You are on page 1of 12

WORK ORDER

Work Order No. :

RDHG1WO/00133/16-17

Work Order Amendment No.:

Client :

Contractor:

RIVERBANK DEVELOPERS PRIVATE LIMITED

FRONT TECH

Dated:

10/05/2016

Dated:

25/07/2016

2a, Prince Anwar Shah Lane,tollygunge

225C A. J. C. BOSE ROAD


4TH FLOOR
KOLKATA 700020, WB, INDIA
KOLKATA 700020
WEST BENGAL INDIA

KOLKATA-700033
West Bengal, India

Contact Person :
Phone No.
E-mail:
Vat No. 19875878024
PAN No. AJHPK9256E
Service Tax No.AJHPK9256EST001
ESI No.
PF No.:
Quotation Ref No. :

Date :

Project :

HILAND GREENS PH-01

Sub Project :

HILAND GREENS PH-01

Location :

TOM BATA AVENUE (New Bata Road) HOLDING NO. 1, BATA NAGAR, MAHESHTALA

Type of Work:
In accordance with the technical specification(s)/ item(s) description/ scope of job &/or service, commercial Terms mentioned hereinunder you are requested to commence the work
&/or provide service described herein.
SALIENT FEATURES
Work Description :

WORK ORDER FOR FINISHING WORKS OF HILAND GREEN PHASE-1

Start Date :

09/05/2016

End Date :

31/03/2017

RETENTIONS
Retention Money

5.00

Retention Money to be Released

After

- to be deducted from running bills on pre-tax actual execution value.


31/03/2018

TAX DETAILS
(a) Tax Additions
Tax Category
Service Tax

Tax

WORKS CONTRACT SERVICES


FINISHING ETC

Tax Type

% of Work Order Value

Tax Amount
(Service Tax@14% = 526149.87
SBC Tax@0.5% = 18791.07
KKC Tax@0.5% = 18791.07)

563732.00

15.00

Exclusive

70.00

VAT

0.00

Exclusive

100.00

0.00

VAT 2

0.00

Exclusive

100.00

0.00

(b) Tax Deductions

Total :

Tax Category

563,732.00
Tax Percentage

TDS

1.00 %

Stax Deduction

50.00 %

WCT

3.00 %

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 1 of 12

BOQ DETAILS
SL. NO.

Work Description

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

2b.10

Sub & Super


Structure

CUM

28.66

5742.00

164,565.72

2b.11

Sub & Super


Structure

CUM

20.06

5800.00

116,348.00

STRUCTURE
1
1.1

1.2

1.3

1.4

2
2.1

BRICK WORK
250 MM THICK BRICKWORK CEMENT MORTAR
(1:6)
ALL CHARGES FOR 250 MM THICK BRICKWORK BY
HANDLING CLAY BRICK AT ALL HEIGHT / LEVEL &
ALL LOCATION USING CEMENT MORTAR (1:6)
RATIO BY USING CONTACTORS OWN TOOLS &
TACKLES, CURING, AND SOAKING THE BRICKS AT
LEAST FOR 24 HOURS BEFORE USE ETC.
INCLUDING V GROOVE JOINTING ON BOTH FACES
COMPLETE AS PER DRAWING , SPECIFICATION
AND THE DIRECTION OF EIC AT ALL LEAD FROM
ANY POINT TO ANY POINT INSIDE THE SITE IN ALL
STRUCTURES SUCH AS WALLS / PILLARS / STUB /
SUPPORTS /DRAINS ETC.COMPLETE IN ALL
RESPECT INCLUDING NECESSARY SCAFOLDING &
STAGING (ONLY CEMENT , SHALL BE SUPPLIED BY
CLIENT FREE OF COST AT GROUND LEVEL)
200 MM THICK BRICKWORK CEMENT MORTAR
(1:6)
ALL CHARGES FOR 200 MM THICK BRICKWORK BY
HANDLING CLAY BRICK AT ALL HEIGHT / LEVEL &
ALL LOCATION USING CEMENT MORTAR (1:6)
RATIO BY USING CONTACTORS OWN TOOLS &
TACKLES, CURING, AND SOAKING THE BRICKS AT
LEAST FOR 24 HOURS BEFORE USE ETC.
INCLUDING VGROOVE JOINTING ON BOTH FACES
COMPLETE AS PER DRAWING , SPECIFICATION
AND THE DIRECTION OF EIC AT ALL LEAD FROM
ANY POINT TO ANY POINT INSIDE THE SITE IN ALL
STRUCTURES SUCH AS WALLS / PILLARS / STUB /
SUPPORTS /DRAINS ETC.COMPLETE IN ALL
RESPECT INCLUDING NECESSARY SCAFOLDING &
STAGING (ONLY CEMENT , SHALL BE SUPPLIED BY
CLIENT FREE OF COST AT GROUND LEVEL)
125 MM MASONRY IN CM (1:4)
125 MM MASONRY IN CM (1:4) RATIO BY CLAY
BRICK MASONRY AT ALL LEVELS INCLUDING
APPROVED CHICKEN WIRE MESH AT EVERY 4TH
LAYER, CLEANING AND SOAKING THE BRICK OR
BLOCKS AT LEAST FOR 24 HOURS ,
SCAFFOLDING, STAGING, ALL LEADS AND LIFTS
FROM ANY POINT TO ANY POINT SIDE THE SITE
IN ALL STRUCTURES SUCH AS WALLS / PILLARS /
STUB / SUPPORTS / DRAINS ETC. AS PER
DRAWING AND SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER - IN- CHARGE.
(ONLY CEMENT SHALL BE SUPPLIED FREE OF
COST AT GROUND LEVEL)
75 MM MASONRY IN CM (1:4)
75 MM MASONRY IN CM (1:4) RATIO BY CLAY
BRICK MASONRY AT ALL LEVELS INCLUDING
APPROVED CHICKEN WIRE MESH AT EVERY 3rd
LAYER,AND 2 NOS 8MM DIA REINFORCEMENT
BAR(TIED WITH BINDING WIRE & SPACER BAR)
HORIZONTALLY AT EVERY 1 M INTERVAL.
INCLUDING CLEANING AND SOAKING THE BRICK
OR BLOCKS AT LEAST FOR 24 HOURS ,
SCAFFOLDING, STAGING, ALL LEADS AND LIFTS
FROM ANY POINT TO ANY POINT SIDE THE SITE
IN ALL STRUCTURES SUCH AS WALLS / PILLARS /
STUB / SUPPORTS / DRAINS ETC. AS PER
DRAWING AND SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER - IN- CHARGE.
(ONLY CEMENT,REINFORCEMENT SHALL BE
SUPPLIED FREE OF COST AT GROUND LEVEL)
STRUCTURE

2b.12

2b.13

791.00

SQM

Sub & Super


Structure

SQM

3.78

565.00

2,135.70

PLASTERING (INT. & EXT.)


INTERNAL PLASTER OF AVERAGE 12 MM AT
2d.14
GROUND FLOOR
ALL CHARGES FOR PROVIDING & APPLYING
INTERNAL PLASTER OF AVERAGE 12 MM(AVG.)
THICK TO ALL INTERNAL WALL SURFACES AT ALL
FLOOR WITH CEMENT AND SAND MORTAR ( 1

SQM

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

150.00

Page 2 of 12

BOQ DETAILS
SL. NO.

