RDHG1WO/00133/16-17
Client :
Contractor:
FRONT TECH
Dated:
10/05/2016
Dated:
25/07/2016
KOLKATA-700033
West Bengal, India
Contact Person :
Phone No.
E-mail:
Vat No. 19875878024
PAN No. AJHPK9256E
Service Tax No.AJHPK9256EST001
ESI No.
PF No.:
Quotation Ref No. :
Date :
Project :
Sub Project :
Location :
TOM BATA AVENUE (New Bata Road) HOLDING NO. 1, BATA NAGAR, MAHESHTALA
Type of Work:
In accordance with the technical specification(s)/ item(s) description/ scope of job &/or service, commercial Terms mentioned hereinunder you are requested to commence the work
&/or provide service described herein.
SALIENT FEATURES
Work Description :
Start Date :
09/05/2016
End Date :
31/03/2017
RETENTIONS
Retention Money
5.00
After
TAX DETAILS
(a) Tax Additions
Tax Category
Service Tax
Tax
Tax Type
Tax Amount
(Service Tax@14% = 526149.87
SBC Tax@0.5% = 18791.07
KKC Tax@0.5% = 18791.07)
563732.00
15.00
Exclusive
70.00
VAT
0.00
Exclusive
100.00
0.00
VAT 2
0.00
Exclusive
100.00
0.00
Total :
Tax Category
563,732.00
Tax Percentage
TDS
1.00 %
Stax Deduction
50.00 %
WCT
3.00 %
Page 1 of 12
BOQ DETAILS
SL. NO.
Work Description
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
2b.10
CUM
28.66
5742.00
164,565.72
2b.11
CUM
20.06
5800.00
116,348.00
STRUCTURE
1
1.1
1.2
1.3
1.4
2
2.1
BRICK WORK
250 MM THICK BRICKWORK CEMENT MORTAR
(1:6)
ALL CHARGES FOR 250 MM THICK BRICKWORK BY
HANDLING CLAY BRICK AT ALL HEIGHT / LEVEL &
ALL LOCATION USING CEMENT MORTAR (1:6)
RATIO BY USING CONTACTORS OWN TOOLS &
TACKLES, CURING, AND SOAKING THE BRICKS AT
LEAST FOR 24 HOURS BEFORE USE ETC.
INCLUDING V GROOVE JOINTING ON BOTH FACES
COMPLETE AS PER DRAWING , SPECIFICATION
AND THE DIRECTION OF EIC AT ALL LEAD FROM
ANY POINT TO ANY POINT INSIDE THE SITE IN ALL
STRUCTURES SUCH AS WALLS / PILLARS / STUB /
SUPPORTS /DRAINS ETC.COMPLETE IN ALL
RESPECT INCLUDING NECESSARY SCAFOLDING &
STAGING (ONLY CEMENT , SHALL BE SUPPLIED BY
CLIENT FREE OF COST AT GROUND LEVEL)
200 MM THICK BRICKWORK CEMENT MORTAR
(1:6)
ALL CHARGES FOR 200 MM THICK BRICKWORK BY
HANDLING CLAY BRICK AT ALL HEIGHT / LEVEL &
ALL LOCATION USING CEMENT MORTAR (1:6)
RATIO BY USING CONTACTORS OWN TOOLS &
TACKLES, CURING, AND SOAKING THE BRICKS AT
LEAST FOR 24 HOURS BEFORE USE ETC.
INCLUDING VGROOVE JOINTING ON BOTH FACES
COMPLETE AS PER DRAWING , SPECIFICATION
AND THE DIRECTION OF EIC AT ALL LEAD FROM
ANY POINT TO ANY POINT INSIDE THE SITE IN ALL
STRUCTURES SUCH AS WALLS / PILLARS / STUB /
SUPPORTS /DRAINS ETC.COMPLETE IN ALL
RESPECT INCLUDING NECESSARY SCAFOLDING &
STAGING (ONLY CEMENT , SHALL BE SUPPLIED BY
CLIENT FREE OF COST AT GROUND LEVEL)
125 MM MASONRY IN CM (1:4)
125 MM MASONRY IN CM (1:4) RATIO BY CLAY
BRICK MASONRY AT ALL LEVELS INCLUDING
APPROVED CHICKEN WIRE MESH AT EVERY 4TH
LAYER, CLEANING AND SOAKING THE BRICK OR
BLOCKS AT LEAST FOR 24 HOURS ,
SCAFFOLDING, STAGING, ALL LEADS AND LIFTS
FROM ANY POINT TO ANY POINT SIDE THE SITE
IN ALL STRUCTURES SUCH AS WALLS / PILLARS /
STUB / SUPPORTS / DRAINS ETC. AS PER
DRAWING AND SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER - IN- CHARGE.
