Professional Documents
Culture Documents
RESUME
NAME: PUDURI GOPI KRISHNA
Email: gopi_iitm@yahoo.co.in
Phone: 0091-9600148825 (Mobile)
Career Abstract
Having 8.5 years of professional experience in design and detailed analysis of Steel and
R.C.C Structures and foundations in Oil & Gas Industry, Process Plants, Industrial
Structures and High rise buildings across the career span.
In-depth knowledge of STAAD-Pro.V8i, Foundation 3D, ETABS and other computer
applications for Civil/ Structural Engineering related activities.
Conversant with International Codes and Standards Such as ACI, AISC, BS, UBC,
Euro Codes, and Indian standards.
Educational Qualifications
Area of Expertise
Analysis and design of RCC and Steel structures using STAAD Pro.
Design of pipe racks, process and industrial steel structures using STAAD Pro.v8i.
Analysis and design of structures with seismic action static and dynamic analysis.
Analysis and design of Equipment Foundations like Heat Exchangers, Horizontal and
Vertical Vessels, Pumps and Block foundations.
Analysis and design of Water Retaining Structures, Sulphur Pits and Cooling water Tower.
/ / 2014-09-29 11:49:35
PROFESSIONAL EXPERINCE
Present Employment;
1
Responsibilities:
Analysis and design of Process, Pipe rack structures & Utility buildings, foundations
and industrial facilities of Middle East countries.
Verification of design calculations and supervision of drawing preparation.
Coordination with Interdisciplinary engineers, Clients and Contractors during project
phase.
Participating in model reviews with Smart plant review.
Guiding the junior engineers and Trainees in various technical tasks during the project.
Project Summary
Algiers Refinery (in progress)
Client:
Codes & Standards:
Software Used:
Algeria
Sonatrach Raifinerried AlgerAlgeria
Algiers and American codes.
Staad.Pro.V8i
Scope of work:
Work involved for 6 major units namely 1.RFCC Block 2.Utilties 3. Existing ADU
plant 4.Inter connecting area 5.Raw water system and 6.Newflare.
Approximate concrete qty - 35000 cum
Approximate steel qty
- 11000 MT
Job Involvement
i.
/ / 2014-09-29 11:49:35
Saudi Arabia(KSA)
Client:
Saudi Aramco Total Refinery and Petro ChemicalsSATORP
Codes & Standards: American and Jubail Export Refinery Engineering (JERE) standards
Software Used:
Staad.Pro.V8i
Scope of work
Work involved for 6 units namely 1.Selective Hydrogenation unit (SHU) 2.Mild Hydro
Cracker unit (MHC) 3. Fluid Catalytic cracking unit (FCC),4.Alkylation Unit (ALK)
5.Unsaturated gas plant(UGP) and 6.Sulphur Acid Regeneration unit(SAR)
Approximate concrete qty - 38000 cum
Approximate steel qty 14000 MT
Job Involvement
i.
ii.
061-STR-180
It is Process structure of size- 27 m x 25.5 m x 17.0 m height supporting Tanks and
silencers at @ El of 11.7 m and19.775 including five levels of access platforms.
The structure is modeled as3D space frame and analyzed for all piping and equipment
loads, wind and seismic loads.
Longitudinal frames and transverse frames are provided with vertical bracings
Plan bracings are provided at all platform levels for lateral stability.
Steel qty: 143 tons.
061-PR-6000
/ / 2014-09-29 11:49:35
iii.
Qatar
Scope of work
Worked involved 3 major units namely 1.AGR4 & SRU TGT unit, 2.Storage and Inter
Connecting unit(SRU and Amine), 3.Utiliteis
Concrete qty: 13000 cum
Steel qty: 5000 MT
Job Involvement
i. 04-XH 11& 12
It is steel structure of size XH-11-15 m x 4.5 m x 7.0 m height & XH-12- 15 m x 15.5
m x 8.3 m height supporting sour water filters at @ El of 4.0 m including piping and
access platforms.