2.2

2.3

3
3.1

3.2

Work Description

Code

PART OF CEMENT + 6 PARTS OF SAND )


INCLUDING NECESSARY SCAFFOLDING,
ROUNDING OFF OR CHAMFERING CORNERS AS
DIRECTED AND RAKING OUT JOINTS &
ROUGHENING OF CONCRETE SURFACE , AND
APPLYING APPROVED CHICKEN WIRE MESH AT
EVERY BRICK AND CONCRETE JUNCTION ,
INCLUDING THROATING, NOSING , GROOVE
WHERE EVER REQUIRED , CURING AT LEAST FOR
7 DAYS COMPLETE AS PER THE DRAWINGS AND
SPECIFICATIONS / AS DIRECTED BY THE
ENGINEER - IN - CHARGE. (EXCLUDING THE COST
OF CEMENT SUPPLIED BY CLIENT)
INTERNAL CEILING PLASTER IN CM (1:4) OF
2d.15
AVERAGE 6 MM AT GROUND LEVEL
ALL CHARGES FOR PROVIDING & APPLYING
INTERNAL CEILING PLASTER IN CM (1:4) OF
AVERAGE 6 MM THICK TO A L L I N T E R N A L C E
I L I N G SURFACES AT ALL LEVEL WITH CEMENT
AND SAND MORTAR ( 1 PART OF CEMENT + 4
PARTS OF SAND ) INCLUDING NECESSARY
SCAFFOLDING, ROUNDING OFF OR CHAMFERING
CORNERS AS DIRECTED AND RAKING OUT JOINTS
& ROUGHENING OF CON CRETE SURFACE ,
INCLUDING THROATING, NOSING , GROOVE
WHERE EVER REQUIRED , CURING AT LEAST FOR
7 DAYS ETC. COMPLETE AS PER THE DRAWINGS
AND SPECIFICATIONS / AS DIRECTED BY THE
ENGINEER - IN - CHARGE. (EXCLUDING THE COST
OF CEMENT SUPPLIED BY CLIENT)
20MM THICK (AVG. THICKNESS) CEMENT
2d.16
PLASTER TO EXTERNAL SURFACES UPTO 1st
FLOOR LEVELS
20MM THICK (AVG. THICKNESS) CEMENT PLASTER
TO EXTERNAL SURFACES UPTO 1st FLOOR
LEVELS OF MASONRY AND CONCRETE SURFACE
IN TWO COATS, UNDERLAYER 12MM THICK
CEMENT MORTAR 1:6 (1 CEMENT : 6 COARSE
SAND) AND TOP LAYER 8MM THICK CEMENT
PLASTER 1:4 (1 CEMENT: 4 COARSE SAND)
COMPLETE WITH SMOOTH LEVELLED SURFACE .
EXTERNAL PLASTERING SHALL INCLUDE ROUGHE
NING OF THE CONCRETE SURFACE , APPROVED
CHICKEN WIRE MESH AT EVERY BRICK AND
CONCRETE JUNCTION, SHRINKAGE PROOF
MATERIAL LIKE RELIANCE POLYMER OR
EQUIVALENT AS APPROVED FOR BOTTOM LAYER
OF PLASTER . (EXCLUDING THE COST OF CEMENT
TO BE SUPPLIED BY CLIENT)
FINISHING

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

135.00

SQM

Sub & Super


Structure

SQM

1,820.76

235.00

427,878.60

FLOORING
COUNTER
CLADDING

SQM

4,964.86

350.00

1,737,701.00

FLOORING
COUNTER
CLADDING

SQM

963.90

335.00

322,906.50

TILING - FLOORING & DADO


FIXING OF CERAMIC TILESFOR DADO _OVER
3b.13
ADHESIVE
ALL CHARGES FOR HANDLING, LIFTING & FIXING
OF CERAMIC TILES OF SPECIFIED SIZE,
APPROVED SHADE AND MAKE FOR DADO AT ALL
LEVELS & HEIGHTS OVER ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINES INCLUDING
CUTTING WHEREVER REQUIRED, MAKING HOLE
FOR TRAPS, PIPES, COMODE & ELECTRIC BOX,
CLADDING, COPLA, V GROOVE CUTTING (WITH
MOULDING) , JOINT FILLING WITH WHITE CEMENT
MIXED WITH PIGMENTS OF MATCHING COLOUR
INCLUDING CLEANING, CURING, TOOLS
COMPLETE IN ALL RESPECT AS PER DRAWING
AND SPECIFICATIONS AND AS DIRECTED AND TO
THE S A T I S F A C T I O N O F T H E PROJECT
MANAGER (INCLUDING ALL BUT EXCLUDING THE
COST OF TILES TO BE ISSUED BY CLIENT ).
VITRIFIED TILES AT ALL FLOOR OVER A CEMENT 3b.14
MORTER (1:4)
ALL CHARGES FOR HANDLING, LIFTING & FIXING
OF VITRIFIED TILES AT ALL FLOOR OF SPECIFIED
SIZE, APPROVED SHADE AT ALL LEVELS &

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 3 of 12

BOQ DETAILS
SL. NO.

3.3

3.4

3.5

3.6

Work Description
HEIGHTS OVER A CEMENT MORTER (1:4) BED OF
15 MM THICKNESS INCLUDING CUTTING
WHEREVER REQUIRED, MAKING HOLE FOR
TRAPS, PIPES, COMODE & ELECTRIC BOX,
CLADDING, COPLA, V GROOVE CUTTING (WITH
MOULDING) , POINTING WITH PIGMENTS OF
MATCHING COLOUR INCLUDING CLEANING,
CURING, TOOLS COMPLETE IN ALL RESPECT AS
PER DRAWING AND SPECIFICATIONS AND AS D I
R E C T E D & T O T H E SATISFACTION OF THE
PROJECT MANAGER (INCLUDING ALL BUT
EXCLUDING THE COST OF CEMENT & TILES TO BE
ISSUED BY CLIENT )
VITRIFIED TILES SKIRTING_ OVER CEMENT
MORTER ( 1:4 )
HANDLING, LIFTING & FIXING OF VITRIFIED TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR (100MM HIGH) SKIRTING FOR ALL FLOOR AT
ALL LEVELS & HEIGHTS OVER A CEMENT MORTER
( 1:4 ) BED INCLUDING CUTTING WHEREVER
REQUIRED, MAKING HOLE FOR TRAPS, PIPES,
COMODE & ELECTRIC BOX, CLADDING, COPLA, V
GROOVE CUTTING (WITH MOULDING) , POINTING
WITH PIGMENTS OF MATCHING COLOUR
INCLUDING CLEANING, CURING, TOOLS
COMPLETE IN ALL RESPECT AS PER DRAWING
AND SPECIFICATIONS AND AS DIRECTED AND TO
THE SATISFACTION OF PROJECT MANAGER
(INCLUDING ALL BUT EXCLUDING THE COST OF
TILES AND CEMENT TO BE ISSUED BY CLIENT ).
CERAMIC TILES ALL FLOOR _CEMENT MORTAR
( 1:4)
HANDLING, LIFTING & FIXING OF CERAMIC TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR ALL FLOOR AT ALL LEVELS & HEIGHTS OVER
A CEMENT MORTAR (1:4) BED OF 15 MM
THICKNESS INCLUDING CUTTING , LAYING SLOPE
WHEREEVER REQUIRED , MAKING
RECESSES/DROPS AT THE SHOWER AREA,
MAKING HOLE FOR TRAPS, PIPES, COMODE &
ELECTRIC BOX, CLADDING, COPLA, V GROOVE
CUTTING AT CORNERS , JOINT FILLING WITH
WHITE CEMENT MIXED WITH PIGMENTS OF
MATCHING COLOUR INCLUDING CLEANING,
CURING, TOOLS COMPLETE IN ALL RESPECT.
(INCLUDING ALL BUT EXCLUDING THE COST OF
CEMENT & TILES TO BE ISSUED BY CLIENT )
CERAMIC TILES FOR SKIRTING _CEMENT
MORTAR
HANDLING, LIFTING & FIXING OF CERAMIC TILES
OF SPECIFIED SIZE, APPROVED SHADE AND MAKE
FOR SKIRTING (100MM HIGH) FOR ALL FLOOR AT
ALL LEVELS & HEIGHTS OVER A CEMENT MORTAR
(1:4) BED INCLUDING CUTTING WHEREEVER
REQUIRED, MAKING HOLE FOR TRAPS, PIPES,
COMODE & ELECTRIC BOX, CLADDING, COPLA, V
GROOVE CUTTING (WITH MOULDING), POINTING
WITH PIGMENTS OF MATCHING COLOUR
INCLUDING CLEANING, CURING, TOOLS
COMPLETE IN ALL RESPECT AS PER DRAWING
AND SPECIFICATIONS AND AS DIRECTED AND TO
THE SATISFACTION OF PROJECT MANAGER
(INCLUDING ALL BUT EXCLUDING THE COST OF
GREY CEMENT & TILES TO BE ISSUED BY CLIENT )
ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN FLOOR ,DECK, RAMP
CHARGES FOR PROVIDING AND LAYING 40MM
THICK ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN FLOOR, DECK, RAMP OR AT ANY
OTHER PLACE WITH CEMENT CONCRETE OF 1:2:4
WITH STONE CHIPS LAID IN PANELS USING GLASS
STRIPS OF 25MM X 3MM ( AREA NOT EXCEEDING
1.0 SQM PER PANEL ) OR AS DIRECTED WITH 3MM
THICK TOPPING MADE WITH ORDINARY CEMENT
INCLUDING SMOOTH FINISHING, AND ROUNDING
OFF CORNERS AND INCLUDING APPLICATION OF
CEMENT SLURRY BEFORE FLOORING WORK
USING CEMENT @ 1.75 KG PER SQM ETC.ALL