(ONLY CEMENT SHALL BE SUPPLIED FREE OF
COST AT GROUND LEVEL)
75 MM MASONRY IN CM (1:4)
75 MM MASONRY IN CM (1:4) RATIO BY CLAY
BRICK MASONRY AT ALL LEVELS INCLUDING
APPROVED CHICKEN WIRE MESH AT EVERY 3rd
LAYER,AND 2 NOS 8MM DIA REINFORCEMENT
BAR(TIED WITH BINDING WIRE & SPACER BAR)
HORIZONTALLY AT EVERY 1 M INTERVAL.
INCLUDING CLEANING AND SOAKING THE BRICK
OR BLOCKS AT LEAST FOR 24 HOURS ,
SCAFFOLDING, STAGING, ALL LEADS AND LIFTS
FROM ANY POINT TO ANY POINT SIDE THE SITE
IN ALL STRUCTURES SUCH AS WALLS / PILLARS /
STUB / SUPPORTS / DRAINS ETC. AS PER
DRAWING AND SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER - IN- CHARGE.
(ONLY CEMENT,REINFORCEMENT SHALL BE
SUPPLIED FREE OF COST AT GROUND LEVEL)
STRUCTURE
2b.12
2b.13
791.00
SQM
SQM
3.78
565.00
2,135.70
SQM
150.00
Page 2 of 12
BOQ DETAILS
SL. NO.
2.2
2.3
3
3.1
3.2
Work Description
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
135.00
SQM
SQM
1,820.76
235.00
427,878.60
FLOORING
COUNTER
CLADDING
SQM
4,964.86
350.00
1,737,701.00
FLOORING
COUNTER
CLADDING
SQM
963.90
335.00
322,906.50
Page 3 of 12
BOQ DETAILS
SL. NO.
3.3
3.4
3.5
3.6
Work Description
HEIGHTS OVER A CEMENT MORTER (1:4) BED OF
15 MM THICKNESS INCLUDING CUTTING
WHEREVER REQUIRED, MAKING HOLE FOR
TRAPS, PIPES, COMODE & ELECTRIC BOX,
CLADDING, COPLA, V GROOVE CUTTING (WITH
MOULDING) , POINTING WITH PIGMENTS OF
MATCHING COLOUR INCLUDING CLEANING,
CURING, TOOLS COMPLETE IN ALL RESPECT AS
PER DRAWING AND SPECIFICATIONS AND AS D I
R E C T E D & T O T H E SATISFACTION OF THE
PROJECT MANAGER (INCLUDING ALL BUT
EXCLUDING THE COST OF CEMENT & TILES TO BE
ISSUED BY CLIENT )
VITRIFIED TILES SKIRTING_ OVER CEMENT
MORTER ( 1:4 )
HANDLING, LIFTING & FIXING OF VITRIFIED TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR (100MM HIGH) SKIRTING FOR ALL FLOOR AT
ALL LEVELS & HEIGHTS OVER A CEMENT MORTER
( 1:4 ) BED INCLUDING CUTTING WHEREVER
REQUIRED, MAKING HOLE FOR TRAPS, PIPES,
COMODE & ELECTRIC BOX, CLADDING, COPLA, V
GROOVE CUTTING (WITH MOULDING) , POINTING
WITH PIGMENTS OF MATCHING COLOUR
INCLUDING CLEANING, CURING, TOOLS
COMPLETE IN ALL RESPECT AS PER DRAWING
AND SPECIFICATIONS AND AS DIRECTED AND TO
THE SATISFACTION OF PROJECT MANAGER
(INCLUDING ALL BUT EXCLUDING THE COST OF
TILES AND CEMENT TO BE ISSUED BY CLIENT ).
CERAMIC TILES ALL FLOOR _CEMENT MORTAR
( 1:4)
HANDLING, LIFTING & FIXING OF CERAMIC TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR ALL FLOOR AT ALL LEVELS & HEIGHTS OVER
A CEMENT MORTAR (1:4) BED OF 15 MM
THICKNESS INCLUDING CUTTING , LAYING SLOPE
WHEREEVER REQUIRED , MAKING
RECESSES/DROPS AT THE SHOWER AREA,
MAKING HOLE FOR TRAPS, PIPES, COMODE &
ELECTRIC BOX, CLADDING, COPLA, V GROOVE
CUTTING AT CORNERS , JOINT FILLING WITH
WHITE CEMENT MIXED WITH PIGMENTS OF
MATCHING COLOUR INCLUDING CLEANING,
CURING, TOOLS COMPLETE IN ALL RESPECT.
