild core
insulators)
33kV Solid core insulators
Vibration dampers, mid span compression
joints, repair sleeves, clamps & connectors
etc
Capacitor Banks
5 MVAR
Neutral C.T.
Scrap items like MS Scrap, GI Scrap,
Ferrous Scrap etc,.
Scrap items like Conductor scrap, Earth
wire Scrap, etc,.
Single channel PLCC Panel
Twin Channel PLCC Panel
Phase to Phase couplings units (LMU)
Bolts & Nuts weighing 50 Kgs bags
including springs washers, flat washers.
3 1/2 Core LTAC Cable bits (loose) by
measuring and load / unload

(3)
Set
Set
Set
Set
Set
Set
Set
Set
Set

SS Rate for 2010-11


(Rs.)
Loading Un loading
(4)
(5)
383.00
383.00
600.00
600.00
874.00
874.00
219.00
191.00
328.00
273.00
219.00
219.00
273.00
273.00
383.00
383.00
328.00
328.00

Each
Set
Set
Set
Set
Set

109.00
7.70
8.00
10.90
11.50
328.00

109.00
7.70
8.00
10.90
11.50
328.00

Each
Each

44.00
246.00

44.00
246.00

Each
Each

27.00
109.00

27.00
109.00

Each
100
Nos

3.00
109.00

3.00
109.00

Set
Each
Per
MT
Per
MT
Each
Each
Set
Each
bag
Mts

874.00
60.00
164.00

874.00
60.00
164.00

219.00

219.00

164.00
219.00
109.00
5.00

164.00
219.00
109.00
5.00

0.55

0.45

APTRANSCO SSR 2010-11

52

Sl.
No.

Description of Item

(1)
(2)
38 Cable bits (loose) up to 6 Core by
measuring and load / un load
39 Cable bits (loose) above 6 Core by
measuring and load / un load
40 Copper Scrap
41 Battery Scrap
42
43
44
45
46
47
48

Capacitor units Scrap


33kV Breaker Limb
132kV Breaker Limb
220kV Breaker Limb
Tyres scrap of all sizes
Empty oi drums
Full oil drums

SS Rate for 2010-11


(Rs.)
Loading Un loading
(4)
(5)
0.50
0.50

Unit
(3)
Mts
Mts
Per
MT
Per
MT
Ea ch
Each
Each
Each
Each
Barrel
Barrel

0.75

0.75

131.00

131.00

137.00

137.00

5.00
120.00
273.00
393.00
13.10
4.60
27.30

3.00
120.00
273.00
393.00
6.60
4.60
27.30

Note - If loading / Un loading is done with Crane, 1/3 rd Charges are to be paid
towards labour charges and remaining amount is towards crane hire
charges.
For example: Loading charges of 100KVA Station Transformer is
Rs.273.00. If it is loaded through crane. 1/3rd of loading charges i.e
91.00 is to be paid towards labour charges and remaining amount of
Rs.182.00 is towards crane hire charges.

(II). Loading and Un loading and counting at Stores for check measuring
and Stock Verification Purpose.
Sl.
No.
(1)

Description of Item

(2)
1 Tower parts counting on part wise and restocking
at stores yard ( for stock verification purpose)
2 Labour charges for weighing and restocking of
GI Tower Parts or Bolts & Nuts, Washers (for
stock verification purpose)
3 Labour charges for loading and unloading of
ACSR, AAA Conductor & Earth wire bits for
weighiment (for stock verification purpose).
4 Counting and Restocking of Hardware (Iron
parts, Al jumper cones, Al Tensition cones, PA
rods, Arcing horns, Al grippers etc) (for stock
verification purpose)

Unit

(3)
Per MT

SS Rate for
2010-11
(Rs.)
(4)
55.00

Per MT

219.00

Per MT

219.00

Each
set

3.30

53

Sl.
No.
(1)
5

6
7

8
9
(a)
(b)
(c)
10

APTRANSCO SSR 2010-11

Description of Item

Unit

(2)
Counting and Restocking of 220kV & 132kV Line
accessories like Dampers, MSC Joints, Repair
sleeves, PA rods, D- Shackles Links, Earthing
sets, Hangers, Counter Poise Earthing Clamps
etc (for stock verification purpose)
Counting and restocking of insulators of various
capacities (for stock verification purpose)
Loading of Assorted tower parts from different
places by observing part wise and loading in to
lorry at stores
For Opening and Repacking of Packing of
Panels for check measuring purpose
For Opening and Repacking of Packing of
Breakers for check measuring purpose
220 kV
132 kV
33 kV
For Opening and Repacking of Packing of
Fragile Materials, and Small Packages like
wooden, Cartoon Boxes etc., for check
measuring purposes.

