1.1
General Requirements
Construction Safety and Health
Mobilization/Demobilization
-The Contractor shall mobilize and put into operation all equipm
ent and plants required to undertake the Contract.
-Mobilization shall include the transferring to the job-sites of
all equipment, plants, supplies and materials, personnel, and all items necessa
ry for the execution and completion of the work, and shall also include the sett
ing up of all equipment, instruments and all other plants until rendered operabl
e, subject to the confirmation of the Engineer.
-Sufficient supply of spares for the equipment and plants shall
be carried on-board the towing/carrying vessels. Equipment/plants encountering b
reakdowns must be repaired on site by the most expeditious method possible at no
cost to PPA. In the event that the equipment/plants call for major repair works
that cannot be undertaken at the site, the Contractor shall replace such equipm
ent/plants with equal or better performance capacity at no additional mobilizati
on costs to PPA and the Contractor shall not be entitled to any time extension.
-The dismantling, preparation and loading for removal and shipme
nt of all Contractor's plant, equipment and personnel at each site after complet
ion of the works.
-Transportation of all the above plant, equipment and materials
from each site to the Contractor's home station or somewhere else outside the si
tes.
-Removal of all supplementary markers furnished and installed by
the Contractor, provided that the Engineer has not taken the option to retain t
he markers.
-The clean up of the Site and the removal of materials, debris,
waste, etc., and making good damages or temporary alterations.
1.3
Hauling of Debris
- Waste materials must be checked by proper/designated personnel
of the owner before proper disposal.
1.4
As-built Plan
- Asbuilt Plan includes Interior Floor plan, Structural plan (Ci
stern Tank), Electrical & Lighting plan (Training Center) And Mechanical plan fo
r Sprinkler System & Air Conditioning unit.
2
Structure Excavation
-Removing material for the placement of foundations, substructur
e units, including the disposal of surplus and unsuitable material, as shown on
the Drawings.
3
Grade 40.
-Secondary Reinforcements shall be deformed, Grade 33.
-Provide concrete reinforcement, which is made from new billet s
teel and free of rust, dirt, oil and grease and any other foreign substances det
rimental to the bonding with concrete.
-Secure reinforcement with accessories and the wire to prevent d
isplacement before and during concreting.
-Lap-splice all bars up to No. 11 in accordance with ACI 318. In
no case the lap-splicing be less than 40 x the diameter of bar.
Concrete Works
3000 psi
3000 psi
iv. Beams and Columns
3000 psi
e as
over
drop
utes
-2 Days
-2 Days
-2 Days
-14 Days
-14 Days
vi. Beams and Girders
5
-14 Days
Masonry Works
-Concrete Hollow Blocks shall be of approved kind by the project
engineer.
-Mortar aggregate shall be Natural River sand, clean and free fr
om soluble salts and organic matter, graded from fine to coarse, compatible with
the thickness of joints in which it is used.
-Cement shall be Wall Right Cement or its equivalent.
-Mix mortar from 3 to 5 minutes in such quantities as are needed
for immediate use. No re-tempering will be permitted if mortar stiffens because
of premature setting.
-Concrete hollow blocks shall be of approved sample (ASTM C129)
Metal Structures
Roof Framing
-Joints must be fully welded with 6mm Gusset Plates
Railings
Roofing
-Used pre-painted plain sheet. Ga. 24 molded for all ridge rolls
, gutters and flashing.
-Use Tekscrew Nails for fasteners.
-Lay roofing sheet as per manufacturer s recommendations with over
laps oriented following storm and wind direction.
-All roofing shall be done by experienced tinsmith known to the
project engineer.
9
a. Doors
Double swing door with glass transom: 6mm thick black ti
nt glass window in analok frame
Single swing door with glass transom: 6mm thick black ti
nt glass window in analok frame
Single swing door: pvc door
Single swing flush door: paint finish
b. Windows
Sliding with fixed window: 6mm thick black tint glass wi
ndow in analok frame
Sliding window: 6mm thick black tint glass window in ana
lok frame
Awning window: 6mm thick black tint glass window in anal
ok frame
Fixed window: 6mm thick black tint glass window in analo
k frame
Seamless glass with security film
Security film with complete fittings
10
Painting Works
Ceramic Tiles
Ceiling Works
Aluminum Cladding
-4mm Thick Aluminum Cladding (With complete accessories, sealant
& consumables)
-The aluminum sheets to be supplied will be in coil form.
