ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED

From
The Asst. Engineer
Mechanical Indoor/Stage2
M.H.E.(J)Scheme
Onukudelli
Lr.No.AE/MECH/OKD/D.No.

To
The Assistant Divisional Engineer
Mechanical Subdivision
M.H.E.(J)Scheme
Onukudelli.
/2016, Date. /

/2016.

Sir,
Sub:- APGENCO-M.H.E(J)S-Estt-E.S-Mechanical Idoor/Stage2 -Submission
of Handing over of Charge from Sri. K.Seetaram, AE (Mech/ Indoor
/Stage2) to Sri S.Raghuram, AE/Mechanical/Indoor Regarding.
Ref:- Memo.No.SE/O&M/MKD/ADM/D.No.

,Date: / 04/2016.

With reference to the letter cited above I am herewith submitting my


handing over notes and charge of Mechanical indoor/Stage2 in complete shape to
Sri S.Raghuram, AE / Mechanical/Indoor. This is for favour of information and further
necessary action please.
Yours faithfully

Assistant Engineer
Mechanical Indoor Section/Stage2
M.H.E.(J)Scheme
Onukudelli.
Encl: 1) Handing over Notes.
Copy submitted to PDE/Gen/OKD (Through ADE/Mech/Okd) for favour of
information please
Copy submitted to SE/O&M/MKD (Through ADE/Mech/Okd) for favour of information
please.
Copy submitted to the Account Officer, O&M, Onukudelli for favour of information
please.

CHARGE HANDING OVER REPORT OF ASSISTANT ENGINEER,


MECHANICAL/STAGE2, ONUKUDELLI.M.H.E.(J) SCHEME FROM
Er.K.SEETARAM to Er.S.RAGHURAM
The Assistant Engineer/Mechanical/indoor/stage2 has got jurisdiction of works are Stage2
O&M works and establishment works of turbine floor staff. With reference vide memo
no.SE/O&M/Mkd/Adm/D.No.158/2012Dt 22.03.2013,
1) STAGE2 OPERATION AND MAINTENACE WORKS.
2) ESTABLISHMENT WORKS OF TURBINE FLOOR STAFF..
The details of works are mentioned below.
Staff and allocation particulars list is herewith enclosed
I.

STAGE2 OPERATION AND MAINTENACE WORKS:(1) Turbines of 2nd stage units (2) spherical valves of 2nd stage units (3) Governors (4)
oil Units 5) pressure Regulator valves (6) Bearings of 2 nd stage units and all other work to
above equipments, staff and allocation of work sheet enclosed.

Material Status.
1) 01 No 2nd stage UGB, 01 No 2nd stage LGB and 1 No. 2 nd stage thrust pad(Sent
for sample) are given to M/S.Venkateswara Agricultural works on 24-03
-2015, Vide T.Note No-526, Gate pass No.6530 for repair / recondition as there
are no spares.
2) Dismantled damaged materials of 2nd stage is kept in power house for
devolution to be sent o&m stores.s
.
The O&M Staff available in the section carries out the day by day maintenance
works of Power House. Major maintenance and over-hauling works carried out by out
sourcing.
Major works completed:
1) Unit.No.4,5 and 6 complete Turbine overhauling work was done.
2) 2nd stage units damaged bearings replaced and align the TG shaft.
3) Unit 4 and 6 MIV over haul work was done
4) Governor heat exchanger pipelines & valves for Unit-4&6 are replaced with new
ones
5) Lube oil cooler gate valves for units-4,5,6 are replaced with new ones.
6) 6 T-joint pipelines of upstream & downstream pipelines for Units- 4, 6 were
replaced with new ones.

2)ESTABLISHMENT WORKS OF TURBINE FLOOR SHIFT STAFF:


1)Ch.Eswara Rao, Plant Asst.
2)B.Thaudu, Plant Asst.

3)Rajendra Khora, Plant Asst.


4)G.Bangaru Babu, Plant Asst.
5)R.Venkata Ramana, Plant Asst.
6)A.Rama Krishna, Plant Asst.
7)Sarat Kumar Khora, JPA
8)K.Surya Prakash Rao, JPA
9)Ashananda Naik, JPA
10)K.Mohan Rao, JPA
11)M.Rama Rao, JPA
12)Ch.R.V.Satya Prasad, JPA
13)S.Bhargava Rao, JPA
14)S.Jagannath
15)Khillo Chaitanya, O.S.
16)S.Chitti Babu, O.S.
17)Niranjana Galli, O.S.
18)Paramananda Sarangi,WM
19)Ganesh Pradhan, Watchman
20)Venkateswara Rajguru, WM
21)Pitambar Patro, JPA
22)Kranthi Kumar, JPA
23)A.Naresh,PA

CHARGE HANDED OVER


ER. K.SEETARAM
ASSISTANT ENGINEER/Stage2
MECHANICAL ONUKUDELLI

CHARGE TAKEN OVER


ER. S.RAGHURAM
ASSISTANT ENGINEER
MECHANICAL ONUKUDELLI

ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED


From
The Asst. Engineer

To
The Assistant Divisional Engineer

Mechanical Indoor/Stage2
M.H.E.(J)Scheme
Onukudelli
Lr.No.AE/MECH/OKD/D.No.