(3)
Each
set

SS Rate for
2010-11
(Rs.)
(4)
1.10

Each

1.10

Per MT

164.00

Each

33.00

Each
Each
Each
Each

109.00
77.00
33.00
16.40

(III). Crane Hire charges:(for departmental works at the premises)


Sl.
No.

Description of Item

(1)
(2)
a) For 2 to 8 Tonne Capacity crane
i.For Ist hour
ii.For every hour or part thereof after Ist hour
b) For 8 to 20 Tonne Capacity crane
i.For Ist hour
ii.For every hour or part thereof after Ist hour
c) For above 20 Tonne Capacity crane
i.For Ist hour
ii.For every hour or part thereof after Ist hour

Unit

(3)

SS Rate for
2010-11
(Rs.)
(4)

Hour
Hour

1742.00
791.00

Hour
Hour

2716.00
905.00

Hour
Hour

4188.00
1472.00

APTRANSCO SSR 2010-11

54

(IV). Sparing of Departmental vehicle to the contractor:


Sl.
No.
(1)
1

Description of Item

Unit

(2)
(3)
Sparing of Departmental vehicle(Lorry) to the Per day
contractor is under emergency only. When
departmental lorry is engaged to the Contractor
on a particular day an amount of Rs2102/- per
Plus
day or part there of should be recovered for a
additional
total KM run up to 100KM on that day plus for
KM
every additional KM at Rs.17.50 per KM Which
ever is higher. The run to be worked out taking
initial reading at starting point and closing
reading after returing the same starting point
duly completing the transport work.

SS Rate for
2010-11
(Rs.)
(4)
2102.00

17.50

Note:1. When the departmental lorry is used for transport of fragile and costly
equipment, they have to be insured by the contractor in first place before
transport and the same will be claimed in the respective work bill.

2. If the crane is given on hire to other than APTRANSCO works, the rate is a
minimum of Rs18984/-(Rs.791/-per hr X 24Hrs) + (Fuel cost & lubricants) per
day or part there of and the time is to be reckoned from the time of leaving
department premises till reaching back.

Sd/- B.UMAKAR RAO)


DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

55

APTRANSCO SSR 2010-11

ANNEXURE -VIII
TRANSPORT OF PROTECTION AND CONTROL EQUIPMENT & LINE
MATERIALS
The following are the minimum materials / equipment, for each
load
One Load=9.0MT
1 CTs, PTs, & CVTs:
a). 220kV
2 Nos.
b).132kV
3 Nos.
c).33kV
12 Nos.
NOTE: For transport of 220kV CTs, PTs &CVTs extra provison of Rs.197/- may be
added for each load towards labour for clearing the obstructions like
electrically and telephone lines as the equipment are very tall.
2 SF6 Circuit Breakers:
a). 220kV
1/2 sets
b).132kV
2/3 sets
c).33kV
1 No.
3 Isolators with or without Earth switch including post type insulators:
a). 220kV
1 set in 2 Loads.
b).132kV
1 No.
c).33kV
8 Nos.
4 Lighting Arrestors:
a). 220kV
6 Nos.
b).132kV
6 Nos.
c).33kV
24 Nos.
5 Control & Relay panels:
6 Nos.
6 ACSR Conductor and Earth wire drums:
a)ACSR moose
3Nos.
b)ACSR Zebra
4Nos.
c)ACSR Panther
6Nos.
d)Earth wire
8Nos.
e)CABLE
DRUMS
10Nos.
7
Solid Core Insulators
(a) 70 KN
- 1000 Nos.
(b) 120KN
- 800 Nos.
Silicon Rubber
8 Insulators
(a) 70 KN
- 275 Nos.
(b) 120KN
- 228 Nos.
9 Wave Traps
a). 220kV
6 Nos.
b).132kV
16 Nos.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


APTRANSCO - Standard Schedule of Rates for the year 2010-11 Communicated - Regarding.
_____________________________________________________________________
T.O.O. No. CE (Construction-2)/ Ms.No.449

dt. 21 .01.2011
Read the following:-

Ref:- i). T.O.O.No. Dir/(Tr. &G.O) Ms.No.156, dt.08.10.2004.


ii). T.O.O.No.CE (Construction)/Ms.No.228, dt.31.10.2006.
iii). Circular Lr.No.CPT 310/SE/PM-II/DE-3/D.No.43/2008, dt.11.06.2008.
iv).T.O.O.Ms.CE (Construction) Ms.No.191, dt.31.10.2008.
v). T.O.O.CE (Civil) Ms No.148, dt.21.10.2009.
vi).T.O.O.No.CE (Construction)/Ms.No.234, dt.31.10.2006.
***
The standard schedule of Rate for the year 2010-11 approved by Transmission
Corporation of Andhra Pradesh Limited in respect of item of works pertaining to EHV
Transmission lines and Substations are communicated herewith for adoption in
preparation of estimates.
For all Civil item of works of EHV Transmission lines & substations, the rates that
are approved in the common SSR2010-11 for all engineering departments of Govt of
A.P and the provisions made in the T.O.O.No.148, dated.21.10.2009 of APTRANSCO
shall be adopted as already approved and communicated vide ref 5th cited.
The Standard Schedule of Rates for 2010-11 will come into force from date of
issue of T.O.O.
Encl: As above.
(By order and in the name of APTRANSCO)

