RATAMO - KESKUS (WORK PLAN)

28

29

30

W42
6

Receive scope document/ project


documents from RFI + coordination
and clearing doubts with RFI + Study
of Design Criteria and study of Euro
codes for application of wind, snow
and earth pressure loads.

review and finalization of


workplan, design criteria and
drawings with krishi +
finalisation of WO/ATR.

load take down.

Global Static Analysis,


Design & Calculations

Start of the etabs model based on


preliminary inputs.

Finalization ETAB Model after


Krisi inputs - Geometry

ETABS - Model Geometry + loading


Completion.

19

ETAB - Model Analysis & Design finalization

Design of floor plates for Level level-0 + Report preperation +


reinforcement intent.

Start of Safe model

20

21

22

29

30

W45
2

W46
3

W47
10

11

12

Project coordination + manual verification of analysis and design

ETAB - Model
Analysis &
Design
finalization

Grouping & Design of Pile Caps & Review + Column design + reinfoircement intent of columns
R/F Intent Grouping & Design of Pile Caps +
Reinforcement Intent

Columns
13.11.

Design of floor plates for Level level-1 + Report preperation + reinforcement intent. (Delay due to Re-work due to change in information
from RFI)

1st floor
6.11.

Design of floor
plates for Level
level-2 + Report
preperation +
reinforcement
intent.

GA drawings
30.10. & 4.11.

BIM Modeler 3 or CAD RC

HOD
Review

Placing Pile Cap Reinforcement in TEKLA &


Generation of Reinforcement Drawings

13

16

W48
17

18

19

20

23

W49
24

25

26

27

30

W50
1

W51
8

10

11

14

W52
15

16

17

18

21

22

23

24

25

Project coordination + manual verification of analysis and design

stair wall design stair wall design + reinfoircement intent of


+ reinfoircement stair walls + Lift walls design + reinfoircement
intent of walls
intent of stair
walls + Lift walls
design +
reinfoircement
intent of walls

Walls
20.11.

beam design and


reinforcement intent

Design of stair-1, 2,
3&4
reinforcement
intent.

Beams & stair landings


27.11.

Design of floor plates for Level level-2 + Report preperation + reinforcement intent.

Design of floor plates for Level level-3 + Report preperation +


reinforcement intent.

2nd floor
27.11.

Design of floor plates for Level level-4 + Report


preperation + reinforcement intent.

3rd floor
11.12.

review of load take down.

HOD
Review

Review of Safe - slab at level -0

HOD
Review

HOD
Review

Placing Column
Tekla Team off Placing Pile Cap
Reinforcement in TEKLA Reinforcement in TEKLA
for the week
& Generation of
& Generation of
Reinforcement Drawings Reinforcement Drawings

Foundation
20.11. & 25.11.

Placing Floor (0 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Tekla Team off


for the week

Placing Floor (0 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Placing Column
Reinforcement
in TEKLA &
Generation of
Reinforcement
Drawings

0 slab
6.11. & 10.11.
HOD
Review

Holiday Deepawali

TEKLA MODEL & GENEATION OF GENERAL ARRANGEMENT DRAWINGS & Typicals

Example drawings
23.10.

Modelling
Delivery dates of drawings
REC & RFI

Review - structural drawings - project engineer +


Principal engineer

28

4th floor
18.12.

Hours to contribute for


any revisions in the
project either from RFI +
architect or during
constructrion phase.

KIRSI IN GEC OFFICE


Sharing Project Information with GEC Team & Co-ordination

BIM Modeler 2 or CAD RC

Review - Design - project engineer + Principal


engineer

27

Foundation
30.10.

0 floor
16.10

BIM Modeler 1

HOD & management


Review (6 hrs each week)

W44
26

23

HOD
Review

Holiday Deepawali

TEKLA Modeling

16

Holiday - Deepawali

GEC

15

Tekla Team off Placing Pile Cap Reinforcement in


TEKLA & Generation of
for the week
Reinforcement Drawings

Review of etabs results + slab results for level 1 (Delay due to Re-work due to change in Review of pile cap design
information from RFI)

drawings review for pile


cap

2nd slab
4.12. & 9.12.

Placing Floor (3 level) Reinforcement in TEKLA &


Generation of Reinforcement Drawings

Dim. sections & details


4.12. & 9.12.

HOD Review

Review of column design

drawings review for


pile cap

4th slab
18.12. & 23.12.
Beams
18.12. & 23.12.

1st slab
27.11. & 2.12.

Placing Column Reinforcement in TEKLA Placing storage lift Wall Building Eleveations + Structural Section and details
& Generation of Reinforcement Drawings + stairwalls + passenger
lift walls Reinforcement
in TEKLA & Generation
of Reinforcement
Drawings

HOD
Review

Placing Floor (4 level) Reinforcement in TEKLA & Generation of


Reinforcement Drawings

Placing Floor (2 level) Reinforcement in TEKLA & Generation of


Reinforcement Drawings

Placing Floor (1 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Columns
20.11. & 25.11.
Holiday - Deepawali Holiday - Deepawali

Arrival of RFI Engineer to


GEC

14

ETABS
16.10.

Holiday
RFI

W43
13

Project coordination + manual verification of analysis and


design

Design
Delivery reports of reports
Engineer-2

12

Holiday - Deepawali

25

Holiday - Deepawali

24

Holiday - Deepawali

23

W41

Project Introducion /
PM (Project
Inputs / Clarifications and Manager)
agreement on WO/ATR

Engineer-1

22

Holiday - Dusherra

GEC

w40

21

Holiday - Dusherra

W39

Activity

HOD
Review

Review of Slab results at level - 2

drawings review for slab and beam


reinforcement at level 0

Drawings Review for


column design

Placing Floor (3 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Placing Floor (4 level) Reinforcement in


TEKLA & Generation of Reinforcement
Drawings

Placing storage lift Wall + stairwalls + passenger lift


walls Reinforcement in TEKLA & Generation of
Reinforcement Drawings

Shafts
28.12. & 30.12.

Placing Staircase 1 &2 Reinforcement in


TEKLA & Generation of Reinforcement
Drawings

Stair landings
28.12. & 30.12.

This person will be included later stage

3rd slab
11.12. & 16.12.

HOD
Review

HOD
Review

HOD
Review

Review of lift and stair


wall design

review of Slab results at level - 3 Review of slab at level 4


+ review of beam design

Drawings review of the


Stairwalls + lift walls

drawings review for slab


and beam reinforcement
at level 1

drawings review for slab


and beam reinforcement
at level 2

Stairacse review-1 to 4

drawings review for slab and beam review of draawings for slab and beams at
reinforcement at level 3
level 4 + staircase 4