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

3b.15

FLOORING
COUNTER
CLADDING

RMT

932.40

59.00

55,011.60

3b.16

FLOORING
COUNTER
CLADDING

SQM

7,970.40

325.00

2,590,380.00

3b.17

FLOORING
COUNTER
CLADDING

RMT

8,292.66

59.00

489,266.94

3b.18

FLOORING
COUNTER
CLADDING

SQM

406.40

300.00

121,920.00

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 4 of 12

BOQ DETAILS
SL. NO.

3.7

3.8

3.9

3.10

Work Description
COMPLETE AS PER THE DIRECTION OF THE
PROJECT MANAGER. (ONLY CEMENT WILL BE
SUPPLIED BY CLIENT AND REST ALL MATERIAL BY
CONTRACTOR)
ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN STAIRCASE
CHARGES FOR PROVIDING AND LAYING 40MM
THICK ARTIFICIAL /INDIAN PATENT STONE (IPS)
FLOORING IN STAIRCASE ( TRADE, RISER,
LANDING ) AT ALL LEVEL WITH CEMENT
CONCRETE OF 1:2:4 WITH STONE CHIPS LAID IN
PANELS USING GLASS STRIPS OF 25MM X 3MM
( AREA NOT EXCEEDING 1.0 SQM PER PANEL ) OR
AS DIRECTED WITH 3MM THICK TOPPING MADE
WITH ORDINARY CEMENT INCLUDING SMOOTH
FINISHING, AND ROUNDING OFF CORNERS AND
INCLUDING APPLICATION OF CEMENT SLURRY
BEFORE FLOORING WORK USING CEMENT @ 1.75
KG PER SQM ETC.ALL COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER. (ONLY
CEMENT WILL BE SUPPLIED BY CLIENT AND REST
ALL MATERIAL BY CONTRACTOR)
KITCHEN COUNTER OF CUDAPPA SLAB
HANDLING, LIFTING, CUTTING AND LAYING /
FIXING PRE-POLISHED CUDDAPA SLAB OVER
VERTICAL STONE SLAB SUPPORT AS PER
APPROVED DRAWING AT ALL LEVELS & HEIGHTS,
BY GROOVE CUTTING IN BRICK MASONARY ,
INSERTING CUDAPPAH MIN. 1" BOTH OR AS
MENTIONED IN DRAWING TO WALL AS WELL AS
FLOOOR, JAMMING BY CEMENT MORTAR &
FIXING BY ARALDITE ON THE TOP EDGE OF THE
CUDAPPAH STONE, FINISHED TO ALL SHAPES
(CURVED OR STRAIGHT), MAKING HOLE FOR
TRAPS, PIPES, ELECTRIC BOX, CUTTING
OPENINGS FOR KITCHEN SINK, CLADDING,
COPLA, V GROOVE CUTTING (WITH MOULDING) &
POLISHING AND FILLING THE PAPER JOINTS WITH
MATCHING COLOUR PIGMENT, CURING ETC AS
PER DRAWINGS, SPECIFICATIONS DIRECTION &
SATISFACTION OF THE PROJECT MANAGER ( I N
C L U D I N G A L L B U T EXCLUDING THE COST
OF CUDAPPA AND GREY CEMENT TO BE
SUPPLIED BY CLIENT ). PAYMENT SHALL BE MADE
AS PER PLAN AREA OF SLAB.
LIFT FACIA AT CORRIDOR
HANDLING, LIFTING AND LAYING/FIXING GRANITE
(OF APPROVED SHADE) AT ALL LEVELS & HEIGHTS
ON VERTICAL SURFACE OF LIFT FACIA AT
CORRIDOR OVER CEMENT MORTER (CM 1:3) OF
25MM THICK, WITH A UNIFORM LAYER OF
ARALDITE AND POP ON TOP OF GRANITE FOR
HOLDING TILL ARALDITE DRIES, FINISHED TO ALL
SHAPES (CURVED OR STRAIGHT) MAKING HOLES,
CLADDING, COPLA, V GROOVE CUTTING (WITH
MOULDING) & POLISHING AND FILLING THE PAPER
JOINTS WITH MATCHING COLOUR PIGMENT, AS
PER DRAWINGS, SPECIFICATIONS, DIRECTION &
TO THE SATISFACTION OF THE PROJECT
MANAGER (INCLUDING ALL BUT EXCLUDING THE
COST OF GRANITE / STONE & GREY CEMENT TO
BE SUPPLIED BY CLIENT ).
PROVIDING & LAYING SCREED CONCRETE 1:2:4
ALL CHARGES FOR PROVIDING & LAYING SCREED
CONCRETE WITH CEMENT CONCRETE NOMINAL
MIX 1:2:4 OF SPECIFIED THICKNESS (AS
MENTIONED IN DRAWING) WITH ONE LAYER OF
CHICKEN WIRE MESH AT ALL HEIGHT & DEPTH
INCLUDING OF ALL MATERIALS, LABOURS,
PREPARATION OF SURFACE, CLEANING AND
MAINTANING PROPER SLOPE , NECESSARY
FINISHING ( TROWEL FINISH OR ROUGH FINISH
AS PER REQUIREMENT ), CURING ETC. ALL
NECESSARY WORK COMPLETE IN ALL RESPECT
AS PER DRAWING AND DIRECTION OF EIC. THE
RATE IS INCLUSIVE OF ALL LEAD AND LIFTS.
(ONLY CEMENT SHALL BE PROVIDED BY CLIENT).
FINISHING