Sd/- B.UMAKAR RAO


DIRECTOR (PROJECTS)
To,
The Chief Engineer/ Construction -2/VS/Hyderabad.
The Chief Engineer/ Construction -1/VS/Hyderabad.
The Chief Engineer/ LIS/VS/Hyderabad.
The Chief Engineer/ Construction/400kV /VS/Hyderabad.
(Contd

The Chief Engineer/ Transmission /VS/Hyderabad.


The Chief Engineer /Civil/VS/Hyderabad.
The Chief Engineer /Zone/Metro/Hyderabad.
The Chief Engineer/Zone/Rural/Hyderabad.
The Chief Engineer/Zone/Kadapa.
The Chief Engineer/Zone/Vijayawada.
The Chief Engineer/Zone/Vishakapatnam.
The Chief Engineer/Zone/Warangal.
The Superintending Engineer/TLC/Metro/Hyderabad.
The Superintending Engineer/TLC/Rural/Hyderabad.
The Superintending Engineer/TLC/Warangal.
The Superintending Engineer/TLC/Vijayawada.
The Superintending Engineer/TLC/Visakhapatnam.
The Superintending Engineer/TLC/Karimnagar`
The Superintending Engineer/TLC/Kadapa.
The Superintending Engineer/TLC/LIS/Kurnool.
The Superintending Engineer/TL&SS/ Metro Circle / Hyderabad
The Superintending Engineer/TL&SS/ Hyderabad Circle / Hyderabad.
The Superintending Engineer/TL&SS/ Mahaboob Nagar.
The Superintending Engineer/TL&SS/ Nalgonda
The Superintending Engineer/400 KV / Mamidipally
The Superintending Engineer/TL&SS/ Warangal
The Superintending Engineer/TL&SS/ Karimnagar
The Superintending Engineer/TL&SS/ Nizamabad
The Superintending Engineer/TL&SS/ Vijayawada
The Superintending Engineer/TL&SS/ Nellore
The Superintending Engineer/TL&SS/ Rajahmundry
The Superintending Engineer/TL&SS/ Vizag
The Superintending Engineer/TL&SS/ Kadapa
The Superintending Engineer/TL&SS/ Kurnool
The Superintending Engineer/Civil /TLC/Hyderabad
The Superintending Engineer/Civil/TLC/Warangal
The Superintending Engineer/Civil/TLC/Vijayawada.
The Superintending Engineer /Civil/TLC/Kadapa.
The Superintending Engineer /Civil/TLC/Visakhapatnam
The Executive Engineer/TLC/RMS/Hyderabad.
The Executive Engineer/TLC/Mahaboob Nagar.
The Executive Engineer/TLC/Nalgonda.
The Executive Engineer/TLC/Erragadda.
The Executive Engineer/TLC/Sanga Reddy.
The Divisional Engineer/ MRT / EHT / TLC / Hyderabad
The Executive Engineer/TLC/Warangal.
(Contd..3)

The Executive Engineer/TLC/Karimnagar.


The Executive Engineer/TLC/Nizamabad.
The Executive Engineer/TLC/Vijayawada.
The Executive Engineer/TLC/Gunadala.
The Executive Engineer/TLC/Guntur.
The Executive Engineer/TLC/Nellore.
The Executive Engineer /TLC/Ongole.
The Executive Engineer/TLC/Thirupathi.
The Executive Engineer/TLC/Rajahmundry.
The Executive Engineer/TLC/Vizag.
The Executive Engineer/TLC/Kurnool
The Executive Engineer/TLC/LIS/Division-I/Kurnool.
The Executive Engineer/TLC/LIS/Division-2/Kurnool.
The Executive Engineer/TLC/Kadapa.
The Divisional Engineer /TLC/TRE/Kadapa
The Divisional Engineer/TL&SS / Chandrayangutta
The Divisional Engineer/TL&SS / Moulali
The Divisional Engineer/TL&SS / Erragadda
The Divisional Engineer/ MRT / Metro Circle / Hyderabad
The Divisional Engineer/ MRT / Hyderabad Circle / Hyderabad
The Divisional Engineer/TL&SS / Mahaboobnagar
The Divisional Engineer/TL&SS / Yeddumailaram
The Divisional Engineer/TL&SS / Miryalaguda
The Divisional Engineer/TL&SS / Nagarjunasagar
The Divisional Engineer/ O&M / 400 KV / Mamidipally
The Divisional Engineer/ TL&SS / Warangal
The Divisional Engineer/ TL&SS / MRT / Warangal
The Divisional Engineer/ TL&SS / Budidampadu
The Divisional Engineer/ TL&SS / Karimnagar
The Divisional Engineer/ TL&SS / Ramagundam
The Divisional Engineer/ MRT / Nizamabad
The Divisional Engineer/ TL&SS / Nirmal
The Divisional Engineer/ TL&SS / Dichpally
The Divisional Engineer/ MRT / TLC / Warangal
The Divisional Engineer/ MRT / EHT / TLC / Vijayawada
The Divisional Engineer/ MRT / EHT / TLC / Nellore
The Divisional Engineer/ TL&SS / Vijayawada
The Divisional Engineer/ TL&SS / Guntur
The Divisional Engineer/ MRT / TL&SS / Vijayawada
The Divisional Engineer/ MRT / TL&SS / Nellore
The Divisional Engineer/ TL&SS / Nellore
The Divisional Engineer/ TL&SS / Ongole
The Divisional Engineer/ TL&SS / Bommur
The Divisional Engineer/ TL&SS / Nidadavole
The Divisional Engineer/ HVDC / TL&SS Circle / Rajahmundry
The Divisional Engineer/ MRT / EHT / Rajahmundry
(Contd..4)