(INCLUDING ALL BUT EXCLUDING THE COST OF
CEMENT & TILES TO BE ISSUED BY CLIENT )
CERAMIC TILES FOR SKIRTING _CEMENT
MORTAR
HANDLING, LIFTING & FIXING OF CERAMIC TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR SKIRTING (100MM HIGH) FOR ALL FLOOR AT
ALL LEVELS & HEIGHTS OVER A CEMENT MORTAR
(1:4) BED INCLUDING CUTTING WHEREEVER
REQUIRED, MAKING HOLE FOR TRAPS, PIPES,
COMODE & ELECTRIC BOX, CLADDING, COPLA, V
GROOVE CUTTING (WITH MOULDING), POINTING
WITH PIGMENTS OF MATCHING COLOUR
INCLUDING CLEANING, CURING, TOOLS
COMPLETE IN ALL RESPECT AS PER DRAWING
AND SPECIFICATIONS AND AS DIRECTED AND TO
THE SATISFACTION OF PROJECT MANAGER
(INCLUDING ALL BUT EXCLUDING THE COST OF
GREY CEMENT & TILES TO BE ISSUED BY CLIENT )
ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN FLOOR ,DECK, RAMP
CHARGES FOR PROVIDING AND LAYING 40MM
THICK ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN FLOOR, DECK, RAMP OR AT ANY
OTHER PLACE WITH CEMENT CONCRETE OF 1:2:4
WITH STONE CHIPS LAID IN PANELS USING GLASS
STRIPS OF 25MM X 3MM ( AREA NOT EXCEEDING
1.0 SQM PER PANEL ) OR AS DIRECTED WITH 3MM
THICK TOPPING MADE WITH ORDINARY CEMENT
INCLUDING SMOOTH FINISHING, AND ROUNDING
OFF CORNERS AND INCLUDING APPLICATION OF
CEMENT SLURRY BEFORE FLOORING WORK
USING CEMENT @ 1.75 KG PER SQM ETC.ALL
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
3b.15
FLOORING
COUNTER
CLADDING
RMT
932.40
59.00
55,011.60
3b.16
FLOORING
COUNTER
CLADDING
SQM
7,970.40
325.00
2,590,380.00
3b.17
FLOORING
COUNTER
CLADDING
RMT
8,292.66
59.00
489,266.94
3b.18
FLOORING
COUNTER
CLADDING
SQM
406.40
300.00
121,920.00
Page 4 of 12
BOQ DETAILS
SL. NO.
3.7
3.8
3.9
3.10
Work Description
COMPLETE AS PER THE DIRECTION OF THE
PROJECT MANAGER. (ONLY CEMENT WILL BE
SUPPLIED BY CLIENT AND REST ALL MATERIAL BY
CONTRACTOR)
ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN STAIRCASE
CHARGES FOR PROVIDING AND LAYING 40MM
THICK ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN STAIRCASE ( TRADE, RISER,
LANDING ) AT ALL LEVEL WITH CEMENT
CONCRETE OF 1:2:4 WITH STONE CHIPS LAID IN
PANELS USING GLASS STRIPS OF 25MM X 3MM
( AREA NOT EXCEEDING 1.0 SQM PER PANEL ) OR
AS DIRECTED WITH 3MM THICK TOPPING MADE
WITH ORDINARY CEMENT INCLUDING SMOOTH
FINISHING, AND ROUNDING OFF CORNERS AND
INCLUDING APPLICATION OF CEMENT SLURRY
BEFORE FLOORING WORK USING CEMENT @ 1.75
KG PER SQM ETC.ALL COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER. (ONLY
CEMENT WILL BE SUPPLIED BY CLIENT AND REST
ALL MATERIAL BY CONTRACTOR)
KITCHEN COUNTER OF CUDAPPA SLAB
HANDLING, LIFTING, CUTTING AND LAYING /
FIXING PRE-POLISHED CUDDAPA SLAB OVER
VERTICAL STONE SLAB SUPPORT AS PER
APPROVED DRAWING AT ALL LEVELS & HEIGHTS,
BY GROOVE CUTTING IN BRICK MASONARY ,
INSERTING CUDAPPAH MIN. 1" BOTH OR AS
MENTIONED IN DRAWING TO WALL AS WELL AS
FLOOOR, JAMMING BY CEMENT MORTAR &
FIXING BY ARALDITE ON THE TOP EDGE OF THE
CUDAPPAH STONE, FINISHED TO ALL SHAPES
(CURVED OR STRAIGHT), MAKING HOLE FOR
TRAPS, PIPES, ELECTRIC BOX, CUTTING
OPENINGS FOR KITCHEN SINK, CLADDING,
COPLA, V GROOVE CUTTING (WITH MOULDING) &
POLISHING AND FILLING THE PAPER JOINTS WITH
MATCHING COLOUR PIGMENT, CURING ETC AS
PER DRAWINGS, SPECIFICATIONS DIRECTION &
SATISFACTION OF THE PROJECT MANAGER ( I N
C L U D I N G A L L B U T EXCLUDING THE COST
OF CUDAPPA AND GREY CEMENT TO BE
SUPPLIED BY CLIENT ). PAYMENT SHALL BE MADE
AS PER PLAN AREA OF SLAB.