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

3b.19

FLOORING
COUNTER
CLADDING

SQM

1,209.60

350.00

423,360.00

3b.20

FLOORING
COUNTER
CLADDING

SQM

376.60

950.00

357,770.00

3b.21

FLOORING
COUNTER
CLADDING

SQM

14.14

538.00

7,607.32

3b.22

FLOORING
COUNTER
CLADDING

CUM

24.56

4361.00

107,106.16

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 5 of 12

BOQ DETAILS
SL. NO.
4
4.1

5
5.1

5.2

5.3

Work Description

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

INTERNAL
FINISHES

SQM

80.66

750.00

60,495.00

FLOORING
COUNTER
CLADDING

RMT

455.40

100.00

45,540.00

FLOORING
COUNTER
CLADDING

RMT

236.00

100.00

23,600.00

FLOORING
COUNTER
CLADDING

RMT

236.00

100.00

23,600.00

FALSE CEILING
FALSE CEILING SYSTEM
3h.2
ALL CHARGES FOR PROVIDING, LIFTING & FIXING
FALSE CEILING SYSTEM AT ALL LEVEL TO THE
REQUIRED PROFILE AND SHAPE WITH 12.5MM
THICK TAPERED EDGE GYPSUM BOARD
(MOISTURE RESISTANT - MR BOARD OF GYPROC
OR EQUIVALENT) CONFIRMING TO IS 2095-PART 1,
2011 SUSPENDED FROM THE RCC CEILING WITH
STANDARD GAUGE T,U & L GALVANIZED
SECTIONS AND ACCESSORIES (OF GYPROC GYPSTEEL ULTRA OR EQUIVALENT) SPACED AT
600 MM C/C BOTH WAYS. ENTIRE WORK TO BE
FINISHED SMOOTH TO FORM A SEAMLESS
SURFACE WITH NECESSARY CURVES, STEPS
INCLUDING MAKING / CUTTING OPENINGS FOR AC
GRILLS, TRAP DOORS, HOLES FOR LIGHT
FITTINGS, FANS, SPEAKERS, MAKING LIGHT
COVES ETC. AND JOINT FINISHING WITH
JOINTING COMPOUND, PAPER TAPE AND DRY
WALL TOP COAT INCLUDING SCAFFOLDING, ALL
LEAD & LIFTS. ENTIRE WORK SHALL BE OF HIGH
QUALITY FINISH AS PER MANUFACTURER'S
SPECIFICATIONS AND SHALL BE AS PER
DRAWING, DIRECTION & TO THE SATISFACTION
OF THE EIC. ( NOTE: MODE OF MEASUREMENT
SHALL BE AS PER PLAN AREA ONLY & ALL
MATERIAL IS UNDER CONTRACTORS SCOPE).
FINISHING
TILING - FLOORING & DADO
DOOR SILL OF CUDAPPA /MARBLE/ANY OTHER
3b.23
STONE
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 100MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF
STONE TO BE SUPPLIED BY CLIENT ) .
Divider bet veranda & dining
3b.24
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 170MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF
STONE TO BE SUPPLIED BY CLIENT ) .
Balcony Sill
3b.25
HANDLING, LIFTING & FIXING OF (CUDAPPA
/MARBLE/ANY OTHER STONE ) OF WIDTH OF
APPROX 200MM OR AS REQUIRED FOR DOOR SILL
IN DESIRED LOCATION AT ALL LEVELS WITH TILE
ADHESIVE ( OF ARDEX
ENDURA/SIKA/BASF/FOSROC/LATCRETE or
EQUIVALENT MAKE ) OF SPECIFIED THICKNESS AS
PER MANUFACTURER'S GUIDELINESTHICK
INCLUDING CUTTING, MOULDING, FLORR JOINT
FINISH WITH WHITE CEMENT & PIGMENT,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION OF THE PROJECT MANAGER,
( INCLUDING ALL BUT EXCLUDING THE COST OF

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 6 of 12

BOQ DETAILS
SL. NO.

5.4

5.5

6
6.1

7
7.1

7.2

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

FLOORING
COUNTER
CLADDING

SQM

30.20

525.00

15,855.00

FLOORING
COUNTER
CLADDING

SQM

23.54

525.00

12,358.50

2b.14

Sub & Super


Structure

SQM

110.00

791.00

87,010.00

INTERNAL PLASTER OF AVERAGE 12 MM AT


2d.17
GROUND FLOOR -Rev
ALL CHARGES FOR PROVIDING & APPLYING
INTERNAL PLASTER OF AVERAGE 12 MM(AVG.)
THICK TO ALL INTERNAL WALL SURFACES AT ALL
FLOOR WITH CEMENT AND SAND MORTAR ( 1
PART OF CEMENT + 6 PARTS OF SAND )
INCLUDING NECESSARY SCAFFOLDING,
ROUNDING OFF OR CHAMFERING CORNERS AS
DIRECTED AND RAKING OUT JOINTS &
ROUGHENING OF CONCRETE SURFACE , AND
APPLYING APPROVED CHICKEN WIRE MESH AT
EVERY BRICK AND CONCRETE JUNCTION ,
INCLUDING THROATING, NOSING , GROOVE
WHERE EVER REQUIRED , CURING AT LEAST FOR
7 DAYS COMPLETE AS PER THE DRAWINGS AND
SPECIFICATIONS / AS DIRECTED BY THE
ENGINEER - IN - CHARGE. (EXCLUDING THE COST
OF CEMENT SUPPLIED BY CLIENT)...
INTERNAL CEILING PLASTER IN CM (1:4) OF
2d.18
AVERAGE 6 MM AT GROUND LEVEL - Rev
ALL CHARGES FOR PROVIDING & APPLYING
INTERNAL CEILING PLASTER IN CM (1:4) OF
AVERAGE 6 MM THICK TO A L L I N T E R N A L C E
I L I N G SURFACES AT ALL LEVEL WITH CEMENT
AND SAND MORTAR ( 1 PART OF CEMENT + 4
PARTS OF SAND ) INCLUDING NECESSARY
SCAFFOLDING, ROUNDING OFF OR CHAMFERING
CORNERS AS DIRECTED AND RAKING OUT JOINTS
& ROUGHENING OF CON CRETE SURFACE ,
INCLUDING THROATING, NOSING , GROOVE
WHERE EVER REQUIRED , CURING AT LEAST FOR

Sub & Super


Structure

SQM

3,311.36

150.00

496,704.00

Sub & Super


Structure

SQM

891.10

135.00

120,298.50

Work Description

Code

STONE TO BE SUPPLIED BY CLIENT ) .