The Divisional Engineer/ TL&SS / Gazuwaka


The Divisional Engineer/ TL&SS / Garividi
The Divisional Engineer/ MRT / TL&SS / Vizag
The Divisional Engineer/ TL&SS / Kadapa
The Divisional Engineer/ TL&SS / Yerraguntla
The Divisional Engineer/ TL&SS / Tirupathi
The Divisional Engineer/ EHT / MRT / Kadapa
The Divisional Engineer/ MRT / TL&SS / Kurnool
The Divisional Engineer/ MRT / TL&SS / Ananthapur
The Divisional Engineer/ Windfarms / Ananthapur
The Divisional Engineer/ TL&SS / Kurnool
The Divisional Engineer/ TL&SS / Ananthapur
The Divisional Engineer/ O&M / 400 KV / Kurnool
The Divisional Engineer/ O&M / 400 KV Lines / Srisailam

The Executive Engineer/Civil/TLC/Mint Compound/Hyderabad.


The Executive Engineer/Civil/TLC/Rajahmundry.
The Executive Engineer/Civil/TLC/Kadapa.
The Divisional Engineer/Quality Control/ Vidyut Soudha / Hyderabad
Superintending Engineer/Construction /PM-I /VS/Hyd.
Superintending Engineer/Construction /PM-II/VS/Hyd.
Superintending Engineer/PM-I/400 KV /VS/Hyderabad.
Superintending Engineer/PM-II/400 KV /VS/Hyderabad.
Superintending Engineer/LIS /VS/Hyderabad.
Superintending Engineer/O&M/Lines/VS/Hyderabad.
Superintending Engineer/O&M/Substations/VS/Hyderabad.
Divisional Engineer-1/Construction-1/VS/Hyderabad.
Divisional Engineer-2/Construction-1/VS/Hyderabad.
Divisional Engineer-3/Construction-1/VS/Hyderabad.
Divisional Engineer-4/Construction-1/VS/Hyderabad.
Divisional Engineer-1/Construction-2/VS/Hyderabad.
Divisional Engineer-2/Construction-2/VS/Hyderabad.
Divisional Engineer-3/Construction-2/VS/Hyderabad.
Divisional Engineer-1/LIS/VS/Hyderabad.
Divisional Engineer-2/LIS/VS/Hyderabad.
Divisional Engineer/Design/Construction/VS/Hyderabad.

PS to Chairperson Managing Director/APTransco/VS/Hyd.


PS to Joint Managing Director/ Comml. IPC, RA & IT/APTransco/VS/Hyderabad.
PS to Joint Managing Director/ V&S/ APTransco/VS/Hyderabad.
(Contd

5)

6
Divisional Engineer / Tech to Addl. Joint Managing Director/HRD& Distribution/
APTransco/ VS/Hyderabad.
Divisional Engineer/Tech to Director /Projects/ APTransco/VS/Hyderabad.
Divisional Engineer/Tech to Director /Transmission/ APTransco/VS/Hyderabad.
Divisional Engineer/Tech to Director /Grid Operation/ APTransco/VS/Hyderabad.
Divisional Engineer/Tech to Director /Finance & Revenue/ APTransco/VS/Hyderabad.
The FA & CCA (A,E &R)/APTransco/VS/Hyderabad.

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II


O/o.Chief Engineer (Construction-2)
Vidyut Soudha, Hyderabad.

C:\Users\APTRANCO\Desktop\APTRANSCO SSR - 2010-11-TOO No.449\SSR TOO Ms.No.449.doc