LIFT FACIA AT CORRIDOR
HANDLING, LIFTING AND LAYING/FIXING GRANITE
(OF APPROVED SHADE) AT ALL LEVELS & HEIGHTS
ON VERTICAL SURFACE OF LIFT FACIA AT
CORRIDOR OVER CEMENT MORTER (CM 1:3) OF
25MM THICK, WITH A UNIFORM LAYER OF
ARALDITE AND POP ON TOP OF GRANITE FOR
HOLDING TILL ARALDITE DRIES, FINISHED TO ALL
SHAPES (CURVED OR STRAIGHT) MAKING HOLES,
CLADDING, COPLA, V GROOVE CUTTING (WITH
MOULDING) & POLISHING AND FILLING THE PAPER
JOINTS WITH MATCHING COLOUR PIGMENT, AS
PER DRAWINGS, SPECIFICATIONS, DIRECTION &
TO THE SATISFACTION OF THE PROJECT
MANAGER (INCLUDING ALL BUT EXCLUDING THE
COST OF GRANITE / STONE & GREY CEMENT TO
BE SUPPLIED BY CLIENT ).
PROVIDING & LAYING SCREED CONCRETE 1:2:4
ALL CHARGES FOR PROVIDING & LAYING SCREED
CONCRETE WITH CEMENT CONCRETE NOMINAL
MIX 1:2:4 OF SPECIFIED THICKNESS (AS
MENTIONED IN DRAWING) WITH ONE LAYER OF
CHICKEN WIRE MESH AT ALL HEIGHT & DEPTH
INCLUDING OF ALL MATERIALS, LABOURS,
PREPARATION OF SURFACE, CLEANING AND
MAINTANING PROPER SLOPE , NECESSARY
FINISHING ( TROWEL FINISH OR ROUGH FINISH
AS PER REQUIREMENT ), CURING ETC. ALL
NECESSARY WORK COMPLETE IN ALL RESPECT
AS PER DRAWING AND DIRECTION OF EIC. THE
RATE IS INCLUSIVE OF ALL LEAD AND LIFTS.
(ONLY CEMENT SHALL BE PROVIDED BY CLIENT).
FINISHING
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
3b.19
FLOORING
COUNTER
CLADDING
SQM
1,209.60
350.00
423,360.00
3b.20
FLOORING
COUNTER
CLADDING
SQM
376.60
950.00
357,770.00
3b.21
FLOORING
COUNTER
CLADDING
SQM
14.14
538.00
7,607.32
3b.22
FLOORING
COUNTER
CLADDING
CUM
24.56
4361.00
107,106.16
Page 5 of 12
BOQ DETAILS
SL. NO.
4
4.1
5
5.1
5.2
5.3
Work Description
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
INTERNAL
FINISHES
SQM
80.66
750.00
60,495.00
FLOORING
COUNTER
CLADDING
RMT
455.40
100.00
45,540.00
FLOORING
COUNTER
CLADDING
RMT
236.00
100.00
23,600.00
FLOORING
COUNTER
CLADDING
RMT
236.00
100.00
23,600.00
FALSE CEILING
FALSE CEILING SYSTEM
3h.2
ALL CHARGES FOR PROVIDING, LIFTING & FIXING
FALSE CEILING SYSTEM AT ALL LEVEL TO THE
REQUIRED PROFILE AND SHAPE WITH 12.5MM
THICK TAPERED EDGE GYPSUM BOARD
(MOISTURE RESISTANT - MR BOARD OF GYPROC
OR EQUIVALENT) CONFIRMING TO IS 2095-PART 1,
2011 SUSPENDED FROM THE RCC CEILING WITH
STANDARD GAUGE T,U & L GALVANIZED
SECTIONS AND ACCESSORIES (OF GYPROC GYPSTEEL ULTRA OR EQUIVALENT) SPACED AT
600 MM C/C BOTH WAYS. ENTIRE WORK TO BE
FINISHED SMOOTH TO FORM A SEAMLESS
SURFACE WITH NECESSARY CURVES, STEPS
INCLUDING MAKING / CUTTING OPENINGS FOR AC
GRILLS, TRAP DOORS, HOLES FOR LIGHT
FITTINGS, FANS, SPEAKERS, MAKING LIGHT
COVES ETC. AND JOINT FINISHING WITH
JOINTING COMPOUND, PAPER TAPE AND DRY
WALL TOP COAT INCLUDING SCAFFOLDING, ALL
LEAD & LIFTS. ENTIRE WORK SHALL BE OF HIGH
QUALITY FINISH AS PER MANUFACTURER'S
SPECIFICATIONS AND SHALL BE AS PER
DRAWING, DIRECTION & TO THE SATISFACTION
OF THE EIC. ( NOTE: MODE OF MEASUREMENT
SHALL BE AS PER PLAN AREA ONLY & ALL
MATERIAL IS UNDER CONTRACTORS SCOPE).
