Table of Contents
1.
General............................................................................................................................... 4
2.
Scope of Work.................................................................................................................... 4
3.
Location.............................................................................................................................. 4
4.
Resources........................................................................................................................... 5
5.
Time Programme................................................................................................................ 7
6.
7.
8.
Environmental Plan........................................................................................................... 10
9.
Safety Plan........................................................................................................................ 11
10.
Reference......................................................................................................................... 12
Appendix A.13
Appendix B.14
PAGE2/ 11
PAGE3/ 11
1. General
Slab (plate) is a horizontal structural element which serves to channel dead load and live load to
the vertical supporting frame structure of a system. The horizontal elements can be made to
work in one direction or the work of two mutually perpendicular directions (biaxial).
Ground slabs are those slabs that are poured directly into excavated trenches in the ground.
They rely entirely on the existing ground for support. The ground (more correctly known in the
industry as the foundation) must be strong enough to support the concrete slab.
This document is describing general part of the method for Ground Slab work. This document
includes the scope of work, location, resources, schedule, work method, environmental plan,
and safety plan.
2. Scope of Work
The scopes of work are stated as follows;
-
Rebar Installation
Concreting
Curing
3. Location
4. Method for Work
PAGE4/ 11
No
No
No
Yes
PAGE5/ 11
6.1.1
Start
Create Schedule
Mobilization
No
Yes
Pouring Concrete
Material
On Site
Check
- Slump
- Technical Data
- Delivery Time
- Temperature
Ret
Finish
PAGE6/ 11
Make sure installation for additional equipment and check on the position
PAGE7/ 11
Curing need to prevent concrete lose moisture content rapidly. Curing method for this
project is covering concrete by wet blanket sheet.
5. Inspection and Test Plan
Inspection and Test Plan is referred to TCI-TWJO-ITP-SLB-XXXX
6. Environmental Plan
TCI will consider for environmental impact during construction. The consents of
environmental plan on this activity are as follows:
a) Dust Control
The possible treatment on dust control is including:
- Watering the working area regularly during the activity.
-
b) Noise
The control of noise instrument will be applied around working area to control the noise
always keep on tolerance.
7. Safety Plan
Safety is important things that shall be enforced during Ground Slab work activity. The
relevant safety procedure will be applied during this work.
The safety plan that will be applied is including:
a. Access Road
PAGE8/ 11
TCI will provide a safety access road for heavy equipment passing and cross, a
boundary line will be carry out around the access road to Area.
b. Job Safety and Analysis (JSA), Permit To Work and Toolbox Talk Agenda,
explain :
-
Job Step
Hazard Identified
Controls Required
PIC
f.
Safety Facilities
PAGE9/ 11
TCI will provide safety facilities at working area. The safety facilities including: traffic
sign, barricade, lamp, PPE accessories (gloves, glasses etc.), shelter, toilet etc.
g. Safety Scaffolding
TCI will provide scaffolders by certificated personnel to ensure and check the scaffolding
is safe to be used. Safety chief Scaffolder will be tagging the scaffolding with two color
(red tag and green tag). Red tag mean the scaffolding need more repair for support and
strengthnes , and green tag is mean the scaffolding are ready and safe to be used.
Prior to the commencement of this work, Safety Officer will conduct safety instruction to all
workers and other relevant project staff to keep working on safe condition. Safety Officer
also will always monitor during this work carried out to prevent unsafe action and unsafe
condition during this work.