Anyone requesting Engineering work MUST first complete the sections highlighted 1-7 section before an engineer can be
assigned. No sections can be deleted from this document.
Please remove any highlighting/mandatory notes before submitting to CDA.
Name
OKEWALE OLULEKE
Revision Description
24/08/2012
Date
Notes
mm-dd-YY
CHECK LIST
Mandatory
Item
Finish
Subject Matters
Please place an X next to each category covered by this design. Your design will not be reviewed unless this section is completed
correctly.
2/18
Ecobank Confidential
Unified Comms
International WAN Routers
In-country WAN routers
LAN routers
Systems/Applications
Monitoring Systems
MQ Series
Oracle DB
Microsoft SQL
MQ Series
SWIFT
Rapid Trade
Intellect
Siron_AML Suite
Flexcube SAP (BFC)
Interface
Security
X
X
x
X
X
X
Firewalls
IDS
TACACS Servers
EPO
Proxy/ISA
X
X
X
X
x
Distributed Infrastructure
File/Print Servers
Active Directory
MS Exchange
X
X
X
CONTENTS
PROJECT SCOPE.................................................................................................5
DELIVERABLES..................................................................................................6
PROJECT ASSUMPTIONS....................................................................................7
a.
PROJECT RISKS.................................................................................................8
3/18
Ecobank Confidential
Implementation Risks............................................................................................8
STREAMS REQUIRED..........................................................................................9
PROJECT JUSTIFICATION..................................................................................9
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Current architecture.......................................................................................12
Functional Specification..................................................................................14
Current configuration.....................................................................................14
Proposed Solution architecture........................................................................14
Proposed Configuration..................................................................................15
Bill of Materials..............................................................................................15
Maintenance and Support...............................................................................15
Contact Information.......................................................................................15
CONTINGENCY DR IMPACT...........................................................................15
TESTING OVERVIEW........................................................................................16
10 QUALITY REVIEW............................................................................................16
11 IMPLEMENTATION PLAN..................................................................................16
12 COST AND SCHEDULE ESTIMATE......................................................................17
APPENDIX A - LEVEL 3 COST AND SCHEDULE ESTIMATE APPROVAL......................18
APPENDIX B: VALIDATION SUMMARY...................................................................18
4/18
Ecobank Confidential
Sponsoring Business:
Business Area:
Business Contact:
Cost Code for charges
Project Code:
GROUP CFO
GROUP FINANCE
SOSTHENE GOUTHON
N/A
N/A
1 Project Scope
Give a high-level account of the scope including the customers or countries impacted,
related products, other systems affected (from interfaces to system decommission), and any
processes and procedures that will be affected. Also consider what is explicitly out of scope.
Collateral Management Database Module is a platform where users input the details
of all collaterals used as security for customer loan facilities. It is to serve as a
database management tool for maintaining collateral details.
The module will enhance the tracking of collateral status with ease, generation of
regulatory/compliance Reports for (both internal and external) which would reduce
the turnaround time to perform the task. The operational risk involved can also be
monitored adequately so as to reduce the probability of loss for the Bank.
The main users of these modules are Availment & Documentation Unit Officers of Risk
Management, Loan Monitoring Unit Officers of Risk Management Department, Legal &
Regulatory Unit Officers, Internal Controller (assigned to the various departments)
and Internal Audit Officers.
2 Deliverables
What must be delivered by this project? Be as specific as possible and break the problem
down into its component parts. You should be able to use bullet points to complete this
section.
1. Customer-Facility (ies) Capturing.
2. Attachment of Collaterals\Security (ies) to facilities.
3. Periodic Valuation of Facilities.
4. Report Generation
5. Activity Monitoring and Audit Trail
Deliverable
Customer Registration Platform
Description
T
5/18
Ecobank Confidential
Project Assumptions
Describe any assumptions that affect the business case analysis. This could include
assumptions concerning projected business growth, new product rollout, economies of scale
for centralization, replacement of a high maintenance existing system, data center cost
reductions, number of users, resource availability etc. Use bullet points to record these
assumptions.
a. Key Implementation Assumptions
Facilities are pre-booked in the Core Banking Applications before being setup on
the Collateral Management Module
6/18
Ecobank Confidential
4 Project Risks
Describe critical risks identified up through the Design Phase of the project. Summarize
current status of critical risks including progress on mitigation actions and contingency and
containment plans. Consider your assumptions when doing this. Each assumption is likely to
describe a risk associated with the project. Remember that a project can introduce risks to
the organization as well as have risks that it will not be completed on time, to budget and to
the requirements of the Business.
A
Implementation Risks
During the Project, issues will occur, which will be outside the boundaries of
the Project teams to be able to resolve. The procedure described below will be
used to address these problems to enable the development process to
continue.
Record Risk and Issue Details
Any team member may raise an issue or discover a risk and get it
added to the Issue Register as it arises. (From here on, risks and issues
are referred as issues)
Approval Risk
Delay in obtaining necessary approvals will affect the delivery date e.g. CDA,
Change, Setup of Test/Live environments
Security Risk
Administrative control
Management of Users
Audit log management and storage
Detailed logging of all context based activity
High availability requirements
Clustering of Web Server
Backup and possible restore to be managed by the database team on a
periodic basis
Configuration management to be handled by an independent
deployment team in conjunction with control based on set polices.
Password management managed by Active Directory
Link Risk
Link Stability
Error Rate
Transaction Integrity built into the Data Extraction Service and to effectively
manage transaction processing issues Interface Risk
CDA Template Version 0.1
7/18
Ecobank Confidential
Risk Description
Impact
(High
Medium
Low)
Responsible
Resource
Mitigation Strategy
Streams Required
List here the streams or technical groups that need to be involved in this project. List all
groups that will need to commit resources to the project.
eProcess
Software
Development
(Lagos)
Ecobank Nigeria
Risk Management
Affiliate
(Nigeria)
Control
Internal Control
(Nigeria)
Legal
CBA Team(Accra)
Project Justification
Why does this project exist to make money, to save money or to achieve compliance?