FINISHING
TILING - FLOORING & DADO
DOOR SILL OF CUDAPPA /MARBLE/ANY OTHER
3b.23
STONE
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 100MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF
STONE TO BE SUPPLIED BY CLIENT ) .
Divider bet veranda & dining
3b.24
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 170MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF
STONE TO BE SUPPLIED BY CLIENT ) .
Balcony Sill
3b.25
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 200MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF
Page 6 of 12
BOQ DETAILS
SL. NO.
5.4
5.5
6
6.1
7
7.1
7.2
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
FLOORING
COUNTER
CLADDING
SQM
30.20
525.00
15,855.00
FLOORING
COUNTER
CLADDING
SQM
23.54
525.00
12,358.50
2b.14
SQM
110.00
791.00
87,010.00
SQM
3,311.36
150.00
496,704.00
SQM
891.10
135.00
120,298.50
Work Description
Code
Page 7 of 12
BOQ DETAILS
SL. NO.
Work Description
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
3e.4
INTERNAL
FINISHES
SQM
32,434.00
56.51
1,832,845.34
MIS_ANCH-01
NOS
16.00
80.00
1,280.00
PREC-CON_01
NOS
8.00
812.00
6,496.00
PREC-CON_02
NOS
60.00
406.00
24,360.00
WOD-FRM-04
NOS
520.00
515.00
267,800.00
9.1
10
10.1
10.2
11
11.1
POP / PUTTY
PUTTY FINSH AT INTERNAL SURFACE
ALL CHARGES FOR PROVIDING, LIFTING AND
APPLICATION OF PUTTY AT INTERNAL SURFACES
(WALL & CEILING SURFACE OF FLAT, CORRIDOR,
& STAIRCASE ) AT ALL LEVEL INCLUDING
RENDERING THE INTERNAL SURFACE WALLS AND
CEILING. THE PUTTY WORK SHALL BE WITH
APPROVED MAKE & THICKNESS NOT LESS THAN
1.5MM OR AS PER MANUFACTURER
SPECIFICATION INCLUDING NECESSARY
SCAFFOLDING, ROUNDING OFF OR CHAMFERING
CORNERS, PROPER FINISH OF JAMB AND SILL AS
PER THE DRAWINGS AND SPECIFICATIONS / AS
DIRECTED & TO THE SATISFACTION OF THE
PROJECT MANAGER AND MENDING THE
JUNCTION OF SKIRTING GOOD AFTER THE
SKIRTING IS FIXED OR FINISHED B Y THE
FLOORING CONTRACTOR.
STEEL WORK
ALL TYPE OF STEEL WORK
CHEMICAL ANCHORAGE
PROVIDNG & FIXING REBAR BY CHEMICAL
ANCHORING TO DEVELOP FULL TENSION WITH
APPROPIATE EMBEDMENT OF HILTI OR BOSCH
OR SIMILAR APPROVED MAKE WITH ALL
NECESSARY TOOLS AND TACKLES ,AS PER
SPECIFIED DIA INCLUDING PERFORMING PULL
OUT TEST BY CONTRACTOR.COMPLETE IN ALL
RESPECT AS PER APPROVED METODOLOGY OF
MANUFACTURER & FOLLOWING RELEVENT IS
STANDARD.
CHEMICAL ANCHORAGE_8 MM DIA
CHEMICAL ANCHORAGE_8 MM DIA (LENGTH OF
HOLE TO BE DRILLED IS 10D WHERED= DIA OF
BAR)
CONCRETING
ALL TYPE CONCRETE WORK
REINFORCEMENT CEMENT CONCRETE_ PRE
CAST
ALL TYPE RCC WORK _ PRE CAST
PRE CAST LINTEL_250mmX150mmX1300 mm
CHARGES FOR Making, positioning and fixing of lintel
by precast / cast in situ at any level. Lintel Size 250
mmX150mmX1300 mm for Opening length- 900 mm.
R/F- main 4 nos- 8mm dia, links 8 mm dia
@200mmc/c, RCC grade : M20. (CEMENT AND
STEEL SHALL BE SUPPLIED BY CLIENT AS FREE
ISSUE MATERIAL)
PRE CAST LINTEL_200mmX75mmX1300 mm
CHARGES FOR supply, Making, positioning and fixing
of lintel by precast / cast in situ at any level Lintel Size
200mmX75mmX1300 mm for Opening length- 900 mm
.R/F- main 2 nos- 8mm dia, links 8 mm dia
@200mmc/c, RCC grade : M20. (CEMENT AND
STEEL SHALL BE SUPPLIED BY CLIENT AS FREE
ISSUE MATERIAL)
WOODEN DOOR
ATT TYPE WOODEN MAIN DOOR
WOODEN FRAME
Charges for assemble & fixing in situ swan & sized
timber sections by using approved mechanical anchor
fastener of using contractor own mechanical tools &
tackles / machines including lifting of frames from
ground floor level to respective locations etc all
complete in all respect including mending good the
damages as per the direction of Project In Charge.
