You are on page 1of 28

KUWAIT GULF OIL COMPANY

AL-KHAFJI JOINT OPERATIONS

CONSTRCUTION OF BACHELORS QUARTER / MTD / AVIATION BLDG. / 5 SCHOOLS


Name of Contractor

Daewoo E&C

Name of Project: HOUT (KRL) Onshore gas facilities

MAU CONSORTIUM : =
Project Location

Al-Khafji

JSA REGISTRY - Common for all Facilities


Sl.No.
1

10

11

12

13

14

JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

15

16

17

ATION BLDG. / 5 SCHOOLS

ities
Project No.

Date Started

all Facilities
LAST REVISION

REV. No.

JSA REGISTRY - Common for all Facilities


Sl.No.

JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

18

12272010 A-018

Forklit Operation

December 29, 2010

19

01012011 A-019

HVAC Duct Work System Installation

January 01, 2011

20

01102011 A-020

Installation of Fire Pump

January 10, 2011

21

01102011 A-021

Identification of Mechanical Systems

January 10, 2011

22

01202011 A-022

Concrete Curing

January 20, 2011

23

01232011 A-023

Concrete Trial MIx

January 23, 2011

24

02032011 A-024

Installation of HVAC Equipment

February 3, 2011

25

02072011 A-025

Roads and Other Paving Works

February 7, 2011

26

02082011 A-026

Waterproofing Works

February 8, 2011

27

02082011 A-027

Base Course Laying

February 8, 2011

28

02132011 A-028

Concrete Repair of Honeycomb

February 13, 2011

29

02222011 A-029

Welding of Pipes & Other Related


Mechanical Works

February 22, 2011

30

02202011 A-030

Termite Control

February 20, 2011

31

02272011 A-031

Installation of Air Handling Unit

February 27, 2011

32

03022011 A-032

Formworks

March 2, 2011

33

03012011 A-033

Tie-in (Potable Water Line)

March 1, 2011

34

03262011 A-034

Anchoring or Fixing the Rebar for the


Axial Support of External Precast Panel

March 26, 2011

35

03272011 A-035

Slab on Grade

36

04022011 A-036

Installation of Anchor bolts

March 27, 2011

April 2, 2011

l Facilities
LAST REVISION

REV. No.

January 27, 2011

March 22, 2011

JSA REGISTRY - Common for all Facilities


Sl.No.

JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

37

04042011 A-037

Subsoil Drainage Works

April 4, 2011

38

04052011 A-038

Trenching and Backfilling for


Underground Utilities

April 5, 2011

39

04042011 A-039

Precast Manhole Sewer and Storm


Manhole

April 5, 2011

40

04162011 A-040

Water Drainage Line

41

05042011 A-041

Installation of Lighting Switches, Power


Outlets & Receptacles

May 4, 2011

42

05152011 A-042

Fabrication of Pre-Engineered Building

May 15, 2011

43

05172011 A-043

Installation of Column and Shearwall


Formwork

May 17, 2011

44

05222011 A-044

Installation of Electrical Boxes and


Fittings

May 22, 2011

45

05232011 A-045

Installation of Above Ground Tank

May 23, 2011

46

05152011 A-046

Erection and Dismantling of Scaffolding

May 31, 2011

April 16, 2011

all Facilities
LAST REVISION

REV. No.

June 5, 2011



KUWAIT GULF OIL COMPANY

AL-KHAFJI JOINT OPERATIONS

CONSTRCUTION OF BACHELORS QUARTER / MTD / AVIATION BLDG. / 5 SCHOO


Name of Project
Name of Contractor

MAU CONSORTIUM : AL-MASHARIQ / AZMEEL / UTC


Project Location

Al-Khafji

Sl. No.

JSA REGISTRY - Facility 1


JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

07102010 B-001

Installation of Temporary Fence

July 10, 2010

08052010 B-002

Fabrication and Installation of Covered


Workshop

0825010 B-003

Demolition of Existing Septic Tank

08082010 B-004

Lifting of Temporary Transformer to Pad


Location

09122010 B-005

Piling Works

10232010 B-006

Structural Concrete

October 23, 2010

12012010 B-007

Compression Load Test

December 1, 2010

01032011 B-008

Pile Head Cutting

January 3, 2011

01132011 B-009

Pile Repair Works

January 13, 2011

10

02262011 B-010

Tower Crane Erection

February 26, 2011

11

03312011 B-011

Road Section Soil Improvements under


the Isolated Foundations

August 5, 2010

August 25, 2010

August 8, 2010

September 12, 2010

March 31, 2011

12

04182011 B-012

Operation of Two Tower Cranes

April 18, 2011

13

06042011 B-013

Installation of Chain Link Fence and


Gates

June 4, 2011

14

07102010 B-014

Shoring Along Isolated Foundations


and Water Tank

June 5, 2011

AVIATION BLDG. / 5 SCHOOLS

ity 1

Project No.

