You are on page 1of 17

Data Sheet Test Pack TP-RW-PIP-ST-011

Unit

Sheet:

1 of 1

System No.

44

System Name

44-PRODUCED WATER TREATMENT

Test Pack Description

TP-RW-PIP-ST-011

Location

RAWA STATION

Service

STATION

Piping Class

Design Pressure

Design Temperature

Flushing Outlet

Rupture Disk

Flushing Medium

Water

Air

Air + Nitrogen

Flushing Temperature

Water

Air

Air + Nitrogen

O
P

Test Medium

Duration of Test

Item Description:

150
Quick opening valve

N/A

barg
psig
minute

Iso Drawing No.


ID-N-RW-LL0-ISO-ST-4A-0054

740

Test Pressure

No.

AA2
psig

Line No.
2"-VA-BA2-4A-0594

DESIGNATION

1110.0
60

Sheet No. Spool No.


All

DATE

P&ID No.

Pipe Support No.

ID-N-RW-PP0-PID-ST-44-0002

REVISION

STATUS

See DWG ISO 054

PREPARED

CHECKED

APPROVED

COMPANY

PIPING COMPLETION TEST SHEET

PIPING FLUSHING

TEST PACKAGE NO.

: TP-RW-PIP-ST-011

FORM

: -

DESCRIPTION

LOCATION

: RAWA STATION

MCL. 06 PIPING FLUSHING


REQUEST TO FLUSH DATE

PERMISSION

NAME

FLUSH DATE

FLUSHING MEDIUM

TO FLUSH

DATE

FLUSH DURATION

FLUSHING FLOW

FLUSHING MEDIUM TEMPERATURE

PIPE WORK INDEX


LINE No.

SPOOL No.

PID No.

REMARKS

REMARKS :

DATE
Carried out by
PERFORMED BY.

ACCEPTED BY.

APPROVED BY. PROJECT

NAME

SIGNATURE

REMARKS

SIGNATURE

INSPECTION REPORT
PROJECT NO. : #REF!

DRYING RECORD
LINE No.

SERVICE LINE

No.

FLUSHING
START

FINISH

PRESSURE (PSIG)

REPORT NO.

: #REF!

DATE

SHEET NO.

: 1 of 1

INSPECTION RESULT
REJECTED

ACCEPTED

REMARKS

NOTE :

Performed BY
PT.Shafindo Energi

Accepted BY
PT. Shaftindo Energi

APPROVED BY
CONOCOPHILLIPS

DATE :

DATE : .

DATE : ..

INSPECTION REPORT
PROJECT NO. :

FLUSHING RECORD
LINE No.

SERVICE LINE

No.

FLUSHING
START

FINISH

PRESSURE (PSIG)

DATE

SHEET NO.

: 1 of 1

INSPECTION RESULT
REJECTED

#REF!

REPORT NO.

ACCEPTED

REMARKS

NOTE :

Performed BY
PT.Shafindo Energi

Accepted BY
PT. Shaftindo Energi

APPROVED BY
CONOCOPHILLIPS

DATE :

DATE : .

DATE : ..

PIPING COMPLETION TEST SHEET PIPEWORK


REINSTATMENT
TEST PACKAGE NO.

: TP-RW-PIP-ST-011

FORM

:-

DESCRIPTION

: #REF!

LOCATION

: RAWA STATION

MCL. 04 PIPING WORK DRYING REPORT


DATA
DRYING DATE

PERMISSION TO DRY

MEDIUM

NAME

MEDIUM TEMPREATURE

DATE

PRESSURE

PIPEWORK INDEX
LINE NO.

SPOOL NO.

PID.NO.

REMARKS

TEST RESUTS AND COMMENTS

DATE
Carried out by

NAME

SIGNATURE

PERFORMED BY.
ACCEPTED BY.
APPROVED BY. PROJECT

RAWA STATION

REMARKS

SIGNATURE

PIPING COMPLETION CHECK SHEET

FLANGE JOINT COMPLETION


CERTIFICATE
TEST PACKAGE NO.

: TP-RW-PIP-ST-011

FORM

:-

DESCRIPTION

: ###

LOCATION

: RAWA STATION

MCL. 09 FLANGE JOINT COMPLETION CERTIFICATE


PID No

Line No

Certificate No. :
Customer :
Contact Name :
Contact No. :
Date :
Engineer :

#REF!

Joint Identification
#REF!
SIZE 1

SIZE 2

SIZE 3

SIZE 4

Flange Type :
Flange Size (Inches) :

#REF!

Flange Class :

#REF!

Gasket Type :

#REF!

Bolt Size :
No of Bolts :
Bolt Material :
Lubricant :
Tool model :
Pump Pressure (Psi) :

#REF!

Bolt stress :
Bolt load :

#REF!

Torque value :
Number of Flanges :
#REF!
#REF!

#REF!

Tool Model

Serial Number

#REF!
#REF!

#REF!
Note :

EQUIPMENT INFORMATION
Pump Type

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!
COMMENTS

The bolt stress and Bolt load values are approved by Client

DATE
Carried out by
PERFORMED BY.

ACCEPTED BY.

NAME

SIGNATURE

APPROVED BY. PROJECT

SIZE 4

Serial Number

SIGNATURE

You might also like