Electrical work status including the temporary works

SL.NO
Work Description
Temporary supply to Block-1 including charging of 3 MVA transformer
1
Cable laying work from incomer to SDB (3 core*240 sq mm & 1 core 120 sq mm cable)
2
Connections of CT & fuse at RMU
3
Installation of incomer DB 400A
4
Cable termination work at RMU & incomer DB
5
Installation of SDB with 160 A,125A,100A MCCB
6
Connection of DG power cable & EB power cable at the changeover 800A
7
Transformer HT fuse installation & Charging of transformer 3MVA
8
Earthing for the Incomer DB and SDB
9
Earthing for the RMU
10
Fixing of 240 sq mm cable at top roof 6 mtrs height
11
Shifting of DG to its exact place
12
Cable termination work from RMU to incomer DB 4 core*300 sq mm & 3 core 240 sq mm
13
cable

BLOCK-1

CABLE LAYING & TRAY INSTALLATION


Note: Installation includes 3 mtrs cable tray laying, cover plate, Bolt Nut Connecting,
Providing Support angle iron 50 mm x 50mm x 10mm, 150mm x 100mm x 10mm, 50
mm x 50mm x 6 mm to drafter beam , Cable tray Support Fixing using chain, support
painting, T-connections , cable tray reducer between the trays and all necessary
accessories to complete the work
Laying the following below CU/XLPE/SWA/PVC cables on cable trays using MS spacers
and Cable clamps etc. complete in all respect. & Termination of following cables using
Lugs & Double Compression gland and making proper connection

19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

MDB to SDB 2 (Denim wet process)


MDB to SDB 3 (Printing)
MDB to SDB 4 (Boiler)
MDB to SDB 5 (Compressor)
MDB to SDB 6 (Knits sewing)
MDB to SDB 8 (Cutting knits & Denim)
MDB to SDB 9 (Denim sewing)
MDB to SDB 11 (Knit finish area)
MDB to SDB 13 (Dry process)
MDB to SDB 16 (Denim finish)
MDB to SDB 24 (packed good storage)
MDB to SDB 26 (Denim packed good storage)
MDB to SDB 27 (Denim Wet process 2)
MDB to SDB 28 Oxygen plant
MDB to Firehydrant
MDB to SDB 7 (ETP & RO)

35

MDB to SDB 1 (villa)

36
37
38
38

Cable Tray 1
Cable Tray 2
Cable Tray 3
Cable Termination at SDB & MDB panel

SDB PANEL
Shifting, Installation, testing & commissioning of Sub Distribution Board(SDB)
18 no's including Panel erection,panel modification, Panel support, Support
painting, Panel testing&Commisioning )

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

57

MDB to SDB 2 (Denim wet process)


MDB to SDB 3 (Printing)
MDB to SDB 4 (Boiler)
MDB to SDB 5 (Compressor)
MDB to SDB 6 (Knits sewing)
MDB to SDB 8 (Cutting knits & Denim)
MDB to SDB 9 (Denim sewing)
MDB to SDB 11 (Knit finish area)
MDB to SDB 13 (Dry process)
MDB to SDB 16 (Denim finish)
MDB to SDB 24 (packed good storage)
MDB to SDB 26 (Denim packed good storage)
MDB to SDB 27 (Denim Wet process 2)
MDB to SDB 28 Oxygen plant
MDB to SDB 29 Fire hydrant
MDB to SDB 19 (Accommodation)
MDB to SDB 7 (ETP)
MDB to SDB 1 (villa)
MDB to laser
Installation of UPS

MACHINE CABLES
SDB 2 Distribution(Denim wet process 1)
SDB2 to Washing M/C 1-8

58

SDB 27 (Denim wet process 2)


SDB27 to Washing M/C 9-20
SDB27 to Ozone panel 1-5

59

SDB 13 Distribution(Dry process)


SDB13 to Dryer triveneta E/250 m/c 1-12

60

SDB 3 Distribution(Printing)
PRINTING M/C MAM SYNCHROPRINT 4000 m/c 1-2
PRINTING CONTINOUS DRYER
EMBROIDERY 1-2

61

SDB 4 Distribution(Boiler)
Boiler 1-3

62

SDB 5 Distribution(compressor)
Compressor 1 -5

63

SDB 9 Distribution(Denim sewing)


INA CONVEYORS 52 STATIONS DENIM
INA CONVEYORS MOTOR DENIM
INA COMPUTER DENIM
Ironing table
DENIM SEWING MACHINES
Tubelight connection
Installation of Socket

64

SDB 6 Distribution(Knits sewing)


INA CONVEYORS 32 STATIONS KNITS
INA CONVEYORS MOTOR KNITS
INA COMPUTER KNITS
KNITS SEWING LINES
Ironing table
Tubelight connection

65

SDB 8 Distribution(Cutting)
CUTTING M/C LECTRA LINE2
CUTTING M/C LECTRA LINE1
CUTTING TABLE OSP-TBLOW71
CUTTING SPREADER OSP-KW71 DENIM
CUTTING SPREADER OSP-W71 KNIT

66

SDB 7 Distribution(ETP & RO)


Air blower for aeration
Motors
Motors

67

SDB 24 (Packed goods storage)

68

SDB 26 (Denim Packed goods storage)

