Professional Documents
Culture Documents
Voltage Transformer
User Instructions
1 Put this manual in a safe and convenient place, in order to facilitate operation and
maintenance personnel when needed for reference. For the other details, please refer
to the information except this manual or contact our company.
2 Operator Requirements: Familiar with oil-immersed inductive type voltage transformer
and can operate skillfully.
3 Read this manual on the product's installation, operation and maintenance of the
equipment carefully, understand all instructions and safety precautions on the product
before using, and then operate the products according to the relevant requirements
properly.
4 During operation, forbid the followings occurring:
Beyond the requirements in this manual
Earth Terminal N is not earthed
Secondary winding is open-circuit
Play open oil drain valve without checking the location of bellow oil indicator,
result in the oil indicator of bellow does not match the ambient temperature.
All above could lead to product damage, we wont be responsible for the
consequences due to the above behaviors.
5 If any questions about this manual, please contact us.
6 If some failures come up, please contact us in time, and also describe the followings:
a) Nameplate (Type, Sr. No., Manufacture Date)
b) Describe the different phenomenon before and after failure (as detailed as possible)
Content
1
Protection
intended to be earthed, the potential decrease gradually, the core and primary is made
equi-potential connection in suitable position. The steel core is double shape on which
the first core is circled by primary winding and balance winding, the second core & the
third core are separately circled by coupling winding, primary winding and balance winding,
the forth core is circled by secondary winding, primary winding and balance winding.
The body is supported with erection parts made of high quality insulation materials, of
which dielectric loss factor is lower. After finishing dry treated for the body, it should be
assembled in the porcelain filled with transformer oil. The transformer oil should be
dewatered and degassed.
The active part and porcelain are assembled on steel base. Besides terminal A, all
terminals are brought out from secondary terminals on the base, also there is an earthed
bolt on the base for product earthed.
This transformer is of a fully enclosed structure, with the stainless steel laminated bellows
on the top, which is to separate the transformer interior from air, prevent the transformer oil
from moisture and prolong the service life of the transformer oil and the transformer. The
oil level indicator is provided on the bellow to monitor the state of bellow, when operation
normally, inner of product should be kept the slight positive voltage.
AN Primary Winding
P
Balance Winding
1a1n Secondary Winding
2a2n Secondary Winding
dadn Residual Winding
1a
1n
2a
2n
da
N
dn
66
72.5
140/160
325/350
126
200
480
90110
220
252
460
1050
Primary Winding Terminal to earth5kV1min
Between Secondary Windings and to earth3kV1min
6Rated Voltage Factor
1.2 For continuous; 1.5 for 30s (Neutral Point Earthed Directly)
1.2 For continuous; 1.9 for 8h (Neutral Point None-earthed directly)
7mm/kVExternal Insulation Creepage Distance
W1
less than 20
W2
less than 25
W3
less than 31
Note: The detailed parameters as per nameplate and order technical agreement. If
necessary, the external insulation level can be adjusted according to the higher
altitude.
4 Transportation and Storage
4.1 Transportation
1Transportation Method
The 66kV90kV and 110kV voltage transformer should be transported on the vertical after
fixed packaged, and the 220kV voltage transformer should be transported on the
horizontal after fixed packaged.
2Load and Unload
Put lifting ropes on the lifting lugs marks on the package before lifting the packages.
During unloading, keep smooth and slow to avoid collisions between packages, at the
same time, control the speed of crane. Put the package on a flat ground.
3Inspection for Transportation State
Please inspect the packages and contents in the package after arriving at the destination.
Possible damages as follows:
Damages due to shaking(such as porcelain, glass break-up)
Oil leakage(due to porcelain damage)
Distortion of metal parts(such as connection terminals, connection poles)
4.2 Storage
Inspect the appearance as per packing list after receiving the packages, if necessary to
open the package to check inside, after inspection, please keep the package same as
original in order to store safely and completely.
1Storage Locations
Ground must be strong enough to withstand the weight of the packages without seeper.
The packages are suitable for stored outdoor, for the wooden cases, it should avoid
prolonged sun and rain.
2Storage Methods
During storage, keep the product from the ground at least 30cm for ventilation, and also
keep the entire packages from rainwater soaking.
5 Installation
5.1 Dismantlement
Remove off the top cover and side plate from the top of the package, it must pay more
attention to the porcelain and other components not to damage each other .
5.2 Erection and Installation for Horizontal Packing(see the following figures)
1Put lifting ropes on the lifting lugs marks on the package during lifting the packages up
for the horizontal Transportation Products.
4
figure 3
Fix the lifting rope to the right position as below, and then suspend the product package,
put the product on a flat ground to dismantle the protection plate and wood.(see figure 3)
figure 4
After finish above steps, stand the steel supporting structure up, dismantle the removable
angle iron, lock the lifting hook on the side of steel supporting structure with lifting holes,
and then start to suspend.(see the figure 4)
figure 5
When lifting the instrument transformer with the 4-hole on the base as per above steps,
and assure that during lifting the metal parts dont touch the porcelain, in any conditions,
the top of products cant stand any pressure, and after that suspend the product from the
steel supporting structure to put it on the ground. (See the figure 5)
Note: Open the top cover of bellow before operation, remove the bar type fixed frame
inside.