Mechanical Subdivision
M.H.E.(J)Scheme
Onukudelli.
/2016, Date.

/2016.

Sir,
Sub:- APGENCO-M.H.E(J)S-Estt-E.S-Mechanical Idoor/Stage2 -Submission
of Handing over of Charge from Sri. K.Seetaram, AE (Mech/ Indoor
/Stage2) to Sri K.SRIKANTH, AE/Electrical/Distribution Regarding.
Ref:- Memo.No.SE/O&M/MKD/ADM/D.No202 ,Date :29/ 04 /2016.
With reference to the letter cited above I am herewith submitting my
handing over notes and charge of Mechanical indoor/Stage2 in complete shape to
Sri K.Srikanth, AE / Electrical/Distribution. This is for favour of information and further
necessary action please.
Yours faithfully

Assistant Engineer
Mechanical Indoor Section/Stage2
M.H.E.(J)Scheme
Onukudelli.
Encl: 1) Handing over Notes.
Copy submitted to PDE/Gen/OKD (Through ADE/Mech/Okd) for favour of
information please
Copy submitted to SE/O&M/MKD (Through ADE/Mech/Okd) for favour of information
please.
Copy submitted to the Account Officer, O&M, Onukudelli for favour of information
please.
CHARGE HANDING OVER REPORT OF ASSISTANT ENGINEER,
MECHANICAL/STAGE2, ONUKUDELLI.M.H.E.(J) SCHEME FROM
Er.K.SEETARAM to Er.K.SRIKANTH

The Assistant Engineer/Mechanical/indoor/stage2 has got jurisdiction of works are Stage2


O&M works and establishment works of turbine floor staff. With reference vide memo
no.SE/O&M/Mkd/Adm/D.No.158/2012Dt 22.03.2013,
1)STAGE2 OPERATION AND MAINTENACE WORKS.
2)ESTABLISHMENT WORKS OF TURBINE FLOOR STAFF..
The details of works are mentioned below.
Staff and allocation particulars list is herewith enclosed
1)STAGE2 OPERATION AND MAINTENACE WORKS:(1) Turbines of 2nd stage units (2) spherical valves of 2nd stage units (3) Governors (4)
oil Units 5) pressure Regulator valves (6) Bearings of 2 nd stage units and all other work to
above equipments, staff and allocation of work sheet enclosed.

Material Status.
01)01 No 2nd stage UGB, 01 No 2nd stage LGB and 1 No. 2nd stage thrust pad(Sent
for sample) are given to M/S.Venkateswara Agricultural works on 24-03 -2015,
Vide T.Note No-526, Gate pass No.6530 for repair / recondition as there are no
spares.
02)Dismantled damaged materials of 2nd stage is kept in power house for
devolution to be sent o&m stores.
.
The O&M Staff available in the section carries out the day by day maintenance
works of Power House. Major maintenance and over-hauling works carried out by out
sourcing.
Major works completed:
01) Unit.No.4, 5 and 6 complete Turbine overhauling work was done.
02)2nd stage units damaged bearings replaced and align the TG shaft.
03) Unit 4 and 6 MIV over haul work was done
04) Governor heat exchanger pipelines & valves for Unit-4&6 are replaced with new
ones
05) Lube oil cooler gate valves for units-4, 5, 6 are replaced with new ones.
06)6 T-joint pipelines of upstream & downstream pipelines for Units- 4, 6 were
replaced with new ones.

2)ESTABLISHMENT WORKS OF TURBINE FLOOR SHIFT STAFF:


1)Ch.Eswara Rao, Plant Asst.
2)B.Thaudu, Plant Asst.
3)Rajendra Khora, Plant Asst.
4)G.Bangaru Babu, Plant Asst.

5)R.Venkata Ramana, Plant Asst.


6)A.Rama Krishna, Plant Asst.
7)Sarat Kumar Khora, JPA
8)K.Surya Prakash Rao, JPA
9)Ashananda Naik, JPA
10)K.Mohan Rao, JPA
11)M.Rama Rao, JPA
12)Ch.R.V.Satya Prasad, JPA
13)S.Bhargava Rao, JPA
14)S.Jagannath
15)Khillo Chaitanya, O.S.
16)S.Chitti Babu, O.S.
17)Niranjana Galli, O.S.
18)Paramananda Sarangi,WM
19)Ganesh Pradhan, Watchman
20)Venkateswara Rajguru, WM
21)Pitambar Patro, JPA
22)Kranthi Kumar, JPA
23)A.Naresh,PA

CHARGE HANDED OVER


ER. K.SEETARAM
ASSISTANT ENGINEER/Stage2
MECHANICAL ONUKUDELLI

CHARGE TAKEN OVER


ER. K.SRIKANTH
ASSISTANT ENGINEER
ELECTRICAL ONUKUDELLI