Project: Mahogany Tower

Date: March 4, 2016


Location: Peafrancia St. Paco, Manila
Subject: Revised OSM Quantities for Steel Doors

Project: Mahogany Tower


Date: January 13, 2016
Location: Peafrancia St. Paco, Manila
Subject: Previous OSM Quantities for Steel Doors

Construction Floors

Construction Floors
DOOR TYPE

Location

SD-1

Single Leaf Steel Swing


Door

Ground Floor, Electrical


Room

SD-1

SD-2

Double Leaf Steel


Louver Door

Ground Floor, Transformer


Vault Room

SD-2

Double Leaf Steel


Louver Door

Ground Floor, Transformer


Vault Room

SD-4

Double Leaf Steel Swing


Door

Ground Floor Trash Room

SD-4

Double Leaf Steel Swing


Door

Ground Floor Trash Room

SD-5

Single Leaf Steel Flush


Door

Ground Floor , Emergency


Exit

SD-5

Single Leaf Steel Flush


Door

Ground Floor , Emergency


Exit

SD-5A

Single leaf Steel Flush


Door

Ground Floor, Emergency


Exit

SD-5A

Single leaf Steel Flush


Door

Ground Floor, Emergency


Exit

SD-6

Steel Louver Window

Water Tank Level, Stairs

SD-6

Steel Door w/ Louver


Window

Water Tank Level, Stairs

SD-7

Double Leaf Steel


Louver Door

Glround Floor, Pump Room

SD-7

Double Leaf Steel


Louver Door

Ground Floor, Pump Room

SD-8

Double Leaf Steel


Louver Door

Ground Floor, Genset Room

SD-8

Double Leaf Steel


Louver Door

Ground Floor, Genset Room

SD-9

Single Leaf Steel Flush


Door

Ground Floor, Emergency


Exit

3 (-3)

Steel Grille Door

Transformer Vault Room

SD-10

Single Leaf Steel Flush


Door

Ground Floor, Emergency


Exit

3 (-3)

Steel Grille Door

Transformer Vault Room

(+1)

TOTAL
Prepared by:
Engr. John Philip S. Garcia
ASCDC-JSE

AGA AND SONS


CONSTRUCTION AND DEVELOPMENT CORPORATION
CIVIL ENGINEERS GENERAL CONTRACTOR

GF

DOOR TYPE

WTL

Location

Single Leaf Steel Swing Ground Floor, Electric Meter


Door
Room

TOTAL

14 (+1) (-6)
Checked by:
_________________________
ATMCI

GF

WTL

Project: Mahogany Tower


Date: January 13, 2016
Location: Peafrancia St. Paco, Manila
Subject: Previous OSM Quantities for Wood Doors
DOOR TYPE

Location

WD-1

Single Leaf Wooden Panel


Door

WD-1A

Single Leaf Wooden Panel


Door

WD-2

Single Leaf Wooden Panel


Door

Ground-18, Unit A-Q


1&2)

WD-2A

Single Leaf Wooden Panel


Door

Ground-18,
Unit AQ (BR-1&2)

WD-3

Single Leaf Wooden Louver


Door

WD-3A

Single Leaf Wooden Louver


Door

WD-5

Double Leaf Wooden Flush


Door w/ Louver Blades

Ground- 18th,
Water
Meter Room

TOTAL

Construction Floors
9F
10F
11F
12F

GF

2F

Ground-18,
Unit
A-Q (Main Door)

(+7)

Ground-18,
Unit
A-Q (Main Door)

(+6)

(+12)

15

15

15

15

15

15

15

15

(+14)

17

17

17

17

17

17

17

2nd-18th Electrical Room

2 (-1)

2nd-18th Electrical Room

1 (-1)

(BR-

3F

4F

5F

6F

7F

8F

WTL

TOTAL

13F

14F

15F

16F

17F

18F

147

147

15

15

15

15

14

14

14

15

15

252

17

17

17

17

17

14

14

14

17

17

280

19
1

41

52

18

864 (+39) (-2)

864

2592

Project: Mahogany Tower


Date: March 4, 2016
Location: Peafrancia St. Paco, Manila
Subject: Revised OSM Quantities for Wood Doors
DOOR TYPE

Location

GF

2F

3F

4F

5F

6F

7F

Construction Floors
9F
10F
11F
12F

8F

13F

14F

15F

16F

17F

18F

WTL

TOTAL

WD-1

Single Leaf Wooden Panel


Door

Ground-18,
Unit A-Q (Main Door)

154

WD-1A

Single Leaf Wooden Panel


Door

Ground-18,
Unit A-Q (Main Door)

153

WD-2

Single Leaf Wooden Panel


Door

Ground-18,
Unit A-Q (BR-1&2)

12

16

16

16

16

16

16

16

16

16

16

16

16

15

15

15

16

16

281

WD-2A

Single Leaf Wooden Panel


Door

14

16

16

16

16

16

16

16

16

16

16

16

16

13

13

13

16

16

277

WD-3

Single Leaf Wooden Louver


Door

2nd-18th
Electrical Room

18

WD-5

Double Leaf Wooden Flush


Door w/ Louver Blades

Ground- 18th,
Water Meter Room

18

41

52

52

52

52

50

50

50

52

52

52

52

52

46

46

46

52

52

TOTAL

901

Ground-18,
Unit A-Q (BR-1&2)

901
Prepared by:
Engr. John Philip S. Garcia
ASCDC-JSE

AGA AND SONS

CONSTRUCTION AND DEVELOPMENT CORPORATION


CIVIL ENGINEERS GENERAL CONTRACTOR

Checked by:
_______________________________
ATMCI

307

558

2703

Project: Mahogany Tower


Date: April 6, 2016
Location: Peafrancia St. Paco, Manila
Subject: Quantities for PVC Doors

DOOR TYPE
PD-1

Single Leaf PVC Door

PD-2

Single Leaf PVC Door w/


Louver Panel

Location

Ground-18, Unit A-Q (T&b


(-6) (+13)
Door)
Ground-18, Unit A-Q (T&b
Door)

Prepared by:
Engr. John Philip S. Garcia
ASCDC-JSE

AGA AND SONS

GF

CONSTRUCTION AND DEVELOPMENT CORPORATION


CIVIL ENGINEERS GENERAL CONTRACTOR

2F

3F

4F

5F

6F

16

16

16

16

7F

16

16

SKY GARDEN

Checked by:

___________________
ATMCI

8F
16

ARDEN

Construction Floors
9F
10F
11F

12F

13F

14F

15F

16F

17F

18F

WTL

TOTAL

16

16

16

16

16

14

14

14

16

16

279

28

______________
ATMCI

307
921