KOTA STONE SLAB
3b.26
ALL CHARGES FOR HANDLING, LIFTING , FIXING
AND LEVELLING OF KOTA STONE SLAB (AV. 25 - 28
MM THICK) ON FLOOR AT ALL LEVELS OVER A
CEMENT MORTAR (1:4) BED OF 20MM THICKNESS
INCLUDING POINTING WITH PIGMENTS OF
MATCHING COLOUR, CUTTING, POLISHING,
CURING ETC. COMPLETE AS PER THE DIRECTION
& TO THE SATISFACTION OF THE PROJECT
MANAGER , EXCLUDING THE COST OF GREY
CEMENT & KOTA STONE SUPPLIED BY CLIENT.
KOTA STONE SLAB for duct cover
3b.27
ALL CHARGES FOR HANDLING, LIFTING , FIXING
AND LEVELLING OF KOTA STONE SLAB (AV. 25 - 28
MM THICK) above roof AT ALL LEVELS OVER A
CEMENT MORTAR (1:4) BED OF 20MM THICKNESS
INCLUDING POINTING WITH PIGMENTS OF
MATCHING COLOUR, CUTTING,moulding,
POLISHING, CURING ETC. COMPLETE AS PER THE
DIRECTION & TO THE SATISFACTION OF THE
PROJECT MANAGER , EXCLUDING THE COST OF
GREY CEMENT & KOTA STONE SUPPLIED BY
CLIENT.
STRUCTURE
BRICK WORK
125 MM MASONRY IN CM (1:4) - Rev
125 MM MASONRY IN CM (1:4) RATIO BY CLAY
BRICK MASONRY AT ALL LEVELS INCLUDING
APPROVED CHICKEN WIRE MESH AT EVERY 4TH
LAYER, CLEANING AND SOAKING THE BRICK OR
BLOCKS AT LEAST FOR 24 HOURS ,
SCAFFOLDING, STAGING, ALL LEADS AND LIFTS
FROM ANY POINT TO ANY POINT SIDE THE SITE
IN ALL STRUCTURES SUCH AS WALLS / PILLARS /
STUB / SUPPORTS / DRAINS ETC. AS PER
DRAWING AND SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER - IN- CHARGE.
( ONLY CEMENT SHALL BE SUPPLIED FREE OF
COST AT GROUND LEVEL)...
STRUCTURE
PLASTERING (INT. & EXT.)

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 7 of 12

BOQ DETAILS
SL. NO.

Work Description

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

3e.4

INTERNAL
FINISHES

SQM

32,434.00

56.51

1,832,845.34

MIS_ANCH-01

Sub & Super


Structure

NOS

16.00

80.00

1,280.00

PREC-CON_01

Sub & Super


Structure

NOS

8.00

812.00

6,496.00

PREC-CON_02

Sub & Super


Structure

NOS

60.00

406.00

24,360.00

WOD-FRM-04

DOOR WINDOWS &


JOINERIES

NOS

520.00

515.00

267,800.00

7 DAYS ETC. COMPLETE AS PER THE DRAWINGS


AND SPECIFICATIONS / AS DIRECTED BY THE
ENGINEER - IN - CHARGE. (EXCLUDING THE COST
OF CEMENT SUPPLIED BY CLIENT)...
FINISHING
8
8.1

9.1

10

10.1

10.2

11

11.1

POP / PUTTY
PUTTY FINSH AT INTERNAL SURFACE
ALL CHARGES FOR PROVIDING, LIFTING AND
APPLICATION OF PUTTY AT INTERNAL SURFACES
(WALL & CEILING SURFACE OF FLAT, CORRIDOR,
& STAIRCASE ) AT ALL LEVEL INCLUDING
RENDERING THE INTERNAL SURFACE WALLS AND
CEILING. THE PUTTY WORK SHALL BE WITH
APPROVED MAKE & THICKNESS NOT LESS THAN
1.5MM OR AS PER MANUFACTURER
SPECIFICATION INCLUDING NECESSARY
SCAFFOLDING, ROUNDING OFF OR CHAMFERING
CORNERS, PROPER FINISH OF JAMB AND SILL AS
PER THE DRAWINGS AND SPECIFICATIONS / AS
DIRECTED & TO THE SATISFACTION OF THE
PROJECT MANAGER AND MENDING THE
JUNCTION OF SKIRTING GOOD AFTER THE
SKIRTING IS FIXED OR FINISHED B Y THE
FLOORING CONTRACTOR.
STEEL WORK
ALL TYPE OF STEEL WORK
CHEMICAL ANCHORAGE
PROVIDNG & FIXING REBAR BY CHEMICAL
ANCHORING TO DEVELOP FULL TENSION WITH
APPROPIATE EMBEDMENT OF HILTI OR BOSCH
OR SIMILAR APPROVED MAKE WITH ALL
NECESSARY TOOLS AND TACKLES ,AS PER
SPECIFIED DIA INCLUDING PERFORMING PULL
OUT TEST BY CONTRACTOR.COMPLETE IN ALL
RESPECT AS PER APPROVED METODOLOGY OF
MANUFACTURER & FOLLOWING RELEVENT IS
STANDARD.
CHEMICAL ANCHORAGE_8 MM DIA
CHEMICAL ANCHORAGE_8 MM DIA (LENGTH OF
HOLE TO BE DRILLED IS 10D WHERED= DIA OF
BAR)
CONCRETING
ALL TYPE CONCRETE WORK
REINFORCEMENT CEMENT CONCRETE_ PRE
CAST
ALL TYPE RCC WORK _ PRE CAST
PRE CAST LINTEL_250mmX150mmX1300 mm
CHARGES FOR Making, positioning and fixing of lintel
by precast / cast in situ at any level. Lintel Size 250
mmX150mmX1300 mm for Opening length- 900 mm.
R/F- main 4 nos- 8mm dia, links 8 mm dia
@200mmc/c, RCC grade : M20. (CEMENT AND
STEEL SHALL BE SUPPLIED BY CLIENT AS FREE
ISSUE MATERIAL)
PRE CAST LINTEL_200mmX75mmX1300 mm
CHARGES FOR supply, Making, positioning and fixing
of lintel by precast / cast in situ at any level Lintel Size
200mmX75mmX1300 mm for Opening length- 900 mm
.R/F- main 2 nos- 8mm dia, links 8 mm dia
@200mmc/c, RCC grade : M20. (CEMENT AND
STEEL SHALL BE SUPPLIED BY CLIENT AS FREE
ISSUE MATERIAL)
WOODEN DOOR
ATT TYPE WOODEN MAIN DOOR
WOODEN FRAME
Charges for assemble & fixing in situ swan & sized
timber sections by using approved mechanical anchor
fastener of using contractor own mechanical tools &
tackles / machines including lifting of frames from
ground floor level to respective locations etc all
complete in all respect including mending good the
damages as per the direction of Project In Charge.
Swan & sized timber set comprises of using 06
( six ) no approved mechanical anchor fastener
Swan & sized timber set comprises of approved vertical

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 8 of 12

BOQ DETAILS
SL. NO.