5.3 Notices for Installation
1) Install the voltage transformer on the flat roof fixed with foundation bolt.
2) The leads made from Liaoning Datang Chaoyang New Energy headstream Company
should be brought into the terminal box by the hole at the bottom.
3) Before connection, the dirt and oxide sheets should be cleaned from the contact surface,
5
the primary outlet terminal can not withstand the over-load mechanical force from bus bar.
4) The earthed bolts of product and N terminal of primary winding is earthed reliably, the
earthed wire can not be too thin.
6 Acceptance Test
6.1
Appearance Inspection
1Data on the nameplate doesnt match with requirements
2Porcelain parts are damaged
3Oil leakage
4Oil level indicator is abnormal
5Other defects impacted on the operation
If above problems occur, the product cant put into operation, please contact us
immediately.
6.2 Acceptance Test
1 Terminal Markings Inspection
2 Measure Insulation Resistance between windings and to earth with 2500V
Meg-ohmmeter under room temperature
3 Measure partial discharge, the pre-applied voltage is 0.8U (Inductive voltage),
measure voltage is 1.2xUm/ 3 kV .( URated Power Frequency Withstand Voltage)
4 Measure dielectric dissipation factortanof product and supporting structure, test
voltage is 10kV, the temperature is between 10 and 30.
5 Measure D.C. resistance of windings.
6 Measure no load current and loss.
7 Determined of error measurement, as per ex-work test reports.(Qualification of
Certificate)
8 Rules of Oil inspection and sampling, oil drain
The products are full enclosed structure, it should be kept the original sealed state, if
sampling, and it should be operated by Oil Drain Valve Operation Instruction.
After oil drain, it should be refilled the equivalent oil as per values in the below table
according to Bellow Installation and Operation Instruction.
Electric Power System Rated Voltage, kV
220
66110
tan(1kV)
0.0025
0.0015
Electric Strength, kV
55
60
Moisture Content
15
10
Air Content
1.0
1.0
Others
Sr.
No.
Test Items
Parameters on Nameplate
3
4
5
6
Requirements
Whether meeting the
operation Conditions or
not
Tight Strength
Tight Enough
Tight Strength
Tight Enough
NO
Oil Level
Porcelain
Yes
Corresponding Ambient
Temperature
No
Pollution or not on
Porcelain
Rainwater Entry or not
Oil Leakage or not
Earthed terminal N
Secondary Winding
Terminal
No
No
No
Reliable Earthed
None short-circuit
1
2
3
4
Test Items
Operation Performance
Meter Indication
Noise or Vibration
Core Noise, Discharge Noise
Smell
Without Abnormal Smell
Oil Level Indication
Oil Level
Requirements
Without Abnormal Phenomena
None
None
Corresponding Ambient Temperature
1
2
3
4
5
Test Items
Operation Performance
Meter Indication
Noise or Vibration
Core Noise, Discharge Noise
Smell
Without Abnormal Smell
Oil Level Meter
Oil Level
Rust
Oil Leakage
Appearance
Crack or not on Porcelain
Pollution or not on Porcelain
Requirements
Without Abnormal Phenomena
None
None
Corresponding Ambient Temperature
None
None
None
None
Test Items
Parameters on Nameplate
3
4
5
Porcelain
Requirements
Yes
Tight Strength
Tight Enough
Tight Strength
Tight Enough
NO
Oil Level
Crack or not on Porcelain
Pollution or not on Porcelain
Rainwater Entry or not
Oil Leakage or not
Insulation Resistance
Corresponding Ambient
Temperature
No
No
No
No
Between secondary
windings and to
earth500M
Special Terminal CT to
Earth
500M
8
Partial Discharge
Sr.
No.
Test Items
9
10
Requirements
Dielectric Loss
Meet the
Nation Standard
Abnormal Current
Indication
Test Items
Inner Failure
Partial Discharge
or Breakdown
Ratio
Measurement
Inspection
Load
Measure the
Insulation
Resistance
False Connection
Secondary is
open-circuit
Relay Protection
Actions
Oil Leakage
Rust and
Corrosion
Crack on
Porcelain
Insulation
Resistance Fell
down
(Reasons)
Configure the
Oil Leakage
Volume
Observe
Contact Us
Correct the
Connection
Line Connection
loose even break
open
Repair the
Failure Point
Over Load
Abnormal
Expand of
Bellow
Stop operation
and
Contact Us
aging and
corrosion on
sealed parts
Contact Us
Environment
Inspection
Resolution
Due to Outside
Force(Seism, Fly Stone)
Pollution or Moisture on
Circuit
Restart to paint
Contact Us
Wipe off the
pollution and Dry, if
doesnt work,
please contact us
9 Order Notice
When order, please specify the Product Type, Rated Ratio, Accuracy Class, Rated Output
8
and so on.
10 Ex-work Documents
1Packing List
2Certification of Qualification (Including Ex-work Test Report)
3Installation and Operation Instruction
4Bellow User Manual
5Oil Drain Valve User Manual