-The material shall be sound and free from harmful defects for t
he intended purpose.
14
Plumbing
a.General:
15
Electrical Works
-All work hereunder shall comply with the latest edition of the
Philippine Electrical Code, the rules and regulations of the Electrical Ordinanc
es of Cagayan de Oro City, the rules and regulation of other governing authoriti
es and with Republic Act No. 184 as applied or enforced in Cagayan de Oro City.
-All work shall comply with the rules and regulations of the Ele
ctric Company and the Telephone Company as far as they are concerned in providin
g their permanent service for use of the said building.
-The drawings and specifications are meant to be complementary t
o each other and what is called for by one shall be binding as if called by both
.
-Built
roperties:
Size of Plates Width
Cross Sectional Area (mm2)
2 inches
a)
b)
c)
d)
Width
50 mm
Thickness
1.2 mm 60 mm
Curing Temperature
TG
7 days
1 day
3 days
7 days
85-95 n/mm2
mm2
25-30 n/mm2
Compressive Strength
85-95 n/mm2
Shear Strength
16-19 n/mm2
Tensile Strength
26-31 n/mm2
"(at 35 deg. celcius)
85-95 n/mm2
15-18 n/mm2
16-19 n/
23-28 n/mm2
"
h) Substrate shall have a temperature = +8 deg. celcius
/ +35 deg. celcius max
i) Ambient shall have a temperature = +8 deg. celcius /
+35 deg. celcius max
j) Adhesive must be applied at temperature = +8 deg. cel
cius / +35 deg. celcius max
k) substrate moisture content shall have a max. of 4% pb
w
-Carbon fiber reinforced plates and its adhesive system shall ha
ve an international test approvals such as:
a) Socotech (france)
b) Empa, report no. 154 490/1, 1994: static loading test
on conc. beams approvals
c) Empa, report no. 154 490/1, 1994: static loading test
on conc. beams approvals
d) Deutsches institute fur bautechnik z-36.12-29, 2006 (
general construction authorized)
-Carbon fiber plates and adhesive shall be with the same manufac
turer to insure compatibility and product guarantee.
-Installation of carbon fiber shall be done by the manufacturer'
s trained applicators and shall have an applicator's training certificate to ins
ure the quality of the workmanship.
-All on-site application shall conforms to the corporate methodo
logy given by the manufacturers.
b. Carbon reinforced polymer sheets
0.12
Fabric Type
Strength
Thickness
Areal weight
carbon fiber 230g/m2
4,100 mpa
230 g/m2
Stiffness
230 gpa
Curing Temperature
+15 deg. celcius
+23 deg. celcius
+40 deg. celcius
f) Viscosity
"Temperature
Viscocity
+15 deg. celcius
+23 deg. celcius
+40 deg. celcius
"
-2'000 mPas
-700 mPas
-200 mPas
7 days
45 n/mm2
45 n/mm2
II. Or two part epoxy based impregnating resin (for dry lay-up a
ppication)
a) Density = 1.30 kg/l + 0.1 kg/l (part a & b) (at +23
deg. celcius)
b) Elongation at break = 0.9% (7 days at +23 deg. celciu
s)
c) Thermal Expansion Coefficient = 4.5 x 10-5 per deg. c
elcius (temp. range -10 to 40 deg. celcius
"d) E-Modulus = Flexural: 3,800 n/mm2 (at +23 deg. celci
us)
according to din 53452"
Tensile : 4,500 n/mm2 (at +23 deg. celciu
s) according to din 53455
e) Thermal Stability:
Curing Time
HDT (Heat Distortion Temp)
7 days
+36 deg. celcius
7 days
+47 deg. celcius
7 days
+53 deg. celcius
Curing Temperature
+10 deg. celcius
+23 deg. celcius
+35 deg. celcius
f) Viscosity
"Temperature
Viscocity
+15 deg. celcius
+23 deg. celcius
+40 deg. celcius
"
-10'000 mPas
-6000 mPas
-5000 mPas
7 days
Concrete Failure (>4 n/m
en 24624
Tensile Strength
(at 23 deg. celcius)
30 n/mm2