12

12.1

13

13.1

13.2

13.3

13.4

13.5

14

Work Description
and horizontal section of specified length using 06 ( six )
no approved mechanical anchor fastener ( 03 nos in
each vertical member) ONLY Swan & sized timber
sections will be supplied by client as free issue.
FLUSH DOOR
ALL TYPE FLUSH DOOR
FLUSH DOOR(a)
CHARGES FOR FIXING OF FLUSH DOORS
SHUTTERS OF DIFFERENT SIZES AND THICKNESS
AT ALL LEVELS WITH fixing of ALL ACCESSORIES
LIKE HINGES, SCREW, BUFFER, Tower bolt ,
CYLINDRICAL LOCKS ETC. WITH ALL tools & tackles
/ machines including lifting of Shutters from ground floor
level to respective locations etc including specified
finishing coat all complete AS PER THE DIRECTION
OF THE PROJECT MANAGER. COMPLETE IN ALL
RESPECT AS PER DRAWING, METHODOLOGY AND
TECHNICAL SPECIFICATIONS.
FIXING OF FLUSH DOORS SHUTTERS WITH SS 4"
BUTT HINGES.
CHARGES FOR FIXING OF FLUSH DOORS
SHUTTERS WITH providing & fixing SS 4" BUTT
HINGES as per IS 12817 ( medium grade ) and SS
Screw AS PER IS, Including TWO COATS OF
SYNTHETIC ENAMEL PAINT (ICI/BERGER/ASIAN
PAINT MAKE) OVER TWO COATS OF PRIMER
COMPLETE. ( ONLY FLUSH DOOR WITH FRAME
SHALL BE SUPPLIED BY CLIENT AS FREE ISSUE )..
DOOR ACCESSORIES.
DOOR ACCESSORIES.
Fixing of Door Accessories .
Charges for fixing of door accessories inclusive of all
necessary consumables using contractor own
mechanical tools & tackles / machines complete as per
the direction of Project In Charge.
CHARGES FOR FIXING OF Door Magic EYE.
CHARGES FOR FIXING OF Door magic EYE.( Only
Door magic EYE shall be supplied by client as free
issue material).
CHARGES FOR FIXING OF PVC DOOR BUFFER.
CHARGES FOR FIXING OF PVC DOOR BUFFER.
( Only PVC DOOR BUFFER shall be supplied by client
as free issue material).
CHARGES FOR FIXING OF TOWER BOLT.
CHARGES FOR FIXING OF TOWER BOLT, ( Only
TOWER BOLT shall be supplied by client as free issue
material).
CHARGES FOR FIXING OF DOOR STOPPER.
CHARGES FOR FIXING OF DOOR STOPPER ( Only
DOOR STOPPER shall be supplied by client as free
issue material)
CHARGES FOR FIXING OF CYLINDRICAL LOCK.
CHARGES FOR FIXING OF CYLINDRICAL LOCK.
( Only CYLINDRICAL LOCK shall be supplied by client
as free issue material)
PLASTERING WORK
ALL TYPE OF PLASTERING WORK
PLASTERING WORK (TO WALL, FLOOR, CEILING
ETC.)
CHARGES FOR PLASTERING WORK (TO WALL,
FLOOR, CEILING ETC.) WITH SAND AND CEMENT
MORTAR IN SINGLE OR MORE LAYER AS
SPECIFIED, INCLUDING SURFACE PREPARATION,
ROUNDING OFF OR CHAMFERING CORNERS AS
DIRECTED AND RAKING OUT JOINTS INCLUDING
THROATING, NOSING AND DRIP COURSE,
SCAFFOLDING/STAGING WHERE NECESSARY,
INCLUDING WORKING AT ANY LEAD AND LIFT &
FIXING OF APPROVED CHICKEN WIRE MESH AT
EVERY BRICK AND CONCRETE
JUNCTION,COMPLETE THE JOB IN ALL RESPECTS
INCLUDING ARRAGEMENT OF NECESSARY
TOOLS,TACKLES,MEANS OF ACCESS,FOLLOWING
RELEVANT STANDARD, APPROVED
METHODOLOGY, TECHNICAL SPECIFICATION &
DRAWINGS

Code

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

DFLU-DORA-02

DOOR WINDOWS &


JOINERIES

NOS

520.00

1035.00

538,200.00

DOW_ACS-01

DOOR WINDOWS &


JOINERIES

NOS

174.00

40.00

6,960.00

DOW_ACS-02

DOOR WINDOWS &


JOINERIES

NOS

518.00

30.00

15,540.00

DOW_ACS-03

DOOR WINDOWS &


JOINERIES

NOS

174.00

45.00

7,830.00

DOW_ACS-04

DOOR WINDOWS &


JOINERIES

NOS

518.00

45.00

23,310.00

DOW_ACS-05

DOOR WINDOWS &


JOINERIES

NOS

860.00

70.00

60,200.00

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 9 of 12

BOQ DETAILS
SL. NO.
14.1

14.2

15

15.1

Work Description

Code

300mm width plaster bid (20 mm plaster) over


PLS_EX-300WD
external plaster
Charges for 300mm width plaster for bit (20 mmthk.)
over external plaster. (1 cement : 6 sand). Only cement
will be supply by client as free issue material.
Outside string plaster (20 mm plaster)
PLS_EX-STRING
Charges for 20 mm thick string plaster (string size : 75
mm X 75 mm), above roof level (1 cement : 6 sand).
Only cement will be supply by client as free issue
material.
PAINTING WORKS
ALL TYPE OF PAINTING WORKS
SYNTHETIC ENAMEL PAINT
CHARGES FOR PAINTING WITH APPROVED
QUALITY SYNTHETIC ENAMEL PAINT OF
APPROVED MAKE,SHADE AND BRAND INCLUDING
SMOOTHENING OF SURFACE BY SAND PAPERING,
USING OF APPROVED PUTTY ON THE SURFACE IF
NECESSARY, WORKING AT ANY LOCATION
WITHIN THE SITE PREMISES INCLUDING
SCAFFHOLDING WITH ALL LEAD & LIFT, WITH ALL
NECESSARY TOOLS AND TACKLES, ACCESSORIES
ETC. COMPLETE IN ALL RESPECT AS PER
DRAWING, TECHNICAL SPECIFICATION AND
RELEVANT IS STANDARD.
Synthetic Enamel Paint two or more coats over one ENML_02
coat of wooden primer on False ceiling
All charges for providing and applying Synthetic Enamel
Paint of approved brand and shade in two or more coats
over one coat of wooden primer and filler putty on False
ceiling using contractor own mechanical tools & tackles
/ machines etc all complete as per the direction of
Project In Charge. The mode of payment shall be on
masonry opening
Sub Total

Budget Head

UOM

Qty

Rate
(Rs.)

Amount
(Rs.)

EXTERNAL
FINISHES

RMT

300.00

210.00

63,000.00

EXTERNAL
FINISHES

RMT

270.00

225.00

60,750.00

INTERNAL
FINISHES

SQM

152.00

130.00

19,760.00

10,737,749.88

WORK ORDER SUMMARY


Work Order Value (Excluding Tax Addition Part)

10,737,749.88

Tax Addition Part (If Any)

563,732.00

Work Order Value (Including Tax Addition Part)

11,301,481.88

The BOQ shown above is indicative only. How ever, all the payments would be made on actual measurement basis.
MATERIAL DETAILS (Supply to Contractor)
Material Details
PPC
S.M WHITE 300X300MM FLOOR CERAMIC TILE
PALLAZO BEIGE 200X300MM WALL CERAMIC TILE
KOTA STONE 2X2FT 25MM TH
MAGIC EYE S.S FINISH
SPRINKLE GREY 300X300MM FLOOR CERAMIC TILE
TOWER BOLT BRASS SATIN FINISH 1FT
SAWNSIZED TIMBR-DOORFRAME 992X2090MM-100X60MM FNSH
SAWNSIZED TIMBR-DOORFRAME 745X2070MM-100X60MM FNSH
SAWNSIZED TIMBR-DOORFRAME 907X2090MM-100X60MM FNSH
CYLINDRICAL LATCH WITH KEY
CYLINDRICAL LATCH WITHOUT KEY
CUDDAPAH / BLACK STONE SLAB
ATL 205 STEEL GREY 200X300MM WALL CERAMIC TILE
CELESTIAL PEARL WHITE 605X605MM FLOOR VITRIFIED
FLUSH DOOR 32MM TH BOTH SIDE COMMERCIAL 2030X824MM
FLUSH DOOR 35MM TH BOTH SIDE COMMERCIAL 2020X909MM
FLUSH DOOR 32MM TH BOTH SIDE COMMERCIAL 2020X662MM
DOOR BUFFER PVC 3INCH
DOOR STOPPER BRASS SS FINISH

Recommended Quantity
198.168716
8588.474016
700.045260
661.395680
174.000000
915.165264
174.000000
104.000000
208.000000
208.000000
516.000000
344.000000
13303.685520
4662.003540
1141.711200
208.000000
104.000000
208.000000
518.000000
518.000000

Unit
MT
SQM
SQM
SFT
NOS
SQM
NOS
SET
SET
SET
NOS
NOS
SFT
SQM
SQM
NOS
NOS
NOS
NOS
NOS

Star Rate (Rs.)

RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata


Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Amount (Rs.)

Page 10 of 12

GENERAL TERMS & CONDITIONS (W.O.Ref.)


RDHG1WO/00133/16-17
Date:
10/05/2016
STATUTORY COMPLIANCES:
1.1 Contractor will fulfill all the Statuary Compliances related to PF, ESI, various Labour Laws, Workmen Insurance and Compensation, Sales Tax and Service Tax, etc. Contractor
will also adhere to all the norms laid down by Central/State/Local Authorities including Management of Local Environment. It is the responsibility of the Contractor to provide all
requisite documents in time. In case of non-compliance and / or post award registration in any category is the sole responsibility of the Contractor to absorb all the Fines, Penalties,
Charges, Taxes and Duties etc.
1.2 Contractor shall be responsible for all taxes arising from compensation and other amounts paid under this Agreement, and shall be responsible for all payroll taxes and fringe
benefits of Contractors employees. Neither Central, nor state, nor local income tax, nor payroll tax of any kind, shall be withheld or paid by the Company on behalf of Contractor or
its employees. Contractor understands that it is responsible to pay, according to law, Contractors taxes and Contractor shall, when requested by the Company, properly document
to the Company that any and all federal and state taxes have been paid.
1.3 Contractor and Contractors employees will not be eligible for, and shall not participate in, any employee pension, health, welfare, or other fringe benefit plan, of the Company.
No workers' compensation insurance shall be obtained by Company covering Contractor or Contractors employees.
1.4 The labour & staff engaged by you shall be in your employment and not in the employment of CLIENT. You shall ensure payment of wages to them as per the prescribed
minimum wages by Government of West Bengal as prevailing presently or as revised from time to time and such other service benefits to your personnel deployed as under:
1.4.a You shall not pay your personnel any wage below the stipulated minimum wages by Government of India or Government of West Bengal from time to time.
1.4.b You shall provide weekly, national & festival holidays to your staff and leave with wages and other benefits as per prevalent rules.
1.4.c You shall observe and abide by all statutory requirement & instructions as mentioned in the following acts & rules & ordinances:
1.4.c.i The Bonded Labour System (Abolition) Ordinance, 1975
1.4.c.ii The Contract Labour (Regulation & Abolition) Act, 1970
1.4.c.iii The West Bengal Contract Labour (Regulation & Abolitions) Act, 1971
1.4.c.iv The Contract Labour (Regulation & Abolitions) Act Central Rules, 1971
1.4.c.v Minimum Wages Act, and Hour Act,1948
1.4.c.vi Payment of Bonus Act, 1965
1.4.c.vii Payment of Gratuity Act, 1972
1.4.c.viii Industrial Disputes Act,
1.4.c.ix Employees Provident Fund and Miscellaneous Provisions Act, 1952
1.4.c.x EmployeesState Insurance Act, 1948
1.4.c.xi Any other relevant acts or rules or ordinances as deemed to be necessary by State or Central Government from time to time.
GENERAL TERMS & CONDITIONS
2.1 SCOPE OF WORK / SERVICE:
1.5 You shall at all times indemnify CLIENT and shall keep it indemnified against all claims including all statutory payments for all statutory enactments for which you shall be wholly
and severally liable.
2.1.A Shall be read in conjugation with the corresponding Schedule of Quantities, rates, specifications as per Indian standard code, & other terms & conditions as agreed, herewith
enclosed along with this rate agreement.
2.1.B All material &/ or consumables necessary to execute this contract are to be kept in contractors custody, client will only accept those unused materials after completion of
work &/or handing over of all deliverables after testing of work / service rendered in all respect with quality assurance. Contractor has to submit (on requirement of E-I-C/ Q.C in
charge)all the MTC, for all the material supplied under this contract in support of invoice.
2.1.C Any work which is subsequently identified for execution / service extension, but not mentioned in the B.O.Q, will require prior permission / approval from E-I-C & the contractor
has to submit fresh quotation supported by detailed cost analysis (attaching necessary document like challan, invoice copy for material, labour engagement record certified by
clients E-I-C ) or submit contract extension request letter.
2.2 FACILITIES TO BE PROVIDED BY CLIENT :
2.2.A Uncovered Space within the project area will be made available to the contractor free of charge for building their stores / go down, camp office etc. The contractor shall make
their own arrangement at their cost for leveling and dressing the ground or developing the land.
2.2.B Unless specifically mentioned client will only provide open space within project premises for their labour accommodation, Contractor has to arrange hutment & proper sanitation
at their cost along with proper maintenance & housekeeping. Power &water at a single near by point will be made available free of cost by client, contractor has to further extend the
service line as per their requirement with proper safety devices.
2.2.C Covered Store shall be provided on availability basis for valuable & weather-shabby goods on submission of application to E-I-C & his discretion in this regards shall be final &
binding on both the parties. Safe Warehousing of Material and Machines at site is in the scope of Contractor.
2.2.D Water / Power if required for the work / service and also for drinking purpose should be arranged by the contractor from his own source and at his cost. If water/ Power from
Clients source is available near the site of the work the CLIENT may supply the same to contractor from one point only Free of charge ( If not separately mentioned)and the
contractor should arrange for extra pipe/ cable as may be required for distribution at his cost.
2.3 CONSIDERATION PRICE :
2.3.A The estimated value of this contract shall be as per the Schedule of Quantities enclosed. The contract shall be operated on item rate basis (unless separately mentioned) as
given in schedule. Actual payment shall be made as per the actual work executed against each item of Schedule of Quantities herewith enclosed. The contract value includes the
completion of the work / service in all respect including but not limited to, supply of material, transportation, shifting and handling labour, consumables, tools and tackles, layout,
repairs, rectifications, maintenance till handing over, establishment, services, contingencies, all temporary & incidental works, scaffoldings,any other activity / facility whether
temporary or permanent in nature required for completion of such work / rendition of such service& all taxes & duties.
2.3.B The contract rates shall remain FIRM and no escalation on price will be allowed unless abnormal price hike upon submission of justifiable document. Works Contract Tax &
T.D.S will be deducted (wherever & whenever applicable) from gross billing amount as per provision of section 40 of the W.B. VAT ACT,2003 with effect from 01,8.2006 at the
prevailing rate.
2.4 QUALITY & STANDARD :
2.4.A All work under this contract shall be carried out in accordance with the technical specification (hereinabove / attached) and the latest issue of the relevant Indian Standard
Specification. If Indian Standards are not available / in effect for any particular work / service, the relevant British Standard / American Standard Specification shall apply. In case of
any confusion or dispute regarding the meaning and interpretation of any specification for the respective works the decision of the Project Manager/Architects shall be final and
binding on the contractor.
2.5 SECURITY & SAFETY MEASURES:
2.5.A The Contractor shall comply with all relevant standard Safety norms/ rules & regulations in force and &/or as recommended & circulated by CLIENT from time to time at site.
2.5.B If the contractor is found not following the safety norms at any time during work/ service tenure,CLIENT may at his discretion provide the safety materials to workers & debit
the same to contractors from subsequent running account bill.
2.6 EXAMINATION OF WORK BEFORE COVERING UP
2.6.A No work shall be covered up or put out of view without the approval of the Project Manager (wherever & whenever applicable).The Contractor shall arrange full opportunity for
the Project Manager to examine and measure any work which is about to be covered up or put out of view and to examine before permanent work is placed thereon. The Contractor
shall give due notice to the Project Manager whenever any such work is or are ready for examination and the Project Manager, shall without unreasonable delay, unless considered
unnecessary, examine and measure such work.
2.7 METHOD OF MEASUREMENT:
RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata
Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 11 of 12