Quantify your justification.
Two key objectives of this project are:
1. To enable management have Realtime online access to financial information by
directly interfacing SAP-BFC to Flexcube.
2. To improve Turn-Around-Time in the submission of financial reports by the various
affiliates to the group
s/n
Task Description
Dependenc
y
A.
Environment Preparation
1.
8/18
Responsibility
Timeline
eProcess Accra
Aug. 27-31
Ecobank Confidential
s/n
Task Description
Dependenc
y
Responsibility
Timeline
(Seun)
2.
eProcess Accra
(Seun)
Aug. 27-31
3.
eProcess Accra
(Seun)
Aug. 27-31
4.
eProcess Accra
(Seun)
Aug. 27-31
5.
eProcess
Lagos(Olumide)
Aug. 31
6.
eProcess Accra
(Seun)
Aug. 27-31
7.
Sosthene
Aug. 29
B.
1.
A7
eProcess Accra
(Seun)
Sept. 3
2.
A7
eProcess Accra
(Seun)
Sept. 3
12.
Cost Allocation
A7
eProcess Accra
(Seun)
Sept. 3
C.
1.
A1-A7
eProcess
Lagos(Melvin)
Sept. 15
2.
Notification Service
A1-A7
eProcess
Lagos(Olumide)
Sept. 15
3.
A1-A7
eProcess
Lagos(Olumide)
Sept. 15
4.
A1-A7
eProcess
Lagos(Sunday)
Sept. 15
5.
A1-A7
eProcess
Lagos(Sunday)
Sept. 15
D.
9/18
A5
Ecobank Confidential
s/n
Task Description
Dependenc
y
Responsibility
Timeline
1.
C1-C4
eProcess
Lagos(Akin)
Sept. 20
2.
C1-C4
eProcess
Lagos(Akin)
Sept. 2024
3.
C1-C4
eProcess
Lagos(Akin)
Sept. 24
E.
Deployment to Production
1.
A1-A7, C1C4
eProcess Lagos
Sept. 27
2.
A1-A7, C1C4
eProcess Lagos
Sept. 28
3.
A1-A7, C1C4
eProcess Lagos
Sept. 28
4.
A1-A7, C1C4
eProcess Accra
Sept. 27
5.
A1-A7, C1C4
eProcess Accra
Sept. 27
F.
Approvals
1.
A1-A7
eProcess
Lagos(Akin/Obi
oma)
Sept. 27
2.
A1-A7
eProcess
Lagos(Akin/Obi
oma)
Sept. 27
3.
A1-A7
eProcess
Lagos/Accra
Sept. 5
4.
A1-A7
eProcess
Accra(Seun)
Sept. 5
5.
A1-A7
eProcess
Accra(Seun)
Sept. 5
6.
A1-A7
eProcess
Accra(Seun)
Sept. 5
10/18
Ecobank Confidential
Current architecture
Architecture: System
Layer Architecture
11/18
Ecobank Confidential
12/18
Ecobank Confidential
13/18
Ecobank Confidential
8.2
Functional Specification
Find attached the functional specification document (Functional Requirement BASIS.docx). This document is not final.
8.3
N/A
Current configuration.
8.4
14/18
Ecobank Confidential
8.5
Proposed Configuration
Memory
Processor
System Type
Operating System
Disk Space
Installation
Data Sizing and
Storage
32GB
Intel Xeon X5690 @3.47GHz 3.46GHz (2
processors)
64-bit Operating System
Windows 2008 Enterprise Server
Volume 1(C:) - 136GB and Volume 2(E:)-1.36TB
User should have adequate right to install application
and components
2TB
8.6
Bill of Materials
N/A (depending on the providers on each affiliate)
<INSERT A SPREADSHEET CONTAINING BILL OF MATERIALS. Include all new
equipment even if sourced from stock, also include software versions to be run on
the devices.>
8.7
8.8
Contact Information
Building Code:
Project Manager Contact:
Olumide Oteniya / Melvin Okoli / Obioma Onwuasoanya
Site Contact: eProcess Lagos (Ade Okeowo)
8 Contingency DR Impact
Summary of any network contingency incorporated into the design.
A backup server for the solution will be located at the group office in Accra.
Testing overview
15/18
Ecobank Confidential
Use this section to give an overview of the entire project testing process. The same
detail should be applied as per change control record.
Each test plan should be detailed referencing its change control record.
A test plan should contain planned objectives and listing commands required to
validate objectives.
The test will cover Functional or Non-Functional. Testing process includes:
User Interface Testing
User Acceptance Testing
Integration Testing
The
10 Quality Review
Give details of CDA reference here. Quote date of CDA review and approval.
11 Implementation Plan
Detail change control records and associated dates.
Include Migration Details (these can be included on the change control record
Description: Section 7 Tasks).
16/18
Ecobank Confidential
12
Items
Licenses
Implementation
fees + training
Servers (Live +
Backup)
Model
QTY
Budget($)
Comments
Memory: 32GB
Processor: Intel
Xeon X5690
@3.47GHz
3.46GHz (2
processors)
System Type: 64bit Operating
System
Operating
System: Windows
2008 Enterprise
Server
Disk Space:
Volume 1(C:) 136GB and Volume
2(E:)-1.36TB
Installation: User
should have
adequate right to
install application
and components
Data Sizing and
Storage: 2TB
0.00
eProcess Accra(Seun) to
provide
Total cost
17/18
Ecobank Confidential
18/18
Ecobank Confidential