The structure is modeled as3D space frame and analyzed for all piping and equipment
loads, wind and seismic loads.
Longitudinal frames and transverse frames are provided with vertical bracings
Plan bracings are provided at platform levels for lateral stability.
Steel qty: 70 tons.
ii. 04-PR-10
/ / 2014-09-29 11:49:35
It is pipe rack structure of size- 55 m x 4.5 m x 9.3 m height having 3 piping levels.
The structure is modeled as3D space frame and analyzed for all piping and equipment
loads, wind and seismic loads.
Longitudinal frames are provided with vertical bracings and transverse frames are
considered as moment frames.
Steel qty: 93 tons.
iii. Design of Sulphur pit, Equipment Drain Drums, Sumps/Pits, Storage Tanks and
Dyke wall.
Sulphur Pit size- 19.5 m x 19.5 m x 4.2 m height. All walls and base modeled as plate
elements and analyzed for earth and water pressure also for temperature (Design
temperature 170 0C) loads.
For design Plate moments are considered with Wood Armer effect.
Concrete qty : 340 m3
Equipment drain drums are analyzed and designed by modeling plate elements for earth
and water pressure and equipment loads
Many sumps/pits are designed manually for earth and water pressure also buoyancy
effect is considered wherever it is applicable.
All above designs are checked for crack control.
Epoxy 120K Expansion Project
(KSA)
Client:
Codes & Standards:
Software Used:
Saudi Arabia
NAMA Chemicals.KSA
American and UBC standards
Staad.Pro.V8i
Scope of work
Detail Engineering for 3 packages WP1 (BLR) line, WP2 (Solid reactor)
& WP3 (Utilities).
Concrete qty: 4000 cum
Steel qty: 1200 Tons
Responsibility
Previous Employment;
2 Senior Civil/Structural Engineer Civil/Structural with Dow Corning India Pvt.Ltd.
(www.dowcorning.com), Chennai, India, a leading manufacturer of Silicones US-based global
design firm, from April 2008 to 2010 June
Responsibilities:
/ / 2014-09-29 11:49:35
Analysis and design of Process structures, foundations and industrial facilities of Dow
Corning USA and China.
Verification of design calculations and supervision of drawing preparation.
Involving in weekly VC meetings with client.
Participating in model reviews with Naviswork freedom
Project Summary
S4G Utility Building.
Client:
Codes & Standards:
Software Used:
/ / 2014-09-29 11:49:35
a) Analysis and design of buildings and industrial facilities of Mott MacDonald, UK.
b) Verification of design calculations and supervision of drawing preparation.
Projects handled:
Nucleus Centre, London, UK 2 storey steel portal frame structure
The Gateway, Leeds, UK RC buildings of 10, 11 & 14 stories
Ashfield Girls School Belfast, Northern Ireland, UK steel buildings 1-3 stories
Plot 406/407 Manchester, UK G+9 steel structure with concrete substructure
4. Civil/Structural Design Engineer- Civil/Structural with Satyavani Projects and Consultancy
(www.svpcpl.com), Hyderabad, India, from June 2004 to May 2006 and March 2001 to January 2002.
Responsibility:
Analyze and Design the Structures using STAAD.Pro package
/ / 2014-09-29 11:49:35
Language: FORTRAN
FEA Packages: Staad.Pro/V8i & Staad Foundation, ETABS, ANSYS, CSC-Orion and
CSC-Fast track.
Design Tools: Foundation 3D, Cell beam, Shearail, BDES Corus and TEDDS and Enercal.
Modeling Packages: PDS Environment, Smart Plant Review & Navisworks Freedom
Personal Data
Fathers Name
Date of Birth
Gender
Nationality
Marital status
Passport
Languages known
Place: Chennai.
Date:
Puduri Lohidas
15-05-1977
Male
Indian
Married
E 9172330 (valid up to 2014)
English, Hindi, Telugu (Mother Tongue) and
Tami
P.GOPI KRISHNA