HQ807PC09
Date Started

Target Date of
Completion

4/10/12010

10/9/2012

LAST REVISION

REV. No.

December 16, 2010

January 15, 2011

March 7, 2011

April 11, 2011

May 10, 2011



KUWAIT GULF OIL COMPANY

AL-KHAFJI JOINT OPERATIONS

CONSTRCUTION OF BACHELORS QUARTER / MTD / AVIATION BLDG. / 5 SCH


Name of Project
Name of Contractor

MAU CONSORTIUM : AL-MASHARIQ / AZMEEL / UTC


Project Location

Al-Khafji

Sl. No.

JSA REGISTRY - Facility 2


JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

10092010 C-001

Installation of Temporary Gate

October 9, 2010

10182010 C-002

Demolition of Drainage Ditches

October 9, 2010

10182010 C-003

Dewatering Activity

12202010 C-004

Soil Testing (Electric Resistivity Testing)

01112011 C-005

Soil Improvements (Drilling)

January 11, 2011

01312011 C-006

Plate Bearing Test

January 31, 2011

02142011 C-007

Trial Pit Excavation

February 14, 2011

05152011 C-008

Installation of Underground Sanitary


Sewer Line

October 18, 2011

December 20, 2010

May 15, 2011

AVIATION BLDG. / 5 SCHOOLS

ity 2

Project No.

HQ807PC09
Date Started

Target Date of
Completion

4/10/12010

10/9/2012

LAST REVISION

REV. No.

February 8, 2011

January 24, 2011



KUWAIT GULF OIL COMPANY

AL-KHAFJI JOINT OPERATIONS

CONSTRCUTION OF BACHELORS QUARTER / MTD / AVIATION BLDG. / 5 SCHOOL


Name of Project
Name of Contractor

MAU CONSORTIUM : AL-MASHARIQ / AZMEEL / UTC


Project Location

Al-Khafji

Sl. No.

JSA REGISTRY - Facility 3


JSA Number

JSA / JOB NAME

PREPARED / ISSUED ON

09102010 D-001

Temporary Fence Installation

September 10, 2010

09122010 D-002

Transfer of Parking Shed

September 12, 2010

09122010 D-003

Asphalt Pavement of Parking Shed

September 12, 2010

11092010 D-004

Stone Column

November 9, 2010

01252011 D-005

Soil Imrovements

January 25. 2011

04012011 D-006

Installation of Chain Link Fence and


Gates

April 1, 2011

04272011 D-007

Installation of Temporary Fence and


Removal of Existing Fence

April 27, 2011

05142011 D-008

Fabrication of Puddle Flange

May 14, 2011

05232011 D-009

Construction of Lift Station

May 23, 2011

AVIATION BLDG. / 5 SCHOOLS

lity 3

Project No.

HQ807PC09
Date Started

Target Date of
Completion

4/10/12010

10/9/2012

LAST REVISION

REV. No.

June 4, 2011

June 6, 2011



KUWAIT GULF OIL COMPANY

AL-KHAFJI JOINT OPERATIONS

CONSTRCUTION OF BACHELORS QUARTER / MTD / AVIATION BLDG. / 5 SCH


Name of Project
Name of Contractor

MAU CONSORTIUM : AL-MASHARIQ / AZMEEL / UTC


Project Location

Al-Khafji

Sl. No.

JSA REGISTRY - Facility 4


JSA Number

JSA / JOB NAME

09082010 E-001

Site Preparation

10202010 E-002

Site Traffic Management

11292010 E-003

Stone Column

PREPARED / ISSUED ON
September 8, 2010

October 20, 2010

November 29, 2010

AVIATION BLDG. / 5 SCHOOLS

ity 4

Project No.

HQ807PC09
Date Started

Target Date of
Completion

4/10/12010

10/9/2012

LAST REVISION

REV. No.

February 28, 2011

You might also like