Swan & sized timber set comprises of using 06
( six ) no approved mechanical anchor fastener
Swan & sized timber set comprises of approved vertical
Page 8 of 12
BOQ DETAILS
SL. NO.
12
12.1
13
13.1
13.2
13.3
13.4
13.5
14
Work Description
and horizontal section of specified length using 06 ( six )
no approved mechanical anchor fastener ( 03 nos in
each vertical member) ONLY Swan & sized timber
sections will be supplied by client as free issue.
FLUSH DOOR
ALL TYPE FLUSH DOOR
FLUSH DOOR(a)
CHARGES FOR FIXING OF FLUSH DOORS
SHUTTERS OF DIFFERENT SIZES AND THICKNESS
AT ALL LEVELS WITH fixing of ALL ACCESSORIES
LIKE HINGES, SCREW, BUFFER, Tower bolt ,
CYLINDRICAL LOCKS ETC. WITH ALL tools & tackles
/ machines including lifting of Shutters from ground floor
level to respective locations etc including specified
finishing coat all complete AS PER THE DIRECTION
OF THE PROJECT MANAGER. COMPLETE IN ALL
RESPECT AS PER DRAWING, METHODOLOGY AND
TECHNICAL SPECIFICATIONS.
FIXING OF FLUSH DOORS SHUTTERS WITH SS 4"
BUTT HINGES.
CHARGES FOR FIXING OF FLUSH DOORS
SHUTTERS WITH providing & fixing SS 4" BUTT
HINGES as per IS 12817 ( medium grade ) and SS
Screw AS PER IS, Including TWO COATS OF
SYNTHETIC ENAMEL PAINT (ICI/BERGER/ASIAN
PAINT MAKE) OVER TWO COATS OF PRIMER
COMPLETE. ( ONLY FLUSH DOOR WITH FRAME
SHALL BE SUPPLIED BY CLIENT AS FREE ISSUE )..
DOOR ACCESSORIES.
DOOR ACCESSORIES.
Fixing of Door Accessories .
Charges for fixing of door accessories inclusive of all
necessary consumables using contractor own
mechanical tools & tackles / machines complete as per
the direction of Project In Charge.
CHARGES FOR FIXING OF Door Magic EYE.
CHARGES FOR FIXING OF Door magic EYE.( Only
Door magic EYE shall be supplied by client as free
issue material).
CHARGES FOR FIXING OF PVC DOOR BUFFER.
CHARGES FOR FIXING OF PVC DOOR BUFFER.
( Only PVC DOOR BUFFER shall be supplied by client
as free issue material).
CHARGES FOR FIXING OF TOWER BOLT.
CHARGES FOR FIXING OF TOWER BOLT, ( Only
TOWER BOLT shall be supplied by client as free issue
material).
CHARGES FOR FIXING OF DOOR STOPPER.
CHARGES FOR FIXING OF DOOR STOPPER ( Only
DOOR STOPPER shall be supplied by client as free
issue material)
CHARGES FOR FIXING OF CYLINDRICAL LOCK.
CHARGES FOR FIXING OF CYLINDRICAL LOCK.
( Only CYLINDRICAL LOCK shall be supplied by client
as free issue material)
PLASTERING WORK
ALL TYPE OF PLASTERING WORK
PLASTERING WORK (TO WALL, FLOOR, CEILING
ETC.)
CHARGES FOR PLASTERING WORK (TO WALL,
FLOOR, CEILING ETC.) WITH SAND AND CEMENT
MORTAR IN SINGLE OR MORE LAYER AS
SPECIFIED, INCLUDING SURFACE PREPARATION,
ROUNDING OFF OR CHAMFERING CORNERS AS
DIRECTED AND RAKING OUT JOINTS INCLUDING
THROATING, NOSING AND DRIP COURSE,
SCAFFOLDING/STAGING WHERE NECESSARY,
INCLUDING WORKING AT ANY LEAD AND LIFT &
FIXING OF APPROVED CHICKEN WIRE MESH AT
EVERY BRICK AND CONCRETE
JUNCTION,COMPLETE THE JOB IN ALL RESPECTS
INCLUDING ARRAGEMENT OF NECESSARY
TOOLS,TACKLES,MEANS OF ACCESS,FOLLOWING
RELEVANT STANDARD, APPROVED
METHODOLOGY, TECHNICAL SPECIFICATION &
DRAWINGS
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
DFLU-DORA-02
NOS
520.00
1035.00
538,200.00
DOW_ACS-01
NOS
174.00
40.00
6,960.00
DOW_ACS-02
NOS
518.00
30.00
15,540.00
DOW_ACS-03
NOS
174.00
45.00
7,830.00
DOW_ACS-04
NOS
518.00
45.00
23,310.00
DOW_ACS-05
NOS
860.00
70.00
60,200.00
Page 9 of 12
BOQ DETAILS
SL. NO.