2.7.A The works shall be measured net, notwithstanding any general or local custom, except otherwise specified or prescribed in the Contract. Unless stated otherwise in the
Contract, all measurements shall be done in accordance with relevant Indian Standards clauses of IS 1200 in Conjunction with IS Codes 3385. In case the same is not available in
the relevant IS Code, the standard procedure adopted in PWD/ CPWD shall be adopted. In case the same is not available in PWD/ CPWD the measurement for the works done will
be based on mutual agreement between CLIENT and the contractor.
2.8 PAYMENT TERMS
2.8.A Payment will be made against progressive &/or final completion of job & submission of Invoices. Joint Measurements shall be taken by the Contractor along with the CLIENT
representative and submitted to the Project Manager along with the invoice (as per pro-forma supplied from site) / reconciliation statement of client supplied materials (if any) & any
other routine test report as the case may be from time to time required by E-I-C for verification.
2.8.B Measurements will be verified and the Project Manager shall issue certificate of payment within 10 days of such receipt of the bill and the certified payment shall be released
after all necessary adjustment(s) within 21 days from the date of submission of Bill (if not separately mentioned).
2.8.C In case it is found that the contractor has not submitted the bill as per the requirement of work order or the measurement given are typical & not as per drawing / work done ,
then the bill will be rejected & contractor has to resubmit fresh bill in the line with the work order terms & conditions with revised submission date.
2.8.D Proof of payment of statutory dues to be submitted along with invoice, i.e. immediate last month for which payment is being claimed.
2.9 CLEARANCE OF SITE
2.9.A The Contractor shall clear away and remove from the site all Plant& Equipments, surplus material, rubbish and temporary works of every kind, leave the whole of the site and
works clean and in a workman like condition to the satisfaction of the Project Manager. In the event of the Contractor's failure to comply with this provision, the Project Manager
shall after giving 7 days notice in writing, get the site cleared as above at the expense and risk of the Contractor and the Contractor shall have no claim whatsoever.
2.10 DEFECT LIABILITY PERIOD:
2.10.A Unless separately specified, the period of maintenance shall be the time period between Work Order end Date (as mentioned in latest Amendment ) & Retention Guaranty
Expiry Date (with respect to latest Amendment )which shall also be treated as the Defect Liability Period. In case of extension of Work Order end Date, the period shall be starting
from Actual Completion Date as certified by E-I-C. To the extent that the Works shall at, or as soon as practicable after the expiration of the Period of Maintenance, be not delivered
up to the Project Manager/Employer in as good as perfect a condition (Fair wear and tear excepted) to the satisfaction of the Project Manager/Employer as that in which they were
at the commencement of the Period of Maintenance, the Contractor shall forthwith execute all such work of repair, amendment, reconstruction, rectification and making good of
defects, imperfections, shrinkage or design failure or any other faults as may be required of the Contractor in writing by the Project Manager during the period of maintenance. All
such work shall be carried out by the Contractor at his own expenses if the necessity thereof is in the opinion of the Project Manager due to the use of materials or workmanship not
in accordance with the Contract or to the neglect or failure on the part of the Contractor to comply with any obligation expressed or implied on the Contractor's part under the
Contract. No material shall be issued on free issue basis for repairing job. If the Contractor shall fail to do any such work as aforesaid required by the Project Manager, the Employer
shall be entitled to carry out such work by his own workmen or by other Contractors and if such work which the Contractor should have carried out at the Contractor's own cost, the
Employer shall be entitled to recover from the Contractor the cost thereof or may deduct the same from any money due or that may become due to the Contractor, under this
Contract.
2.11 RETENTION MONEY:
2.11.A Unless separately specified, Retention money will be deducted @ 5 % from each running bill /bill & will be retained in cash or can be released against Bank Guarantee from
any nationalized bank & will be released if no defect is observed during the D.L. period. The above amount shall not bear any interest.
2.12 SUCCESSORS AND ASSIGNS:
2.12.A This Agreement may not be assigned by either party without the prior written consent of the other party; provided, however, that the Agreement shall be assignable by the
Company withoutContractors consent in the event the Company is acquired by or merged into another corporation or business entity. The benefits and obligations of this Agreement
shall be binding upon and inure to the parties hereto, their successors and assigns.
2.12.B This Agreement constitutes the complete agreement and sets forth the entire understanding and agreement of the parties as to the subject matter of this Agreement and
supersedes all prior discussions and understandings in respect to the subject of this Agreement, whether written or oral.
2.13 ARBITRATION / JURISDICTION:
2.13.A In case of any dispute or difference of opinion, the matter shall be referred to Vice President Project of CLIENT for arbitration, whose decision shall be final and binding on
both the parties.
2.13.B The arbitration proceedings shall be conducted in Kolkata, West Bengal, India and shall be governed by and constructed in accordance with the laws of India and the
jurisdiction of the courts for any of the purposes under the said Act or otherwise & shall exclusively be the original jurisdiction of the Honble Court of Law at Kolkata.
2.14 TERMINATION / SHORT CLOSURE OF CONTRACT:
2.14.A Client reserve the right to terminate the contract wholly or partly (reduce scope of service)any outstanding services hereunder, or reschedule in whole or in part on grounds of
non / dis-satisfactory/ under performance against given work schedule & /or any dis-obeisance of client directive & violation of code of conduct & any other reason leading to such
consequence by serving 07 days prior notice.
2.14.B Client shall have no liability to you beyond payment of any balance owing for services completed hereunder and accepted by client prior to the Vendors receipt of the notice
of termination.
In case of any difference between GGTC & Special terms & condition (if any) , the latter will always supersede the former & shall stand final.
Special Terms & Conditions :

Any difference of opinion related to the financial & contractual terms & conditions are to be reported, discussed , and mutually settled within 07 Seven) days from receipt of this
order by your authorised representative, otherwise this contract shall stand accepted in full by you without any dispute.
M/s RIVERBANK DEVELOPERS PRIVATE LIMITED and M/s FRONT TECH are entering into a Legally binding Agreement by virtue of this Work Order ref.
RDHG1WO/00133/16-17 dt. 10-May-2016 if The General terms & conditions & specific terms & conditions (attached as Annexure) are agreed upon and mutually accepted.
Note:
For RIVERBANK DEVELOPERS PRIVATE LIMITED

Accepted :For FRONT TECH

Authorised Signatory

Authorised Signatory

(Please affix Rubber Stamp)

(Please affix Rubber Stamp)

Name

Name

Designation

Designation

Contact No.

Contact No.

Date

Date
RegisteredOffice : 225C, A. J. C. Bose Road. 4th Floor Kolkata
Telephone : 91-33-2283 9015-20 Fax : 91-33-2289 2148Website : www.hilandcal.com, www.calcuttariverside.com

Page 12 of 12

You might also like