Autchawut P. to Pichet Th. : 24 Sep 21 Oct 2016


SSHE Highlight
Bi-week Meeting @ CCR on 20th Oct 2016.
IOP for October 2016.
ZATIKA ONSHORE HAZARD HUNTING CAMPAIGN from now on until 31st October, 2016.

ZAWTIKA ONSHORE
HAZARD HUNTING CAMPAIGN.msg

Good suggestion award campaign , Good suggestion submit period : 1st Sep 31st Oct 2016

Good suggestion
award.msg

Attend SSHE Committee meeting.


Attend 2nd Session of Lifting and Gas Cylinder Handling Training on 10th -14th Oct 2016.
My action pending of Maintenance Section.

My action pending of
Maintenance team.msg

Emergency drill: Methanol skid get fire.


Technical safety audit recommendation ( Related item 3 and especially take care for item 21
recommend by Site Manager)

RE Technical safety
audit recommendation .msg

Technical safety audit recommendation with photo.

Technical safety
audit recommendation with photo.msg

SHUTDOWN 2017
Zawtika Onshore full shutdown lesson learn (2016) rev 7 sent to Yangon on 17 Oct 2016.

PMZ/N Handover log book

PAGE 2/5

Zawtika Onshore full


shutdown lesson learn (2016) rev 7 send to Yangon (17 October 2016).xlsx

PMZ/N Follow up shutdown meeting.

PMZ N Follow up shut


down meeting .msg

ZOC
1MPM G-8935 Diesel Engine.
1MPM G-8920 Gas Engine and found lube oil leak from shaft seal of Lube oil pump (Size:25*35*7.5)
contact PMZ/I to support order parts and request Perkin engine parts book to identify defective part
correctly when get the problem. (Unit Out- Off Service)

RE G-8920 Lube oil


leak fromShaft seal of Lube oil pump.msg

1MPM G-8930 Gas Engine found alternator damaged and replace by swop from G-8920.
PDA_2016 PMZ/N Common Core KPI. Rev.01

FW PMZ N Common
Core KPIs_rev 01.msg

Lifting equipment inspection trips (Campaign-2 2016/ Sep-Oct 2016).


Onshore Rotation Plan for 2017 base on Saturday Crew change day was completed and Wednesday
crew change day will inform again once is finish.
Electrical safety training.

RE Schedule for
Electrical safety cause during 22-25 Oct 2016 .msg

Install utility water station for Generators PM activity and portable Air compressor to be ordered
from Thailand, P Tuk (ROW) who is focal point and Supplier by P Nipon, Ban I-Tong (10,580 +3,000
Bath)
Zawtika Onshore Reliability Enhancement October 2016.

ZBV1
G-8020, Diesel generator lube oil pressure low.
Activity report => Links

PMZ/N Handover log book

PAGE 3/5

Transport G-8020 and FG Wilson spare generator to TKT warehouse by Cargo Tuck (DAN had been
issued).

RE RE Two Diesel The lists for missing


Generator.msg
parts of spare Generator and defective parts of G-8020 at ZBV 1 .msg

Plan to change over Diesel generator G-8010 to KLOHER backup generator every on Monday and
change back to G-8010 after completed weekly PM, KLOHER will be running in case of emergency
and personnel stand by on site.

ZBV2
1MPM G-8320, Diesel Generator.
1MPM G-8310, Diesel Generator.

Spare part inventory

Fire water spare parts PO#3450014936.


Acknowledged
Purchase Order#3450014936_Provision of Fire Water Engine Spare Parts (Qtec).msg

Lube oil for Gas Engine due to out of stock at ZOC and ZMS.
RE Request Delivery
Status for Gas Engine Oil.msg

Spare parts for ZMS air compressor in workshop.


RE Request for
Quotation (RFQ) No 1300194295 - 1300194308 APS Quotation 013510 Gasket P09191A.msg

Follow up spare parts for ZOC and ZMS Instrument air compressor.
Request for
Quotation_Air Compressor Spare Parts for ZOC and ZMS.msg

Request to follow up PRs for Shoe Assembly and Excavator Sprockets for Mini Excavator.

PMZ/N Handover log book

PAGE 4/5

RE Request to
follow up PRs for Shoe Assembly and Excavator Sprockets for Mini Excavator PO#3450014836.msg

Equipment and Tools


Maintenance Strategy for Onshore Generator.

RE Maintenance
Strategy for Onshore Generators.msg

Received cooling fan belt for G-8935 kept in Maintenance Store room no.1.
CMMS Request No: 2301_Two Week PM Diesel Generator in ZBV-1 and ZBV-2 Start on Nov-2016.

CMMS Request No
RE Revise PM plan
2301_Two Week PM Diesel
in ZBV-1atand
ZBV-2
sg
forGenerator
Diesel generator
ZBV1
andStart
ZBV2m
inonth.m
SAP system
.msg

ZMS

Verify 16" ball valve hard to operate. (BA-0440) separate valve gearbox and exercise valve hand
wheel found freely move to be replaced in shutdown Feb 2017.

Follow up

Private flight (Twin Otter) will out of contract on end of October it mean 1 ST November 2016 start to
commercial flight and travelling plan in process. (Not confirmed )

Follow up to perform Fire pump performance test on December 2016.


Work order for Concrete work at Gas metering skid at ZMS.
FW Work order for
Concrete work at Gas metering skid .msg

ZOC and ZMS door to be improved waiting for summarize list.

PMZ/N Handover log book

PAGE 5/5

Size of steel doors


The door need to
.msg
improve at CCR building.msg

Vehicle

Issued GSM WO and reserved TOYOTA spare parts in SAP system.


Replaced Bucket Teeth for CAT Excavator.
Quotation for KOBELCO Excavator

FW Myanmar Kaido
Quotation_YGN-Q-007227.msg

Using PTT Car no. 10 instead of PTT Car no.7 for Maintenance activity because of front seat not
comfortable and not properly adjustment.
Request for quotation of TC1 wire rope sling from Crane manufacture. (FURUKAWA UNIC THAILAND)

Request Quotation
for New wire rope sling of UNIC Crane URV-553.msg

SPIE
ZOC PM Plan _CW1606 Onshore period : 26 Oct 22 Nov 2016.

ZOC MC Daily Report


and WO Progress Campaign#5 (CW1606) 05-Oct- 2016.msg