14.1
14.2
15
15.1
Work Description
Code
Budget Head
UOM
Qty
Rate
(Rs.)
Amount
(Rs.)
EXTERNAL
FINISHES
RMT
300.00
210.00
63,000.00
EXTERNAL
FINISHES
RMT
270.00
225.00
60,750.00
INTERNAL
FINISHES
SQM
152.00
130.00
19,760.00
10,737,749.88
10,737,749.88
563,732.00
11,301,481.88
The BOQ shown above is indicative only. How ever, all the payments would be made on actual measurement basis.
MATERIAL DETAILS (Supply to Contractor)
Material Details
PPC
S.M WHITE 300X300MM FLOOR CERAMIC TILE
PALLAZO BEIGE 200X300MM WALL CERAMIC TILE
KOTA STONE 2X2FT 25MM TH
MAGIC EYE S.S FINISH
SPRINKLE GREY 300X300MM FLOOR CERAMIC TILE
TOWER BOLT BRASS SATIN FINISH 1FT
SAWNSIZED TIMBR-DOORFRAME 992X2090MM-100X60MM FNSH
SAWNSIZED TIMBR-DOORFRAME 745X2070MM-100X60MM FNSH
SAWNSIZED TIMBR-DOORFRAME 907X2090MM-100X60MM FNSH
CYLINDRICAL LATCH WITH KEY
CYLINDRICAL LATCH WITHOUT KEY
CUDDAPAH / BLACK STONE SLAB
ATL 205 STEEL GREY 200X300MM WALL CERAMIC TILE
CELESTIAL PEARL WHITE 605X605MM FLOOR VITRIFIED
FLUSH DOOR 32MM TH BOTH SIDE COMMERCIAL 2030X824MM
FLUSH DOOR 35MM TH BOTH SIDE COMMERCIAL 2020X909MM
FLUSH DOOR 32MM TH BOTH SIDE COMMERCIAL 2020X662MM
DOOR BUFFER PVC 3INCH
DOOR STOPPER BRASS SS FINISH
Recommended Quantity
198.168716
8588.474016
700.045260
661.395680
174.000000
915.165264
174.000000
104.000000
208.000000
208.000000
516.000000
344.000000
13303.685520
4662.003540
1141.711200
208.000000
104.000000
208.000000
518.000000
518.000000
Unit
MT
SQM
SQM
SFT
NOS
SQM
NOS
SET
SET
SET
NOS
NOS
SFT
SQM
SQM
NOS
NOS
NOS
NOS
NOS
Amount (Rs.)
Page 10 of 12
Page 11 of 12
2.7.A The works shall be measured net, notwithstanding any general or local custom, except otherwise specified or prescribed in the Contract. Unless stated otherwise in the
Contract, all measurements shall be done in accordance with relevant Indian Standards clauses of IS 1200 in Conjunction with IS Codes 3385. In case the same is not available in
the relevant IS Code, the standard procedure adopted in PWD/ CPWD shall be adopted. In case the same is not available in PWD/ CPWD the measurement for the works done will
be based on mutual agreement between CLIENT and the contractor.
2.8 PAYMENT TERMS
2.8.A Payment will be made against progressive &/or final completion of job & submission of Invoices. Joint Measurements shall be taken by the Contractor along with the CLIENT
representative and submitted to the Project Manager along with the invoice (as per pro-forma supplied from site) / reconciliation statement of client supplied materials (if any) & any
other routine test report as the case may be from time to time required by E-I-C for verification.
2.8.B Measurements will be verified and the Project Manager shall issue certificate of payment within 10 days of such receipt of the bill and the certified payment shall be released
after all necessary adjustment(s) within 21 days from the date of submission of Bill (if not separately mentioned).
2.8.C In case it is found that the contractor has not submitted the bill as per the requirement of work order or the measurement given are typical & not as per drawing / work done ,
then the bill will be rejected & contractor has to resubmit fresh bill in the line with the work order terms & conditions with revised submission date.
2.8.D Proof of payment of statutory dues to be submitted along with invoice, i.e. immediate last month for which payment is being claimed.