69

SDB 28 (Oxygen Plant)

70

SDB 28 (FireHydrant)

71

SDB 1 Distribution(villa)
Villa
Bore well 1
Bore well 2

72

EARTHING SYSTEM
Earth Pits using 3M long, 25 mm Dia heavy duty GI pipe complete with 12 mm
holes at 180 degree horizontally and at every 250 mm center to center vertically.
electrode shall be provided with funnel for watering, 2 no of C clamp of 50X6 mm
GI strip welded to earth electrode for connection to external grid. Complete with
manhole cover of 450mm x 450mm & with brick masonry work / all civil work
upto ground level above all complete with alternate layer of coke, charcoal & salt
as per BS standard

73

LIGHTINGS BLOCK -1
Installation of surface mounted Light Distribution Boards
Total LED fittings 150W for Block-1
2 core *2.5 sq mm cable for LED lights connection (2*2.5 sq mm)
4 core*6 sq mm cable for incoming supply connection to LDBs from SDBs

74

Industrial Lighting Philips Twin FL LED


Industrial Lighting Philips Twin FL LED, 36Watt, 1.2mt long, Complete set, Day
Light Color including BUSBAR & support, For Cutting Knits and Denim area
Industrial Lighting Philips Twin FL LED, 36Watt, 1.2mt long, Complete set, Day
Light Color including BUSBAR & support, For Preparation Area
Industrial Lighting Philips Twin FL LED, 36Watt, 1.2mt long, Complete set, Day
Light Color including BUSBAR & support, For Knits sewing Area
Industrial Lighting Philips Twin FL LED, 36Watt, 1.2mt long, Complete set, Day
Light Color including BUSBAR & support, For Denim Sewing area

Industrial Lighting Philips Twin FL LED, 36Watt, 1.2mt long, Complete set, Day
Light Color, For workers accommodation
Lighting Cable 2*2.5 sq.mm &Flexible cable 3 core x 1 sq mm
75

INDUSTRIAL TYPE MAINTENANCE SOCKET FOR BLOCK-1


Industrial power socket outlet points 3P+N+E,400V with 63A 5 pin 4 pole MCB & 1P+N+E
with 220V 16A single phase 3 pin 2 pole MCB combined in a single outlet box including male
,female connectors .
4 core*6 sq mm cable for incoming supply connection to INDUSTRIAL TYPE
MAINTENANCE SOCKET

77

Main gate Guard & Weigh Bridges


road cutting & installation of pipe for cable
Incoming supply to the Main gate
Installation of feeder pillar for main gate power, Weigh bridge & Garden lights

78

Garden Lightings
Laying of cables 10 mtrs span for the garden light
Installation of 50W fitting for garden

79

EXTERNAL LIGHTINGS
Solar cum vertical wind turbine streetlight installation
Boundary light installation

80

ACCOMANDATION
Block 1-6

83

TRANSFORMER & MDB ROOM


BED foundation for 33KV Transformer
BED foundation for 15KV Transformer
MDB installation
Cable termination MDB
Installation of 33KV line including pole errection,conductor laying,pin insulator etc
Installation of 15KV line including pole errection,conductor laying,pin insulator etc
Shifting of 33KV,3MVA transformer to new location
Installation of 15kv, 6mva transformer,VCB & its accessories

BLOCK-2

Cable laying and Panel Board Installation, including temporary installa


88
89
90
91
92
93
94
95
96
97
98
99
100
101

MDB to SDB 19 (Accamodation)


MDB to SDB 12 (Thread dyeing)
MDB to SDB 14 (Dinning Hall)
MDB to SDB 15 (Adminstration)
MDB to SDB 17 (Chemical store)
MDB to SDB 18 (Machine store)
MDB to SDB 20 (Poly bag making)
MDB to SDB 21 (Training center)
MDB to SDB 22 (Empty shade & Sample room)
MDB to SDB 23 (Carton box making)
MDB to SDB 25 (Lathe & workshop)
Boiler
Panel Board installation & Cable tray installation at Block-2
Bay lightings at Block-2

rary works
Status
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

In Progress
Not Started
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Not Started
Not Started
In Progress
In Progress
In Progress
Not Started
In Progress
Not Started

Completed
In Progress
Not Started
In Progress
In Progress

Completed
Not Started
Not Started
Completed
Completed
Completed
Completed
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Completed
Not Started
Completed
Not Started
Completed

In Progress

Not Started
Not Started

Not Started

Not Started
Not Started
Not Started

In Progress

In Progress

Not
Not
Not
Not
Not
Not
Not

Started
Started
Started
Started
Started
Started
Started

Completed
Completed
Completed
Completed
Completed
Completed

Completed
Completed
Completed
Completed
Completed

Not Started
Not Started
Not Started

Not
Not
Not
Not

Started
Started
Started
Started

Not
Not
Not
Not

Started
Started
Started
Started

Completed
In Progress
In Progress

In Progress

In
In
In
In

Progress
Progress
Progress
Progress

In Progress
In Progress

In Progress

In Progress

In Progress
In Progress

Not Started
Not Started

In Progress
In Progress
Not Started

Completed
Not Started

In Progress
Not Started

Completed

Completed
Completed
Completed
In Progress
In Progress
In Progress
In Progress
Not Started

emporary installations
Completed
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Not Started
Not Started