2.9 CLEARANCE OF SITE
2.9.A The Contractor shall clear away and remove from the site all Plant& Equipments, surplus material, rubbish and temporary works of every kind, leave the whole of the site and
works clean and in a workman like condition to the satisfaction of the Project Manager. In the event of the Contractor's failure to comply with this provision, the Project Manager
shall after giving 7 days notice in writing, get the site cleared as above at the expense and risk of the Contractor and the Contractor shall have no claim whatsoever.
2.10 DEFECT LIABILITY PERIOD:
2.10.A Unless separately specified, the period of maintenance shall be the time period between Work Order end Date (as mentioned in latest Amendment ) & Retention Guaranty
Expiry Date (with respect to latest Amendment )which shall also be treated as the Defect Liability Period. In case of extension of Work Order end Date, the period shall be starting
from Actual Completion Date as certified by E-I-C. To the extent that the Works shall at, or as soon as practicable after the expiration of the Period of Maintenance, be not delivered
up to the Project Manager/Employer in as good as perfect a condition (Fair wear and tear excepted) to the satisfaction of the Project Manager/Employer as that in which they were
at the commencement of the Period of Maintenance, the Contractor shall forthwith execute all such work of repair, amendment, reconstruction, rectification and making good of
defects, imperfections, shrinkage or design failure or any other faults as may be required of the Contractor in writing by the Project Manager during the period of maintenance. All
such work shall be carried out by the Contractor at his own expenses if the necessity thereof is in the opinion of the Project Manager due to the use of materials or workmanship not
in accordance with the Contract or to the neglect or failure on the part of the Contractor to comply with any obligation expressed or implied on the Contractor's part under the
Contract. No material shall be issued on free issue basis for repairing job. If the Contractor shall fail to do any such work as aforesaid required by the Project Manager, the Employer
shall be entitled to carry out such work by his own workmen or by other Contractors and if such work which the Contractor should have carried out at the Contractor's own cost, the
Employer shall be entitled to recover from the Contractor the cost thereof or may deduct the same from any money due or that may become due to the Contractor, under this
Contract.
2.11 RETENTION MONEY:
2.11.A Unless separately specified, Retention money will be deducted @ 5 % from each running bill /bill & will be retained in cash or can be released against Bank Guarantee from
any nationalized bank & will be released if no defect is observed during the D.L. period. The above amount shall not bear any interest.
2.12 SUCCESSORS AND ASSIGNS:
2.12.A This Agreement may not be assigned by either party without the prior written consent of the other party; provided, however, that the Agreement shall be assignable by the
Company withoutContractors consent in the event the Company is acquired by or merged into another corporation or business entity. The benefits and obligations of this Agreement
shall be binding upon and inure to the parties hereto, their successors and assigns.
2.12.B This Agreement constitutes the complete agreement and sets forth the entire understanding and agreement of the parties as to the subject matter of this Agreement and
supersedes all prior discussions and understandings in respect to the subject of this Agreement, whether written or oral.
2.13 ARBITRATION / JURISDICTION:
2.13.A In case of any dispute or difference of opinion, the matter shall be referred to Vice President Project of CLIENT for arbitration, whose decision shall be final and binding on
both the parties.
2.13.B The arbitration proceedings shall be conducted in Kolkata, West Bengal, India and shall be governed by and constructed in accordance with the laws of India and the
jurisdiction of the courts for any of the purposes under the said Act or otherwise & shall exclusively be the original jurisdiction of the Honble Court of Law at Kolkata.
2.14 TERMINATION / SHORT CLOSURE OF CONTRACT:
2.14.A Client reserve the right to terminate the contract wholly or partly (reduce scope of service)any outstanding services hereunder, or reschedule in whole or in part on grounds of
non / dis-satisfactory/ under performance against given work schedule & /or any dis-obeisance of client directive & violation of code of conduct & any other reason leading to such
consequence by serving 07 days prior notice.
2.14.B Client shall have no liability to you beyond payment of any balance owing for services completed hereunder and accepted by client prior to the Vendors receipt of the notice
of termination.
In case of any difference between GGTC & Special terms & condition (if any) , the latter will always supersede the former & shall stand final.
Special Terms & Conditions :
Any difference of opinion related to the financial & contractual terms & conditions are to be reported, discussed , and mutually settled within 07 Seven) days from receipt of this
order by your authorised representative, otherwise this contract shall stand accepted in full by you without any dispute.
M/s RIVERBANK DEVELOPERS PRIVATE LIMITED and M/s FRONT TECH are entering into a Legally binding Agreement by virtue of this Work Order ref.
RDHG1WO/00133/16-17 dt. 10-May-2016 if The General terms & conditions & specific terms & conditions (attached as Annexure) are agreed upon and mutually accepted.
Note:
For RIVERBANK DEVELOPERS PRIVATE LIMITED
Authorised Signatory
Authorised Signatory
Name
Name
Designation
Designation
Contact No.
Contact No.
Date
Date
RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata
Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com
Page 12 of 12